1.

Which of the following methods of bidding is required on most


projects for which government funds are to be used?
A) Direct
B) Negotiated
C) Open Competitive
D) Limited competitive

2. Which one is not true about time control in construction according


to PPA?
A) The work program shall be updated based on the progress of
the work including any changes
B) The contractor is responsible for updating the work program
within the time stated in SCC
C) The engineer shall extend the intended completion date if a
compensation event occurs or a variation are issued
D) Justifiable delay incurs liquidated damage Cost to the
contractor.

3. A multi-purpose dam is proposed to be constructed on Chemoga


River (East Gojjam), Ethiopia at a Particular site. At proposed site it is
being observed that the River changes its course year to year from one
side of the bank to the other side due to the wideness of the cross
section of the valley. If the area is frequently affected by an earthquake,
the geology of the foundation at the site is good sound rock laying just
over the surface of the river bed. The topography of the site permits a
separate spillway having a saddle of deep narrow gorge with steep
banks, separated from a flank by a hillock with its level above the top
of the dam. As Engineer, which type of dam do you recommend for the
site?
A) Concert gravity dam
B) Arch dam
C) Buttress dam
D) Earth dam

4. The moisture content of timber needs to be reduced for one the


following reasons:
A) Makes the timber more resistant to biological decay,
B) Increases its strength, stiffness and dimensional stability,
C) Reduces its weight (and consequently transportation costs).
D) All of the above

5. Traffic surveys are carried out


A) To know the type of traffic
B) To determine the facilities to traffic regulations
C) To design proper drainage system
D) All the above

6. The location of flexural reinforcements on a rectangular cantilever


beam is
A) Bellow the neutral axis
B) Above the neutral axis
C) At the neutral axis
D) No flexural reinforcement for cantilever beam

7. The reduction in volume of the soil because of compression of solid


particles just after the application of the load is known as ---------------
A) Initial consolidation
B) Secondary consolidation
C) Primary consolidation
D) A and C
8. For walls, columns and vertical faces of all structural members, the
form work is generally removed after
A) 24 to 48 hours
B) 3 days
C) 7 days
D) 14 days

9. If You are a project manager in a contractor company and have


signed a lump-sum contract with a public institute to build office
building. You faced performance and financial risks associated with
estimation failure. Which of the following statements is true for this
situation?
A) Your company shall take the responsibility.
B) Lending institute shall take the responsibility
C) The employer shall take the responsibility
D) The consultant shall take the responsibility

10. Which of the following statement is not true about the mechanism
of shrinkage of concrete?
A) Dry shrinkage occurs when contracting of a hardened concrete
mixture due to the loss of capillary water.
B) Plastic Settlement occurs due to excessive temperature
difference within a concrete structure or its surroundings.
C) Carbonation shrinkage occurs when carbon dioxide penetrates
into the concrete through pores.
D) Plastic shrinkage occurs due to the amount of water lost to
evaporation is greater than the rate of bleeding there is a net
reduction in volume.

11. For a gravity retaining wall intended to support a backfill soil


alongside of a certain road section, which pressure is most important
for analysis and design of the wall?
A) At rest pressure
B) Active earth pressure
C) Passive earth pressure
D) All

12. By adding chromium to steel which of the following property is


enhanced as an alloy construction material?
A) Resistance to corrosion
B) Electrical characteristics
C) Magnetic property
D) Ductility

13. _______________is a systematic approach to implement health


and safety policy through an effective health and safety management
system.
A) Organizing
B) Planning
C) Measuring performance
D) Auditing performance

14. An earth moving equipment mainly used for handling loose


materials such as sand, gravel, crushed stone, coal, etc. and for
removing materials from inside cofferdams, pier foundations, sewer
manholes, sheet-lined trenches.
A) Drag line
B) Clam shell
C) Face shovel
D) Loader

15. As the project is built, the actual quantities are checked against
the estimated quantities. For example, if the estimated quantity of
concrete for a sheer wall is 23 m3, but the actual installed concrete is
26 m3, then the contractor would be paid for the additional 3m3.who is
responsible for this addition of cost due to variation of work when the
types of contact is guaranteed maximum price addition of cost due to
variation of work when the types of contact is guaranteed maximum
price
A) Contractor
B) Consultant
C) Client
D) Government

16. In a long and short wall method of estimation, the length of wall is
the center-to-center distance between the walls and
A) Breadth of the wall
B) Half breadth of wall on each side
C) One fourth breadth of wall on each side
D) None of the above

17. A flow-net is plotted for homogeneous earthen dam of height 22


m and free-board 2.0 m. Number of potential drops and flow channels
are 10 and 4 respectively. The dam has a horizontal filter of 30 m length
at a downstream end and the coefficient of permeability of the dam
material is 5 x 10-4 cm/sec. To calculate the discharge per m run of the
dam, which one is not correct given?
A) Depth of water =22m
B) Depth of water =20m
C) Number of flow line =4
D) Number of equipotential line =10

18. Which of the following is true about flat slab?


A) Slab is uniform thickness throughout without down stand beams
and with the reinforcement more closely spaced.
B) Slab is monolithically cast with the supporting columns without
any provision of beams.
C) Used in case of large span and heavy loads
D) All of the above.

19. A crawler mounted bull dozer has a costs 19,000,000 birr; its
useful life is 10 years, and an end-of-life salvage value is 2,000,000-
birr. Thus, with sum of years digit method (SOYD) the depreciation at
end of year 8 is:
A) 618,182-birr
B) 2,927,274-birr
C) 927,273-birr
D) 309,091-birr

20. Number of stirrups in a simply supported rectangular beam, is?


A) Kept constant throughout the length
B) Decreased towards the center of the beam
C) Decreased at the ends
D) Increased at the center of the beam

21. Design of horizontal and vertical alignments, super-elevation,


sight distance and grades, is worst affected by:
A) Width of the vehicle
B) Length of the vehicle
C) Speed of the vehicle
D) Height of the vehicle

22. Which of the following is the advantage of concrete structure over


steel structure?
A) Steel has the highest strength-to weight ratio of any construction
material
B) Concrete buildings are taking many different shapes
C) Concrete and its ingredients are not easily available in any
native area as compare to Steel
D) Reinforced concrete requires high skilled labor than steel for the
erection of structure.

23. Stones used for the construction of retaining walls must be


A) Soft
B) Hard
C) Light
D) Heavy

24. The number of brick of size 20cm*10cm*10cm required for 100


sqm of masonry wall is
A) 50
B) 5000
C) 50000
D) 500000

25. The perception-reaction process through which a driver, cyclist,


or pedestrian can see a control device, warning sign, or object on the
road is known as
A) Identification
B) Perception
C) Emotion
D) Reaction or volition

26. A brick factory wishes to produce two types of bricks in a profit of


type A $1.00 and type B $1.20. To manufacture type A requires 2
minute on machine l and 1 minute on machine ll and also type B
requires 1 minute on machine l and 3 minute on machine ll. There are
3 hours available on machine l and 5 hours available on machine ll.
How many bricks of each type should factory make in order to
maximize the profit?
A) 45, 75
B) 51, 83
C) 48, 84
D) 41, 72

27. Flexible pavement distribute the wheel load


A) Directly to sub-grade
B) Through a set of layers to the sub-grade
C) Through structural action
D) None of the above

28. In a singly reinforced beam, the effective depth is measured from


its
A) Compression edge to tensile edge
B) Compression edge to tensile reinforcement
C) Tensile edge to neutral axis of the beam
D) Compression edge to longitudinal central axis

29. Select the correct order of travel demand forecasting process


A) Trip Distribution → Trip Generation→ Mode Choice→ Traffic
Assignment
B) Trip Generation → Mode Choice→ Trip Distribution→ Traffic
Assignment
C) Trip Generation → Trip Distribution→ Mode Choice→ Traffic
Assignment
D) Mode Choice → Trip Generation→ Trip Distribution → Traffic
Assignment

30. A graphical solution method can be used to solve a linear program


with two variables but it has different cases of optimal solution. In which
situation that the value of the objective functions goes on increasing
without leaving the feasible region?
A) An unbounded solution
B) Multiple optimal solution
C) Infeasible solution
D) A unique feasible point

31. Which of the following is false about the Locations of a door?


A) The number of the door should be kept maximum in the single
room
B) It should not be located in the center of the wall; rather
preferably be located near the corner of a room- nearly 20cm away
from the corner.
C) If there are two doors in a room, the doors should preferably
located in opposite walls, facing each other
D) All of the above

32. In low - heat of hydration Portland cement, which one of the


following compound is high in the clinker
A) 3 CaO.SiO2 (Tri-calcium silicate), C3S
B) 2CaO.SiO2 ( Di-calcium silicate), C2S
C) 3CaO.Al2O3 (Tri-calcium Aluminate), C3A
D) 4CaO.Al2O3. Fe2O3 (Tetra-calcium Alumino ferrite) C4 AF

33. Construction Industry to be efficiently operating and be successful


the elements or the resources should be well known, planned and
made available; to coordinate all construction projects resources and
achieve the required goal, a system shall be devised to plan, organize,
execute, and control the project. Such system which helps to achieve
the necessary goal is called
A) Human Resources
B) Financial Resources / Fund
C) Time Resource
D) Construction Management
34. Which of the following statement about construction financial
management is incorrect?
A) Construction financial management is allocating and accounting
for financial resources to cut project costs, maximize profits and
assure long-term company financial health.
B) Construction financial management is allocating and accounting
for financial resources to maximize profits but not to assure long-
term company financial health.
C) Financial management is that specialized activity which is
responsible for obtaining and effectively utilizing the funds for the
efficient functioning of the business.
D) It involves risk management.

35. Which of the following is the correct statement?


A) Liquidity Ratios help in analyzing the cash position of the firm
B) In calculation of Acid Test Ratio, Inventory is included in current
assets.
C) Working Capital Turnover Ratio may be classified as an Activity
Ratio.
D) Ratio Analysis provides the solution to the financial problems.

36. Which type of bond submitted for procurement of works?


A) Performance security bond
B) Bid bond
C) Advance payment security bond
D) None

37. Which of the following is Not correct about excavator?


A) It is designed to excavate above the ground surface on which
the machine rests.
B) It has good mobility and versatility
C) It is excellent for general-purpose work, such as excavating
trenches and pits.
D) Designed to replace the cable operated crane shove family

38. Look for Figure 1 and Table 1 What will be the possible minimum
cost and duration of the project?
A) 24000 Birr and 10 days
B) 24000 Birr and 11 days
C) 24500 Birr and 11 days
D) 25000 Birr and 10 days

39. Specification can’t describe


A) The quality of material
B) The quality of workmanship required
C) Duties and obligations of contracting parties
D) Quantity of individual item of works

40. Total executed amount (the value of work executed and material
supplied to date) is 10,000,000 Birr; total previous payment is Birr
3,400,000, Retention 5%, Advance payment paid to the contractor is
Birr 3,000,000, Previous VAT were Birr 510,000. Now; how much of
total payment to the contractor with 15% VAT you certify? (if other
variables are constant)
A) Birr 4,090,000.00
B) Birr 5,295,549.95
C) Birr 3,148,212.90
D) Birr 2,049,404.30
41. The excavation exceeding 1.5 m in width and 10 sq. m in plan
area with a depth not exceeding 20 cm, is termed as __________
A) Pit excavation
B) Site clearance
C) bulk excavation
D) trench excavation

42. If a construction contractor has a salary based paid electrician,


who works for the whole construction company full-time as an
employee, then the electrician’s payment is recorded as
A) Direct cost of the projects
B) Indirect cost of the projects
C) Contingency cost
D) Bonus cost

43. One of the following is not a preventive design and construction


measure of structures built on expansive soils.
A) Increase the density of the foundation soil
B) Provide adequate surface drainage around foundations
C) Introduce a floating foundation
D) Prewetting or flooding the in-situ soil prior to construction

44. The generator house project has 600,000 ETB budget cost for the
construction. According to the project schedule the construction team
should be done with 35% of the work. As of today, the project is 45%
complete while 50% budget has been used. What is the performance
of the project regarding cost and time?
A) Over budget and ahead of schedule
B) Under budget and behind a schedule
C) Over budget and behind a schedule
D) Under budget and ahead of schedule
45. The major ideal composition of a good brick earth is
A) Clay (Alumina)
B) Iron oxide
C) Silica
D) CaO & MgO

46. Which one of the following termination types gives a right to claim
for one of the parties?
A) Termination by agreement
B) Termination by performance
C) Termination by frustration
D) None of the above

47. One of the following is not components of site plan.


A) Site orientation
B) Physical features
C) Access road
D) Section plan

48. You are a project manager on a construction project. You have


just prepared Request for proposal (RFP) to send around to electrical
contractors. You get a call from your uncle who owns an electrical
contracting company. He wants to bid on your project. You know he’s
done good work before, and it may be a good fit for your company.
How do you proceed?
A) You disclose the conflict of interest to your company, and
disqualify your uncle’s company
B) You disclose the conflict of interest to your company, and
make the selection based on objective criteria
C) You disclose the conflict of interest to your company, and
provide your uncle with information that the other bidders don’t
have so that he has a better chance of winning the contract
D) You do not disclose the conflict of interest, and give your uncle
the bid

49. Which one of the following is true?


A) Composite stair uses concrete and timber in construction
B) Asbestos sheets are the most applicable roofing materials know
a days
C) Rise is the horizontal distance between the upper surface of two
consecutive steps
D) All of the above

50. Grade-1 construction firms which is located at the Debre Markos


was analyzed his balance sheet at the end of 2014 E.C. The balance
sheet report summary of the firm shows that, the total capital employed
of the firm is 6,000,000 ETB during end of 2014 Ethiopian calendar. If
the required return on capital employed is assumed to be 20%, then
the Return on Capital Employed (ROCE) for the firm is:
A) 1,300,000 ETB
B) 1,200,000 ETB
C) 1,500,000 ETB
D) 2,000,000 ETB

51. Which of the following is NOT an input to Perform Quality Control?


A) Deliverables
B) Work Results
C) Checklists
D) Change Requests

52. Interest paid (earned) on both the original principal borrowed (lent)
and previous interest earned is often referred to as __________.
A) Present value
B) Simple interest
C) Future value
D) Compound interest.

53. Which is NOT an example of cost of quality?


A) The cost of inspecting your product to be sure that it meets
requirements.
B) The cost of reviewing documents used to produce your product
to be sure that they do not have defects.
C) The costs of training your team on techniques that will help them
avoid defects.
D) The cost of contracting another company to build part of the
product.

54. Suppose the Cost of the project is 600,000 ETB, life of the project
is 5 years annual cash flow is 200,000 ETB with an interest rate is 10%.
Therefore, how much is the discounted payback period
______________.
A) 2 yrs.
B) 2 yrs. 6 months
C) 3 yrs.
D) 3 yrs. and 9 months

55. One of the following is not about the difference between Pile &
Pier foundations?
A) Pier foundation transfer load only through bearing.
B) Pier foundation is shallower in depth than pile foundation
C) Pier foundation is preferred where the top strata consist of
decomposed rock overlaying strata of hard rock.
D) Pier foundation transfer load through fiction & bearing.

56. One of the following alternatives comprises the correct order for
“Program → Project → Task → Work package” level of division of the
WBS structure. Which one?
A) Residential building → Real estate development →
Substructure → Site clearance
B) Residential building → Real estate development →
Substructure → Earthwork
C) Real estate development → Residential building →
Substructure → Earthwork
D) Real estate development → Residential building →
Substructure → Site Clearance

57. In computer-based (Microsoft Project) scheduling how can we


prepare a material, machinery, and manpower schedules?
A) By printing a resource sheet view
B) By printing a resource usage view
C) By printing a resource graph view
D) By printing a cash flow report

58. Pile foundation can be used in the following conditions except:


A) When there exists uplift forces
B) When there exists a strong hard rock foundation
C) To control earth movements (e.g. landslides)
D) To compact loose deposits

59. The phase of highway location study used to identify several routs
by considering various factors such as terrain and soil conditions,
directness of the rout is
A) Desk study of existing information
B) Reconnaissance survey
C) Preliminary location survey
D) Final location survey

60. In payment certificate preparation, which one of the following item


is not deductible component?
A) Material on site
B) Rebate
C) Advance Repayment
D) Retention

61. There are four primary methods used to estimate construction


costs. Each method of estimating offers a level of confidence that is
directly related to the amount of time required to prepare the estimate.
Advice stake holders on which method is least accurate and less time
required to estimate than others?
A) Area/Volume Estimating,
B) Project Comparison/ Parametric Cost Estimating,
C) Unit Price/Schedule Estimating.
D) Assembly /System Estimating,

62. Suppose, for a loader bucket whose heaped capacity is 3.82 m3;
the soil’s bucket fill factor is 0.9 and its load factor is 0.8. Hence, the
actual bucket load in bank cubic meter for a loader is:
A) 3.82 Bm3
B) 2.82 Bm3
C) 2.75 Bm3
D) 3.75 Bm3

63. Over-topping is the most common cause of failure of an


embankment dam, Over-topping of earth dam does not occurs if :
A) The design flood is undermined;
B) The spillway capacity is not adequate;
C) The spillway gates are not properly operated
D) The free board is sufficient
64. When there is lack of capacity from the private sector to undertake
very large and technologically new projects, which type of delivery
system preferred
A) Facility Management
B) Force Account
C) DBB
D) BOT

65. The most common non-hydraulic binder is


A) Portland cement
B) Lime
C) Gypsum
D) All of the above

66. Concerning expansive soils, which one of the following sentences


is true?
A) For a given dry density, percent expansion decreases with
increase in moisture content
B) For a given moisture content, the swelling pressure decreases
with increase in dry density
C) Percent expansion increases with increase in confining
pressure for a given initial moisture content and density.
D) Percent expansion decreases with increase in dry density for a
given initial moisture content.

67. Look at Figure 2, if you take the number in bracket as the number
of daily labors for each activity, then after, how many resources is
required at the 9th date of the project (Hint: do resource aggregation)?
A) 3 Daily Labor
B) 4 Daily Labor
C) 5 Daily Labor
D) 2 Daily Labor
68. From the following, choose incorrect statement. Tensile
reinforcement bars of a rectangular beam
A) Are curtailed if not required to resist the bending moment
B) Are bent up at suitable places to serve as shear reinforcement
C) Are bent down at suitable places to serve as shear
reinforcement
D) Are maintained at bottom to provide at least local bond stress.

69. Which one is/are the advantages of hollow concrete block


masonry among the following
A) Concrete blocks are regular in size, but requiring dressing work.
B) Blocks are light and therefore easy to handle.
C) The loads transferred to foundations are much heavier than the
stone masonry.
D) Has bad insulating properties against sound, heat and
dampness.

70. The gross direct wages paid to the worker is


A) Wage rate
B) Bare labor cost
C) Burdened labor cost
D) All in labor cost

71. ____________is a definite plan of action designed to prevent


accidents and occupational diseases.
A) Health and safety program
B) Accident reporting
C) Health
D) All of the above
72. Which one of the following is different?
A) Improper lifting
B) Failure to wear PPE
C) Unstable work areas/platform
D) Alcohol use

73. Which of the following sections should preferably be used at


places where torsion occurs?
A) Angle section,
B) Channel section,
C) Box section,
D) Standard section,

74. __________is the system which comprises of the reinforced


concrete columns and connecting beams.
A) RC frame structure
B) RC shell structure
C) RC dome structure
D) RC hinge

75. The give required resources for C-5 lean concrete were material
cost birr 882.3, labor cost birr 82.08 and equipment cost birr 46.15.
Determine the rates of C-5 lean concrete by considering 30% both over
head & profit margin; And 2.5m3 hourly labors and equipment outputs?
A) 882.3
B) 933.59
C) 1213.67
D) 32.83

76. If the transverse slope of a country is 25% to 50%, the terrain is


classified as
A) Rolling
B) Escarpment
C) Mountainous
D) Plain

77. Which one of the following “the potential of a substance, activity


or process to cause harm on construction workers.”
A) Health
B) Accident
C) Hazard
D) None of the above

78. Workability of concrete mix with low water cement ratio is


determined by
A) Tensile strength test
B) Slump test
C) Compaction factor test
D) Flexural strength test

79. The main purpose of diversion head-work


A) To raise the water level in the river so that sufficient quantity of
water can be supplied.
B) To regulate the intake of water into the canal
C) To control silt entry into the canal
D) All of the above

80. Which of the following is the benefit of building information


modeling (BIM)?
A) BIM Provides an Early Digital Representation of building
B) Reduce the Risk of Rework
C) Ensure that the project requirements are met from the early
design stage
D) All of the above

81. In design of reinforced concrete structure the strength of concrete


can be increase with
A) Increase in water cement ratio
B) Increase in fineness of cement
C) Decrease in curing time
D) Decrease in size of aggregate

82. Which one of the following is not included in Proactive measures


of health and safety?
A) Safety training & program
B) Safety measures committee is formulated
C) Personal protective equipment’s (PPE)
D) Accident reporting and analysis

83. Bitumen of grade 60/80 means


A) Its penetration value is 6 mm
B) Its penetration value is 8 mm
C) Its penetration value is 6 to 8 cm
D) Its penetration value is 6 to 8 mm

84. When do the engineer can adjust unit rate without the prior
approval of the client based on PPA condition of contract
A) If the final quantity of the work done differs from the quantity in
the bill of quantities for the particular item by more than 25 percent
B) If the executed work price exceeds by 5 percent from the initial
contract price
C) If the changes in quantities brings the initial contract price to
exceeded by more than 15 percent
D) None
85. A long column has maximum buckling/crippling load when
A) Both ends are hinged
B) Both ends are fixed
C) One end is fixed and another end is hinged
D) One end is fixed and another end is free

86. Which of the following alternative includes a scheduling technique


one is used for scheduling of repetitive projects and the other one is
used for probabilistic scheduling?
A) Bar chart and PERT
B) CPM and PERT
C) CPM and LOB
D) LOB and PERT

87. The process of proper and accurate measurement of concrete


ingredients for uniformity of proportion, is known?
A) Grading
B) Curing
C) Mixing
D) Batching

88. Assume you are assigned as site engineer and you want to
construct six 1300mm x 1300mm square footing pads having a depth
of 1000mm & 50mm concrete cover on each side of square footing
pad. Calculate the quantity of Ø14 reinforcement bar required if c/c
spacing is 200mm and the length of reinforcement bar is 1.8m.
A) 149 Kg
B) 144 Kg
C) 183 Kg
D) 14 Kg
89. Which paint is commonly used in walls, doors, windows and metal
structures?
A) Enamel paint
B) Cement paint
C) Emulsion paint
D) Oil paint

90. Which one of the following construction material is Ferrous metal


A) Wrought iron
B) Aluminum
C) Cast iron
D) A and C

91. The potential labor hours available for a large energy complex
were found to be 5.4 million hours. The non-productive activities
expressed in thousands of labor hours were 360 for holidays and
strikes, 1,152 for absentees, 785 for temporary stoppage and 1,084 for
indirect labor. Determine the productive labor yield after the above
factors are taken into consideration?
A) 37.5
B) 31.5
C) 41.5
D) 39.5

92. One of the following is not basic design performance requirements


that should be satisfied in building structures?
A) Factor of safety
B) Stiffiness
C) Comfort
D) None
93. How BIM improves communication and collaboration on design
and construction projects?
A) By creating a shared 3D model of a project
B) BIM allows all team members to understand the design intent
clearly.
C) Every stakeholder can visualize the plans for a building and
make changes in real-time.
D) All of the above

94. The wall constructed for the stability of an excavated portion of a


road on the uphill side and back filling portion of a road on the downhill
side respectively, are known as
A) Retaining wall and Breast Wall
B) Breast wall and Retaining Wall
C) Parapet wall
D) All the above

95. Putting activities and resources on a calendar time scale is known


as?
A) Scheduling
B) Monitoring
C) Planning
D) Implementing

96. The maximum direct stress in the concrete gravity dam is the
major principal stress acting on the major principal plane passing
through the point, if Reservoir Full Condition, the maximum vertical
stress is occurred :
A) At the toe (downstream of the dam)
B) At the heel(upstream of the dam)
C) At the center of the dam
D) At the foundation of the dam site
97. Which of the following is not true about building information
modeling (BIM)?
A) Building Information Modeling (BIM) is the process of generating
and managing building data during its life cycle.
B) BIM uses modeling software to increase productivity in building
design and construction.e
C) BIM is Software
D) None of the above

98. Which method refers to the class of linear programming problems


that involve determining the most efficient assignment of resources to
tasks? One important characteristic of this method is that only one job
or worker can be assigned to one machine or project.
A) Stepping Stone Method
B) Assignment Model Method
C) MODI Method
D) Simplex Method

99. An experienced operator has to excavate ‘wet gravel’ with a drag-


line capacity of 2.3 m3. The theoretical cycle per hour is 120 cycle/hr.
and its correction factor is 0.46. The material is dumped onto stockpile.
And the actual working time is 50 min per hour. Therefore, the
productivity of drag-line is:
A) 229.08 m3/hr.
B) 126.96 m3/hr.
C) 276 m3/hr.
D) 1.89 m3/hr.
100. Select the correct statement about highway construction
A) The rolling on super-elevated curves shall proceed from Lower
edge towards the upper edge
B) The rolling on normal crowned road shall proceed from Sides
towards the center
C) The rolling on super-elevated curves shall proceed from Upper
edge towards the lower edge
D) A and B