Professional Documents
Culture Documents
Jsa For Pipe Fabrication Errection
Jsa For Pipe Fabrication Errection
Safety Representative
Back injury
Training of personnel on proper
manual handling and lifting
techniques
(2.01) Using crane Defective crane Crane must have valid 3rd party
inspection sticker and must have
passed with Client inspection.
Crane must have a documented
regular (i.e. monthly) maintenance
inspection.
Crane must have a documented
daily inspection before being used
(5.0) Painting works Fumes inhalation /dermatitis Ensure proper paint mask
aerosols (cartridge mask are using will
spray painting) for manual painting
use dust mask &disposable
overalls rubber gloves
Ensure fire extinguisher are in
place
Environmental hazard land All empty paint tins must dispose
contaminations in designed area
Follow chemical MSDS Procedure