SWOT ANALYSIS

2x Gas Genset Running 3x Gas Gensets Running

Total Generation Capacity is 4.34MW against the essential load of 3.036MW. Total Generation Capacity is 6.510MW against the essential load of 3.036MW.
Insufficient amount of spinning reserve is available on bus to feed additional load as per Surplus amount of spinning reserve is available on bus to feed additional load as per operation
operation requirements. requirements.

Incase of tripping of one Gas Genset,the sudden transient load on the other Gas Incase of tripping of one Gas Genset,the sudden transient load on the other Gas Generator will be
Generator will be around 500-900KW. around 50-100KW.

Smooth transition of load from one Gas Genset to another will be difficult incase of Smooth transition of load from one Gas Genset to another will be possible incase of failure of one
failure of one generator due to high sudden load torque. Gas Generator.

Plant reliability is highly dependent upon these two GG generators, Tripping of any Reliability of plant has been improved by using three generators in parallel that can help
single Gas Genset can lead us to hours of production downtime. us to avoid production downtime incase of any abnormal generator tripping.

In order to ensure smooth operation of generators we need to partially shed one ASU Partial Plant load shed will not be required incase failure of one Gas Genset , so their will be no
load thus their will be partial production loss incase of failure of one Gas Genset. production loss that improves plant reliability.

Operational cost will be lower due to low fuel consumption. Running cost will be higher due to additional 0.5MMSCF consumption.