Risk Assessment For Working On Existing Structure Premises

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

RISK ASSESSMENT FOR WORKING ON EXISTING STRUCTURES Page 1 of 1

LULWORTH
Documents Ref:
BUILDING SERVICES Department Effective date
RA-WES Rev 00
SHEQ 07-11-2023

SEVERITY: 1 – Slightly Harmful, 2 – Harmful, 3 – Extremely Harmful; LIKELIHOOD: 1 – Unlikely, 2 – Likely, 3 – Very Likely; RISK LEVEL: 1 – Trivial, 2 – Low, 2 to 4 – Medium, 4
to 6 – High, Above 6 – Extremely High.

Risk Evaluation Residual Risk

Sr.

Likelihood

Likelihood
Risk Level

Risk Level
Activity Hazard Effect / Harm Control Measures Monitoring Mechanism

Severity

Severity
No.

1. Working on existing Electrical contact, Property damage, lost of 3 3 9 Appropriate PPE should 1 3 L Safety personnel
structures, premises Slips and falls, assets, electric shock, be provided. Adequate surveillance, giving
Pressurized systems, personnel injury, Fall safety warning signs first aid, & proper tool
Working on heights, form height. should be in place. box talk.
Induction training and Induction training.
Tool Box Talk should be
carried out on regular
basis before
commencement on work.
Training and refresher
training should be carried
out on regular basis. Use
lock or tag out system and
permit. Ensure system is
drained-use permit. Direct
supervision of
supervisors.

Prepared by: Name: Reviewed by: Name:

Signature & Date: Signature & Date:

Doc. No.: Rev. No.: 00 Date: Page 1 of 1