HPC Template Revised Final 310518
HPC Template Revised Final 310518
General Guidelines
a) Hume Pipe Culvert (HPC) shall be provided for disposal of storm water through
RCC pipes and unflumed canal is taken over the HPC.
b) HPC is economical option for small stream having catchment area up to 50 Ha.
(0.50 Sq.Km.) with flood depth up to 1.20 m and for flood discharge upto 10
cumecs.
c) RCC pipe of required class of max. diameter 1200 mm in maximum 4 rows may be
provided with 0.50 m. gap between two rows. Minimum dia. of the pipe shall be
0.60 m for maintenance point of view. The pipe's vent way shal be designed for
velocity of 1.0 m/sec. ( self cleansing velocity ) to 2.5 m/sec. (non abbrassive) .
d) Invert level of the pipe may be kept 0.15 m. below stream bed Level.
e) The NP2 pipe shall be provided with encased in concrete M15, with skin
reinforcement of 10 mm dia. @ 250 c/c both way, all faces to avoid damages to the
pipes and to sustained overburden pressure and to make the HPC durable.
Encasing thickness shall be of 150 mm to 300 mm.
f) Minimum depth for head wall shall be 1.25 m below stream bed level for soft strata
but may be taken at higher level with embedment of 0.60 m in case of hard rock.
g) Top of the headwall shall be generally kept 0.60 m. above the soffit of the pipe.
Pipe diameter of HPC is decided so as it should run fully. Toes of the canal
embankment shall be protected upto 0.60 m. above the soffit of pipe by dry rubble
pitching.
h) When natural drainage is suitable for HPC, but headway is not available, and the
stream bed slope is quite steep, drop HPC shall be provided.
i) For skew crossing, HPC shall be provided right angle to the canal alignment with
suitable regradation of stream on U/S & D/S side.
j) CC M15 apron of 0.20 m thickness shall be provided at stream bed atleast 3.0 m at
U/S & D/S of the HPC.
Design Criteria / Procedure
Step 1:- Design Flood Discharge Calculations :
Fill all necessary data related to Canal & Nalla in appropriate field in "Input"
sheet as described below
Name of Project :
A) CANAL DATA :
Design Discharge : cumecs Fill from Data
Bed width : m Fill from Data
Full supply depth : m Fill from Data
Free board : m Fill from Data
Side slope Inner : : 1 Fill from Data
Outer : : 1 Fill from Data
Bed gradient : 1 : Fill from Data
Type of canal : Lined or Unlined Fill from Drop down
Value of 'n' : Fill from Data
Velocity : m/sec Fill from Data
Canal bed level : m Fill from Data
Normal F.S.L. : m Auto calculated
Avg. Ground Level : m Fill from Data
Width of S.R. Right Side : m Fill from Data
or Left Side Select side of SR from Drop Down
Width of I.P. : m Fill from Data
Trial pit strata classification : At Ch. : m Fill from Data
G.L. at which the T.P. is taken : m Fill from Data
Depth of soil : m Fill from Data
Depth of murum : m Fill from Data
Depth of soft rock : m Fill from Data
Top of hard rock Level : m Fill from Data
B) STREAM DATA :
Catchment Area : Ha Fill from Data & Unit
N.B.L. at crossing : m Fill from Data
Design Discharge of Nalla : cumecs Calculated separatly
Observed H.F.L. (If available) : m Fill from Data
Design H.F.L. ( If available ) : m Fill from Data
Bed Slope ( If available ) 1 in : Fill from Data
Velocity of Nalla Stream (If available) : m/sec Fill from Data
Value of 'n' ( If available ) : Fill from Data
Nalla Flow from : From IP to SR Select direction of
Nalla from Drop
or From SR to IP down
Step 2:- Design Discharge Calculations
Fill the value of Design Discharge of nalla, Observed HFL (if available ), Bed
Slope ( If available ), Velocity of Nalla Stream (If available), Value of 'n' ( If available )
Subzone :
Design flood discharge : cumecs
HPC or DHPC : "Drop Required" or "No Drop Required"
If Drop Required then "GO FOR DESIGN 'DHPC'"
If No Drop Required then "GO FOR DESIGN 'HPC'"
iii) Select nos. of row from drop down to pass design discharge.
If above all three conditions as i), ii) & iii) are not fulfill then revised parameters
of pipe calculations as dia of pipe, gradient of pipe or no. of pipe so as all conditions
should be as a " Hence O.K. "
Once above all three conditions is as a " Hence O.K. " then go for subsequent
drawing as described below.
Revised Parameters of
If not fulfill all conditions as above i), ii) & iii)
Pipe Calculations
i) Select the case as per foundation strata from the drop down menu.
ii) Top RL of Head Wall and Foundation RL of retaining wall automatically calculated as per
design.
iii) Input Top Width and Heel side slope for respective data from the given Table.
iv) Output will be shown in the stability sheet .
General Note :-
a) Selection of Strata
Case 1: Retaining wall resting on strata of rock crush /soft rock/hard murrum
Assumed field parameters
i. Safe bearing capacity : 30 tone/sqm +
ii. Sliding co-efficient at foundation : 0.60
iii. Ø of embankment in wet condition : 300
5) Checked By : ABC
GOSI/GPC/GRBC/RBC/DY-1/MR-1/HPC/100/
6) Drawing No. :
001/2018-19
7) Date : 5/30/2018
Input Design
Parameters
TEMPLATE FOR DESIGN OF HUME PIPE CULVERT
A) CANAL DATA :
Design Discharge : 0.663 cumecs
Bed width : 1.300 m
Full supply depth : 1.000 m
Free board : 0.500 m
Side slope Inner : 2.000 : 1
Outer : 2.000 : 1
Bed gradient : 1 : 2000
Type of canal : Unlined
Value of 'n' : 0.040
Velocity : 0.750 m/sec
Canal bed level : 243.190 m
Normal F.S.L. : 244.190 m
Avg. Ground Level : 244.055 m
Head losss avilable : 0.000 m
Width of S.R. Right Side : 3.600 m
Width of I.P. : 1.500 m
Trial pit strata classification : At Ch. : 100.000 m
G.L. at which the T.P. is taken : 243.105 m
Depth of soil : 0.600 m
Depth of murum : 0.300 m
Depth of soft rock : 0.000 m
Top of hard rock Level : m
B) STREAM DATA :
Catchment Area : 9.92900 Ha Ha
N.B.L. at crossing : 243.105 m
Design Discharge of Nalla : 3.361 cumecs
Observed H.F.L. ( If available ) : 243.905 m
Design H.F.L. ( If available ) : 243.980 m
Bed Slope ( If available ) 1 in : 246
Velocity of Nalla Stream ( If available ) : 0.87 m/sec
Strata available at foundation level : Soft Soft
Value of 'n' ( If available ) : 0.04
Skew Angle : 0 Degree
Nalla Flow from : From IP to SR
1) Name of Circle : GOSIKHURD PROJECT CIRCLE, NAGPUR
5) Checked By : ABC
7) Date : 30/05/2018
Design
Users Manual Parameters
Design of HPC at RD 100 m on Minor-1 of offtaking at RD 200 m of
Distributory-1 of Main Canal
Subzone :
Design flood discharge : 3.361 cumecs
HPC or DHPC : 1.785 m DROP REQUIRED
GO FOR DESIGN 'DHPC'
Case 1: Retaining wall resting on strata of rock crush /soft rock/hard murrum
Assumed field parameters
i. Safe bearing capacity : 30 tone/sqm
ii. Sliding co-efficient at foundation : 0.60
iii. Ø of embankment in wet condition : 300
DHPC DHPC
Back DHPC DHPC Drawing 1 Drawing 2 Drawing 3
General Note :-
a) Selection of Strata
Case 1: Retaining wall resting on strata of rock crush /soft rock/hard murrum
Assumed field parameters
i. Safe bearing capacity : 30 tone/sqm +
ii. Sliding co-efficient at foundation : 0.60
iii. Ø of embankmentin wet condition : 300
(TOP WIDTH)
450 R.L. 244.355
4234.99999999999
Skin reinforcment
10mm Ø @250 c/c EMBANKMENT
both way and all 0.85 SIDE
faces
1
(HEIGHT )
BED LEVEL
3345
TOE 150 150 HEEL
300
4095
RUBBLE SAND SOILING (BASE WIDTH)
(*ONLY FOR B.C. SOIL)
A) CANAL DATA :
: 0.09929 km2
Design : 243.980 m
6 Strata : Soft
Hence O.K.
Dropped NBL = CBL - Cushion over pipe - Diameter Of pipe - pipe thickness.
Assume Dia. Of pipe = 1200 mm
Min. Cushion = 0.60 m
pipe thk. = 70 mm
Pipe Bed slope 1 in = 250
Dropped NBL = 243.19 - 0.6 - 1.27
= 241.3200 m
NBL at crossing = 243.1050 m
NBL at crossing - Dropped NBL = 1.78 m
Hence 1.785 m DROP REQUIRED
It is proposed to provide ' Drop HPC ' at this RD . Accordingly the calculations are done.
i) Top R.L. of Head Wall = Dropped NBL + Pipe Dia. + Free Board
= 241.32 + 1.2 + 0.60
= 243.12 m
ii) Top R.L. of Head Wall = Avg G.L./ Bank Level + 0.30
= 244.055 + 0.30
= 244.355 m
Hence adopt Top RL of Head Wall = 244.355 m [ Maximum of i), ii) or iii) ]
Assume depth of foundation below CBL = 1.50 m
Height of Head Wall = 244.355 - 241.32 + 1.5
= 4.5350 > 4.00 m
The tentative layout of structure is as shown below.
12.40
1.3 S.R. 7.30 I.P. 1.3
3.60 244.690 1.50
D/S of Nalla 244.190
244.355
243.190
0.6
1200
241.286 241.32 241.346
8.55 6.450
To check whether the pipe will run full or otherwise ( Refer p-137 para 22.7 of IRC Special Pub.13 )
" Guidelines for the design of small bridge and culverts "
242.765 AHFL
0.219
0.209 Ha =
242.556
D/S
241.286
L = 15 m
TABLE 5
Values of Ke and K f
Ke = 1.107 x (R) 0.5 0.1 0.572 x (R) 0.5 0.572 x (R) 0.5
Cord length
a a x= 0
Ø y = 0.6
1.200
0.60
Tan Ø = a/y
= 0 / 0.6
= 0
Hence , Ø = 0 degree
Arc length = P' = 2 * ( Ø / 180 ) * 2 π * r
= 2 * 0 / 360 ) * 2 * 3.14 * 0.6
= 0 m
Wetted Perimeter = P = Circumference of pipe - Arc length
= 2 * π * r - L'
= 2 * 3.14 * 0.6 - 0
= 3.768 m
Hydraulic mean depth = R = A2 / P
= 1.13 / 3.768
= 0.30 m
R 2/3 = 0.448
1 / S 1/2 = 0.0632
Velocity through pipe = V2 = 1 / N x R 2/3 x 1/S 1/2
= 76.923 x 0.448 x 0.0632
= 2.178 m/s
C = 1/(1+Ke+Kf)^0.50
Ke = 0.5
Kf = 20 x n^2 x L/R^1.33
= 20 x 0.013^2 x (15/0.3^1.33)
= 0.251
C = 0.76
Discharge Q = C x A x V2
= 0.76 x 1.13 x 2.178
= 1.870 cumecs
For 2 rows, Total Q = 3.740 cumecs > 3.361Cumecs
Hence O.K.
450 244.355
0.85
1
4.535
4235
240.120
300
239.820
Note:- Where concrete or masonry floor is provided under the works,scour condition is not applicable and the
foundations are usually taken to about 1.5 m below the floor levels with suitable cut off for the concrete or masonry
floors.However where such a floor is not provided,foundations are taken to provide a margin below the anticipated
scour level. (As per IS 7784(Part 1): 1993)
the minimum embedment of the foundations shall be as below. (As per IRC:78-2000 )
(a) For hard rocks 0.6 m
(b) All other cases 1.5 m
*
* ( Including PCC & Rubble solling but foundation depth of head wall should not be less than 1.25 m in any
case )
(If available )
(If available )
(If available )
( optional )
3.44
242.765
242.546
1.41900000000001
UU
U/S
241.346
Rectangular culverts
Bevelled entry
0.00394 x ( L / ( R)1.25 )
242.765
243.980
1.200
L level, The Foundation level of Head,
of structure is protected by rubble
P/10 )
8-2000 )
HPC
Drawing 3
HPC
Drawing 3
Design of HPC at RD 100 m on Minor-1 of offtaking at RD 200 m of Distributory-1 of
Main Canal
( Drop Type )
A) CANAL DATA :
Outer : 2 :1
: 0.09929 km2
Design : 243.980 m
6 Strata : Soil
It is proposed to provide ' Drop HPC ' at this RD . Accordingly the calculations are done.
12.40
1.30 S.R. 7.30 I.P. 1.30
3.60 244.690 1.50
D/S of Nalla 244.190
244.355
243.190
0.60
1200
241.286 241.320 241.346
8.550 6.450
To check whether the pipe will run full or otherwise ( Refer p-137 para 22.7 of IRC Special Pub.13 )
" Guidelines for the design of small bridge and culverts "
242.765
0.219
0.209 Ha =
242.556
D/S
241.286
L = 15 m
TABLE 5
Values of Ke and K f
Ke = 1.107 x (R) 0.5 0.10 0.572 x (R) 0.5 0.572 x (R) 0.5
450 244.355
0.85
1
3935
240.420
300
240.120
As per trial pit result supplied by field officer there is soft strata available at NBL level, The Foundation level of Head,
Drop and wing wall is fixed 1.50 m below drop N.B.L. As the U/S & D/S of end of structure is protected by rubble
apron with toe wall, scour criteria is not applicable. ( IS 7784 Part 1 Para 9.1.7 P/10 )
Note:- Where concrete or masonry floor is provided under the works,scour condition is not applicable and the
foundations are usually taken to about 1.5 m below the floor levels with suitable cut off for the concrete or masonry
floors.However where such a floor is not provided,foundations are taken to provide a margin below the anticipated
scour level. (As per IS 7784(Part 1): 1993)
the minimum embedment of the foundations shall be as below. (As per IRC:78-2000 )
(a) For hard rocks 0.6 m
(b) All other cases 1.5 m
*
* ( Including PCC & Rubble solling but foundation depth of head wall should not be less than 1.25 m in any
case )
(If available )
(If available )
(If available )
( optional )
(Referance book -
hydraulic design of
culvert)
242.765
242.546
1.419
U/S
241.346
Rectangular culverts
Bevelled entry
0.00394 x ( L / ( R)1.25 )
level, The Foundation level of Head,
d of structure is protected by rubble
10 )
2000 )
DHPC
Drawing 3
I: GENERAL NOTES :
15000 1. All dimensions are in millimeters unless specified.
2. All reduced levels are in meters.
1800 1300 1500 7300 3600 1300 1500 3. Drawings should not be scaled out. It should be read as per dimensions.
I.P. TBL : 244.690 S.R. 4. Any one location, laps shall be suitably staggered.
U/S of Nalla D/S of Nalla 5. Drawing shall be used for construction only after approval from competent
244.355 450 FSL : 244.190 1 450 244.355 authority.
Avg.G.L.: 5280 2 2 5280
244.055 AHFL : 242.765 0.85 1
4535
1 II: SPECIFIC NOTES :
HFL : 243.980 CBL: 243.190 PCC, M15, 200 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
1300 THK ENCASING before laying levelling course.
M-15 M-15
2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200
FLOOR 200
3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
THK RUBBLE APRON
3 THK structure.
243.105 4. Embankment close to the structure shall be protected from flood by providing dry rubble
1200
300 1
241.346 DROP NBL: 241.320 241.286 300 pitching of 300 mm up to HFL + 0.60 m.
5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
1000
THICKNESS OF PIPE = 70 mm
staggered manner for the retaining structure with filter of graded material.
###
3600 200
240.120 240.120 6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
U/S CUTOFF WALL 300 239.820 239.820 dia. at 250 c/c.
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 4050 150 150 4050 150 D/S CUTOFF WALL
4350 4350
SECTIONAL ELEVATION AT 'A-A'
III: CANAL PARAMETERS :
CANAL
C/L OF
10 CBL i) U/S 243.190 m
U/S of Nalla D/S of Nalla ii) D/S 243.190 m
200 11 FSL i) U/S 244.190 m
STREAM BED LEVEL 1800 STREAM BED LEVEL ii) D/S 244.190 m
PCC, M15, 200 THK ENCASING 12 TBL i) U/S 244.690 m
ii) D/S 244.690 m
U/S CUTOFF WALL
1200
3440
###
###
3440
16 Head Loss 0 m
4350 4350
III: STREAM PARAMETERS :
300 300
4535
1 II: SPECIFIC NOTES :
HFL : 243.980 CBL: 243.190 PCC, M15, 200 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
1300 THK ENCASING before laying levelling course.
M-15 M-15
2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200
FLOOR 200
3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
THK RUBBLE APRON
3 THK structure.
243.105 4. Embankment close to the structure shall be protected from flood by providing dry rubble
1200
300 1
241.346 DROP NBL: 241.320 241.286 300 pitching of 300 mm up to HFL + 0.60 m.
5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
1000
THICKNESS OF PIPE = 70 mm
staggered manner for the retaining structure with filter of graded material.
###
3600 200
240.120 240.120 6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
U/S CUTOFF WALL 300 239.820 239.820 dia. at 250 c/c.
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 4050 150 150 4050 150 D/S CUTOFF WALL
4350 4350
SECTIONAL ELEVATION AT 'A-A'
III: CANAL PARAMETERS :
CANAL
C/L OF
10 CBL i) U/S 243.190 m
U/S of Nalla D/S of Nalla ii) D/S 243.190 m
200 11 FSL i) U/S 244.190 m
STREAM BED LEVEL 1800 STREAM BED LEVEL ii) D/S 244.190 m
PCC, M15, 200 THK ENCASING 12 TBL i) U/S 244.690 m
ii) D/S 244.690 m
U/S CUTOFF WALL
A 150 450 3600 150 STREAM FLOW 150 3600 450 150 A 13 Service Road S.R. 3.60 m
14 Inspection Path I.P. 1.50 m
PCC, M15, 300 THK ENCASING 15 Avg. Ground Level 244.055 m
3440
3440
###
###
3440
500
16 Head Loss 0 m
1200
4535
1 II: SPECIFIC NOTES :
HFL : 243.980 CBL: 243.190 PCC, M15, 200 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
1300 THK ENCASING before laying levelling course.
M-15 M-15
2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200
FLOOR 200
3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
THK RUBBLE APRON
3 THK structure.
243.105 4. Embankment close to the structure shall be protected from flood by providing dry rubble
1200
300 1
241.346 DROP NBL: 241.320 241.286 300 pitching of 300 mm up to HFL + 0.60 m.
5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
1000
THICKNESS OF PIPE = 70 mm
staggered manner for the retaining structure with filter of graded material.
###
3600 200
240.120 240.120 6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
U/S CUTOFF WALL 300 239.820 239.820 dia. at 250 c/c.
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 4050 150 150 4050 150 D/S CUTOFF WALL
4350 4350
SECTIONAL ELEVATION AT 'A-A'
III: CANAL PARAMETERS :
CANAL
C/L OF
10 CBL i) U/S 243.190 m
U/S of Nalla D/S of Nalla ii) D/S 243.190 m
200 11 FSL i) U/S 244.190 m
STREAM BED LEVEL 1800 STREAM BED LEVEL ii) D/S 244.190 m
PCC, M15, 200 THK ENCASING 12 TBL i) U/S 244.690 m
ii) D/S 244.690 m
1200
U/S CUTOFF WALL
1200
3780
3780
###
###
16 Head Loss 0 m
500
300 300
4235
HFL : 243.980 1 1 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
CBL: 243.190 PCC, M15, 200 before laying levelling course.
243.105 300 1300 THK ENCASING 2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
M-15 M-15 3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200 structure.
1000
1200
1
1000
241.346 DROP NBL: 241.320 241.286 5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
U/S CUT OFF WALL staggered manner for the retaining structure with filter of graded material.
M15, 300x1000 THICKNESS OF PIPE = 70 mm
6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
3345 200
240.420 240.420 dia. at 250 c/c.
D/S CUT OFF WALL
300 240.120 240.120 M15, 300x1000
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 3795 150 150 3795 150
4095 4095
SECTIONAL ELEVATION AT 'A-A'
CANAL
C/L OF
8 Lined / Unlined Unlined
U/S of Nalla D/S of Nalla 9 Mannings Coefficent n 0.04
200 10 CBL i) U/S 243.190 m
STREAM BED LEVEL B STREAM BED LEVEL ii) D/S 243.190 m
PCC, M15, 200 THK ENCASING 11 FSL i) U/S 244.190 m
5280 1800 1800 7600 ii) D/S 244.190 m
U/S CUTOFF WALL
1200
3440
3440
###
###
14 Inspection Path I.P. 1.50 m
15 Avg. Ground Level 244.055 m
16 Head Loss 0 m
300 300
4235
HFL : 243.980 1 1 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
CBL: 243.190 PCC, M15, 200 before laying levelling course.
243.105 300 1300 THK ENCASING 2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
M-15 M-15 3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200 structure.
1000
1200
1
1000
241.346 DROP NBL: 241.320 241.286 5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
U/S CUT OFF WALL staggered manner for the retaining structure with filter of graded material.
M15, 300x1000 THICKNESS OF PIPE = 70 mm
6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
3345 200
240.420 240.420 dia. at 250 c/c.
D/S CUT OFF WALL
300 240.120 240.120 M15, 300x1000
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 3795 150 150 3795 150
4095 4095
SECTIONAL ELEVATION AT 'A-A'
CANAL
C/L OF
8 Lined / Unlined Unlined
U/S of Nalla D/S of Nalla 9 Mannings Coefficent n 0.04
200 10 CBL i) U/S 243.190 m
STREAM BED LEVEL B STREAM BED LEVEL ii) D/S 243.190 m
PCC, M15, 200 THK ENCASING 11 FSL i) U/S 244.190 m
5280 1800 1800 7600 ii) D/S 244.190 m
1200
U/S CUTOFF WALL
3440
3440
###
500
###
14 Inspection Path I.P. 1.50 m
15 Avg. Ground Level 244.055 m
1200
4235
HFL : 243.980 1 1 1. Bearing capacity below the head wall, Drop wall & Wing wall shall be assertained
CBL: 243.190 PCC, M15, 200 before laying levelling course.
243.105 300 1300 THK ENCASING 2. Field officer to verify the S.R. & I.P. side and if required shall be suitably modify layout.
M-15 M-15 3. Stream bed shall be suitably regrated upto minimum 30 m on U/S & D/S of the
200
CANAL BED WIDTH
PCC, M15
PCC, M15 FLOOR 200 structure.
1000
1200
1
1000
241.346 DROP NBL: 241.320 241.286 5. Weep hole of 100 mm dia. shall be placed at 2.0 m horizontaly and 1.0 m vertically in
U/S CUT OFF WALL staggered manner for the retaining structure with filter of graded material.
M15, 300x1000 THICKNESS OF PIPE = 70 mm
6. Skin R/F shall be provided at all open surfaces for head wall, encaseing etc. @ 10 mm
3345 200
240.420 240.420 dia. at 250 c/c.
D/S CUT OFF WALL
300 240.120 240.120 M15, 300x1000
PCC, M15, 200
THK ENCASING
LEVELLING COURSE 150 3795 150 150 3795 150
4095 4095
SECTIONAL ELEVATION AT 'A-A'
CANAL
C/L OF
8 Lined / Unlined Unlined
U/S of Nalla D/S of Nalla 9 Mannings Coefficent n 0.04
200 10 CBL i) U/S 243.190 m
STREAM BED LEVEL B STREAM BED LEVEL ii) D/S 243.190 m
PCC, M15, 200 THK ENCASING 11 FSL i) U/S 244.190 m
5280 1800 1800 7600 ii) D/S 244.190 m
1200
U/S CUTOFF WALL
1200
3440
3440
###
###
14 Inspection Path I.P. 1.50 m
500 15 Avg. Ground Level 244.055 m
STREAM FLOW 16 Head Loss 0 m
1200