A Proposed Two Storey Residential Building Mr. Bonnie James Arcenal Justine D. Botilla

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4

1 2 3

3
REPUBLIC OF THE PHILIPPINES
9000 DEPARTMENT OF PUBLIC WORKS
1000 1750 1750 1750 1750 1000
AND HIGHWAYS
1 2 3 1 2 3 OFFICE OF THE BUILDING OFFICIAL

1000

680
7000 TRUSS TRUSS
3000 4000 3000
7000 MM
4000
CEBU CITY
C

680
C C RFB RFB RECOMMENDING APPROVAL:
C1F1 B1 C1F1 B1 B1 C1F1 2B2 2B1

WF1

680
WF1

B1

680
HEAD ARCHITECTURAL SECTION DATE
S2 C-PURLINS
WF1

680

RFB

RFB

RFB
5000
APPROVED:

2B3

2B3

2B3
5000

WF1

5000
B1
B1 S1

680
WF1 2B1
TRUSS TRUSS BUILDING OFFICIAL DATE

680
B1

680
S2

MM
RFB RFB

680
B1 B1
B
10000

B B

680
10000
C1F1 C1F1 C1F1 2B2 2B1 C-PURLINS
10 MM THK. CHB

680
SEE CONSTRUCTION
NOTES FOR MASONRY

680
WF1 WALL REINFORCEMENT
(TYPICAL)

5000

RFB

RFB

RFB
2B3

680
2B3

2B3
B1

B1

B1
WF1
5000

5000
S1 S2

680
10 MM Ø HORIZONTAL
BARS @600 MM O.C.

680
C-PURLINS
FINISH GRADE LINE

680
WF1 RFB RFB
B1 B1 2B2 2B1 A
A A TRUSS

680
320
1000
C1F1 C1F1 C1F1
SLAB ON FILL: THK = 100 MM 10 MM Ø VERTICAL
WITH 12 MM DIA. BARS SPACED
AT 400 O.C.
BARS @600 MM O.C.
2

1 FOUNDATION PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN


S02 SCALE 1:80 S02 SCALE 1:80 S02 SCALE 1:80 12 MM Ø HORIZONTAL
REBARS @400 MM O.C.
5

LONG SPAN 100 MM THK. GRAVEL FILL


(L2) (L1) (L3)
3-12 MM Ø BOTT BARS
L2/4 L1/4 L1/4 L3/4

4 TYPICAL WALL FOOTING


S02 SCALE 1:30

L4/4

SPAN (L4)
ADD 2-T16 TOP, IN

SHORT
ADDITION TO TOP
TOP BARS ALONG SHORT SPAN

BO. BARS ALONG LONG SPAN


STEEL CALLED FOR
IN THE SCHEDULE

L4/4
L1 L2
ADD 2-T20 FOR
0.9 0.9 BEAMS UP TO 300 L1/3 L1/3 L2/3
WIDE 3-20M FOR TOP TOP

L5/4
0.6 WIDER BEAMS

L/5
BOTTOM BOTTOM
L1/6 BAR L1/5 L2/5 BAR
0.6
BOT. BARS ALONG LONG SPAN

BOT BRS ALONG LONG SPAN TYPICAL SLAB


SECOND POUR REGULAR REINFORCING AS
SLAB PLAN LAYOUT L1 L2 L3
LONG L2/3 LAP SPLICES ARE L2/3 L3/3 LAP SPLICES ARE L3/3
CALLED FOR IN BEAM
LONG SPAN LONG SPAN SPAN 2D 2D ALLOWED ONLY IN 2D 2D ALLOWED ONLY IN 2D
SCHEDULE THIS PORTION THIS PORTION
50x150 KEY FOR D > 450 50X100 (L2) (L1) (L3)
ADD 2 SETS OF CLOSED TIES
KEY FOR D < 450 STOP KEY 75

D
TOP BARS ALONG LONG SPAN
FROM ARCHITECTURALLY TOP BARS ALONG SHORT SPAN
EXPOSED FACES (L2/4) L1/4 L1/4 L3/4
L2/5 L2/5 L3/5 L3/6
CONSTRUCTION JOINTS IN SINDERS SHALL BE SLAB THICKNESS 2-Ø12mm SIDE BARS TOP BARS
OFFSET A MINIMUM DISTANCE OF TWO TIMES WEB BARS
BOTTOM BARS
THE WIDTH OF INTERSECTING BEAMS BOT BARS ALONG SHORT SPAN
BOT BARS ALONG LONG SPAN TYPICAL BEAM
TYPICAL SLAB SECTION
5 BEA M DETAILS fc' = 28 MPa
SCHEDULE SLAB
S02 SCALE NTS
fy = 276 MPa for Stirrups 7 TYPICAL SLAB AND BEAM ELEVATION
S02 SCALE NTS
fy = 420 MPa for Main Bars

6 SLA B DETAILS
S02 SCALE NTS

FROM THE OFFICE OF: SUBJECT COURSE: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

BUILDING SYSTEMS A PROPOSED TWO STOREY FOR SUBMISSION


JUSTINE D. BOTILLA AND DESIGN
(CE-PC 328)
RESIDENTIAL BUILDING
MR. BONNIE JAMES ARCENAL
06/03/23
FOUNDATION PLAN, FRAMING
PLAN, BEAM AND SLAB
DETAILS, AND WALL FOOTING
S02
DATE:
V. SOTTO ST., CEBU CITY, CEBU MW 8:30 - 10:30 A.M. 26 DR PABLO U. ABELLA ST., CEBU CITY, CEBU 26 DR PABLO U. ABELLA ST., CEBU CITY, CEBU DRAWN BY: NIKKI MARIE A. CABAHUG 4 5

You might also like