FDAS CONTRACT Chesvet Steel Corp.
FDAS CONTRACT Chesvet Steel Corp.
Upon mutual agreement, Party A decides to entrust Party B to take charge of the
installation of fire detection and alarm system project. This contract is signed for mutual
compliance in accordance with the relevant laws and regulations of the Philippines in
order to ensure the smooth progress of the project.
1.2 The scope of fire protection project contracted by Party B:Supply and installation of
fire detection and alarm system (FDAS). The construction of building including the
warehouse is around (10,000) square meters.
Contracting methods: contracting labor, materials, contracting period, quality of
contracting, safe and civilized installation, testing and commissioning.
2.Contract price
Total project price in Philippine Pesos 1,453,000.00 (excluding tax)
The total price of the project includes engineering materials, labor costs, machinery
costs, management costs, safety construction costs, garbage/debris cleaning costs.
3.4. Party A shall pay Party B the remaining 10% of the total contract price after
acceptance.
Party B shall not be liable for any construction problems caused by Party A's failure to
pay Party B's progress payment in time.
BUSINESS PERMIT, BIR 2303, CONTRACTOR’S LICENSE. Party B is a a DTI registered legal
entity approved and registered by the Philippine Contractors Accreditation Board. It has
passed the latest annual inspection of the enterprise and has the qualification of engaging
in fire detection and alarm system installation. The qualification level meets the
requirements of this construction. Party B shall show party A the BUSINESS PERMIT, BIR
2303, CONTRACTOR’S LICENSE before signing this contract.
9. Warranty responsibility
Party B promises to guarantee the project for one year from the completion date.
Improper use, artificial damage and damage caused by non-engineering quality reasons
are not covered by warranty.
The party shall pay 30% of the total contract amount as penalty to the other party if the
party cancels the contract without authorization during the performance of the contract
after the contract comes into effect. Compensation shall be made if the actual loss
caused by the other party exceeds the penalty due to the unauthorized termination of
the contract.
This contract is made in two originals with the same legal effect, one of which shall be
kept by Party A and Party B respectively.
Date of Sign:
ACKNOWLEDGEMENT
known to me be the same persons who executed the foregoing instrument and
acknowledged to me that same is their free act and deed as well as the corporate act and
deed of the corporation which they represent.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my notarial seal on the date
and at the place first written above.