Under the Airport Improvement Program (AIP) funds, the Dallas-Fort Worth
performance and safety requirements. This complex project calls for the development of a
Southeast End-Around Taxiway, an essential component that will transform the airport's taxiing
operations (Karp, 2023; DFW Airport, 2023). The major purpose of this endeavor is to reduce
bottlenecks and simplify aircraft movements, especially during arrival, by letting them to taxi
with no waiting for outbound flights. This not only improves operating efficiency but also
dramatically raises safety standards, having a considerable beneficial influence on the airport's
In terms of funding, the Federal Aviation Administration (FAA) is helping this project
with a $28,850,034 granting. This funding will help to offset a percentage of the $180 million
total projected construction expenses (Vandergriff, 2023). The funding successfully covers a
large portion of the costs, demonstrating the FAA's devotion to advancing aviation infrastructural
developments. This project's debut date is set for 2023, with finalization scheduled for 2025.
This two-year timeframe emphasizes the complexities of building a taxiway that crosses the
runway's Southeast End while supporting sophisticated engineering and development procedures
entrance, or passenger’s intake (Feng & Johnson, 2021; Karp, 2023). Parking spaces, car rental
3
infrastructure, eateries, and physical safety features are not included in the material supplied,
References
DFW Airport. (2023, March 30). U.S. Secretary of Transportation Celebrates DFW Airport’s
https://news.dfwairport.com/us-secretary-of-transportation-celebrates-dfw-airports-
groundbreaking-of-third-end-around-taxiway-announces-288-million-federal-
funding
Feng, Y., & Johnson, M. E. (2021). Simulation analyses of end-around taxiway operations under
four different runway and taxiway choices. Transportation Research Record: Journal of
Karp, A. (2023, April 3). DFW airport begins construction of third end around taxiway.
airport-begins-construction-third-end-around-taxiway
Vandergriff, C. (2023, March 30). Crews at DFW Airport break ground on airfield safety
ground-on-airfield-safety-project/