Name of Work:Periodical Renewal to Katkapur to Thatlawai Via :- Khairigudem from km 0/0 to 3/0 &km 4/5- 5/0 in

Jagtial District.
1st &Part Bill
Name of agency:M/S Sree Sai Ram Enterprises,Hyderabad
Agrement No : S.E (R&B) KRMR LS AB No. /2022-23 Dt: 07.10.2022
Sl. Schedule - A
No Description of the Work
. Qty Rate Unit Amount
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical
means and disposal of scarified material with all leads and lifts upto 1000
1 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

Qty Vide pg 14 of MB no 2310/A 11812.875 9.40 Sqm 111041.00


Construction of embankment with material obtained from borrowed useful
earth from outside road boundary by mechanical means upto SDR with
all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrow

Qty Vide pg of MB no 2310/A 399.000 280.00 cum 111720.00


Construction of Granular sub-base by providing HBG/HBT material
confirming to Grading - VI of MoRT&H Table 400-1 including cost,
(excluding seigniorage charges) and conveyance of all materials to work
site and spreading in uniform layers with motor grad
3

Qty Vide pg of MB no 2310/A 97.500 2260.00 cum 220350.00


Providing, Laying, Spreading and compacting graded HBG crushed
stone aggregate to Wet Mix Macadem specification including cost of all
materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by ti
4

Qty Vide pg of MB no 2310/A 1771.930 2513.00 cum 4452860.00


Providing and aplying Prime coat with bitumen emulsion (Slow setting
SS1) bulk using emulsion pressure distributor on prepared surface of
Granular base including cleaning of road surface and spraying emulsion
5 at the rate of 0.70 Kg/sqm using emulsion pres

Qty Vide pg of MB no 2310/A 11812.875 47.30 Sqm 558749.00


Providing and applying tack coat with VG-10 (Bulk) using Bitumen
pressure distributor at the rate of 0.20 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished
6 item of work as per MoRT&H Specification 503 (5th

Qty Vide pg of MB no 2310/A 11812.875 13.10 Sqm 154749.00


Providing 30 mm thick compacted Bituminous Concrete with 100-120
TPH batch type hot mix plant using HBG crushed aggregates of Grading
– 2 as per table 500-17 of specification 507 of MoRT&H (5th revision),
premixed with bitumen VG-30 grade @ 5.4% of mix a

Qty Vide pg of MB no 2310/A 354.380 11698.00 cum 4145537.00


Construction of earthen shoulders with selective soils obtained from
trench cut quantity with MDD of 17.5 KN/Cum from approved sources,
grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @
8 OMC to meet requirement of MoRT&H, including all

Qty Vide pg of MB no 2310/A 933.900 239.00 cum 223202.00

9978208.00
Add T.P 2.99% Excess 298348.00
Total 10276556.00
Add NAC @ 0.1% 10277.00
SEGINIORAGE CHARGES+DMF 30%+SMET 2% 348830.00
10635663.00
Add 12% G.S.T 1276280.00
11911943.00
Certificates:
1 Certified that the work is in progress.
2 Certified that the Technical Assistant engaged by the Contractor were present
3 Certified that the work has been carreid out by the contractor as per the design and
specifications of the agreement.
4 Certified no machinery have been supplied to the Contractor by the department.
5 Certified that there are no recoveries except proposed in this bill.

Asst . Exe. Engineer (R&B) Dy. Exe. Engineer (R&B)


Section : Medipally Sub Division : Metpally
FORM NO P.P.10

Movement slip to accompany the bills of the contractor's and the suppliers

1) Name of the division : : R&B Division,Jagtial

2) Name of the work Periodical Renewal to Katkapur to Thatlawai Via :-


: Khairigudem from km 0/0 to 3/0 &km 4/5- 5/0 in
Jagtial District.

3) Name of the contractor : M/S Sree Sai Ram Enterprises,Hyderabad

4) Date of measurement by the


Asst.Executive Engineer :

5) Date of check-measurement by the :


i) Dy.E.E :
ii) Executive Engineer :
iii) Superintending Engineer :
6) date of receipt of the bill in Sub-
Division office :

7) Date of receipt of the bill in Division


office :

8) Date of transmission of the bill to the


pay &Accounts Officer :

9) Date of return of the bill by the pay &


Accounts Officer to the Division Officer :
for clarification if any

10) Date of re-transmission of the bill to


the pay &Accounts Officer after :
clarifying the points

11) Date of payment of the bill by the


pay & Accounts Officer :

12) Reasons for delay at any stage


quoting the item numbers referred to :
above

Asst. Exe. Engineer (R&B) Dy.Executive Engineer (R&B) Executive Engineer [R&B]
Section :Medipally Sub Division:Metpally Division:Jagtial
LUMPSUM CONTRACT
FINAL BILL
(To be used for final payments to Contractors on Lumpsum Contracts)

Cash Book Voucher No…………………………………………… Date………………………….


Schedule Docket No……………………………………………….
Name of the Contractor: M/S Sree Sai Ram Enterprises,Hyderabad
Name of the Work : Laying BT road from Existing water tank Mythapur road to
Veternary hospital at Raikal,Raikal Muncipality(from Km 0/0 to
0/350)

Serial Number of this bill : 1st &part Bill


Number and Date of his previous Bill for this work…………………………………….
Reference to Agreement : sE's L S A B No. 7/2019-20 Date: 04.02.2020
Date of Commencement of work : 06.02.2020
Date of actual completion of work or sullies :
Account of work execute
(i) Total lumpaum amount as entered in Rs. Ps.
contractor's Agreement…………………….
Add:-
(ii) Value of additional work done up-date as "authorised
extras" the details of which are given in the attached statement.

(iii) Value of items ctually measured under Clause 62 (a) and (b)
of the preliminary specification in the M.D.S.S. fetming part
of the contract (items 1) the details of which are given in the
attachede statement………………………………
Total
Deduct:- Rs. Ps.
(iv) Value of items committed to be
executed as authorised commissions
the details of which are given in the
attached statement.

(v) Value as per lumpsum contract for


items of work covered by actual
measurement vide item.

(vi) above
Nett value of work done F
11 CERTIFICATES AND SIGNATURE
1. Certify the work has been completed in accordance with the prescribed Specification
and after taking into account all the authorised additions and alterations the value of work
done up-to-date confirmable with the term of the Contractor's Agreement Rs.

2. The detailed measurement of the authorised additionslk and alterations and mentioned
above and of the items of work specified in item of 1 of Account 1 of last bill are recorded at
pages 2 to 8 of M.B.N 2930/A and I am satisfied that are correct
Dated signature of the
Signature of the Contractor. Certifying Engineer
(No. P.W.A. XXII)
FORM P.W.A. XXII - Cont.
111. MEMORADUM OF PAYMENTS

1 Total value of lwork done up-to-date as per 'P' Rs. Ps.


of Account of this Bill
…………………………………………………….A
2 Deduct 1
Up-to-date intermediate payments already made
according to entry 'K' of account of previous Bill
No……………………………dated …………………
C.B.Vr.No……………………………………..Dt……………….
Rs. Ps.

3 Payment now to be made:- G


(a) By recovery of amounts
Creditable to this work.

(b) By recovery of amount H


credotable to other work
or heads of account

(c) By cheque

Pay Rs…………………………………….(Rupees
)

Dated Signature and Rank of


Officer authorising payment

Here specify the net ammount payble vide item 3 c) of Account III both words and figures
VI Acquittance
Received Rs…………………………………(Rupees
) as above in full settlement of all
demands of the contract.

Date:
Witness:
Signature of Contractor
Paid by me by cheque No. Dated

Dated intials of of person of


actually making payment
The payee's acknowledgements should be for the fross amount as item 3 (abc) Account III both
in words and figures
Payment should be attested by some known person when the payee as acknowledgement is
given by mark, seal of thumb-impression.
V. Remarks
FORM P.W.A.XX
LUMP-SUM-CONTRACT
RUNNING ACCOUNT BILL
Cash Book Voucher No. : Dated:
Schedue docket No :

Name of the contractor : M/S Sree Sai Ram Enterprises,Hyderabad


Periodical Renewal to Katkapur to Thatlawai
Name of the work Via :- Khairigudem from km 0/0 to 3/0 &km 4/5-
: 5/0 in Jagtial District.

Serial number of the bill : 1st & Part


No. and date of his previous bill
for this work :

Reference to agreement : SE's L S A B No. /2022-23 Date:07.10.2022

Date of commencement of work : 08.10.2022


___________________________________________________________________________________________________
Rs. Ps.
1 Value of items actually measusred under clause 62(a)
and (b) of the preliminary specifications of the MDSS
forming part of the contract, the details of which are
given in the attached statement. :
2 Value of measured up additions of alterations excuted
upto date as "Authorised etras" the details of which are
given in the attached. :

3 Approlximate va of work done upto date excluding


the items specified in 1 & 2 above. :

4 Dedudct amount to be with-held percent


on Rs. :

5 Balance i.e. "upti-date" intermediate paymnent


(item 1,2,3,4) :
6 Deduct intermediate Payment already made as shown
in entry K of the last Running Account bill. :

7 Intermediate payments now to be made (item 5-6 D):


8 Total payments now to be made as detailed below
( a ) By recovery of amounts crediatable to this work G :

( b ) By recovery of amounts crfediatable to other


works or heads of accounts. :
( c ) By Cheque. :
FORM P.W.XXI Contd.
II CERTIFICATIONS AND SIGNATURES

1 I have satisfied my self to the best of my knowledge by that the value of work
done upto date under item 3 of I account of work of this bill is not less than
Rs. Confirmably with the contractor's agreement.

2 The detailed measurements of authorised additions and alterations upto-date


and of the items of this work specified in item I of account of this bill are
recorded at page 14 to 22 of M.B. No. 2310/A

Signature of Contractor Dated Signature of the


Officer preparing the Bill.
___________________________________________________________________________

Pay Rs. (Rupees

Dated Signature of the


Officer authorising payment.

___________________________________________________________________________
III. ACQUITTANCE

Received Rs. (Rupees


) as an intermediate payment in connection
with the contract reffered to above.

Dated
Witness Signature in Indian languaage

Full signature of the contractor. Stamp


__________________________________________________________________________

Paid by me by Cash/Cheque Dated

Date and initials of persons actually making payment.


Widening and Strengthening of Existing Single lane road to
Name of work : double lane road on Chelgal to Itikyal road from Km.23/2 to
25/4 in Karimnagar Dist.
CERTIFICATE

1 Certified that the work is in progress.

2 Certified that the Technical Assistant engaged by the Contractor were present

3 Certified that the work has been carreid out by the contractor as per the design and
specifications of the agreement.

4 Certified that the contractor used his own mixers, Vibraters and rollers.

5 Certified no machinery have been supplied to the Contractor by the department.

6 Certified that the materials used in the work were as per the agreement.

7 Certified that there are no recoveries except proposed in this bill.

Asst. Exe. Engineer (R&B) Dy.Executive Engineer (R&B) Executive Engineer [R&B]
Section : Metpally Sub Division: Metpally Division:Jagtial
B-G Road 8/875 to 20/0
Construction of Granular sub-base by providing HBG material confirming to Grading - I of
MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved
means, on prepared surface mixing by mix in place method with Rotavator / approved
means at OMC and compacting with vibratory roller to achieve the desired density etc.,
complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as
directed by the Engineer-in-charge.

Right Side
9/085-9/200 1 115 1.82 0.2 41.86
10/650-750 1 100 1.82 0.2 36.4
78.26

Construction of Granular sub-base by providing HBG material confirming to Grading - I of


MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by approved
means, on prepared surface mixing by mix in place method with Rotavator / approved
means at OMC and compacting with vibratory roller to achieve the desired density etc.,
complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as
directed by the Engineer-in-charge.

Left side
8/870 -9/0 1 130 1.82 0.2 47.32
9/0 - 9/200 1 200 1.82 0.2 72.8
9/200 - 9/400 1 200 1.82 0.2 72.8
9/400 - 9/600 1 200 1.82 0.2 72.8
9/600 - 9/800 1 200 1.82 0.2 72.8
9/800 -10/00 1 200 1.82 0.2 72.8

10/0 - 10/200 1 200 1.82 0.2 72.8


10/200 - 10/400 1 200 1.82 0.2 72.8
10/400 - 10/600 1 200 1.82 0.2 72.8
10/600 - 10/615 1 15 1.82 0.2 5.46
Bolder gap(10/615-10/617) 1 2 1.82 0.2 -0.728
10/617 - 10/620 1 3 1.82 0.2 1.092
Bolder gap(10/620 - 10/624) 1 4 1.82 0.2 -1.456
10/624 - 10/627 1 3 1.82 0.2 1.092
Bolder gap(10/627 - 10/629) 1 2 1.82 0.2 -0.728
10/629 - 10/800 1 171 1.82 0.2 62.244
Disput Culvert gap (10/750-10/800) 1 50 1.82 0.2 -18.2
10/800 - 10/930 1 130 1.82 0.2 47.32
Culvert gap (10/930-10/950) 1 20 1.82 0.2 7.28
10/950 - 11/000 1 50 1.82 0.2 18.2

11/00 - 11/200 1 200 1.82 0.2 72.8


11/200 - 11/400 1 200 1.82 0.2 72.8
11/400 - 11/600 1 200 1.82 0.2 72.8
11/600 - 11/800 1 200 1.82 0.2 72.8
Causway Gap 11/827 - 11/877 1 75 1.82 0.2 -27.3
11/800 - 12/000 1 200 1.82 0.2 72.8

12/000 - 12/200 1 200 1.82 0.2 72.8


Causway Gap 12/204 - 12/241 1 40 1.82 0.2 -14.56
12/200 - 12/400 1 200 1.82 0.2 72.8
12/400 - 12/600 1 200 1.82 0.2 72.8
12/600 - 12/800 1 200 1.82 0.2 72.8

12/800 - 13/000 1 200 1.82 0.2 72.8


13/000 - 13/200 1 200 1.82 0.2 72.8
13/200 - 13/400 1 200 1.82 0.2 72.8
13/400 - 13/600 1 200 1.82 0.2 72.8
13/600 - 13/800 1 200 1.82 0.2 72.8
13/800 - 14/000 1 200 1.82 0.2 72.8

14/000 - 14/200 1 200 1.82 0.2 72.8


14/200 - 14/400 1 200 1.82 0.2 72.8
Bolder gap(14/403-14/405) 2 1.82 0.2 0
14/400 - 14/600 1 200 1.82 0.2 72.8
14/600 - 14/800 1 200 1.82 0.2 72.8
Causway Gap 14/749 - 14/801 52 1.82 0.2 0
14/800 - 15/000 1 200 1.82 0.2 72.8

15/000 - 15/200 1 200 1.82 0.2 72.8


15/200 - 15/400 1 200 1.82 0.2 72.8
15/400 - 15/600 1 200 1.82 0.2 72.8

2383.836
Right Side
9/085-9/200 115 1.82 0.2
10/650-750 100 1.82 0.2

Right Side
9/085-9/200 115 1.82 0.2
10/650-750 100 1.82 0.2
55
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate
to Wet Mix macadem specification including cost of all materials and including
premixing the material with water at OMC in Mechanical mix plant carriage of mixed
material by tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive the desired
density etc., as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work.

Right side
9/085-9/200 1 115 1.77 0.25 50.8875
10/650-750 1 100 1.77 0.25 44.25
95.1375
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate
to Wet Mix macadem specification including cost of all materials and including
premixing the material with water at OMC in Mechanical mix plant carriage of mixed
material by tipper to site , laying in uniform layers with paver in base courses on
well prepared surface and compacting with Vibratory roller to acheive the desired
density etc., as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work.

Left side
8/870 -9/0 1 130 1.77 0.25 57.525
9/0 - 9/200 1 200 1.77 0.25 88.5
9/200 - 9/400 1 200 1.77 0.25 88.5
9/400 - 9/600 1 200 1.77 0.25 88.5
9/600 - 9/800 1 200 1.77 0.25 88.5
9/800 -10/00 1 200 1.77 0.25 88.5

10/0 - 10/200 1 200 1.77 0.25 88.5


10/200 - 10/400 1 200 1.77 0.25 88.5
10/400 - 10/600 1 200 1.77 0.25 88.5
10/600 - 10/620 1 20 1.77 0.25 8.85
10/620-10/624 1 4 1.77 0.25 -1.77
10/624 - 10/627 1 3 1.77 0.25 1.3275
Bolder gap(10/627 - 10/629) 1 2 1.77 0.25 -0.885
10/629 - 10/800 1 171 1.77 0.25 75.6675
Disput Culvert gap (10/750-1 1 50 1.77 0.25 -22.125
10/800 - 10/930 1 130 1.77 0.25 57.525
Culvert gap (10/930-10/950) 1 20 1.77 0.25 -8.85
10/950 - 11/000 1 50 1.77 0.25 22.125

11/00 - 11/200 1 200 1.77 0.25 88.5


11/200 - 11/400 1 200 1.77 0.25 88.5
11/400 - 11/600 1 200 1.77 0.25 88.5
11/600 - 11/800 1 200 1.77 0.25 88.5
Causway Gap 11/827 - 11/877 1 75 1.77 0.25 33.1875
11/800 - 12/000 1 200 1.77 0.25 88.5

12/000 - 12/200 1 200 1.77 0.25 88.5


Causway Gap 12/204 - 12/241 1 40 1.77 0.25 17.7
12/200 - 12/400 1 200 1.77 0.25 88.5
12/400 - 12/600 1 200 1.77 0.25 88.5
12/600 - 12/800 1 200 1.77 0.25 88.5

2983.778
597
B-G Road 8/875 to 20/0
Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate to Wet Mix macadem specification including cost of all materials
and including premixing the material with water at OMC in Mechanical mix
plant carriage of mixed material by tipper to site , laying in uniform layers
with paver in base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by the
Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for
finished item of work.

For Curves
9/705 - 9/843 R/s 1 138 1.77 (0.080+0.175)/2 31.143
10/268 - 10/423 L/s 1 155 1.77 (0.080+0.175)/2 34.980
10/845 - 11/374 L/s 1 529 1.77 (0.080+0.175)/2 119.382
11/411 - 11/506 R/s 1 95 1.77 (0.080+0.175)/2 21.439
12/582 -12/868 L/s 1 286 1.77 (0.080+0.175)/2 64.543
271.487
Construction of Granular sub-base by providing HBG material
confirming to Grading - I of MoRT&H Table 400-1 including cost,
(excluding seigniorage charges) and conveyance of all materials to
work site and spreading in uniform layers with motor grader or by
approved means, on prepared surface mixing by mix in place method
with Rotavator / approved means at OMC and compacting with
vibratory roller to achieve the desired density etc., complete for
finished item of work as per MoRT&H Specification 401 (5th
revision) and as directed by the Engineer-in-charge.

Right side
Bellmouth 1 1.6 4.5 0.2 1.44
0/001.6-0/375 1 373.4 1.82 0.2 135.9176
0/375-0/4 1 25 (1.82+.82)/2 0.2 6.6
0/4-425 1 25 (0.82+1.82)/2 0.2 6.6
0/425-0/700 1 275 1.82 0.2 100.1
0/700-760 1 60 1.82 0.2 21.84
deduct culvert gap 1 55 1.82 0.2 -20.02
0/760-1/0 1 240 1.82 0.2 87.36

1/0-1/600 1 600 1.82 0.2 218.4


1/6-1/625 1 25 (1.82+2.82)/2 0.2 11.6
1/625-650 1 25 (2.82+1.92)/2 0.2 11.85
1/650-1/675 1 25 (1.92+0.82)/2 0.2 6.85
1/675-1/700 1 25 (0.82+0.92)/2 0.2 4.35
1/700-1/725 1 25 (0.92+1.82)/2 0.2 6.85
1/725-2/0 1 275 1.82 0.2 100.1

2/0-2/100 1 100 1.82 0.2 36.4

2/100-730 1 630 1.82 0.2 229.32


2/780-2/875 1 95 1.82 0.2 34.58
Bellmouth sirpur 1 42 1.82 0.2 15.288
1 5 1.82 0.2 1.82

2/875-2/915 1 40 1.82 0.2 14.56


2/915-3/0 1 85 1.82 0.2 30.94
3/0-350 1 350 1.82 0.2 127.4
3/350-3/500 1 150 1.82 0.1 27.3
3/5-3/650 1 150 1.82 0.2 54.6
deduct 3/172-3/187 1 15 0.42 0.2 -1.26
central carriageway 1 20 3.66 0.1 7.32
3/650-3/700 1 50 1.82 0.2 18.2
3/700-3/770 1 70 1.82 0.2 25.48
3/770-3/805 1 35 (1.82+0)/2 0.2 6.37
3/820-3/855 1 35 (0+3.49)/2 0.2 12.215
3/855-3/925 1 70 3.49 0.2 48.86
3/925-3/950 1 25 (3.49+1.82)/2 0.2 13.275
3/950-4/0 1 50 1.82 0.2 18.2
4/0-5/0 1 1000 1.82 0.2 364
bellmouth4/800 1 23.5 1.82 0.2 8.554
1 8 (1.82+0)/2 0.2 1.456

5/0-100 1 100 1.82 0.2 36.4


1 20 1.82 0.2 7.28
5/120-210 1 90 7.3 0.2 131.4
1 40 1.82 0.2 14.56
5/250-375 1 125 1.82 0.2 45.5
5/375-400 1 25 (1.82+1.62)/2 0.2 8.6
5/400-425 1 25 (1.62+0.97)/2 0.2 6.475
5/425-450 1 25 (0.97+1.62)/2 0.2 6.475
5/450-475 1 25 (1.62+1.82)/2 0.2 8.6
5/475-6/0 1 525 1.82 0.2 191.1

6/0-6/725 1 725 1.82 0.2 263.9


6/725-750 1 25 (1.82+1.52)/2 0.2 8.35
6/750-6/775 1 25 (1.52+1.12)/2 0.2 6.6
6/775-6/800 1 25 (1.12+1.27)/2 0.2 5.975
6/800-6/825 1 25 (1.27+1.62)/2 0.2 7.225
6/825-850 1 25 (1.62+1.82)/2 0.2 8.6
6/850-7/0 1 150 1.82 0.2 54.6
junction 1 100 1.82 0.2 36.4
deduct slab 1 3.5 1.82 0.2 -1.274

13/840-14/0 1 160 1.82 0.2 58.24


14/0-15/0 1 1000 1.82 0.2 364
15/0-300 1 300 1.82 0.2 109.2
15/300-354 1 54 1.82 0.2 19.656
15/354-680 1 326 1.65 0.2 107.58
15/680-790 1 110 1.82 0.2 40.04
3340.198
680.2

3412.998 6638
6219.3
-2806.302 2100 -5893235
Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate to Wet Mix macadem specification including cost of all materials
and including premixing the material with water at OMC in Mechanical mix
plant carriage of mixed material by tipper to site , laying in uniform layers with
paver in base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by the
Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for
finished item of work.

Right side
Bellmouth 1 1.6 4.5 0.25 1.8
1 23.4 1.82 0.25 10.647
0/025-0/375 1 350 1.82 0.25 159.25
0/375-0/4 1 25 (1.82+2.72)/2 0.25 14.1875
0/4-425 1 25 (2.72+1.82)/2 0.25 14.1875
0/425-0/700 1 275 1.82 0.25 125.125
0/700-760 1 60 1.82 0.25 27.3
deduct culvert gap 1 55 1.82 0.25 -25.025
0/760-1/0 1 240 1.82 0.25 109.2

1/0-1/600 1 600 1.82 0.25 273


1/6-1/625 1 25 (1.82+2.82)/2 0.25 14.5
1/625-650 1 25 (2.82+1.92)/2 0.25 14.8125
1/650-1/675 1 25 (1.92+0.82)/2 0.25 8.5625
1/675-1/700 1 25 (0.82+0.92)/2 0.25 5.4375
1/700-1/725 1 25 (0.92+1.82)/2 0.25 8.5625
1/725-2/0 1 275 1.82 0.25 125.125
1000
2/0-100 1 100 1.82 0.25 45.5
2/100-730 1 630 1.82 0.25 286.65
50
2/780-2/875 1 95 1.82 0.25 43.225
Bellmouth SirpurL/s 1 42 1.82 0.25 19.11
1 5 1.82 0.25 2.275
2/875-2/915 1 40 7.3 0.25 73
2/915-3/0 1 85 1.82 0.25 38.675
1047
3/0-3/650 1 650 1.82 0.25 295.75
3/650-3/700 1 25 1.82 0.25 11.375
1 25 7.3 0.25 45.625
deduct 3/172-3/187 1 15 0.42 0.25 -1.575
3/700-3/770 1 70 1.82 0.25 31.85
3/770-3/805 1 35 (1.82+0)/2 0.25 7.9625
3/820-3/855 1 35 (0+3.49)/2 0.25 15.26875
3/855-3/925 1 70 3.49 0.25 61.075
3/925-3/950 1 25 (3.49+1.82)/2 0.25 16.59375
3/950-4/0 1 50 1.82 0.25 22.75
1000
bellmouth4/800 1 23.5 1.82 0.25 10.6925
1 8 (1.82+0)/2 0.25 1.82
4/0-5/0 1 1000 1.82 0.25 455

5/0-100 1 100 1.82 0.25 45.5


5/100-230 1 110 7.3 0.25 200.75
2 10 7.3 0.125 18.25
1 40 1.82 0.25 18.2
5/250-375 1 125 1.82 0.25 56.875
5/375-400 1 25 (1.82+1.62)/2 0.25 10.75
5/400-425 1 25 (1.62+0.97)/2 0.25 8.09375
5/425-450 1 25 (0.97+1.62)/2 0.25 8.09375
5/450-475 1 25 (1.62+1.82)/2 0.25 10.75
5/475-6/0 1 525 1.82 0.25 238.875
1010
6/0-6/725 1 725 1.82 0.25 329.875
6/520-580 1 60 3.66 0.25 54.9
6/725-750 1 25 (1.82+1.52)/2 0.25 10.4375
6/750-6/775 1 25 (1.52+1.12)/2 0.25 8.25
6/775-6/800 1 25 (1.12+1.27)/2 0.25 7.46875
6/800-6/825 1 25 (1.27+1.62)/2 0.25 9.03125
6/825-850 1 25 (1.62+1.82)/2 0.25 10.75
6/850-7/0 1 150 1.82 0.25 68.25

junction 1 100 1.82 0.25 45.5


deduct slab 1 3.5 1.82 0.25 -1.5925

13/840-14/0 1 160 1.82 0.25 72.8


14/0-15/0 1 1000 1.82 0.25 455
15/0-300 1 300 1.82 0.25 136.5
15/300-354 1 54 1.82 0.25 24.57
15/354-680 1 326 1.65 0.25 134.475
15/680-790 1 110 1.82 0.25 50.05
4401.697
950
680.2

4673.184 8297
7968.43
-3295.246 2520 -8304020
-5893235
-14197255
COMPARTIVE STATEMENT
Name of Work:AM TO (R&B) MEDIPALLY SECTION ROADS FOR THE YEAR 2019-20 IN JAGTIAL DISTRICT

Agency :- Sri A.Prabhakar Rao,Jagtial EE's L S A B No. 7/2019-20 Date: 04.11.2019

Sl. Description of item As per sanctioned Estimate As per Revised Estimate Excess Less Remarks
No. Qty Rate Per Amount Qty Rate Per Amount
1 2 3 4 5 6 7 8.0 9 10 15 16 17
1 #REF!

45 2082 Cum 93690 4.736 2082 Cum 9860.352 83829.648

2 #REF!

800 308.4 Sqm 246720 1625 308.4 Sqm 501072.3 254352.3

#REF!

2750 127.4 Sqm 350350 717.59 127.4 Sqm 91420.97 258929.034


340410 602353.6 254352.3

Asst.Exe. Engineer(R&B) Dy.Exe. Engineer (R&B) Executive Engineer(R&B) Superintending Engineer(R&B)


Section: Metpally Sub division : Metpally Division : Jagtial Circle : Karimnagar
Name of Work: Widening and Strengthening of Existing Single lane road to double lane road on Battapur -
Godur road from Km.8/875 to 20/0 in Karimnagar Dist.

1st & Part


Name of agency: Sri A.Prabhakar Rao,Jagtial
Agrement No : S.E (R&B) KNR LS AB /2015-16 Dt: 04.01.2016
Sl. Schedule - A
No Description of the Work
.
Qty Rate Unit
1 Earthwork excavation in soils upto SDR by mechanical means for
foundations of structures as per drawing and technical specification
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back
filling the excavation earth to the extent required etc., complete for
finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge

1 V 800 mm Dia Qty Vide pg 86 of MB no 1979/A 401.76 27 Cum


2 V 1000 mm Dia Qty Vide pg 86 of MB no 1979/A 87 27 Cum
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-
2 of MoRT&H including cost, conveyance of all materials to site and
labour charges, centering, machine mixing, laying, Vibrating, curing
etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-
Charge for base coarse below pipe culvert

1 V 800 mm Dia Qty Vide pg 87 of MB no 1979/A 50.31 4470 cum


2 V 1000 mm Dia Qty Vide pg 87 of MB no 1979/A 9.91 4470 Cum
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm
and 10mm size HBG crushed stone aggregate (Coarse aggregate
conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, and conveyance of all materials to site and all
labour charges for machine mixing, laying in position,Compacting,
Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .

3
1 V 800 mm Dia Qty Vide pg 87 of MB no 1979/A 290.550 5996 cum
2 V 1000 mm Dia Qty Vide pg 87 of MB no 1979/A 47.92 5996 cum
Providing, laying Reinforced cement concrete Hume pipes of
800/1000mm Dia., NP-3 class for pipe culverts including cost
and conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 800mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per
drawing and as per MoRT&H Specification 2900, 2905 and 2906
(5th Revision) and IRC Special Publication No: 13 and as
directed by the Engineer-in-Charge for finished item of work.
4
1 V 800 mm Dia Qty Vide pg 88 of MB no 1979/A 112.500 5046 RM
2 V 1000 mm Dia Qty Vide pg 88 of MB no 1979/A 25.00 7990 RM

Filling in between body walls with gravel including


cost ,conveyance of all materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No.
2200&2907 (5th Revision) and as per Drawing and technical
specifications for finished item of work
5
1 V 800 mm Dia Qty Vide pg 89 of MB no 1979/A 81.00 558 Cum
2 V 1000 mm Dia Qty Vide pg 89 of MB no 1979/A 21.00 558 Cum
Construction of Granular sub-base by providing HBG material
confirming to Grading - II of MoRT&H Table 400-1 including cost,
(excluding seigniorage charges) and conveyance of all materials
to work site and spreading in uniform layers with motor grader or
by approved means, on prepared surface mixing by mix in place
method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density
etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the
Engineer-in-charge.

6
1 V 800 mm Dia Qty Vide pg 89of MB no 1979/A 7.900 2205 cum
2 V 1000 mm Dia Qty Vide pg 89 of MB no 1979/A 1.92 2205 cum
Providing, Laying, Spreading and compacting graded HBG
crushed stone aggregate to Wet Mix macadem specification
including cost of all materials and including premixing the material
with water at OMC in Mechanical mix plant carriage of mixed
material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by
the Engineer-in-Charge and as per MoRT&H specification.406
(5th revision) for finished item of work.

7
1 V 800 mm Dia Qty Vide pg 90 of MB no 1979/A 12.00 2527 cum
2 V 1000 mm Dia Qty Vide pg 90 of MB no 1979/A 3.00 2527 cum
8 Forming embankment with Side earth by mechanical means
upto SDR including pre-watering of soil , removal of top soil,
excavation of soils , depositing the soils on the embankment,
spreading soil, breaking clods, sectioning , grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC
to meet requirement of table 300-2 of MoRT&H, including all
hire and operational charges of T&P and , complete for finished
item of work as per MoRT&H specification 305 (5th revision)
(Payment will be made based on level for finished item of work).

Qty Vide pg 01 of MB no 2276/A 17040.85 114 Cum


9
Construction of Granular sub-base by providing HBG material
confirming to Grading - II of MoRT&H Table 400-1 including cost,
(excluding seigniorage charges) and conveyance of all materials
to work site and spreading in uniform layers with motor grader or
by approved means, on prepared surface mixing by mix in place
method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density
etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the
Engineer-in-charge.

Qty Vide pg 02 of MB no 2276/A 6219.3 2205 Cum


10 Providing, Laying, Spreading and compacting graded HBG
crushed stone aggregate to Wet Mix macadem specification
including cost of all materials and including premixing the material
with water at OMC in Mechanical mix plant carriage of mixed
material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by
the Engineer-in-Charge and as per MoRT&H specification.406
(5th revision) for finished item of work.

Qty Vide pg 03 of MB no 2276/A 7968.43 2527 Cum


11 Providing and applying with prime coat with Bitumen Emulsion @
0.60 kg / sqm on prepares surface of granular surface including
cost and conveyance of all materials to work site and laid on
prepared surface and including clearing the road surface and
spraying primer etc., complete for finished item of work as per
MoRT&H Specification 502 (5th Revision) and as directed by the
Engineer-in-charge.

Qty Vide pg 04 of MB no 2276/A 29567.06 35.7 Sqm


12 Providing and laying of Dense Graded Bituminous Macadam with
hot mix plant producing an average output of 37.5 tones per
hour using hard blasted granite crushed aggregates of Grading -
II as per table 500-4 of MoRT&H Specification 504 (4th revision)
premixed with bituminous binder of 60/70 grade @ 4.50% of
weight of total mixture, transported to site, laid over a previously
prepared surface with mechanical paver finisher to the required
grade, level and alignment and rolled as per Clauses 501.6 and
501.7 to achieve the desired compaction for finished item of work
as directed by the Engineer-in-Charge including hire and
operational charges all T&P and all other contingent charges
necessary including of all materials etc., complete and as per
MoRTH specification No. 504 (5th Revision) (Excluding VAT
Charges) (Excluding Seignioage charges) .

Qty Vide pg 06 of MB no 2276/A 2745.65 9167 Cum


13 Providing 30mm thick compacted Bituminous Concrete with
100-120 TPH batch type hot mix plant using HBG crushed
aggregates of Grading – 2 as per table 500-17 of specification
507 of MoRT&H (5th revision), premixed with bitumen VG-30
grade @ 5.4% of mix and filler, transporting the hot mix to work
site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
MoRT&H Specification 507 (5th revision) complete for finished
item of work in all respects as directed by Engineer-in-Charge

Qty Vide pg 07 of MB no 2276/A 1653.41 10270 Cum

14 Add T.P 4.59 % excess


total
1 Earthwork excavation in soils upto SDR by mechanical means for
foundations of structures as per drawing and technical specification
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back
filling the excavation earth to the extent required etc., complete for
finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge

1 V 800 mm Dia Qty Vide pg 8 of MB no 2276/A 1091 27 Cum


1 V 1000 mm Dia Qty Vide pg 8 of MB no 2276/A 457.56 27 Cum
2 V 800 mm Dia Qty Vide pg 9 of MB no 2276/A 399.33 27 Cum
2 V 1000 mm Dia Qty Vide pg 9 of MB no 2276/A 358.41 27 Cum
4V 1000 mm Dia Qty Vide pg 9 of MB no 2276/A 89.1 27 Cum
3 V 1000 & 3V 800 mm Dia Qty Vide pg 9 of MB no 2276/A 102.45 27 Cum
2 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-
2 of MoRT&H including cost, conveyance of all materials to site and
labour charges, centering, machine mixing, laying, Vibrating, curing
etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-
Charge for base coarse below pipe culvert

1 V 800 mm Dia Qty Vide pg 10 of MB no 2276/A 120.31 4470 Cum


1 V 1000 mm Dia Qty Vide pg 10 of MB no 2276/A 50.6 4470 Cum
2 V 800 mm Dia Qty Vide pg 10 of MB no 2276/A 42 4470 Cum
2 V 1000 mm Dia Qty Vide pg 10 of MB no 2276/A 37.83 4470 Cum
4V 1000 mm Dia Qty Vide pg 11 of MB no 2276/A 17.29 4470 Cum
3 V 1000 & 3V 800 mm Dia Qty Vide pg 11 of MB no 2276/A 17.84 4470 Cum
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm
and 10mm size HBG crushed stone aggregate (Coarse aggregate
conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, and conveyance of all materials to site and all
labour charges for machine mixing, laying in position,Compacting,
Vibrating and curing including all other incidental and all other
operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .

3
1 V 800 mm Dia Qty Vide pg 12 of MB no 2276/A 559.17 5996 Cum
1 V 1000 mm Dia Qty Vide pg 12 of MB no 2276/A 291.77 5996 Cum
2 V 800 mm Dia Qty Vide pg 12 of MB no 2276/A 176 5996 Cum
2 V 1000 mm Dia Qty Vide pg 12 of MB no 2276/A 174 5996 Cum
4V 1000 mm Dia Qty Vide pg 13 of MB no 2276/A 117 5996 Cum
3 V 1000 & 3V 800 mm Dia Qty Vide pg 13 of MB no 2276/A 138 5996 Cum

Providing, laying Reinforced cement concrete Hume pipes of


800mm Dia., NP-3 class for pipe culverts including cost and
conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 800mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per
drawing and as per MoRT&H Specification 2900, 2905 and 2906
(5th Revision) and IRC Special Publication No: 13 and as
directed by the Engineer-in-Charge for finished item of work.
4
1 V 800 mm Dia Qty Vide pg 14 of MB no 2276/A 295.000 5046 RM
2V 800 mm Dia Qty Vide pg 14 of MB no 2276/A 125.000 5046 RM
3 V 800 mm Dia Qty Vide pg 14 of MB no 2276/A 15.000 5046 RM
Providing, laying Reinforced cement concrete Hume pipes
of1000mm Dia., NP-3 class for pipe culverts including cost and
conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 800mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per
drawing and as per MoRT&H Specification 2900, 2905 and 2906
(5th Revision) and IRC Special Publication No: 13 and as
directed by the Engineer-in-Charge for finished item of work.
4
1 V 1000 mm Dia Qty Vide pg 15 of MB no 2276/A 102.50 7990 RM
2 V 1000 mm Dia Qty Vide pg 15 of MB no 2276/A 100.00 7990 RM
4 V 1000 mm Dia Qty Vide pg 15 of MB no 2276/A 20.00 7990 RM
3 V 1000 mm Dia Qty Vide pg 15 of MB no 2276/A 15.00 7990 RM

Filling in between body walls with gravel including


cost ,conveyance of all materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No.
2200&2907 (5th Revision) and as per Drawing and technical
specifications for finished item of work
5
1 V 800 mm Dia Qty Vide pg 16 of MB no 2276/A 437 558 Cum
1 V 1000 mm Dia Qty Vide pg 16 of MB no 2276/A 157.88 558 Cum
2 V 800 mm Dia Qty Vide pg 16 of MB no 2276/A 170.98 558 Cum
2 V 1000 mm Dia Qty Vide pg 16 of MB no 2276/A 33.76 558 Cum
4V 1000 mm Dia Qty Vide pg 17 of MB no 2276/A 58.01 558 Cum
3 V 1000 & 3V 800 mm Dia Qty Vide pg 17 of MB no 2276/A 63.75 558 Cum
Construction of Granular sub-base by providing HBG material
confirming to Grading - II of MoRT&H Table 400-1 including cost,
(excluding seigniorage charges) and conveyance of all materials
to work site and spreading in uniform layers with motor grader or
by approved means, on prepared surface mixing by mix in place
method with Rotavator / approved means at OMC and
compacting with vibratory roller to achieve the desired density
etc., complete for finished item of work as per MoRT&H
Specification 401 (5th revision) and as directed by the
Engineer-in-charge.
6
1 V 800 mm Dia Qty Vide pg 18 of MB no 2276/A 27 2205 Cum
1 V 1000 mm Dia Qty Vide pg 18 of MB no 2276/A 10.48 2205 Cum
2 V 800 mm Dia Qty Vide pg 18 of MB no 2276/A 10.95 2205 Cum
2 V 1000 mm Dia Qty Vide pg 18 of MB no 2276/A 9.87 2205 Cum
Providing, Laying, Spreading and compacting graded HBG
crushed stone aggregate to Wet Mix macadem specification
including cost of all materials and including premixing the material
with water at OMC in Mechanical mix plant carriage of mixed
material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by
the Engineer-in-Charge and as per MoRT&H specification.406
(5th revision) for finished item of work.

7
1 V 800 mm Dia Qty Vide pg 19 of MB no 2276/A 34 2527 Cum
1 V 1000 mm Dia Qty Vide pg 20 of MB no 2276/A 13.12 2527 Cum
2 V 800 mm Dia Qty Vide pg 20 of MB no 2276/A 13.7 2527 Cum
2 V 1000 mm Dia Qty Vide pg 20 of MB no 2276/A 12.34 2527 Cum

85966306.00 14995289.00
15 Add 5% Vat
16 Seigniorage Charges

Asst . Exe. Engineer(R&B) Dy. Exe. Engineer (R&B)


Section : Metpally Sub Division : Metpally
lane road on Battapur -

2016
chedule - A

Amount

10847.52
2349.00

224885.70
44297.70

1742137.80
287328.32
567675.00
199750.00

45198.00
11718.00

17419.50
4233.60 6229.12

30324.00
7581.00
1942656.90

13713556.50

20136222.61

1055544.04
25169373.55

16980520.70
82193619.00
3772687.00
85966306.00

29457.00
12354.12
10781.91
9677.07
2405.70
2766.15
537785.70 122 1.69
226182.00 58 7.4
187740.00 3.31 14795.7
169100.10 38.8 0.97
77286.30 18.45 1.16
79744.80 20.79 2.95

3352783.32 633 73.83


1749452.92 333 41.23
1055296.00 39.43 236422.28 115.06 51.69 215.43
1043304.00 6.95 41672.2
701532.00 10.94 65596.24
827448.00 6.05 36275.8 215.43
63.37

1488570.00 17.5 88305 312.500


630750.00
75690.00
818975.00
799000.00
159800.00 20 100920
119850.00

243846.00
88097.04
95406.84
18838.08 115.11 64231.38 148.87
32369.58
35572.50

59535.00 1.08 2381.4


23108.40
24144.75
21763.35

85918.00 0.89 2249.03


33154.24
34619.90
31183.18
14995289.00 652849.03 488.76 17529.61

100961595.00 90164897 10796698.00


5048080.00
1870474.00
107880149.00

Engineer (R&B)
sion : Metpally
Providing and applying with prime coat with Bitumen Emulsion @ 0.70 kg / sqm on prepares
surface of granular surface including cost and conveyance of all materials to work site and laid
on prepared surface and including clearing the road surface and spraying primer etc.,
complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

Right side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/800 1 200 1.67 334
9/800 -10/00 1 200 1.67 334
10/0 - 10/200 1 200 1.67 334
10/200 - 10/400 1 200 1.67 334
10/400 - 10/600 1 200 1.67 334
10/600 - 10/800 1 15 1.67 25.05
100/700-750 1 50 1.67 -83.5
10/800 - 11/0 1 200 1.67 334
Culvert gap (10/930-10/950) 1 20 1.67 -33.4
10/950 - 11/000 1 50 1.67 83.5
3214.75
Providing and applying with prime coat with Bitumen Emulsion @ 0.70 kg / sqm on prepares
surface of granular surface including cost and conveyance of all materials to work site and laid
on prepared surface and including clearing the road surface and spraying primer etc.,
complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

Right side
11/00 - 11/200 1 200 1.67 334
11/200 - 11/400 1 200 1.67 334
11/400 - 11/600 1 200 1.67 334
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 1 50 1.67 -83.5
11/800 - 12/000 1 200 1.67 334
12/000 - 12/200 1 200 1.67 334
Causway Gap 12/204 - 12/241 1 37 1.67 -61.79
12/200 - 12/400 1 200 1.67 334
12/400 - 12/600 1 200 1.67 334
12/600 - 12/800 1 200 1.67 334
2860.71
Providing and applying with prime coat with Bitumen Emulsion @ 0.70 kg / sqm on prepares
surface of granular surface including cost and conveyance of all materials to work site and laid
on prepared surface and including clearing the road surface and spraying primer etc.,
complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

Left side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/800 1 200 1.67 334
9/800 -10/00 1 200 1.67 334
culvert gaps 9/0-2 1 3.5 3.66 12.81
9/2-4 1 1.6 3.66 5.856
9/6-8 1 1.6 3.66 5.856
9/700 1 3 3.66 10.98
10/0 - 10/200 1 200 1.67 334
10/200 - 10/400 1 200 1.67 334
10/400 - 10/600 1 200 1.67 334
10/600 - 10/620 1 20 1.67 33.4
Bolder gap(10/620 - 10/624) 1 4 1.67 -6.68
10/624 - 10/627 1 3 1.67 5.01
Bolder gap(10/627 - 10/629) 1 2 1.67 -3.34
10/629 - 10/800 1 171 1.67 285.57
Disput Culvert gap (10/750-10/800) 1 50 1.67 -83.5
10/800 - 10/930 1 130 1.67 217.1
Culvert gap (10/930-10/950) 1 20 1.67 -33.4
10/950 - 11/000 1 50 1.67 83.5
10/0-2 1 1.6 3.66 5.856
10/2-4 1 1.6 3.66 5.856
10/6-8 1 1.6 3.66 5.856
10/6-8 1 1.8 3.66 6.588
3446.418
Providing and applying with prime coat with Bitumen Emulsion @ 0.70 kg / sqm on prepares
surface of granular surface including cost and conveyance of all materials to work site and laid
on prepared surface and including clearing the road surface and spraying primer etc.,
complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as
directed by the Engineer-in-charge.

Left side
11/00 - 11/200 1 200 1.67 334
11/200 - 11/400 1 200 1.67 334
11/400 - 11/600 1 200 1.67 334
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 1 50 1.67 -83.5
11/800 - 12/000 1 200 1.67 334
11/4-6 1 1.6 3.66 5.856
11/6-8 1 1.6 3.66 5.856
12/000 - 12/200 1 200 1.67 334
Causway Gap 12/204 - 12/241 1 37 1.67 -61.79
12/200 - 12/400 1 200 1.67 334
12/400 - 12/600 1 200 1.67 334
12/600 - 12/800 1 200 1.67 334
12/0 1 1.6 3.66 5.856
12/0-2 1 1.6 3.66 5.856
12/6-8 1 1.6 3.66 5.856
2889.99

12/0
12/0-2
12/6-8
11/4-6
11/6-8
12/0
12/0-2
12/6-8
Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH batch type
hot mix plant using HBG crushed aggregates of Grading – 2 as per table 500-17 of
specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @
5.4% of mix and filler, transporting the hot mix to work site, laying with mechanical
paver finisher to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRT&H
Specification 507 (5th revision) complete for finished item of work in all respects as
directed by Engineer-in-Charge

Left side
13/840-14/0 1 160 1.67 0.03 8.016
14/0-2 1 200 1.67 0.03 10.02
14/2-4 1 200 1.67 0.03 10.02
14/4-6 1 200 1.67 0.03 10.02
14/6-8 1 200 1.67 0.03 10.02
14/8-10 1 200 1.67 0.03 10.02
15/0-2 1 200 1.67 0.03 10.02
15/2-354 1 154 1.67 0.03 7.7154
15/354-680 1 326 7 0.03 68.46
15/680-15/8 1 120 1.67 0.03 6.012
Culvert gaps13/8-10 1 1.6 3.66 0.03 0.17568
13/8-10 1 1.6 3.66 0.03 0.17568
14/0-2 1 1.6 3.66 0.03 0.17568
14/2-4 1 1.6 3.66 0.03 0.17568
14/2-4 1 1.6 3.66 0.03 0.17568
14/2-4 1 1.6 3.66 0.03 0.17568
14/6-8 1 1.8 3.66 0.03 0.19764
14/6-8 1 1.6 3.66 0.03 0.17568
15/0-2 1 1.6 3.66 0.03 0.17568
15/0-2 1 1.6 3.66 0.03 0.17568
15/6-8 1 1.8 3.66 0.03 0.19764
Right side
13/840-14/0 1 160 1.67 0.03 8.016
14/0-2 1 200 1.67 0.03 10.02
14/2-4 1 200 1.67 0.03 10.02
14/4-6 1 200 1.67 0.03 10.02
14/6-8 1 200 1.67 0.03 10.02
14/8-10 1 200 1.67 0.03 10.02
15/0-2 1 200 1.67 0.03 10.02
15/2-354 1 154 1.67 0.03 7.7154
15/680-15/8 1 120 1.67 0.03 6.012

0/025-0/100 1 75 7 0.03 15.75


0/1-0/690 1 590 7 0.03 123.9
0/770-1/4 1 630 7 0.03 132.3
1/4-9 1 500 7 0.03 105.0
1/9-2/6 1 700 7 0.03 147
2/6-3/4 1 800 7 0.03 168
deduct2/875-2/925 1 50 7 0.03 -10.5
3/4-4/100 1 700 7 0.03 147
deduct3/650-3/700 1 50 7 0.03 -10.5
4/100-4/800 1 700 7 0.03 147
4/800-5/100 1 300 7 0.03 63
5/250-5/800 1 550 7 0.03 115.5
5/8-6/6 1 800 7 0.03 168
6/6-7/0 1 500 7 0.03 105
Junction 1 100 7 0.03 21
1671.613
B-G Road 8/875 to 20/0

Providing and applying Tack coat with VG10 0.20 kg / sqm on prepares surface of granular surface
including cost and conveyance of all materials to work site and laid on prepared surface and
including clearing the road surface and spraying primer etc., complete for finished item of work as
per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

For Curves
9/705 - 9/843 R/s 1 138 3.50 483.000
11/411 - 11/506 R/s 1 95 3.50 332.500
10/268 - 10/423 L/s 1 155 3.50 542.500
10/845 - 11/374 L/s 1 529 3.50 1851.500
12/582 -12/868 L/s 1 286 3.50 1001.000
4210.500
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an
average output of 37.5 tones per hour using hard blasted granite crushed aggregates of Grading -
II as per table 500-4 of MoRT&H Specification 504 (4th revision) premixed with bituminous binder
of 60/70 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously
prepared surface with mechanical paver finisher to the required grade, level and alignment and
rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work
as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other
contingent charges necessary including of all materials etc., complete and as per MoRTH
specification No. 504 (5th Revision) (Excluding VAT Charges) (Excluding Seignioage charges) .

Left side
For Curves
9/705 - 9/843 R/s 1 138 1.67 0.05 11.523
1 138 1.83 (0.02+0.050)/2 8.839
11/411 - 11/506 R/s 1 95 1.67 0.05 7.933
1 95 1.83 (0.02+0.050)/2 6.085

10/268 - 10/423 L/s 1 155 1.67 0.05 12.943


1 155 1.83 (0.02+0.050)/2 9.928
10/845 - 11/374 L/s 1 529 1.67 0.05 44.172
1 529 1.83 (0.02+0.050)/2 33.882
12/582 -12/868 L/s 1 286 1.67 0.05 23.881
1 286 1.83 (0.02+0.050)/2 18.318
177.503

Tack coat
Left side
For Curves
9/705 - 9/843 R/s 1 138 1.83 252.54
10/268 - 10/423 L/s 1 155 1.83 283.65
10/845 - 11/374 L/s 1 529 1.83 968.07
11/411 - 11/506 R/s 1 95 1.83 173.85
12/582 -12/868 L/s 1 286 1.83 523.38
2201.49
29.4
58.8

29.4
58.8
Providing and applying Tack coat with VG10 0.20 kg / sqm on prepares surface
of granular surface including cost and conveyance of all materials to work site
and laid on prepared surface and including clearing the road surface and
spraying primer etc., complete for finished item of work as per MoRT&H
Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

Left side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/800 1 200 1.67 334
9/800 -10/00 1 200 1.67 334
10/0 - 10/200 1 200 1.67 334
10/200 - 10/400 1 200 1.67 334
10/400 - 10/600 1 200 1.67 334
10/600 - 10/800 1 200 1.67 334
Disput Culvert gap (10/930-10/950) 0
10/800 - 10/930 1 130 1.67 217.1
Culvert gap (10/930-10/950) 0
10/950 - 11/000 1 50 1.67 83.5
11/00 - 11/200 1 200 1.67 334
11/200 - 11/400 1 200 1.67 334
11/400 - 11/600 1 200 1.67 4191.7
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 50 1.67 0
11/800 - 12/000 1 200 1.67 334
12/000 - 12/200 1 200 1.67 334
Causway Gap 12/204 - 12/241 37 1.67 0
12/200 - 12/400 1 200 1.67 334
12/400 - 12/600 1 200 1.67 334
12/600 - 12/800 1 200 1.67 334
0.025 0.15
0.15
150

750
700
FORM P.W.A.XX
LUMP-SUM-CONTRACT
RUNNING ACCOUNT BILL
Cash Book Voucher No. : Dated:
Schedue docket No :

Name of the contractor : M/s Sree Sai Ram Enterprises , Hyderabad


Name of the work Widening and Strengthening of Existing Single lane road to
double lane road on Chelgal to Itikyal road from Km.23/2
to 25/4 in Karimnagar Dist.
:
Serial number of the bill : 4th & Part
No. and date of his previous bill
for this work :
Reference to agreement : S.E (R&B) KNR LS AB /2015-16 Dt: 04.01.2016

Date of commencement of work :


___________________________________________________________________________________________________
Rs. Ps.
1 Value of items actually measusred under clause 62(a)
and (b) of the preliminary specifications of the MDSS
forming part of the contract, the details of which are
given in the attached statement. :
2 Value of measured up additions of alterations excuted
upto date as "Authorised etras" the details of which are
given in the attached. :

3 Approlximate va of work done upto date excluding


the items specified in 1 & 2 above. :

4 Dedudct amount to be with-held percent


on Rs. :

5 Balance i.e. "upto-date" intermediate paymnent


(item 1,2,3,4) :
6 Deduct intermediate Payment already made as shown
in entry K of the last Running Account bill. :

7 Intermediate payments now to be made (item 5-6 D):


8 Total payments now to be made as detailed below
( a ) By recovery of amounts crediatable to this work G :

( b ) By recovery of amounts crediatable to other


works or heads of accounts. :
( c ) By Cheque. :
FORM P.W.XXI Contd.
II CERTIFICATIONS AND SIGNATURES

1 I have satisfied my self to the best of my knowledge by that the value of work
done upto date under item 3 of I account of work of this bill is not less than
Rs. Confirmably with the contractor's agreement.

2 The detailed measurements of authorised additions and alterations upto-date


and of the items of this work specified in item I of account of this bill are
recorded at page 53 to 66 of M.B. No. 1818/A

Signature of Contractor Dated Signature of the


Officer preparing the Bill.
___________________________________________________________________________

Pay Rs. (Rupees

Dated Signature of the


Officer authorising payment.

___________________________________________________________________________
III. ACQUITTANCE

Received Rs. (Rupees


) as an intermediate payment in connection
with the contract reffered to above.

Dated
Witness Signature in Indian language

Full signature of the contractor. Stamp


__________________________________________________________________________

Paid by me by Cash/Cheque Dated

Date and initials of persons actually making payment.


B-G Road 8/875 to 20/0
Providing and laying of Dense Graded Bituminous Macadam with hot mix
plant producing an average output of 37.5 tones per hour using hard
blasted granite crushed aggregates of Grading - II as per table 500-4 of
MoRT&H Specification 504 (4th revision) premixed with bituminous
binder of 60/70 grade @ 4.50% of weight of total mixture, transported to
site, laid over a previously prepared surface with mechanical paver
finisher to the required grade, level and alignment and rolled as per
Clauses 501.6 and 501.7 to achieve the desired compaction for finished
item of work as directed by the Engineer-in-Charge including hire and
Left side
8/870 -9/0 1 130 1.67 0.05 10.855
9/0 - 9/200 1 200 1.67 0.05 16.7
9/200 - 9/400 1 200 1.67 0.05 16.7
9/400 - 9/600 1 200 1.67 0.05 16.7
9/600 - 9/800 1 200 1.67 0.05 16.7
9/800 -10/00 1 200 1.67 0.05 16.7
10/0 - 10/200 1 200 1.67 0.05 16.7
10/200 - 10/400 1 200 1.67 0.05 16.7
10/400 - 10/600 1 200 1.67 0.05 16.7
10/600 - 10/800 1 200 1.67 0.05 16.7
Disput Culvert gap (10/930-10/950) 0.05 0
10/800 - 10/930 1 130 1.67 0.05 10.855
Culvert gap (10/930-10/950) 0.05 0
10/950 - 11/000 1 50 1.67 0.05 4.175
11/00 - 11/200 1 200 1.67 0.05 16.7
11/200 - 11/400 1 200 1.67 0.05 16.7
11/400 - 11/600 1 200 1.67 0.05 16.7
11/600 - 11/800 1 200 1.67 0.05 16.7
Causway Gap 11/827 - 11/877 50 1.67 0.05 0
11/800 - 12/000 1 200 1.67 0.05 16.7
12/000 - 12/200 1 200 1.67 0.05 16.7
Causway Gap 12/204 - 12/241 37 1.67 0.05 0
12/200 - 12/400 1 200 1.67 0.05 16.7
12/400 - 12/600 1 200 1.67 0.05 16.7
12/600 - 12/800 1 200 1.67 0.05 16.7

326.485
Providing and applying with prime coat with Bitumen Emulsion @ 0.70
kg / sqm on prepares surface of granular surface including cost and
conveyance of all materials to work site and laid on prepared surface and
including clearing the road surface and spraying primer etc., complete for
finished item of work as per MoRT&H Specification 502 (5th Revision) and
as directed by the Engineer-in-charge.

Right side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/800 1 200 1.67 334
9/800 -10/00 1 200 1.67 334
10/0 - 10/200 1 200 1.67 334
10/200 - 10/400 1 200 1.67 334
10/400 - 10/600 1 200 1.67 334
10/600 - 10/615 1 15 1.67 25.05
Bolder gap(10/615-10617) 0
10/617 - 10/620 1 3 1.67 5.01
Bolder gap(10/620 - 10/624) 0
10/624 - 10/627 1 3 1.67 5.01
Bolder gap(10/627 - 10/629) 0
10/629 - 10/800 1 171 1.67 285.57
Disput Culvert gap (10/930-10/950) 0
10/800 - 10/930 1 130 1.67 217.1
Culvert gap (10/930-10/950) 0
10/950 - 11/000 1 50 1.67 83.5
11/00 - 11/200 1 200 1.67 334
11/200 - 11/400 1 200 1.67 334
11/400 - 11/600 1 200 1.67 4178.34
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 50 1.67 0
11/800 - 12/000 1 200 1.67 334
12/000 - 12/200 1 200 1.67 334
Causway Gap 12/204 - 12/241 37 1.67 0
12/200 - 12/400 1 200 1.67 334
12/400 - 12/600 1 200 1.67 334
12/600 - 12/800 1 200 1.67 334
DETAILED CUM ABSTRACT ESTIMATE

Sl. Description of work No Measurements Quantity


No. L B D

1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal
of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to
the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th
Revision) and as directed by the Engineer-in-Charge For Body Walls

Km 10/6-8 1 V 1000mm 1 6.5 1.8 1.05 12.2850


1 6.6 1.8 1.05 12.4740
Canal widening 2 V 800mm 1 7.5 1.7 1.05 13.3875
1 7.5 1.7 1.05 13.3875
Canal 1V of 800mm widening 1 5.8 1.6 1.05 9.7440
1 5.8 1.6 1.05 9.7440
14/0-2 1V 800mm dia 1 5.8 1.6 1.05 9.7440
1 5.8 1.6 1.05 9.7440
90.5100
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all
materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete for finished item of
work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge for base coarse below pipe culvert

For Body Walls


Km 10/6-8 1 V 1000mm 1 6.5 1.8 0.15 1.7550
1 6.6 1.8 0.15 1.7820
Canal widening 2 V 800mm 1 7.5 1.7 0.15 1.9125
1 7.5 1.7 0.15 1.9125
Canal 1V of 800mm widening 1 5.8 1.6 0.15 1.3920
1 5.8 1.6 0.15 1.3920
14/0-2 1V 800mm dia 1 5.8 1.6 0.15 1.3920
1 5.8 1.6 0.15 1.3920
12.9300

3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to
site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body
walls of HP Culverts.

For Body Walls


Km 10/6-8 1 V 1000mm 1 6.5 (1.6+1.22)/2 0.9 8.2485
1 6.6 (1.6+1.22)/2 0.9 8.3754
Canal widening 2 V 800mm 1 7.5 (1.5+1.12)/2 0.9 8.8425
1 7.5 (1.5+1.12)/2 0.9 8.8425
Canal 1V of 800mm widening 1 5.8 (1.40+1.06)/2 0.9 6.4206
1 5.8 (1.40+1.06)/2 0.9 6.4206
14/0-2 1V 800mm dia 1 5.8 (1.40+1.06)/2 0.9 6.4206
1 5.8 (1.40+1.06)/2 0.9 6.4206
59.9913
1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal
of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to
the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th
Revision) and as directed by the Engineer-in-Charge For pipes

Km 10/6-8 1 V 1000mm 1 9.1 1.8 1.875 30.7125


Canal widening 2 V 800mm 1 2.4 0.9 0.15 0.3240
1 2.4 0.9 0.15 0.3240
Canal 1V of 800mm widening 1 1 1 0.15 0.1500
1 1 1 0.15 0.1500
14/0-2 1V 800mm dia 1 9.5 1.6 1.7 25.8400
57.5005
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all
materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete for finished item of
work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the
Engineer-in-Charge for base coarse below pipe culvert

Km 10/6-8 1 V 1000mm 1 1.8 (9.94+10.06)/2 0.15 2.7


Canal widening 2 V 800mm 1 2.4 (1.315+1.38)/2 0.15 0.49
1 2.4 (1.315+1.38)/2 0.15 0.49
Canal 1V of 800mm widening 1 1 (1.38+1.44)/2 0.15 0.21
1 1 (1.38+1.44)/2 0.15 0.21
14/0-2 1V 800mm dia 1 1.6 (10.26+10.38)/2 0.15 2.48
6.57
4 Providing, laying Reinforced cement concrete Hume pipes of 1000mm/800mm Dia., NP-3 class for
pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 1000mm/800mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
Km 10/6-8 1 V 1000mm 5 2.5 12.5
12.50

Canal widening 2 V 800mm 2X2 2.5 10.00


Canal 1V of 800mm widening 2X1 2.5 5.00
14/0-2 1V 800mm dia 5 2.5 12.50
27.50

3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to
site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body
walls of HP Culverts.

For Body Walls


Km 9/0-2 2V 1000mmR/S 1 8.5 (1.15+.45)/2 1.75 11.9000
Parapet wall 1 8.5 0.4 0.5 1.7000
L/S 1 8.5 (1.15+.45)/2 1.75 11.9000
Parapet wall 1 8.5 0.4 0.5 1.7000
deduct Pipe portion 2X2 0.785 1.2^2 (1.15+.68)/2 -4.1373

Km 10/6-8 1 V 1000mmR/S 1 6.6 (1.22+.45)/2 1.7 9.3687


Parapet wall 1 6.6 0.4 0.45 1.1880
L/S 1 6.55 (1.22+.45)/2 1.75 9.5712
Parapet wall 1 6.55 0.4 0.45 1.1790
deduct Pipe portion 1X2 0.785 1.2^2 (1.22+.7)/2 -2.1704

Canal widening 2 V 800mmR/S 1 7.5 (1.12+.45)/2 1.55 9.1256


Parapet wall 1 7.5 0.4 0.55 1.6500
L/S 1 7.5 (1.12+.45)/2 1.4 8.2425
Parapet wall 1 7.5 0.4 0.55 1.6500
deduct Pipe portion 2X2 0.785 1^2 (1.12+.7)/2 -2.8574

Canal 1V of 800mm wideningL/S 1 5.8 (1.06+.45)/2 1.85 8.1012


Parapet wall 1 5.8 0.4 0.9 2.0880
R/S 1 5.8 (1.06+.45)/2 1.9 8.3201
Parapet wall 1 5.8 0.4 0.85 1.9720
deduct Pipe portion 1X2 0.785 1^2 (1.06+.68)/2 -1.3659

14/0-2 1V 800mm diaR/s 1 5.8 (1.06+.45)/2 1.55 6.7875


Parapet wall 1 5.8 0.4 0.85 1.9720
L/S 1 5.8 (1.06+.45)/2 1.6 7.0064
Parapet wall 1 5.8 0.4 0.85 1.9720
deduct Pipe portion 1X2 0.785 1^2 (1.06+.68)/2-1.3659
95.4973
5 Filling in between body walls with gravel including cost ,conveyance of all materials to site etc.,
complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th
Revision) and as per Drawing and technical specifications for finished item of work

Km 9/0-2 2V 1000mm 1 3.5 (10.2+11.6)/2 1.75 66.7625


Deduct pipe Portion 2 0.785 (10.2+11.14)/2 1.2*1.2 -24.1227
Deduct Crust 1 3.5 7 0.53 -12.9850

Km 10/6-8 1 V 1000mm 1 1.8 (10.06+11.6)/2 1.725 33.6272


Deduct pipe Portion 1 0.785 (10.2+11.10)/2 1.2*1.2 -12.0388
Deduct Crust 1 1.8 7 0.53 -6.6780

Canal widening 2 V 800mm 1 2.4 (1.38+2.05)/2 1.55 6.3798


2 0.785 (1.38+1.8)/2 1*1 -2.4963
1 2.4 (1.38+2.05)/2 1.4 5.7624
2 0.785 (1.38+1.8)/2 1*1 -2.4963

Canal 1V of 800mm widening 1 1 (1.44+2.05)/2 1.85 3.2283


1 0.785 (1.44+1.82)/2 1*1 1.2796
1 1 (1.44+2.05)/2 1.9 3.3155
1 0.785 (1.44+1.82)/2 1*1 1.2796

14/0-2 1V 800mm dia 1 1.6 (10.38+11.6)/2 1.575 27.6948


1 0.785 (10.38+11.14)/2 1*1 -8.4466
Deduct Crust 1 1.6 7 0.53 -5.9360
74.13
1287
174
381
1842
1.7

1.75
DETAILED CUM ABSTRACT ESTIMATE

Sl. Description of work No Measurements Quantity


No. L B D

1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the
extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge For Body Walls

1 Km 16/4-6 2V 800mm 1 7.5 1.7 1.05 13.388


1 7.5 1.7 1.05 13.388
2 Km 16/6-8 1V 1000mm 1 6.6 1.7 1.05 11.781
1 6.6 1.7 1.05 11.781
3 Km 18/8-10 1V 1000mm widening 1 6.6 1.7 1.05 11.781
1 6.6 1.7 1.05 11.781

4 Km 16/0-2 1V800mm 1 5.8 1.6 1.05 9.744


1 5.8 1.6 1.05 9.744
5 Km 16/2-4 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
6 17/2-4 1V of 800mm widening 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
7 Km 17/8-10 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
8 Km 18/2-4 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
9 Km 18/6-8 1V800mm widening 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
10 Km 19/8-10 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
11 Km 19/8-10 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
12 Km 20/0-2 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
249.291
Widening of slab culvert

2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below pipe culvert

For Body Walls


Km 16/4-6 2V 800mm 1 7.5 1.7 0.15 1.913
1 7.5 1.7 0.15 1.913
Km 16/6-8 1V 1000mm 1 6.6 1.8 0.15 1.782
1 6.6 1.8 0.15 1.782
Km 18/8-10 1V 1000mm widening 1 6.6 1.8 0.15 1.782
1 6.6 1.8 0.15 1.782

Km 16/0-2 1V800mm 1 5.8 1.6 0.15 1.392


1 5.8 1.6 0.15 1.392
Km 16/0-2 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
17/2-4 1V of 800mm widening 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 17/8-10 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 18/2-4 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 18/6-8 1V800mm widening 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 19/8-10 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 19/8-10 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 20/0-2 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
36.009

3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to site and
labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body walls of HP
Culverts.

For Body Walls


Km 16/4-6 2V 800mm 1 7.5 (1.5+1.12)/2 0.9 8.843
1 7.5 (1.5+1.12)/2 0.9 8.843
Km 16/6-8 1V 1000mm 1 6.6 (1.60+1.22)/2 0.9 8.375
1 6.6 (1.60+1.22)/2 0.9 8.375
Km 18/8-10 1V 1000mm widening 1 6.6 (1.60+1.22)/2 0.9 8.375
1 6.6 (1.60+1.22)/2 0.9 8.375

Km 16/0-2 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421


1 5.8 (1.4+1.06)/2 0.9 6.421
Km 16/2-4 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
17/2-4 1V of 800mm widening 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 17/8-10 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 18/2-4 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 18/6-8 1V800mm widening 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 19/8-10 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 19/8-10 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 20/0-2 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
166.757
1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the
extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge For pipes

Km 16/4-6 2V 800mm 1 3 9.3 1.75 48.825


Km 16/6-8 1V 1000mm 1 1.8 9.1 1.7 27.846
Km 18/8-10 1V 1000mm widening 1 1.8 0.8 0.15 0.216
1 1.8 0.8 0.15 0.216

Km 16/0-2 1V800mm 1 1.6 9.5 1.75 26.600


Km 16/2-4 1V800mm 1 1.6 9.5 1.725 26.220
17/2-4 1V of 800mm widening 1 1 1 0.15 0.150
1 1 1 0.15 0.150
Km 17/8-10 1V800mm 1 1.6 9.5 1.725 26.220
Km 18/2-4 1V800mm 1 1.6 9.5 2 30.400
Km 18/6-8 1V800mm widening 1 1 1 0.15 0.150
1 1 1 0.15 0.150
Km 19/8-10 1V800mm 1 1.6 9.5 1.75 26.600
Km 19/8-10 1V800mm 1 1.6 9.5 1.65 25.080
Km 20/0-2 1V800mm 1 1.6 9.5 1.675 25.460
264.283
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below pipe culvert

Km 16/4-6 2V 800mm 1 3 (10.13+10.26)/2 0.15 4.588


Km 16/6-8 1V 1000mm 1 1.8 (9.94+10.06)/2 0.15 2.700
Km 18/8-10 1V 1000mm widening 1 1.2 (1.22+1.28)/2 0.15 0.225
1 1.2 (1.22+1.28)/2 0.15 0.225

Km 16/0-2 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477


Km 16/2-4 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
17/2-4 1V of 800mm widening 1 1 (1.38+1.44)/2 0.15 0.212
1 1 (1.38+1.44)/2 0.15 0.212
Km 17/8-10 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 18/2-4 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 18/6-8 1V800mm widening 1 1 (1.38+1.44)/2 0.15 0.212
1 1 (1.38+1.44)/2 0.15 0.212
Km 19/8-10 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 19/8-10 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 20/0-2 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
25.921
4 Providing, laying Reinforced cement concrete Hume pipes of 1000mm/800mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of
1000mm/800mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc.,
as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special
Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

Km 16/6-8 1V 1000mm 5 2.5 12.500


Km 18/8-10 1V 1000mm widening 1 2.5 2.500
1 2.5 2.500
17.500
Km 16/4-6 2V 800mm 5X2 2.5 25.000
Km 16/0-2 1V800mm 5 2.5 12.500
Km 16/2-4 1V800mm 5 2.5 12.500
17/2-4 1V of 800mm widening 1 2.5 2.500
1 2.5 2.500
Km 17/8-10 1V800mm 5 2.5 12.500
Km 18/2-4 1V800mm 5 2.5 12.500
Km 18/6-8 1V800mm widening 1 2.5 2.500
1 2.5 2.500
Km 19/8-10 1V800mm 5 2.5 12.500
Km 19/8-10 1V800mm 5 2.5 12.500
Km 20/0-2 1V800mm 5 2.5 12.500
122.500

3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to site and
labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body walls of HP
Culverts.

For Body Walls


Km 16/4-6 2V 800mm L/S 1 7.5 (1.12+0.45)/2 1.6 9.420
Parapet Wall 1 7.5 0.4 0.45 1.350
R/S 1 7.5 (1.12+0.45)/2 1.6 9.420
Parapet Wall 1 7.5 0.4 0.45 1.350
deduct pipe portion 2x2 0.785 (1.12+0.70)/2 1*1 -2.857

Km 16/6-8 1V 1000mmL/S 1 6.6 (1.22+0.45)/2 1.6 8.818


Parapet Wall 1 6.6 0.4 0.55 1.452
R/S 1 6.6 (1.22+0.45)/2 1.5 8.266
Parapet Wall 1 6.6 0.4 0.45 1.188
deduct pipe portion 1x2 0.785 (1.22+0.70)/2 1.2*1.2 -2.170
Km 18/8-10 1V 1000mm widening L/s 1 6.6 (1.22+0.45)/2 1.5 8.266

Parapet Wall 1 6.6 0.4 0.5 1.320


R/S 1 6.6 (1.22+0.45)/2 1.6 8.818
Parapet Wall 1 6.6 0.4 0.45 1.188
deduct pipe portion 1x2 0.785 (1.22+0.70)/2 1.2*1.2 -2.170

Km 16/0-2 1V800mm L/S 1 5.8 (1.06+0.45)/2 1.6 7.006


Parapet wall 1 5.8 0.4 0.45 1.044
R/S 1 5.8 (1.06+0.45)/2 1.6 7.006
Parapet wall 1 5.8 0.4 0.45 1.044
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 16/2-4 1V800mm R/s 1 5.8 (1.06+0.45)/2 1.65 7.225


Parapet walls 1 5.8 0.4 0.4 0.928
L/s 1 5.8 (1.06+0.45)/2 1.6 7.006
Parapet walls 1 5.8 0.4 0.4 0.928
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

17/2-4 1V of 800mm widening R/S 1 5.8 (1.06+0.45)/2 1.55 6.787

Parapet walls 1 5.8 0.4 0.45 1.044


L/S 1 5.8 (1.06+0.45)/2 1.55 6.787
Parapet walls 1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
Km 17/8-10 1V800mm L/s 1 5.8 (1.06+0.45)/2 1.55 6.787
Parapet walls 1 5.8 0.4 0.5 1.160
R/s 1 5.8 (1.06+0.45)/2 1.55 6.787
Parapet walls 1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 18/2-4 1V800mm l/s 1 5.8 (1.06+0.45)/2 1.85 8.101


Parapet walls 1 5.8 0.4 0.45 1.044
R/s 1 5.8 (1.06+0.45)/2 1.9 8.320
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 18/6-8 1V800mm widening L/s 1 5.8 (1.06+0.45)/2 1.55 6.787


1 5.8 0.4 0.55 1.276
R/s 1 5.8 (1.06+0.45)/2 1.45 6.350
1 5.8 0.4 0.55 1.276
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 19/8-10 1V800mmR/S 1 5.8 (1.06+0.45)/2 1.6 7.006


1 5.8 0.4 0.5 1.160
L/S 1 5.8 (1.06+0.45)/2 1.6 7.006
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
Km 19/8-10 1V800mL/S 1 5.8 (1.06+0.45)/2 1.45 6.350
1 5.8 0.4 0.55 1.276
R/s 1 5.8 (1.06+0.45)/2 1.5 6.568
1 5.8 0.4 0.45 1.044
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
Km 20/0-2 1V800mmL/S 1 5.8 (1.06+0.45)/2 1.55 6.787
1 5.8 0.4 0.45 1.044
R/S 1 5.8 (1.06+0.45)/2 1.5 6.568
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
186.672
5 Filling in between body walls with gravel including cost ,conveyance of all materials to site etc.,
complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th
Revision) and as per Drawing and technical specifications for finished item of work

Km 16/4-6 2V 800mm 1 3 (10.26+11.60)/2 1.6 52.464


Deduct pipe Portion 2 0.785 (10.26+11.10)/2 1*1 -16.768
Deduct Crust 1 3 7 0.53 -11.130

Km 16/6-8 1V 1000mm 1 1.8 (10.06+11.6)/2 1.6 31.190


Deduct pipe Portion 1 0.785 (10.06+11.10)/2 1.2*1.2 -11.960
Deduct Crust 1 1.8 7 0.4 -5.040

Km 18/8-10 1V 1000mm widening 1 1.2 (1.28+2.05)/2 1.5 2.997


1 0.785 (1.28+1.8)/2 1.2*1.2 -1.741
1 1.2 (1.28+2.05)/2 1.6 3.197
1 0.785 (1.28+1.8)/2 1.2*1.2 -1.741

Km 16/0-2 1 1.6 (10.38+11.60)/2 1.6 28.134


1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 16/2-4 1 1.6 (10.38+11.60)/2 1.575 27.695
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 17/2-4 1 1 (1.44+2.05)/2 1.55 2.705
1 0.785 (1.44+1.82)/2 1*1 -1.280
1 1 (1.44+2.05)/2 1.55 2.705
1 0.785 (1.44+1.82)/2 1*1 -1.280
Km 17/8-10 1 1.6 (10.38+11.60)/2 1.55 27.255
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 18/2-4 1 1.6 (10.38+11.60)/2 1.85 32.530
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 18/6-8 1 1 (1.44+2.05)/2 1.55 2.705
1 0.785 (1.44+1.82)/2 1*1 -1.280
1 1 (1.44+2.05)/2 1.45 2.530
1 0.785 (1.44+1.82)/2 1*1 -1.280
Km 19/8-10 1 1.6 (10.38+11.60)/2 1.6 28.134
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 19/8-10 1 1.6 (10.38+11.60)/2 1.45 25.497
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km20/0-2 1 1.6 (10.38+11.60)/2 1.5 26.376
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.5 -5.600

142.275
1287
174
381
1842

#VALUE! 543
543

M20
#VALUE! 543
543

M20
M20

1.75
1.65

(10.08+10.20)/2
(9.94+10.06)/2
(1.315+1.38)/2
(1.315+1.38)/2
(1.38+1.44)/2
(1.38+1.44)/2
(10.26+10.38)/2

(10.08+10.20)/2
(9.94+10.06)/2
(1.315+1.38)/2
(1.315+1.38)/2
(1.38+1.44)/2
(1.38+1.44)/2
(10.26+10.38)/2
M20

9.3

9.1

0.9

0.9

9.5

9.5

Km 19/8-10 1V800mm 1 1.6 9.5


Km 19/8-10 1V800mm 1 1.6 9.5
Km 20/0-2 1V800mm 1 1.6 9.5
1.75
1.65
1.675
1V 800mm dia 1V1000mm dia 2V800mm dia 2V800mm dia 4V1000mm dia
9/2-4 9/0-2 9/700
9/6-8 12/950
10/0-2 13/900
10/2-4
10/6-8
11/4-6
11/6-8
12/0
12/0-2
12/6-8
DETAILED CUM ABSTRACT ESTIMATE
Name of Work: Widening and Strengthening of Single lane to double lane road of Battapur to Godur road from K
20/400 in Karimnagar Dist.
Sub Work : Widening of 1V of 4.37 meters Span Minor Bridge at Km 16/0-2
S.
No. Description of work No Length Breadth Depth Quantity Rate
1 2 3 4 5 6 7 8
Earthwork excavation in soils upto SDR by mechanical means for foundations of
structures as per drawing and technical specification including setting out,
construction of shoring and bracing, removal of stumps and other deleterious
1 matter, dressing sides of bottom, back filling the excavation earth to the extent
required etc., complete including seignioarge charges for finished item of work as
per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-
Charge
U/S 1 2.5 5.39 1.8 24.255
D/S Abutment A1 1 2.5 2.2 1.8 9.9
D/SAbutmentA2 1 2.5 2.2 1.8 9.9
44.06 28.00
Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG
crushed stone aggregate and fine aggregate conforming to table 1000-2 of
MoRT&H including cost, conveyance of all materials to site and labour
charges, centering, machine mixing, laying, Vibrating, curing etc., including
2 all other incidental and operational charges of all T&P etc., complete for
finished item of work as per MoRT&H specification 1500,1700, 2100 (5th
Revision) and as directed by the Engineer-in-Charge for base coarse .

U/S 1 2.5 5.39 0.15 2.02125


D/S Abutment A1 1 2.5 2.2 0.15 0.825
D/SAbutmentA2 1 2.5 2.2 0.15 0.825
3.67 4438.00
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including cost,seignorage and
3 conveyance of all materials to site and all labour charges for machine mixing,laying
in position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .
U/S 1 2.5 5.39 1 13.475
D/S Abutment A1 1 2.5 2.2 1 5.5
D/SAbutmentA2 1 2.5 2.2 1 5.5
24.48 5623.00
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including cost,seignorage and
3 conveyance of all materials to site and all labour charges for machine mixing,laying
in position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .
D/S Abutment A1 1 2.5 (1.8+1.2)/2 0.65 2.4375
D/SAbutmentA2 1 2.5 (1.8+1.2)/2 0.65 2.4375
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including cost,seignorage and
4 conveyance of all materials to site and all labour charges for machine mixing, laying
in position,Compacting, Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure .

U/S Abutment A1 2.5 (1.75+0.75)/2 1.995 6.234


U/SAbutmentA2 2.5 (1.75+0.75)/2 1.995 6.234
D/S Abutment A1 2.5 (1.2+0.75)/2 1.885 4.595
D/SAbutmentA2 2.5 (1.2+0.75)/2 1.885 4.595
21.658

Asst.Exe. Engineer (R&B) Dy Exe Enginee


Section :: Metpally Sub-Division :: M

Executive Engineer (R&B) Superinteding engineer


Division : jagtial (R&B) Circle :Karimnagar
ur road from Km.8/870 to
-2
Per Amount
9 10

cum 1234.00

cum 16294.00

cum 137623.00
Dy Exe Engineer (R&B)
Sub-Division :: Metpally

eding engineer
cle :Karimnagar
Providing and laying of Dense Graded Bituminous Macadam with hot mix plant producing an
average output of 37.5 tones per hour using hard blasted granite crushed aggregates of Grading - II
as per table 500-4 of MoRT&H Specification 504 (4th revision) premixed with bituminous binder of
60/70 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared
surface with mechanical paver finisher to the required grade, level and alignment and rolled as per
Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by
the Engineer-in-Charge including hire and operational charges all T&P and all other contingent
charges necessary including of all materials etc., complete and as per MoRTH specification No. 504
(5th Revision) (Excluding VAT Charges) (Excluding Seignioage charges) .

Right side
8/870 -9/0 1 130 1.67 0.05 10.855
9/0 - 9/200 1 200 1.67 0.05 16.7
9/200 - 9/400 1 200 1.67 0.05 16.7
9/400 - 9/600 1 200 1.67 0.05 16.7
9/600 - 9/705 1 105 1.67 0.05 8.7675
curve at 9/705 - 9/843 R/s 1 138 1.67 0.05 11.523
1 138 1.83 (0.05+0.02)/2 8.8389
9/843 -10/00 1 157 1.67 0.05 13.1095

10/0 - 10/200 1 200 1.67 0.05 16.7


10/200 - 10/400 1 200 1.67 0.05 16.7
10/400 - 10/600 1 200 1.67 0.05 16.7
10/600 - 10/800 1 200 1.67 0.05 16.7
100/700-750 1 50 1.67 0.05 -4.175
10/800 - 11/0 1 200 1.67 0.05 16.7
Culvert gap (10/930-10/950) 1 20 1.67 0.05 -1.67
180.8489
Right side
11/00 - 11/200 1 200 1.67 0.05 16.7
11/200 - 11/411 1 211 1.67 0.05 17.6185
curve at 11/411 - 11/506 R/s 1 95 1.67 0.05 7.9325
1 95 1.83 (0.05+0.02)/2 6.08475
11/506-11/600 1 94 1.67 0.05 7.849
11/600 - 11/800 1 200 1.67 0.05 16.700
Causway Gap 11/827 - 11/877 1 50 1.67 0.05 -4.175
11/800 - 12/000 1 200 1.67 0.05 16.700
12/000 - 12/200 1 200 1.67 0.05 16.7
Causway Gap 12/204 - 12/241 1 37 1.67 0.05 -3.0895
12/200 - 12/400 1 200 1.67 0.05 16.7
12/400 - 12/600 1 200 1.67 0.05 16.7
12/600 - 12/800 1 200 1.67 0.05 16.7
149.1203

Left side
8/870 -9/0 1 130 1.67 0.05 10.855
9/0 - 9/200 1 200 1.67 0.05 16.7
9/200 - 9/400 1 200 1.67 0.05 16.7
9/400 - 9/600 1 200 1.67 0.05 16.7
9/600 - 9/800 1 200 1.67 0.05 16.7
9/800 -10/00 1 200 1.67 0.05 16.7
culvert gaps 9/0-2 1 3.5 3.66 0.05 0.6405
9/2-4 1 1.6 3.66 0.05 0.2928
9/6-8 1 1.6 3.66 0.05 0.2928
9/700 1 3 3.66 0.05 0.549
10/0 - 10/200 1 200 1.67 0.05 16.7
10/200 - 10/268 1 68 1.67 0.05 5.678
Curve at Km 10/268-10/423 1 155 1.67 0.05 12.9425
1 155 1.83 (0.05+0.02)/2 9.92775
10/423 - 10/600 1 177 1.67 0.05 14.7795
10/600 - 10/800 1 200 1.67 0.05 16.7
Disput Culvert gap (10/750-10/800) 1 50 1.67 0.05 -4.175
10/800 - 10/845 1 45 1.67 0.05 3.7575
10/0-2 1 1.6 3.66 0.05 0.2928
10/2-4 1 1.6 3.66 0.05 0.2928
10/6-8 1 1.6 3.66 0.05 0.2928
10/6-8 1 1.8 3.66 0.05 0.3294
173.6482
Left side
10/845 - 11/0 1 155 1.67 0.05 12.942
1 155 1.83 (0.05+0.02)/2 9.928
11/0-2 1 200 1.67 0.05 16.700
1 200 1.83 (0.05+0.02)/2 12.810
11/200-11/374 L/s 1 174 1.67 0.05 14.529
1 174 1.83 (0.05+0.02)/2 11.145
Culvert gap (10/930-10/950) 1 20 1.67 0.05 -1.67
11/374 - 11/400 1 26 1.67 0.05 2.171
11/400 - 11/600 1 200 1.67 0.05 16.7
11/600 - 11/800 1 200 1.67 0.05 16.7
Causway Gap 11/827 - 11/877 1 50 1.67 0.05 -4.175
11/800 - 12/000 1 200 1.67 0.05 16.7
11/4-6 1 1.6 3.66 0.05 0.2928
11/6-8 1 1.6 3.66 0.05 0.2928
12/000 - 12/200 1 200 1.67 0.05 16.7
Causway Gap 12/204 - 12/241 1 37 1.67 0.05 -3.0895
12/200 - 12/400 1 200 1.67 0.05 16.7
12/400 - 12/582 1 182 1.67 0.05 15.197
12/582 -12/868 L/s 1 286 1.67 0.05 23.881
1 286 1.83 (0.05+0.02)/2 18.3183
12/0 1 1.6 3.66 0.05 0.2928
12/0-2 1 1.6 3.66 0.05 0.2928
12/6-8 1 1.6 3.66 0.05 0.2928
213.651
14.01725 2.23275

151.3503
11/6-8

12/0-2
12/6-8

29.4
Providing and applying Tack coat with VG10 0.20 kg / sqm on prepares surface of granular
surface including cost and conveyance of all materials to work site and laid on prepared
surface and including clearing the road surface and spraying primer etc., complete for finished
item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-
in-charge.

Right side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/705 1 105 1.67 175.35
curve at 9/705 - 9/843 R/s 1 138 1.67 230.46
1 138 1.83 252.54
9/843 -10/00 1 157 1.67 262.19
10/0 - 10/200 1 200 1.67 334
10/200 - 10/400 1 200 1.67 334
10/400 - 10/600 1 200 1.67 334
10/600 - 10/800 1 200 1.67 334
100/700-750 1 50 1.67 -83.5
10/800 - 11/0 1 200 1.67 334
Culvert gap (10/930-10/950) 1 20 1.67 -33.4
3692.74
Right side
11/00 - 11/200 1 200 1.67 334
11/200 - 11/411 1 211 1.67 352.37
curve at 11/411 - 11/506 R/s 1 95 1.67 158.65
1 95 1.83 173.85
11/506-11/600 1 94 1.67 156.98
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 1 50 1.67 -83.500
11/800 - 12/000 1 200 1.67 334.000
12/000 - 12/200 1 200 1.67 334.000
Causway Gap 12/204 - 12/241 1 37 1.67 -61.79
12/200 - 12/400 1 200 1.67 334
12/400 - 12/600 1 200 1.67 334
12/600 - 12/800 1 200 1.67 334
3034.56

Left side
8/870 -9/0 1 130 1.67 217.1
9/0 - 9/200 1 200 1.67 334
9/200 - 9/400 1 200 1.67 334
9/400 - 9/600 1 200 1.67 334
9/600 - 9/800 1 200 1.67 334
9/800 -10/00 1 200 1.67 334
culvert gaps 9/0-2 1 3.5 3.66 12.81
9/2-4 1 1.6 3.66 5.856
9/6-8 1 1.6 3.66 5.856
9/700 1 3 3.66 10.98
10/0 - 10/200 1 200 1.67 334
10/200 - 10/268 1 68 1.67 113.56
Curve at Km 10/268-10/423 1 155 1.67 258.85
1 155 1.83 283.65
10/423 - 10/600 1 177 1.67 295.59
10/600 - 10/800 1 200 1.67 334
Disput Culvert gap (10/750-10/800) 1 50 1.67 -83.5
10/800 - 10/845 1 45 1.67 75.15
10/0-2 1 1.6 3.66 5.856
10/2-4 1 1.6 3.66 5.856
10/6-8 1 1.6 3.66 5.856
10/6-8 1 1.8 3.66 6.588
3558.058
Left side
10/845 - 11/0 1 155 1.67 258.850
1 155 1.83 283.650
11/0-2 1 200 1.67 334.000
1 200 1.83 366.000
11/200-11/374 L/s 1 174 1.67 290.580
1 174 1.83 318.420
Culvert gap (10/930-10/950) 1 20 1.67 -33.4
11/374 - 11/400 1 26 1.67 43.42
11/400 - 11/600 1 200 1.67 334
11/600 - 11/800 1 200 1.67 334
Causway Gap 11/827 - 11/877 1 50 1.67 -83.5
11/800 - 12/000 1 200 1.67 334
11/4-6 1 1.6 3.66 5.856
11/6-8 1 1.6 3.66 5.856
12/000 - 12/200 1 200 1.67 334
Causway Gap 12/204 - 12/241 1 37 1.67 -61.79
12/200 - 12/400 1 200 1.67 334
12/400 - 12/582 1 182 1.67 303.94
12/582 -12/868 L/s 1 286 1.67 477.62
1 286 1.83 523.38
12/0 1 1.6 3.66 5.856
12/0-2 1 1.6 3.66 5.856
12/6-8 1 1.6 3.66 5.856
4720.450
332.5 -316.25

3036.79
11/6-8

12/0-2
12/6-8

29.4
DETAILED CUM ABSTRACT ESTIMATE

Sl. Description of work No Measurements Quantity


No. L B D

1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the
extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge For Body Walls

5 Km 16/2-4 1V800mm 1 5.8 1.6 1.05 9.744


1 5.8 1.6 1.05 9.744
8 Km 18/2-4 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
10 Km 19/8-10 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
11 Km 19/8-10 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
12 Km 20/0-2 1V800mm 1 5.8 1.6 1.05 9.744
1 5.8 1.6 1.05 9.744
97.440

2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below pipe culvert

For Body Walls


Km 16/0-2 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 18/2-4 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 19/8-10 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 19/8-10 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
Km 20/0-2 1V800mm 1 5.8 1.6 0.15 1.392
1 5.8 1.6 0.15 1.392
13.920
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to site and
labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body walls of HP
Culverts.

For Body Walls


Km 16/2-4 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 18/2-4 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 19/8-10 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 19/8-10 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
Km 20/0-2 1V800mm 1 5.8 (1.4+1.06)/2 0.9 6.421
1 5.8 (1.4+1.06)/2 0.9 6.421
64.206
1 Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the
extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision)
and as directed by the Engineer-in-Charge For pipes

Km 16/2-4 1V800mm 1 1.6 9.5 1.725 26.220


Km 18/2-4 1V800mm 1 1.6 9.5 2 30.400
Km 19/8-10 1V800mm 1 1.6 9.5 1.75 26.600
Km 19/8-10 1V800mm 1 1.6 9.5 1.65 25.080
Km 20/0-2 1V800mm 1 1.6 9.5 1.675 25.460
133.760
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site
and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base
coarse below pipe culvert

Km 16/2-4 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477


Km 18/2-4 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 19/8-10 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 19/8-10 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
Km 20/0-2 1V800mm 1 1.6 (10.26+10.38)/2 0.15 2.477
12.384
4 Providing, laying Reinforced cement concrete Hume pipes of 1000mm/800mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of
1000mm/800mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc.,
as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special
Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

Km 16/2-4 1V800mm 5 2.5 12.500


Km 18/2-4 1V800mm 5 2.5 12.500
Km 19/8-10 1V800mm 5 2.5 12.500
Km 19/8-10 1V800mm 5 2.5 12.500
Km 20/0-2 1V800mm 5 2.5 12.500
62.500

3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including cost conveyance of all materials to site and
labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification
1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body walls of HP
Culverts.

For Body Walls


Km 16/2-4 1V800mm R/s 1 5.8 (1.06+0.45)/2 1.65 7.225
Parapet walls 1 5.8 0.4 0.4 0.928
L/s 1 5.8 (1.06+0.45)/2 1.6 7.006
Parapet walls 1 5.8 0.4 0.4 0.928
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
Km 18/2-4 1V800mm l/s 1 5.8 (1.06+0.45)/2 1.85 8.101
Parapet walls 1 5.8 0.4 0.45 1.044
R/s 1 5.8 (1.06+0.45)/2 1.9 8.320
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 19/8-10 1V800mmR/S 1 5.8 (1.06+0.45)/2 1.6 7.006


1 5.8 0.4 0.5 1.160
L/S 1 5.8 (1.06+0.45)/2 1.6 7.006
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366

Km 19/8-10 1V800mL/S 1 5.8 (1.06+0.45)/2 1.456.350


1 5.8 0.4 0.551.276
R/s 1 5.8 (1.06+0.45)/2 1.5 6.568
1 5.8 0.4 0.451.044
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
Km 20/0-2 1V800mmL/S 1 5.8 (1.06+0.45)/2 1.556.787
1 5.8 0.4 0.451.044
R/S 1 5.8 (1.06+0.45)/2 1.5 6.568
1 5.8 0.4 0.5 1.160
deduct pipe portion 1x2 0.785 (1.06+0.68)/2 1*1 -1.366
75.014
5 Filling in between body walls with gravel including cost ,conveyance of all materials to site etc.,
complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th
Revision) and as per Drawing and technical specifications for finished item of work

Km 16/2-4 1 1.6 (10.38+11.60)/2 1.575 27.695


1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 18/2-4 1 1.6 (10.38+11.60)/2 1.85 32.530
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 19/8-10 1 1.6 (10.38+11.60)/2 1.6 28.134
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km 19/8-10 1 1.6 (10.38+11.60)/2 1.45 25.497
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.53 -5.936
Km20/0-2 1 1.6 (10.38+11.60)/2 1.5 26.376
1 0.785 (10.38+11.14)/2 1*1 -8.447
1 1.6 7 0.5 -5.600
68.655
1287
174
381
1842

M20

M20
M20

(9.94+10.06)/2
(1.38+1.44)/2

(9.94+10.06)/2
(1.38+1.44)/2

M20
9.5

Km 19/8-10 1V800mm 1 1.6 9.5


Km 19/8-10 1V800mm 1 1.6 9.5
1.75
1.65
Name of Work: Widening and Strengthening of Battapur-Godur road from Km.8/870 to 20/400 in
Karimnagar Dist.
IV & Part
Name of agency: M/s Sree Sai Ram Enterprises , Karimnagar.
Agrement No : S.E (R&B) KNR LS AB /2015-16 Dt: 14.03.2016
Sl. Schedule - A
No Description of the Work
.
Qty Rate Unit Amount
4 Earthwork excavation in soils upto SDR by mechanical
means for foundations of structures as per drawing and
technical specification including setting out, construction of
shoring and bracing, removal of stumps and other
deleterious matter, dressing sides of bottom, back filling the
excavation earth to the extent required etc., complete for
finished item of work as per MoRT&H specification 304(5th
Revision) and as directed by the Engineer-in-Charge

Qty Vide pg 26 of MB no 2391/A 231.2 27.5 Cum 6358.00


5 Providing Vibrated Cement Concrete (1:3:6) mix using
40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including
cost, conveyance of all materials to site and labour charges,
centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all
T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2100 (5th Revision) and
as directed by the Engineer-in-Charge for foundation of HP
Culverts

Qty Vide pg 27 of MB no 2391/A 26.30 4818 cum 126733.00

Providing Vibrated Cement Concrete (1:3:6) mix using


40mm size HBG crushed stone aggregate and fine
aggregate conforming to table 1000-2 of MoRT&H including
cost, conveyance of all materials to site and labour charges,
centering, machine mixing, laying, Vibrating, curing etc.,
including all other incidental and operational charges of all
T&P etc., complete for finished item of work as per
MoRT&H specification 1500,1700, 2200 (5th Revision) and
as directed by the Engineer-in-Charge forbody walls of HP
Culverts.

6
Qty Vide pg 28 of MB no 2391/A 139.220 5300 cum 737867.59

Providing, laying Reinforced cement concrete Hume


pipes of 800mm Dia., NP-3 class for pipe culverts
including cost and conveyance of Pipes etc., complete
and Labour charges for laying, jointing of 800mm dia.
R.C.C Hume pipes in position including lifting, aligning,
lowering and hoisting etc., as per drawing and as per
MoRT&H Specification 2900, 2905 and 2906 (5th
Revision) and IRC Special Publication No: 13 and as
directed by the Engineer-in-Charge for finished item of
work.
7
Qty Vide pg 29 of MB no 2391/A 62.500 5142 cum 321375.00
Filling in between body walls with gravel including
cost ,conveyance of all materials to site etc., complete
as per Clause 710.1.4 of IRC : 78and as per
MoRT&H Specification No. 2200&2907 (5th Revision)
and as per Drawing and technical specifications for
9 finished item of work
Qty Vide pg 31 of MB no 2391/A 68.655 525 cum 36044.09

1228378.00
17 Add T.P 4.59 % excess 56383.00
total 1284761.00
18 Add 5% Vat 64238.00
19 Seigniorage Charges 1287564.00
2636563.00

1 Certified that tha work is in progress.


2 Certified that the Technical Assistants 1) B.Venkata Ramana 2) M.Krishna Reddy, engaged by the Contractor
were present
3 Certified that the work has been carreid out by the contractor as per the design and
specifications of the agreement.
4 Certified that the contractor used his own mixers, Vibraters and rollers.
5 Certified no machinery have been supplied to the Contractor by the department.
6 Certified that the materials used in the work is as per the agreement.
7 Certified that there are no recoveries except proposed in this bill.

Asst . Exe. Engineer(R&B) Dy. Exe. Engineer (R&B)


Section : Metpally Sub Division : Metpally
Compatibility Report for B-G Road Bill 7th & Final.xls
Run on 3/11/2019 19:24

The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when opening this workbook
in an earlier version of Excel or if you save this workbook in an earlier file
format.

Minor loss of fidelity # of occurrences

Some formulas in this workbook are linked to other workbooks that are 6
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.

1 Final Bill 1A'!D7

Sheet11'!A2
Sheet12'!A2
Sheet12'!I10
Sheet12'!I15
Sheet12'!I20

Some formulas in this workbook are linked to other workbooks that are 500
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.

Some cells or styles in this workbook contain formatting that is not supported 21
by the selected file format. These formats will be converted to the closest
format available.
Version

Excel 97-2003

Excel 97-2003
Excel 97-2003

Excel 97-2003

Excel 97-2003

You might also like