Coding Midrex

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 16

Discipline Code

L Planing & Project Control


C Civil & Building
E Electrical
I Instrumentation & Automation
M Mechanical
P Process
QC Quality Control
R Refractory
U Utility & Piping
Area Code
Description FSTCO CODE Client Code
All Buildings A 1011
Blower Area B 1011
Cold Briquettings C 1004
Furnace Area F 1003
General Area (General Documents,Standard, G 1002
Specifications,Data Sheets,Design Data,…)
Heat Recovery Area H 1005
Inter Connecting Pipes Area I 1006
Overall Plant/Common Services(for Core Area O 1000
Documents Which are not Specificity for one Area
Material Handling System M 1007
Reformer Area R 1008
Compressor Area S 1009
Water Treatment Plant Area W 1010
Civil & Building & Steel Structure Equipment Code
Description Designer FSTCO CODE
Design Criteria&Techs Spec and Standard 00 AA
Topograohy& Leveling&Site Preparation 01 AA
Fencing & Gate 02 FN
Electrical Trench 03 EF
Surface Water Network 04 WN
Road & Access 05 RV
Sewage & Sewerage System 06 WA
Paving & Green Area 07 AA
Trench for Piping 08 TP
Seal Leg 09 SL
Furnace 10 FU
Personal Lift Shaft Furnace 11 FU
Classifier 12 CL
Pipe Bridge Furnace 13 FU
Inter Connection Pipe Rack 15 FU
Scrubber Blow Down Sump 16 SB
Blower 20 BL
Process Gas Compressor 21 CO
Process Gas Compressor First Stage (B) 22 CO
Perocess Gas Compressor Second Stage 23 CO
Cooling Gas Compressor 24 CO
Seal Gas Compressor 25 CO
Seal Gas Compressor Inlet Filter 26 CO
Purge Gas Compressor 27 CO
Seal Gas After Cooler 28 CO
Purge Gas Dryer 29 CO
Seal Gas Refrigerant Dryer 30 CO
Found of Pump 31 PU
Inter Gas Generator / Seal Gas Tank 32 EG
Reformer 35 RM
Purge Gas Tank 36 TA
Seal Gas Cooler Sump 37 SU
Heat recovery Area 40 SK
Recuperator 41 RU
Pipe Bridge Stack 42 SK
Process Gas Mist Eliminator 43 ME
Ejector Stack Fan 44 SK
Ejector Stack Fan 45 SK
Main Air Blower 46 BL
Pipe Rack 47 PR
Dilution Air Blower 48 BL
Auxiliary Air Blower 49 BL
Office Building & Parking 50 PK
Electrical Room & Control Room 51 EE
Diesel Room & Emergency Diesel Generator & Fuel Tank 52 EG
Laboratory 53 LR
Maintenance Shop & Workshop 54 WM
Compressor Room 55 CO
Gas Analyzer Room 56 RM
Natural Gas Filtration Station/Gas Rack 57 RM
Mechanical Room 58 KS
Ware House 59 WM
W.T.P 60 WA
Thickener 61 TH
Clarifier 62 TH
Settling Pond 63 TH
Pump House 64 PU
Contaminated Cooling Tower 65 TO
Clean Cooling Tower 66 TO
Fire Fighting 67 FP
Chemical Dosing Building / Chemical Room 68 DS
Transportation 69 TR
Gate House 70 GH
H.S.E 71 HS
Reformer Gas Duct Bridge 72 RM
Bottom Seal Gas (B.S.G) 73 BS
Dust Collection of Product Material Handling 75 DC
Dust Collection of Oxide Material Handling 76 DC
Briquetting Plant 80 BU
Control Room(MHU) 81 ER
Canteen , Locker & Shower 82 LS
Office Building (MHU) 83 PK
Ware House (MHU) 84 WM
Operation Deck 85 AA
Material Handling 90 CV
Auxillary Building 91
Desulpuurization 92 DP
ADD
ADD

ADD

‫تغییر عنوان‬ Process Gas Compressor First Stage (A)


Del.
Del.

‫تغییر عنوان‬

‫تغییر عنوان‬ Stack Area

‫ تغییر عنوان و کد‬Pipe Bridge Main Air Blower


‫‪ADD‬‬

‫تغییر عنوان‬

‫‪ADD‬‬

‫‪ADD‬‬
Electrical Equipment Code
Description Designer FSTCO CODE
General,Vendor Data 00 GG ADD
Bust Duct 01 SD
C.B.P Process Building 02 BU
C.B.P Substation 03 BU
Cables and Heat Tracing 04 CB ‫تغییر عنوان‬
Conduits & Accessories 05 EE
Communication System 06 TE
Capacitor Bank 07 CD
Compressor Room /Design Criteria 08 CO
Diesel Generator 09 EG
fire Detection System 10 FP
Gas Analyzer Building 11 RM
Natural Gas Filtration Station 12 RM
Hazardous Area Classification 13 HZ
Installation Detail Drawings 14 EE
Laboratory 15 LA
LCB 16 EC
Logic Diagrams 17 EE
Load Flow-Motor Starting-Short Cricut Study 18 EE ‫تغییر عنوان‬
Load List 19 EE
Earthing & Lightning System and Cathodic Protection 20 LG ‫تغییر عنوان‬
Lighting Panel 21 LG
Lighting & Socket System 22 LG
LV Switchgears 23 SW
Main Lighting Distribution Panels 24 PA
M.H.U Substation 25 SD
Motor & Soft Starter 26 MR
MV Switchgears 27 SW
Office Building 28 OM
Package Units 29 CU
Power System Layout 30 EE
Relay Coordination Study 31 RL
Short Circuit Study 32 EE
Overall One Line Diagram/Symbols & Legends 33 EE
Substation & Control Room 34 SD
Termination Kits 35 XX
Transformer & NGR & AVR 36 TS ‫تغییر عنوان‬
C.C.T.V Systerm 37 VS
DC UPS 38 UP
Ware House 39 WM
Work Shop / Maintenance Shop 40 WM ‫تغییر عنوان‬
W.T.P Pump House 41 WA
HVAC 42 AC
AC UPS 43 UP ADD
Mechanical Equipment Code (Core Area)
Description Designer FSTCO CODE
General Documents 00 AA
Direct Reduction Furnace 01 FU
Furnace Charge Hopper 02 FU
Furnace Upper and Lower Slide Gate 03 FU
Furnace Lubrication System 04 FU ADD
Upper Burden Feeder Reduction Furnace 05 FU
Middle Burden Feeder Reduction Furnace 06 FU
Lower Burden Feeder Reduction Furnace 07 FU
Furnace Hydraulic System 08 FU
Furnace Personal Lift 09 FU
Middle Burden Feeder Product Cooler 10 CX ADD
Lower Burden Feeder Product Cooler 11 CX ADD
Product Discharge Chamber Hydraulic System 12 CH ADD
Seal Gas Inlet Filter 13 CO ADD
Electrical Hoist for Shaft Furnace 14 FU
Water Return Tank 16 TA
Top Gas Scrubber 17 SB
Cooling Gas Scrubber 18 SB
Cooling Gas Mist Eliminator 19 ME
Classifier 20 CL
Process Gas Compressor & Silencer 21 CO ‫تغییر عنوان‬
Cooling Gas Compressor & Silencer 25 CO
Reformer Tube 27 RM
Main Burner 28 BR ‫تغییر عنوان‬
Auxiliary Burner 30 BR
Fuel Gas Mixer 31 MX
Bottom Seal Gas (B.S.G) 32 BS ADD
Reformed Gas Cooler 33 CX
Seal Gas Cooler 34 CX
Seal Gas Compressor 35 CO
Seal Gas After Cooler 36 CX
Seal Gas Refrigerant Dryer 37 CO
Purge Gas Dryer 38 CO
Purge Gas Compressor 39 CO
Purge Gas Tank 40 TA
Liquid Nitrogen 41 EG ADD
Bottom Seal Mist Eliminator 42 ME
Process Gas Mist Eliminator 43 ME
Process Gas Mixer 44 MX
Main Air Fan 45 FA
Auxiliary Air Fan 46 FA
Dilution Air Fan 47 FA
Recuperator 48 RU ‫تغییر عنوان‬
Ejector Stack 50 SK
Ejector Stack Fan 51 SK
Product Discharge Chamber 53 CH
Product Cooler 54 CX
Dust Collection System 55 DC
Pump Statin Crane 56 CA
Spring Hanger 57 SB
Process Gas First Stage Compressor (Cp-Xa48 A,B)

Main Burner A
Remunerator
Mechanical Equipment Code (M.H.U)
Description Designer FSTCO CODE
General 00 AA
Furnace Discharge Belt Conveyor 03 CV
Hoist for Day Bin Feed Conveyor 05 HT
Procuct Cooler Discharge Belt Conveyor 06 CV ‫تغییر عنوان‬
Product Belt Scale 09 CV
Day Bin 10 BI
Product Sampler 12 SA
Day Bin Discharge Feeder 15 FE
Grating Feeder 15 FE
Vibrating Feeder 15 FE
Feeders 15 FE
Furnace Discharge Diverter 18 FU
Day Bin Dust Collecting System 20 DC
Remet Transfer Diverter 21 TS
Remet Hopper 24 HO
Day Bin Discharge Belt Conveyor 25 CV
Remet Hopper Discharge Feeder 27 HO
Oxide Sampler 30 SA
Remet Transfer Belt Conveyor 30 CV
Remet Belt Scale 33 CV
Oxide Incoming Hopper 35 HO
Product Transfer Belt Conveyor 36 CV
Storage Bin Feed Divertor 39 BI
Oxide Screen Charge Feeder 40 FE
Shuttle Belt Conveyor 42 CV
Oxide Screen 45 SC
Storage Bin 45 BI
Storage Bin Discharge Slide Gate 46 GA
Two Way Chute Under Storage Bin 47 CH
Storage Bin Discharge Feeder 48 FE
Oxide Screen Dust Collecting System 51 CV
Product Junction Tower 52 TO
Product Screen Charging Belt Conveyor 53 CV
Product Screen 54 SC
Oxide Fine Belt Conveyor 55 CV
Product Dust Collecting System 57 DC
Fine Bin 60 BI
Product Fine Belt Conveyor 60 CV
Hoist for Remet Belt Conveyor 63 HT
Lime Coating System 65 XX
Hoist for Storage Belt Conveyor 65 HT
DRI Reclaming Hopper 69 HO
Oxide Coating Sampler 75 SA
Belt Scale 80 CV
Furnace Feed Belt Conveyor 85 CV
Transfer Tower 86 KT ADD
Truck loading 87 TL ADD
Series Co
A0 Planning & Project Control Procedures,Reports,Schedules
C0 Civil & Steel Structure Standard Documents
C1 Architectural
C2 Concrete & Foundations
C3 Structural Steel
C4 Calculations
CF Clarifier Rake
CP Compressor Specification
CT Cooling Tower Specification
DR Drier Specification
DS Classifier Specification
DA Data Sheet
DI Block Diagram
E1 Single Line Drawing
E3 Motor Interconnection Drawing
E4 Equipment Layout and Levels
E5 Electrical Device Location
E6 Instrument Device Location
E7 DCS Screen Graphic
E8 Signal List
E9 Control Logic Diagram
EM Erection Manuals
EO General Document
F1 Reduction Furnace Area
F2 Reformer Area
F3 Misc.Vessels(Scrubbers,Coolesr,Mist Eliminator,Mixer,Heat
Exchangers)
F4 Refractory Lined Ductwork
F6 Heat Recovery Ejector Stack
F7 Miscellaneous Alloy Equipment
FL Filter Specification
G1 Hvac Document
G2 Site / Core Plans/Elevations(Plant Layout)
G3 General Piping Routing
G4 Interconnection Pipes
GN General Specification
HE Heat Exchanger Specification
HT Hoist Specification
IN Instrument Specification
IS Piping Isometric
L1 Line List
L3 Equipment List
L5 Instrument List
L6 Valve List

L8 Piping List
L9 Motor List
LI Cable List
LB Lubrication Specification
LC Low Current Specification
M1 Equipment Arrangements,Plan,Section
M2 Equipment Arrangements , Reformer Below
M3 Detailed Piping Orthographic/Supports
M4 Mechanical Details,Material Handling, and Dust Collection
M5 Piping & Instrumentation Diagrams(P & ID)
MC Medium Current Specification
MT MTO
PI Process Documents & Drawings
PC Pant Condition
PH Communication Specification
PP Piping Specification
PU Pump Specification
QC Quality Control Testing Manual
SE Automation Control System
SR Mist Eliminator Specification
SS Steel Fabrication Specification
T6 Heat Recovery Equip & Refractory
TK Tank Specification
VD Vendor Data
WT Water Treatment Specification
WI Wiring Diagramp