OPENINGS TABLE:
W1 W1 W1 W1 W1
WINDOW
1 1
D3 D3 W1 2.05 1.50 .90 Aluminum sliding 2 sashes
3.02
3.47 4.15 3.80 3.65 4.45 10.99 8.15 CW1 6.50 2.60
D4 D4
OFFICE 5.50 OFFICE OFFICE OFFICE5.13 MECHANICAL ROOM WOMEN MEN
W.C. W.C
7.46
FINISHINGS TABLE:
2.05
7.75
7.75
TERRACE 7.75
D3 D3
2 2 2 2 3 Item: Space name: Flooring: Skirting: Walls: Ceiling:
D3 D3
0.97
D2 D2 D2 Ceramic Ceramic Plastering Gypsum
2.29
D2
1.00
D2 5 5 2 Office tiles tiles 10 +Paint board, false
D4 2.00 D4 60x60x20 cm ceiling
5.45
2 2 cm
2.89
10.82 4.25 4.74 3.49 2.97 4.19 1.85 1.00 5.10 3 Mechanical Ceramic Ceramic Plastering Plastering+
4.11 3.21 room tiles tiles 10 +Paint Paint
60x60x20 cm
+8.40 m cm
2.05
2.05
7.50
7.50
7.50
Ceramic Ceramic Ceramic Gypsum
2 2.00 13 5 Toilets tiles tiles 10 tiles30x board, false
1
+8.10 m 30x30x20 cm 30x20 ceiling
+8.10 m 1 22
cm cm
3.20
2 21
12 D2
3
4
20
19
D2
5 18
30.50
30.46
Ceramic Ceramic Ceramic Gypsum
5.45
3 3
6 17
7 16
7.84
4.25
8
9
15
14
12 Labratory tiles 30 x tiles 10 tiles board, false
30 x20 cm cm 30x30x20 ceiling
D2 D2
9 cm
12
10
11
12
13
Wood
panel 300 Soft wood Plastering Gypsum
LABRATORY 13 Break room cm x183 10 cm +Paint board, false
7.17
2.05
7.17
cm x 20 ceiling
7.50
7.17 CW1
D2 2.35
2.35
D2 D2 D2
10.43
7.75
7.75
3.47 4.03 3.84 3.86 15.28 7.89 7.95
7.37
CW1
OFFICE OFFICE OFFICE OFFICE CO-WORKING OFFICE
5.07 5.40
2 2 2 2 2
5 5
CW1 CW1 W1 W1 W1 W1 W1 W1
36.71 6.66 1.25 6.65 1.33 1.90 2.05 2.00 1.75 1.90 2.05 2.00 1.75 1.90 2.05 2.00 1.14
0.63 12.65 7.58 7.70 3.38 4.45 7.58 7.58 4.44 3.38 7.70 7.83
75.08
A B C D E F G H I J K L COURSE:
EXECUTION DESIGN (1)
LECTURER:
DR. ABDELAZIZ FAROUK
NAME:
LAMA TAREK
REGISTRATION NUMBER:
211008111
DRAWING:
Second floor plan
SCALE:
1:100