PILING WORKS (All Provisional)

TAKING-OFF LIST

Project : Academic Block UiTM Sarawak


Contract : AP/JUN 2019/DQS251
Type of Piling : Bored Cast-In-Place Concrete Piles/ Bored Piles

ITEM CLAUSE DESCRIPTIONS UNIT

BORED CAST IN PLACE CONCRETE PILES

1 Soil Information/Preambles Notes


2 E4.1a Provision Of Piling Plant Item
3 E4.1b Moving & Handling Of Piling Plant Item

Trial Pile - 600mm Dia.


4 E5.4a Total No. Of Piles No.
5 E5.4b Total Concreted Length M
6 E5.4c Total Bored Depth M
7 E5.6a Extra Over For Boring Through Rock M
8 E5.6b Extra Over For 10Mm Thk Ms Permanent Casing M
9 E5.6c Extra Over For Placing Concrete By Tremie Pipe M
10 E5.9a Form 800Mm Dia. Enlarged Bases No.
11 E5.9b Cut-Off Top Of Piles No.
12 E5.9c Prepare Concrete Pile Heads No.
13 F8.5a 20Mm Dia. Ht, Staright & Bent Bars Kg.
14 F8.5c 10Mm Dia. Ms, Helical Binders Kg.
15 E7 Integrity Testing Item
16 E7 Preliminary Load Test Item

Working Pile - 400mm Dia.


17 E5.4a Total No. Of Piles No.
18 E5.4b Total Concreted Length M
19 E5.4c Total Bored Depth M
20 E5.6a Extra Over For Boring Through Rock M
21 E5.4c Total Bored Depth, raking M
22 E5.6a Extra Over For Boring Through Rock, raking M
23 E5.6b Extra Over For 10Mm Thk Ms Permanent Casing M
24 E5.6c Extra Over For Placing Concrete By Tremie Pipe M
25 E5.9a Form 1200Mm Dia. Enlarged Bases No.
26 E5.9b Cut-Off Top Of Piles No.
27 E5.9c Prepare Concrete Pile Heads No.
28 F8.5a 20Mm Dia. Ht, Staright & Bent Bars Kg.
29 F8.5c 10Mm Dia. Ms, Helical Binders Kg.
30 E7 Integrity Testing Item
31 E7 Subsequent Load Test Item
PILING WORKS (All Provisional)
TAKING-OFF LIST

Project : Academic Block UiTM Sarawak


Contract : AP/JUN 2019/DQS251
Type of Piling : Bored Cast-In-Place Concrete Piles/ Bored Piles

ITEM CLAUSE DESCRIPTIONS UNIT

BORED CAST IN PLACE CONCRETE PILES

Working Pile - 600mm Dia.


32 E5.4a Total No. Of Piles No.
33 E5.4b Total Concreted Length M
34 E5.4c Total Bored Depth M
35 E5.6a Extra Over For Boring Through Rock M
36 E5.6b Extra Over For 10Mm Thk Ms Permanent Casing M
37 E5.6c Extra Over For Placing Concrete By Tremie Pipe M
38 E5.9a Form 1200Mm Dia. Enlarged Bases No.
39 E5.9b Cut-Off Top Of Piles No.
40 E5.9c Prepare Concrete Pile Heads No.
41 F8.5a 20Mm Dia. Ht, Staright & Bent Bars Kg.
42 F8.5c 10Mm Dia. Ms, Helical Binders Kg.
43 E7 Integrity Testing Item
44 E7 Subsequent Load Test Item

Working Pile - 800mm Dia.


45 E5.4a Total No. Of Piles No.
46 E5.4b Total Concreted Length M
47 E5.4c Total Bored Depth M
48 E5.6a Extra Over For Boring Through Rock M
49 E5.6b Extra Over For 10Mm Thk Ms Permanent Casing M
50 E5.6c Extra Over For Placing Concrete By Tremie Pipe M
51 E5.9a Form 1200Mm Dia. Enlarged Bases No.
52 E5.9b Cut-Off Top Of Piles No.
53 E5.9c Prepare Concrete Pile Heads No.
54 F8.5a 20Mm Dia. Ht, Staright & Bent Bars Kg.
55 F8.5c 10Mm Dia. Ms, Helical Binders Kg.
56 E7 Integrity Testing Item
57 E7 Subsequent Load Test Item