Projek Name : Academic Block UiTM Sarawak Element : Piling Works (All Provisional)
Drawing Title : Piling Works - Bored Pile Page No. : 1
Drawing No. : AP/JUN 2019/DQS251 Member :
P2
Main bar T20 88/13 24.85 28,428.40
Helical bar T12 88/1 111.81 9,839.28
P2A
Main bar T20 6/13 24.85 1,938.30
Helical bar T12 6/1 111.81 670.86
P5
Main bar T20 70/13 27.15 24,706.50
Helical bar T12 70/1 122.16 8,551.20
P2A H 3.142 A + d + 8d
P
312.31 358
111,806.98
P5 H 3.142 A + d + 8d
P
341.22 358
122,156.76