1. Tower foundation rebar full view 2.

Tower foundation depth of excavation from NGL

3. Tower foundation perimeter distance (Matt/Isolated) 4. Footing thickness

5. Footing formworks 6. Side concrete cover


8. TB1 length, spacing and number of rebars (Photo and
7. Bottom concrete cover
Video)

9. TB2 length, spacing and number of rebars (Photo and 10. BB1 length, spacing and number of rebars
Video) (Photo and Video)

11. BB2 length, spacing and number of rebars (Photo 12. Footing column formworks and support
and Video) installation
13. VB1 length, spacing and number of rebars (Photo 14. ST1 measurement, spacing and number of rebar
and video) (photo and video)

15. ST2 measurement, spacing and number of rebar


16. Column formworks measurement
(photo and video)

17. Column Height from footing 18. Column Height from NGL
19. Column concrete cover 20. Column formworks and support installation

21. TB measurement, spacing and number of rebar 22. BB measurement, spacing and number of rebar
(photo and video) (photo and video)

23. S/U measurement, spacing and number of rebar


24. Tie beam concrete cover
(photo and video)
25. Tie beam formworks measurement 26. Anchor bolt center to center distance

27. Anchor bolt exposed height from finish column


28. Anchor bolt levelling per column
concrete

29. Anchor bolt levelling all column 30. Anchor bolt eccentricity from Tower pedestal
31. Manpower 32. One bagger mixer minimum 2unit

33. Concrete vibrator 34. Cylinder molds ( 6 pcs)

35. Slump cone (75-100mm) 36. Chute installation and readiness


37. Tempo light incase activity during night time Team in PEE

Before casting Ongoing casting

On going casting After casting