Akal Company Profile For Wadessa Bridge
Akal Company Profile For Wadessa Bridge
AKAL CONSTRUCTION
tadesse tufa
Paving the way to the future
nekemte
0911336484/0920414005
fenettadesse@gmail.com
8/10/2021
Table Content
1. General Information
Introduction
Legal Documents
Recommendation Letters
2. Work Experience
work Experience
3. Financial Stand
Machinery’s
Heavy Trucks
Light vehicles
6. Work Methodology
AKAL CONSTRUCTION
Legal Name:-
Authorized:- Name:- Tadesse Tufa Debele
Representative:- Position:- Share holder and General Manager
Nationality:- Ethiopia
Address:- Addis Ababa, Ethiopia
Mobile +251-9-11-336484/+251-9-20-414005-/+251-9-46-269760
E-mail Address:- delinatadesse3@gmail.com
Office Address:- Tel. +
Nekemte, Ethiopia
OR/17/02/00000052/04
Trade License:-
Guto Gida, Oromia Ethiopia
Certificate of Competence ROAD CONTRACTOR Grade 4,(RC-4) Reference #
Registration no. BKO 0001498 Dated 17/02/ 2014 by Oromia
National Regional State Construction Bureau.
TIN Registration
TIN Registration number 0022871806
Certificate
VAT Registration
VAT Registration number 3310100032
Certificate
Introduction
Our company with a total capability across the spectrum of Road and civil engineering
construction works, including Design and Supervision works (turnkey project). It is a full
service general construction firm established in 2004. We are specializing in Road ,bridge &
related works construction. Since inception, we have completed many projects. Our service
range is typically throughout Ethiopia. Occasionally, we venture even further depending on
the type of work and the client.
The way we run our business is very straightforward. We have conducted a high quality job
and provide all our customers with good service, treating their property with respect. We are
reliable and competitive with our pricing. It's the way we've managed to grow and develop
our business over the years
Staff: - Our Construction Company is engineering driven and believes that management is
about getting the right people for the particular task. People are our most valuable asset. Our
success over the years is due to the dedication and commitment of both staff and workforce.
The result is quality at every stage of construction.
Society: - We recognize that our activities will always have an impact on the society but
we endeavor to minimize the negative impacts wherever possible at the same time we will
try to increase its positive impacts like to employee them in our company. Through a
review of the practices in our head office, production department and on construction sites we
have developed documented procedures and checklists to manage our social objectives.
COMPANY VISION
Our vision is to be the first choice for all construction types of works in
Ethiopia and Competitive actor undertaking all types of construction works in
East Africa.
COMPANY MISSION
To participate on the Country’s Socio-economic development without
reservation by delivering ethical, reliable and quality construction service in
a timely and cost effective manner thereby giving maximum to all
stockholders.
Leadership
Spirit of Partnership
Excellence
Integrity
Responsibility
Professionalism
COMPETITIVE ADVANTAGES
1. Extensive experience and consequent reputation in bridge
and Gravel road construction works.
2. Modern and diversified machineries and equipment with
well-equipped central workshop.
3. Devoted and committed work force.
4. Continuous focus on internal and external training for its
employees to enhance their skill and knowledge.
5. Very effective and efficient organization structure with inbuilt
flexibility to accommodate changes for the future challenges of the
construction industry, to execute company’s laid out business plan.
6. Proactive logistics system established to meet construction
materials and equipment spares demand.
7. Determined and working fiercely to establish Quality and
Environmental Management System.
8. Exclusive experience of working with different giant international
partners as sub- contractors
QUALITY POLICY
AKAL CONSTRUCTION is dedicated to provide high quality, effective,
reliable and on time service with economical cost in construction Works
to meet customer needs and expectations as well statutory and regulatory
requirements.
We are dedicated to the quality policy which ensures the satisfaction of our
clients by meeting their requirements.
We prepare our quality policy together with our organizational quality objective
to align its framework and content.
The quality policy principles and objectives will be communicated and available to
staff at all times. We shall ensure that all our personnel understand and fully
implement our company’s policies and objectives.
LEGAL STATUS
Documents that justify the LEGAL STATUS of our company.
Trade license
VAT Certificate
Tax Clearance
NEKEMTE-
KITTESA ROAD GUTO GIDA
PROJECT 2007-2009 E.C WOREDA
5.81 km , 547 calendar ROAD
11 7 pipe culverts 1,883,035.85 days 100% AUTHORITY P YES
GARII-BUFATA
RADIO ROAD GUTO GIDA
PROJECT 2007-2009 E.C WOREDA
5.61 km , 547 calendar ROAD
12 6 pipe culverts 2,293,528.32 days 100% AUTHORITY P YES
LUGOO -
GADDISA ODA GUTO GIDA
ROAD PROJECT 2009-2010 E.C WOREDA
8.62 km , 365 calendar ROAD
13 6 pipe culverts 2,614,030.33 days 100% AUTHORITY P YES
AWASH 20 M
SPAN GIRDER 2010-2012 E.C
BRIDGE 547 calendar SATO KAGYO
14 PROJECT 19,952,538.32 days 100% CO. LTD S YES
LAGGA
WADDESSA 20 EAST
M SPAN GIRDER 2011-2013 E.C WOLLEGA
BRIDGE 365 calendar ZONE ROAD PROVESIONAL
15 PROJECT 14,845,287.11 days 100% AUTHORITY P ACCEPTANCE
BONEYA
BILLO TOWN BOSHE
ROAD PROJECT 2011-2012 E.C WOREDA
3.8 km , 365 calendar ROAD PROVESIONAL
16 12 pipe culverts 2,729,157.56 days 100% AUTHORITY P ACCEPTANCE
Prime
Percenta Contract
ge of or (P) or
Name of Works Subcont
project/kind of Period of Complet Client and ractor Final acceptance
Sn no works Value of Works Contract ed Place (S) issued?
GUTE- DALLO
KOMTO ROAD
PROJECT WAYU TUKA
5.2 km , 2011-2013 E.C WOREDA
1 bridge 365 calendar ROAD PROVESIONAL
17 4 pipe culverts 4,177,999.20 days 100% AUTHORITY P ACCEPTANCE
HINTSA-
WALLENE WAYU TUKA
ROAD PROJECT 2011-2013 E.C WOREDA
3.5 KM, 365 calendar ROAD PROVESIONAL
18 4 pipe culverts 1,356,028.77 days 100% AUTHORITY P ACCEPTANCE
TINFA- GIDDA
ABALLO ROAD
PROJECT WAYU TUKA
8.5km , 2012-2013 E.C WOREDA
1 bridge 365 calendar ROAD
19 7 pipe culverts 6,754,131.83 days 80% AUTHORITY P UNDER CON.
ALI
GORDOMMO-
FECHASE
HARRO ROAD
PROJECT WAYU TUKA
15 km , 2013-2014 E.C WOREDA
2 bridgeS 365 calendar ROAD
20 9 pipe culverts 15,730,548.87 days 75% AUTHORITY P UNDER CON.
30 SENE 2009
INDEPENDENT AUDITORS’ REPORT
ON FINANCIAL STATEMENTS OF
AKAL CONSTRUCTION ENTERPRISE
The Company’s Management is responsible for the preparation and fair presentation of
these financial statements in accordance with international Financial Reporting
Standards. This responsibility includes: designing, implementing and maintaining
internal control relevant to the preparation and fair presentation of financial statements
that are free from material misstatement, whether due to fraud or error; selecting and
applying appropriate accounting policies; and making accounting estimates that are
reasonable in the circumstances.
Auditors’ Responsibility
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a
basis for our audit opinion.
Unqualified opinion
In our opinion the financial statements present fairly, in all material respects, the financial
position of Akal Construction Enterprise as of 30 Sene 2009 and of its financial performances and
cash flows for the year then ended and are prepared in accordance with applicable laws and
2
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF FINANCIAL POSITION
AS AT 30 SENE 2009
CURRENCY:BIRR
BALANCE AT
ASSETS EMPLOYED Notes 30 SENE 2008
CURRENT ASSETS
CURRENT LIABILITIES
0.00 -
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF PROFIT & LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 SENE 2009
CURRENCY:BIRR
BALANCE AT 30
Notes SENE 2008
ADMINSTRATION EXPENSES
CURRENCY: BIRR
0.00 -
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF CHANGE IN SHAREHOLDERS EQUITY
FOR THE YEAR ENDED 30 SENE 2009
CURRENCY: BIRR
Accmulated Legal
Capital Profit/Loss Reserve Total
BACKGROUND
ACCOUNTING POLICIES
a) Fixed Assets
%
Motor vehicle 20
Construction equipments 20
Office furniture & fixtures 20
Computer and accessories 25
Other Assets 20
3 FIXED ASSETS
BALANCE AT BALANCE AT
COST 30 SENE 2008 ADDITIONS 30 SENE 2009
Computer & Data Storage 29,486.86 29,486.86
Office Furniture & Equipme 33,485.16 33,485.16
Plants and Machinery 769,898.25 769,898.25
Tools 122,695.55 122,695.55
Other Assets 87,293.50 87,293.50
1,042,859.32 - 1,042,859.32
DEPRECIATION
Computer & Data Storage 21,023.71 2,115.79 23,139.50
Office Furniture & Equipme 20,161.99 2,664.63 22,826.62
Plants and Machinery 514,208.07 51,138.04 565,346.11
Tools 75,281.71 9,482.77 84,764.48
Other Assets 56,015.01 6,255.70 62,270.71
686,690.49 71,656.92 758,347.41
Cash on hand - -
Cash at Bank 209,593.31 1,435,746.17
209,593.31 1,435,746.17
Accruals - 1,500.00
8 CONSTRUCTION COSTS
CONSRUCTION OVERHEADS
4,716,747.55 7,764,709.15
30 SENE 2010
INDEPENDENT AUDITORS’ REPORT
ON FINANCIAL STATEMENTS OF
AKAL CONSTRUCTION ENTERPRISE
The Company’s Management is responsible for the preparation and fair presentation of
these financial statements in accordance with international Financial Reporting
Standards. This responsibility includes: designing, implementing and maintaining
internal control relevant to the preparation and fair presentation of financial statements
that are free from material misstatement, whether due to fraud or error; selecting and
applying appropriate accounting policies; and making accounting estimates that are
reasonable in the circumstances.
Auditors’ Responsibility
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a
basis for our audit opinion.
Unqualified opinion
In our opinion the financial statements present fairly, in all material respects, the financial
position of Akal Construction Enterprise as of 30 Sene 2010 and of its financial performances and
cash flows for the year then ended and are prepared in accordance with applicable laws and
2
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF FINANCIAL POSITION
AS AT 30 SENE 2010
CURRENCY:BIRR
CURRENT ASSETS
CURRENT LIABILITIES
(1,499.99) 0.01
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF PROFIT & LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 SENE 2010
CURRENCY:BIRR
ADMINSTRATION EXPENSES
CURRENCY: BIRR
(1,500.00) 0.00
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF CHANGE IN SHAREHOLDERS EQUITY
FOR THE YEAR ENDED 30 SENE 2010
CURRENCY: BIRR
Accmulated Legal
Capital Profit/Loss Reserve Total
BACKGROUND
ACCOUNTING POLICIES
a) Fixed Assets
%
Motor vehicle 20
Construction equipments 20
Office furniture & fixtures 20
Computer and accessories 25
Other Assets 20
3 FIXED ASSETS
BALANCE AT BALANCE AT
COST 30 SENE 2009 ADDITIONS 30 SENE 2010
Computer & Data Storage 29,486.86 29,486.86
Office Furniture & Equipme 33,485.16 33,485.16
Plants and Machinery 769,898.25 769,898.25
Tools 122,695.55 122,695.55
Other Assets 87,293.50 87,293.50
1,042,859.32 - 1,042,859.32
DEPRECIATION
Computer & Data Storage 23,139.50 1,586.84 24,726.34
Office Furniture & Equipme 22,826.62 2,131.71 24,958.33
Plants and Machinery 565,346.11 40,910.43 606,256.53
Tools 84,764.48 7,586.21 92,350.69
Other Assets 62,270.71 5,004.56 67,275.27
758,347.41 57,219.75 815,567.16
Cash on hand - -
Cash at Bank 363,246.53 209,593.31
363,246.53 209,593.31
Accruals 1,500.00 -
Penality - - 23,928.83
8 CONSTRUCTION COSTS
CONSRUCTION OVERHEADS
1,696,256.18 4,716,747.55
30 SENE 2011
INDEPENDENT AUDITORS’ REPORT
ON FINANCIAL STATEMENTS OF
AKAL CONSTRUCTION ENTERPRISE
The Company’s Management is responsible for the preparation and fair presentation of
these financial statements in accordance with international Financial Reporting
Standards. This responsibility includes: designing, implementing and maintaining
internal control relevant to the preparation and fair presentation of financial statements
that are free from material misstatement, whether due to fraud or error; selecting and
applying appropriate accounting policies; and making accounting estimates that are
reasonable in the circumstances.
Auditors’ Responsibility
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a
basis for our audit opinion.
Unqualified opinion
In our opinion the financial statements present fairly, in all material respects, the financial
position of Akal Construction Enterprise as of 30 Sene 2011 and of its financial performances and
cash flows for the year then ended and are prepared in accordance with applicable laws and
2
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF FINANCIAL POSITION
AS AT 30 SENE 2011
CURRENCY:BIRR
CURRENT ASSETS
CURRENT LIABILITIES
(0.00) 0.01
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF PROFIT & LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 SENE 2011
CURRENCY:BIRR
ADMINSTRATION EXPENSES
CURRENCY: BIRR
0.00 (0.00)
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF CHANGE IN SHAREHOLDERS EQUITY
FOR THE YEAR ENDED 30 SENE 2011
CURRENCY: BIRR
Accmulated Legal
Capital Profit/Loss Reserve Total
BACKGROUND
ACCOUNTING POLICIES
a) Fixed Assets
%
Motor vehicle 20
Construction equipments 20
Office furniture & fixtures 20
Computer and accessories 25
Other Assets 20
3 FIXED ASSETS
BALANCE AT BALANCE AT
COST 30 SENE 2010 ADDITIONS 30 SENE 2011
Computer & Data Storage 29,486.86 29,486.86
Office Furniture & Equipme 33,485.16 33,485.16
Plants and Machinery 769,898.25 769,898.25
Tools 122,695.55 122,695.55
Other Assets 87,293.50 87,293.50
1,042,859.32 - 1,042,859.32
DEPRECIATION
Computer & Data Storage 24,726.34 1,190.13 25,916.47
Office Furniture & Equipme 24,958.33 1,705.37 26,663.70
Plants and Machinery 606,256.53 32,728.34 638,984.88
Tools 92,350.69 6,068.97 98,419.66
Other Assets 67,275.27 4,003.65 71,278.91
815,567.16 45,696.46 861,263.62
Cash on hand - -
Cash at Bank 1,121,902.29 363,246.53
1,121,902.29 363,246.53
Penality - - -
8 CONSTRUCTION COSTS
CONSRUCTION OVERHEADS
6,035,890.99 1,696,256.18
30 SENE 2012
INDEPENDENT AUDITORS’ REPORT
ON FINANCIAL STATEMENTS OF
AKAL CONSTRUCTION ENTERPRISE
The Company’s Management is responsible for the preparation and fair presentation of
these financial statements in accordance with international Financial Reporting
Standards. This responsibility includes: designing, implementing and maintaining
internal control relevant to the preparation and fair presentation of financial statements
that are free from material misstatement, whether due to fraud or error; selecting and
applying appropriate accounting policies; and making accounting estimates that are
reasonable in the circumstances.
Auditors’ Responsibility
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a
basis for our audit opinion.
Unqualified opinion
In our opinion the financial statements present fairly, in all material respects, the financial
position of Akal Construction Enterprise as of 30 Sene 2012 and of its financial performances and
cash flows for the year then ended and are prepared in accordance with applicable laws and
2
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF FINANCIAL POSITION
AS AT 30 SENE 2012
CURRENCY:BIRR
CURRENT ASSETS
CURRENT LIABILITIES
(0.00) (0.00)
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF PROFIT & LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE YEAR ENDED 30 SENE 2012
CURRENCY:BIRR
ADMINSTRATION EXPENSES
CURRENCY: BIRR
(0.00) 0.00
AKAL CONSTRUCTION ENTERPRISE
STATEMENT OF CHANGE IN SHAREHOLDERS EQUITY
FOR THE YEAR ENDED 30 SENE 2012
CURRENCY: BIRR
Accmulated Legal
Capital Profit/Loss Reserve Total
BACKGROUND
ACCOUNTING POLICIES
a) Fixed Assets
%
Motor vehicle 20
Construction equipments 20
Office furniture & fixtures 20
Computer and accessories 25
Other Assets 20
3 FIXED ASSETS
BALANCE AT BALANCE AT
COST 30 SENE 2011 ADDITIONS 30 SENE 2012
Computer & Data Storage 29,486.86 29,486.86
Office Furniture & Equipme 33,485.16 33,485.16
Plants and Machinery 769,898.25 769,898.25
Tools 122,695.55 122,695.55
Other Assets 87,293.50 87,293.50
1,042,859.32 - 1,042,859.32
DEPRECIATION
Computer & Data Storage 25,916.47 892.60 26,809.07
Office Furniture & Equipme 26,663.70 1,364.29 28,027.99
Plants and Machinery 638,984.88 26,182.67 665,167.55
Tools 98,419.66 4,855.18 103,274.84
Other Assets 71,278.91 3,202.92 74,481.83
861,263.62 36,497.66 897,761.28
Trade 3,037,263.05 -
Retention 1,148,503.28 1,213,946.52
Withholding tax 32,805.89 32,805.89
Purchase advance 113,606.65 113,606.65
Value Added Tax 87,692.30 87,692.30
4,419,871.17 1,448,051.36
AKAL CONSTRUCTION ENTERPRISE
NOTES TO THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 30 SENE 2012
Cash on hand - -
Cash at Bank 246,280.34 1,121,902.29
246,280.34 1,121,902.29
Trade 824,415.15
Project Advance 1,174,631.62
Income tax 120,392.10 101,355.24
Accruals 5,000.00 5,000.00
Pension payable 86,128.64 104,242.24
Value added tax 3,097.95 283,816.05
2,213,665.46 494,413.53
Penality - - -
8 CONSTRUCTION COSTS
CONSRUCTION OVERHEADS
7,767,912.07 6,035,890.99
no name position profession year
1 Abduselam Nasser Project manager Bachelor of Science in Civil 13 years
kelil Engineering
Employer Record 1
From: July, 2017 GC - Up to date
Employer: AKAL Construction Enterprise
Position held: Project Manager
Project: Different project
Employer Record 2
From: Jan. 28, 2013 to Jan. 23, 2017 GC
Employer: A.M.B Contractor PLC
Position Held: Project Manager
Project: Jigjiga University Asphalt Road project
Employer Record 3
From: Dec. 15, 2010 to Sep. 27, 2012 GC
Employer: FLINTSTONE ENGINEERING
Position Held: Construction Engineer
Project: Real estate development
Employer Record 4
From: Feb, 2009 to Jan, 2011GC
Employer: PREFABRICATED BUILDING PARTS PRODUCTION
ENTERPRISE
Position Held: Project Engineer
Project: Head Office (Addis Ababa)
13. Certification:-
11. Detail Tasks Assigned:- 12. Work Undertaken that Best Illustrates Capability to
-Control project daily activity as of Handle the Tasks Assigned:
planned schedule and allocation of Name of Assignment or Project:-
labor material and equipment Year:-
- Have discussion with the clients Location:-
and subcontractors for short Client: -
comings and claims during the Main project features:
construction period. Positions held: - Project Manager
- Evaluation of working labor, Activity Performed: - Leading both the project site works
material and equipment schedule in accordance with the contract agreement, design drawing
- Evaluation on daily, weekly and and specification
cumulative monthly project
progress report
- prepare work methodology of the
project
- Preparation of working labor,
material and equipment schedule.
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
1: Proposed personnel
Expert Name Abdulaziz Kedir
Nationality Ethiopian
U Understanding Has exposure to education in the subject area but has not used this
skill set in practice.
W Working Has limited working experience using this skill set?
P Proficient Has hands-on experience using this skill set to implement between
2 to 5 projects of various scope/ complexity.
X Expert Has hands –on experience using this skill set in a key role to
implement more than 5 project of various scope/complexity.
Curriculum Vitae for Proposed Personnel-3
Employer Record 1
From: - March 2015 - Up to date
Employer: -AKAL Construction Enterprise
Positions held: - Office Engineer
Project: Different Projects
Employer Record 2
From: - Aug 2014 - Feb 2015
Employer: MAN General Contractor
Positions held: - Office engineering unit head
Project: Head Office
Employer Record 3
From: - March 2013-May 2014
Employer: Yemane Girmay General Contractor MAN General Contractor
Positions held: - Office Engineer and Office engineering unit head
Project: Tendaho Sugat Factory & Rigid Pavement road in the factory
Employer Record 4
From: - February 2012 - March 2013
Employer: YENCOMAD Inc. PLC
Positions held: - ________________________________Project.
Preparation of work schedule using 12. Work Undertaken that best illustrates
Microsoft project, Setting Plans and Capability to Handle the tasks assigned
implement accordingly, Preparation of Name of assignment or project:
Technical & Monthly Report, Year :
Preparation of Claim, Preparation of Location:
cost breakdown for Variation Order, Client :
Organizing Warranties / Guarantees, Main project features:
Ensure the timely preparation of work
measurements and payment
certifications
Employer Record 5
From: - Dec 2010- Dec 2011
Employer: DAZ consultants & Architects
Positions held: - Quantity Surveyor
Project: Hawassa City Housing Development Projects
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
__________________________________________ Date:-_________________________
U Understanding Has exposure to education in the subject area but has not used this
skill set in practice.
W Working Has limited working experience using this skill set?
P Proficient Has hands-on experience using this skill set to implement between
2 to 5 projects of various scope/ complexity.
X Expert Has hands –on experience using this skill set in a key role to
implement more than 5 project of various scope/complexity.
Curriculum Vitae for key Personnel-11
Employment Record I
From: July 2010 – March 2011
Employer: Oromia Water Works Enterprise
Position Held: Construction Engineer
Project: Treatment Plant
Employment Record II
From: Nov 2011 – Sep 2013
Employer: GKP Construction & import
Position Held: Material Engineer
Project: Jimma Road and Drainage
Employment Record III
From: Oct 2013 - Jan 2017
Employer: Wubcon General Contractor
Position held: Project Manager
Project: Different Building Projects
Employment Record IV
From: Feb 2017- July 2017
Employer: GKP Construction & Import
Position held: Material Engineer
Employment Record V
From: June, 2017- July 2018
Employer: MCG Construction PLC
Position held: Project Manager
Project: 2B +G+3 Building
Employment Record VI
From: Sep 2018 –June 2019
Employer: Mengesha Legesse Building Contractor
Position held: Contract Administration Head
Employment Record IIV
From: July 2019 – Up to date
Employer: AKAL Construction Enterprise
Position held: Material Engineer
Project: Different Projects
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
__________________________________________ Date:-_________________________
Nationality Ethiopian
U Understanding Has exposure to education in the subject area but has not used this
skill set in practice.
W Working Has limited working experience using this skill set?
P Proficient Has hands-on experience using this skill set to implement between
2 to 5 projects of various scope/ complexity.
X Expert Has hands –on experience using this skill set in a key role to
implement more than 5 project of various scope/complexity.
Curriculum Vitae for Proposed Personnel-4
Employment Record 1
From: Aug, 2013 – Up to date
Employer: AKAL Construction Enterprise
Position held: Site Engineer
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
8. Employment Record
Employment Record 1
From: Jan 2017 –up to date
Employer: AKAL Construction Enterprise
Position held: Material Engineer
Project: Different Projects
Employment Record 2
From: April 2011 – Jan 2017
Employer: Oromia Water Works Design & Supervision Enterprise
Position held: Material Engineer
Project: Jima Zone Cira – Afalo & Senxu – Bege Rural Road projects, Shenen –
Babichi & Hararto –Wayu DS 6, Senxu – Bege, Chira – Afalo &
Shanan – Gudar Babnichi road projects
Employment Record 3
From: Oct 2010 – April 2011
Employer: Horo Gudru Zone Road Authority
Position held: Construction Engineer
9. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
_____________________________________ Date:-_________________________
P
Experience indicated in the matrix is backed up in the individual’s resume.
We have used the following rating in order to accurately reflect the skill ratings of our team:
U Understanding Has exposure to education in the subject area but has not used this
skill set in practice.
W Working Has limited working experience using this skill set?
P Proficient Has hands-on experience using this skill set to implement between
2 to 5 projects of various scope/ complexity.
X Expert Has hands –on experience using this skill set in a key role to
implement more than 5 project of various scope/complexity.
Curriculum Vitae for Proposed Personnel – 8
Employment Record 1
From: Sep 2007 – Sep 2008
Employer: Ministry of Defense Kality Construction & Material Production
Position held: Surveyor
Employment Record 2
From: Apr 2008 – Jul 2011
Employer: DMC construction P.L.C
Position held: Surveyor
Project: Humbo Arbaminch Road Project
Employment Record 3
From: Jul 2011 – Dec 2013
Employer: MAT General Contractor
Position held: Surveyor
Project: Bulle Hora University
Employment Record 4
From: July 2013- Up-to-date
Employer: AKAL Construction Enterprise
Position held: Chief Surveyor
Project: Different projects
12. Work Undertaken that best illustrates
11. Detailed Tasks assigned
Capability to Handle the tasks assigned
Topographic, cross-sectional, and setting
Name of assignment or project: Positions held :
out data collection and Submittal to the
Activities performed : Refer Item No 11
engineer for Approval.
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and, this CV Correctly describes
myself, my qualifications, and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if engaged.
__________________________________________ Date:-_________________________
U Understanding Has exposure to education in the subject area but has not used
this skill set in practice.
W Working Has limited working experience using this skill set?
P Proficient Has hands-on experience using this skill set to implement
between 2 to 5 projects of various scope/ complexity.
X Expert Has hands –on experience using this skill set in a key role to
implement more than 5 project of various scope/complexity.
Curriculum Vitae for Proposed Personnel-9
Employment Record 1
From: Aug 2015 Up to date
Employer: AKAL Construction Enterprise
Position held: Laboratory Technician
Project: Different Projects
10. Certification
The undersigned certify that to the best of my knowledge and belief, this CV correctly
describes me, my qualifications, and my experience. I understand that any willful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
_____________________________________ Date:-_________________________