TO NEAK LOEUNG TO KOH PICH

BP25 BP24 BP23


E

TO BANK
1 2 4 56 57
3

3240
184 2H-400x400x13x21 58

BP06 BP04 BP01


F

*CASTING BY PUMP TRUCK 01 REV01 **CASTING BY PUMP TRUCK 02 REV01


PUMP SPEED = 30m3/hour PUMP SPEED = 30m3/hour

5000
FOR 1ST LAYER (thickness=400mm): FOR 1ST LAYER (thickness=400mm):
-TOTAL VOLUME = 12.28 m3 -TOTAL VOLUME = 8.83 m3
-DURATION = 25mins (ESTIMATED) -DURATION = 18mins (ESTIMATED)

FOR 2ND & 3RD LAYER (thickness=600mm): FOR 2ND&3RD LAYER (thickness=600mm):
-TOTAL VOLUME = 18.43 m3 -TOTAL VOLUME = 13.24 m3
-DURATION = 37mins (ESTIMATED) -DURATION = 27mins (ESTIMATED)
BP07 BP02
G

17060
FOR 4TH LAYER (thickness=700mm):
2H-400x400x13x21

2H-400x400x13x21
FOR 4TH LAYER (thickness=700mm):
-TOTAL VOLUME = 21.50 m3 -TOTAL VOLUME = 15.45 m3
-DURATION = 43mins (ESTIMATED) -DURATION = 31mins (ESTIMATED)

TOTAL DURATION : 142 mins (ESTIMATED) TOTAL DURATION : 103 mins (ESTIMATED)
TOTAL AREA : 30.72 m2 TOTAL AREA : 22.08 m2
TOTAL VOLUME : 70.65 m3 TOTAL VOLUME : 50.76 m3

5000
BRACING BRACING
LEVEL +2.7M LEVEL +4.5M

DIRECTION DIRECTION
FOR PUMP-01 FOR PUMP-02

BP08 BP05 BP03 BP10 H


TO RIVER

STARTING POINT

3840
150 92
2H-400x400x13x21
149 148 116 94 93

2070 9200 3450 5750 2070 1730


24270

1 2 3 4 5

DIRECTION FOR CASTING RC WALL CONCRETE-COVER TEND DURING CONCRETING


SCALE LAYOUT PLAN FOR 2ND LIFT 1:100

REMARK : DUE TO EARLY RAINING SEASON, THERE ARE SOME RAINING ON SITE. CONSTRUCTION WOULD PROPOSE THE
COVERING PLASTIC TEND ON SITE DURING RAINING ESPECIALLY DURING CONCRETING THE INTAKE WALL.
· CASE 1: LITTLE RAINING, NO NEED TO COVER AND CONTINUE CASTING CONCRETE BUT CONSTRUCTION NEED TO PREPARE
WHEN LITTLE RAINS TO HEAVY RAINS.SOME EQUIPMENT NEED TO BE CHANGED TO NON ELECTRICAL SHOCK TO AVOID
SHOCKING HUMAN ON CONSTRUCTION AREA.
· CASE 2: HEAVY RAINING, NEED TO COVER PLASTIC TEND AS SHOWN AS LAYOUT ABOVE AND CONTINUE CASTING CONCRETE.

APPROVED BY CLIENT: CLIENT: INSPECTOR: DESIGN-BUILD CONTRACTOR: MS: BY SIGNATURE DATE DRAWING No MS-016A-07
KOH NOREA INTAKE RC WALL STEEL FORMWORK INSTALLATION FOR 1ST AND 2ND LIFT
PHNOM PENH WATER PREPARED MR. CHEANG PHEARUM SHEET No 02
REPLACEMENT TITLE: CHECKED MR. KUCH MENGHY No of SHEETS 02
SUPPLY AUTHORITY (PPWSA) COVERING TEND DURING RAINING
INTAKE PROJECT APPROVED MR. THA BUNNA REVISION 03
TO RIVER

TO BANK When concrete pump pipe arrive, construction


team need to remove tend temporary. And
return it back, when pipe is moved out.

PLASTIC TEND COVER PLASTIC TEND COVER PLASTIC TEND COVER PLASTIC TEND COVER
DURING RAINING DURING RAINING
TOP OF SHEET PILE
+5.00m
STEEL PIPE D48 STEEL PIPE D48
COVER TEND COVER TEND

2000
ESTIMATED WATER LEVEL
+3.00m

1300
+2.70m
1ST LAYER BRACING

SHEET PILE
(400x175x15.5)

STEEL STEEL PIPE D48 STEEL


V70x70x6mm THK.2.5mm V70x70x6mm STEEL PIPE
STEEL PIPE D60mm
3400

D60mm THK.3.5mm
10620

THK.3.5mm PROP STEEL PIPE D60


THK.3.5mm

1000
PROP STEEL PIPE
D49mm THK.2.5mm BRACING BOX OUT PROP STEEL PIPE
2ND LAYER BRACING H-300x300x10x15 TYPE B D49mm THK.2.5mm
-1.70m
470

1500
WATER

WATER
300

STEEL CANTILEVER SUPPORT


1ST LIFT CASTING
V70x70x6mm I-400 REV03
LV: -2.220
2000

1500
2660
400 1200 1200 400
300

600
800 50

-4.82m
TOP OF BOTTOM SLAB

-5.62m
CASING D1.4m

CASING D1.4m

CASING D1.4m
MASS CONCRETE
TOP LEVEL MASS CONCRETE THK.4m MASS CONCRETE THK.4m

2070 5000 5000 2670

14740

F G H

SECTION 1-1
SCALE 2ND CASTING CONCRETE 1:75

APPROVED BY CLIENT: CLIENT: INSPECTOR: DESIGN-BUILD CONTRACTOR: MS: BY SIGNATURE DATE DRAWING No MS-016A-07
KOH NOREA INTAKE RC WALL STEEL FORMWORK INSTALLATION FOR 1ST AND 2ND LIFT
PHNOM PENH WATER PREPARED MR. CHEANG PHEARUM SHEET No 02
REPLACEMENT TITLE: CHECKED MR. KUCH MENGHY No of SHEETS 02
SUPPLY AUTHORITY (PPWSA) COVERING TEND DURING RAINING
INTAKE PROJECT APPROVED MR. THA BUNNA REVISION 03