LN EXISTING LINKNET POLE 008 PCS PT.

LINKNET, TBK
LIPPO CYBERPARK, BULEVAR GAJAH MADA NO 2088
LIPPO VILLAGE - TANGERANG 15811 - INDONESIA
TEL. (021) 55777755 FAX. (021) 55777373

9/200
INSTALL NEW POLE LINKNET(9/200) 000 PCS
NP COPYRIGHT

No part of this drawing may by reproduced, transmitted

8/200 or recorded in any form or otherwise without the prior


writen permission of System & Network Design Division

NP INSTALL NEW POLE LINKNET(8/200) 006 PCS


DESCRIPTION

HEADEND / HUB CKG007 CIPINANG MUARA


7/250
OPTICAL NODE -
INSTALL NEW POLE LINKNET(7/250) 000 PCS
NP CLOSURE 0 EA

7/200 COIL CABLE 060 METER

ODC

NP INSTALL NEW POLE LINKNET(7/200) 000 PCS 300 CORE


OPTICAL DATA CABINET -

SPLICE POINT 15 POINT

[+] CROSS SECTION FRAME [+]


003 PCS

MRep MYREP POLE 000 PCS Manhole


MANHOLE 000 PCS

Handhole HANDHOLE 000 PCS

4" BRACKET 4" 000 EA

FMI FMI POLE 000 PCS 6" BRACKET 6" 000 EA

8" BRACKET 8" 000 EA

10"
BRACKET 10" 000 EA

MTI MTI POLE 000 PCS


4/6" BRACKET 4/6" 000 EA

6/8" BRACKET 6/8" 000 EA

GV GALVANIZED PIPE 000 METER

XL XL POLE 000 PCS B2


BOR-MAN2 000 METER

B4-1
BOR-MAN4-1 000 METER

GA 000 METER
TRENCHING ASPHALT

INSTALL COIL 20m GT


TRENCHING SOIL 000 METER

GR
TRENCHING GRASS 000 METER

PF PLAFOND 000 METER

BR CLAMP ON BRIDGE / WALL 000 METER


JL. KEBON NANAS
00
8/2
0
8/
2 CB PAVING BLOCK 000 METER
LN10m L 0
N

32 EP EXISTING POLE PLN 000 PCS


m 8
/
2
0
0
L NP NEW POLE 000 PCS
N

A 1
TOTAL POLE 000 PCS

50m
40

ARG
m HDPE PIPE / PVC PIPE 000 METER

A W
8
/
2
0
0

C
N
P CABLE TYPE

PAN
JL.
FIBER 12/2T 000 METER
39
8/2
00 m
LN
8/
20
0
8/200
FIBER 24/4T 705 METER
NP
28m NP

32m 8/
FIBER 36/6T 000 METER
20
0

LN
FIBER 48/4T 000 METER
29

40m
m 8/ FIBER 72/6T 000 METER
20
0
LN
FIBER 96/8T 000 METER

20
0 55 FIBER 144/12T 000 METER
8/

LN m
AERIAL 479m 8/
20
0
FIBER 216/18T 000 METER

NP
FIBER 288/18T 000 METER
PULL FO CABLE 645m

33
HOME PASSED/CORE : 800 HP / 2 CORE

m
24 CORE SURVEYOR : -
0
20
8/

NP INPUT RECOMMENDED BY : FAISAL


EXISTING CLOSURE
NOTE :
40m CGG96-005E
Kode Proyek
INSTALL COIL 20m Project Code REBUILD
JL. GRIYA WARTAWAN
8/200

LN -6.233028° 106.882467° Nama Proyek


Project Name

BB JTN04 Line A to Hub Pondok Kelapa


WARGA 1
51m

(Temporary)
JL.PANCA

Gg.PANCA WARGA 31

Tipe Gambar
Drawing Type
PRELIMINARY

3
8/200

GA
NP
CONSTRUCTION DRAWING

WAR
JL.PANCA WARGA 3

CA
PAN
JL.PANCA WARGA 3

JL.
DRAWING APPROVAL

36
JL. PANCA MARGA 4

GA
WAR
JL.KESAD

CA
ARAN Digambar Tanggal

PAN

Gg. PANCAW
Gg.
Drawn

37
Date

GA
GG. PANCA WARGA 34

WAR
CA

ARGA 38
PAN
Gg.

JL.KESADARAN
INDANA ZULFA July 10th, 2023

Diperiksa Tanggal

Checked Date
JTN04
INSTALL COIL 20m
JL. PANCA WARGA SATU
DONY ERRY July 10th, 2023

-6.234060° 106.880331° Disetujui Tanggal

Approved Date

SUHARDJONO July 10th, 2023

ID Node/Referensi Revisi
Node ID/Reference Revision

R - 0
-
Ref. Peta No. Gambar
Map Ref. Drawing No.

46.DGN FM_2_PC_21734_0

Arah Skala

Direction Scale
N
N.T.S

W E Halaman
Page

S
1 OF 1
A2