Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 1 Academic Block UiTM Sarawak Piling Works 2
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
Preambles to piling works Piling plant Item

Description : Quantity: Description : Quantity:


1. Ground water level establised at 3.60m below existing Bringing to and removing from site all plants required for
ground level on 7th October 2018 this section of the works
2. 6 nos. of boreholes were sunk on the site.
3. Underground high voltage cable cross the east side of the site.
SQD : SQD :
4. The works is on a flat and high ground level.
5. The piling work is expected to start from platform level.
CHK SQD : CHK SQD :

RED : RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 3 Academic Block UiTM Sarawak Piling Works 4
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
Piling plant Item 400mm Diameter reinforced in-situ concrete, ordinary No.
prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Maintaining on site all plant required for this section of Total number of piles
the works

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 164 No.
RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 5 Academic Block UiTM Sarawak Piling Works 6
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Total concreted length of piles, done by tremie method Total bored depth, maximum depth of 22.60m, vertical.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 4,113.40 M Quantity as per 3,731.80 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 7 Academic Block UiTM Sarawak Piling Works 8
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Extra over for boring through rock, maximum depth of Total bored depth, maximum depth of 20.30m, raking
22.60m, vertical. piles, Inclination 20° / angle ratio 1 in 2.7475.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 3,731.80 M Quantity as per 135.60 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 9 Academic Block UiTM Sarawak Piling Works 10
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Extra over for boring through rock, maximum depth of Extra over for placing concrete by tremie pipe
20.30m, raking piles, Inclination 20° / angle ratio 1 in
2.7475.
SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 135.60 M Quantity as per 4,113.40 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 11 Academic Block UiTM Sarawak Piling Works 12
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary No. 400mm Diameter reinforced in-situ concrete, ordinary No.
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Cut-off top of pile to required level Prepare concrete pile head and reinforcement for
capping

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 164 No. Quantity as per 164 No.
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 13 Academic Block UiTM Sarawak Piling Works 14
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary Kg. 400mm Diameter reinforced in-situ concrete, ordinary Kg.
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
20mm Diameter, high tensile reinforcement bar, to BS 12mm Diameter, mild steel reinforcement bar, to BS 4449,
4449, as straight and bent vertical bars. as helical binders.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 135810.51 Kg. Quantity as per 16926.47 Kg.
Rebar Schedule RED : Rebar Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 15 Academic Block UiTM Sarawak Piling Works 16
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary Item 400mm Diameter reinforced in-situ concrete, ordinary Item
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Allow for Pile Integrity Test (PIT), to all 400mm diameter Allow for dynamic pile testing on on 5 nos. of piles to be
piles, by using Shock Method. selected by the Engineer using the Pile Dynamic Analyser
(PDA) and to carry out computer Case Pile Wave Analysis
SQD : Program (CAPWAP) analysis to stimulate pile/soil model SQD :
and load settlement behaviour of tested pile.

CHK SQD : CHK SQD :

RED : RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST: