Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
AMIMS-G-3105
Sealless Centrifugal Pumps
“Any modification on the AMIRAL standard is not retroactive and does not require implementation
or modification to existing facilities.”
This standard defines the minimum mandatory requirements for designing and manufacturing sealess
pumps for Company.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 1 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
Table of Contents
1 Scope ............................................................................................................................................ 4
2 Normative References .................................................................................................................. 4
3 Definitions .................................................................................................................................... 5
Appendix 1 - Tangential or self cleaning strainers ............................................................................... 37
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 3 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
1 Scope
This standard defines the minimum mandatory requirements for designing and
manufacturing sealless centrifugal pumps for Company.
This standard sets the rules and basis for selecting the applicable Company
Engineering Standards and/or Material Specifications that supplement the applicable
Codes.
This specification governs in its core requirements for sealless pumps according API
685 2nd edition.
The following paragraph numbers refer to API STD 685, 2nd Edition, February 2011,
which are part of this specification. The text in each paragraph below is an addition
unless it is noted as an exception, modification, or deletion to API STD 685.
Paragraph numbers not appearing in API STD 685 are new paragraphs to be inserted
in numerical order.
1.1 Conflicts, Deviations and Clarifications
Any conflicts between this standard and other applicable Company Engineering
Standards (AMIES), Material Specifications (AMIMS), Standard Drawings
(AMISD), Engineering Procedures (AMIEP), Company Forms or Industry
standards, specifications, Codes and forms shall be brought to the attention of
Company Representative by the Contractor for resolution.
Until the resolution is officially made by the Company Representative, the most
stringent requirement shall govern.
Where a licensor specification is more stringent than those of this standard, the
Licensor’s specific requirement shall apply.
Where applicable Codes or Standards are not called by this standard or its
requirements are not clear, it shall be brought to attention of Company
Representative by Contractor for resolution.
Direct all requests for deviations or clarifications in writing to the Company or its
Representative who shall follow internal Company procedure and provide final
resolution.
2 Normative References
The selection of material and equipment, and the design, construction, maintenance,
and repair of equipment and facilities covered by this standard shall comply with the
latest edition of the references listed below as of the CUT-OFF DATE as specified
in the Contract unless otherwise noted.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 4 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
Page 5 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
3.87 (Addition) ΔTv: difference between fluid boiling temperature and fluid
pumping temperature, at suction pressure
4. General
6. Basic Design
6.1.3.1 Operating conditions and liquid properties shall be based on datasheet and
purchase order specifications. When the specific gravity of any of the
fluids being pumped is less than 1, at any pumping temperature applicable
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 6 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
to that fluid, the vendor shall ensure that the pump and its accessories
shall be able to operate without deterioration during the performance test
with water. Performance tests at reduced speeds shall require Purchaser
written approval prior to any purchase order.
6.1.3.7 (Modification) Vendor shall furnish the temperature and pressure profiles
according to Annex K with the proposal. The temperature versus
pressure profile throughout the pump must be above the vapor pressure
curve at all locations in the flow path for all conditions and with a
sufficient margin as per the below:
a) For liquid with vapor pressure at rated temperature of less than or
equal 2 b a r a ( 30 psia), a minimum of 3 meter (10 feet) margin is
required.
b) For liquid with vapor pressure more than 2 bara (30 Psia), a
minimum of 5 meter (16 feet ) margin is required.
6.1.4 (Clarification) When the specific gravity of the fluid being pumped is less
than 1, at the pumping temperature, the vendor shall ensure that the pump
and its accessories are able to operate without deterioration during the
performance test with water. Performance tests at reduced speeds shall
require Company written approval prior to any purchase order.
6.1.6 (Clarification) The proposed rated impeller diameter for pumps with
constant-speed drives shall be not be greater than 95% or less than 80% of
the maximum impeller diameter that can be installed in the pump casing.
For pumps with variable speed drives, the impeller diameter giving the
maximum efficiency shall be selected. If this results in the selected
impeller diameter being the maximum for the chosen casing, then the
driver and pump shall be capable of the speed increase necessary to give a
5% increase in head (per API STD 685 clause 6.1.6) and to correct any
head shortfall during testing, including the tolerance per table 11.
6.1.12 For all pumps, the vendor shall indicate on the pump performance curve,
the NPSH3 curve for 3% reduction in differential head. For variable
speed applications, the vendor shall also indicate on the pump
performance curve the NPSH3 curve for the maximum speed required to
meet the process conditions specified in the pump data sheet.
The NPSH requirements shall not exceed the specified NPSH available
over the range of minimum continuous stable capacity to 120% of the
rated capacity. At rated capacity, the NPSHA shall also exceed the
NPSH3 as per the following:
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 7 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
a) For pumps where the heated fluid from the drive section is recycled
back to the pump suction, there shall be a minimum NPSH margin of
3 feet (1 meter) or 20% (i.e. NPSHA is 120% of NPSH3), whichever
is higher. The vendors shall consider the effect of recycled liquid
from the drive section which will cause an increase the vapor
pressure and reduction in the NPSHA.
b) For pumps where the heated fluid from the drive section is sent to
the discharge or to an intermediate pressure point, a minimum
NPSH margin of 1 meter (3 feet ) is required.
c) For pumps handling a product containing greater than 2% by
volume dissolved gas/air or when ΔTv lower than 15°C (27°F), the
difference between the required NPSH (NPSHR) and the available
NPSH (NPSHA) at the rated point shall be greater than 1.5 metres
(5 feet) or 35% of the available NPSH (NPSHA) whichever is the
greatest
d) For critical pumps or pumps operating in parallel, the difference
between the NPSHA and NPSHR at the rated point shall not be less
than 1 meter (3 feet).
For variable speed pumps, the above NPSH requirements apply for all
speeds required to meet the specified operating conditions.
6.1.13 The Vendor shall indicate, in the proposal, the value of the suction
specific speed for the pumps proposed. Suction specific speeds, without
inducer, shall be limited as indicated in the table below.
Q in M3/sec, Q in M3/hr Q in USGPM
Suction specific speed S=N(Q)0.5/(NPSHR)0.75
NPSHR in Metres NSPHR in ft
Maximum allowable (all pumps) 252 15100 13000
Maximum preferred 213 12780 11000
Maximum allowable for pumps handling liquefied gases,
213 12780 11000
volatile liquids or containing dissolved gases
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 8 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
The use of a discharge orifice for pump with driver rated power of more
than 110 kW (150 HP) is not permitted unless approved by Company.
6.1.16 Unless accepted by Company, the capacity at the end of the curve shall not
be less than 120% of the rated capacity. Normal flow shall not be less
than 70% of BEP. The minimum continuous stable capacity shall not
exceed 50% of the rated capacity.
6.1.17 Control of the sound pressure level to meet the specified requirements
shall be the responsibility of the vendor and purchaser.
6.1.18 (Exception) For all pumps regardless of size, the radial clearance between the
diffuser vane or volute tongue (cut water) and the periphery of the rated
impeller blade shall be at least 3% of the rated impeller blade radius for
diffuser designs and at least 6% of the rated impeller blade radius for volute
designs. Pumps with smaller clearances require Company approval. For such
cases, the following shall be submitted for review:
The impellers shall not be modified after the final test to correct
hydraulic performance by underfiling, overfilling, V-cutting or any other
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 9 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.1.20 The need for cooling shall be determined by the vendor, and the method
shall be agreed upon by the purchaser.
The cooling system shall be suitable for operation with the coolant type,
pressure, and temperature specified in the purchase order. The vendor shall
specify the required flow. To avoid condensation, the minimum inlet water
temperature to bearing housings should be above the ambient air
temperature.
6.1.27 The vendor shall review and specifically comment Purchaser’s piping
drawings when the difference between the NPSHA and NPSHR is less
than 1 metre (3 feet). Vendor comment shall include a statement that the
NPSHA was considered in the review. The vendor shall be present to
observe a check of the piping, performed by parting the flanges after
installation.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 10 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
The vendor shall be present during the initial alignment of the pump and
drive train. Alarm and shutdown limits shall be provided by the vendor.
6.1.31.1 (Modification) The details of threading shall conform to ISO 261, ISO
262, ISO 724, ISO 965, ASME B1.1 or other internationally
standardized threading.
6.1.34 (Modification) The hexagon socket head cap can be used inside the pump
and also as the fasteners for the secondary pressure casing to make the
pump compact.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 11 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.2.12 (Clarification) The use of threaded holes with plug is prohibited. Flanges
with blind shall be provided.
6.2.14 (Addition) The Vendor shall specify the tightening torque for the casing
joint bolting. Tightening torques shall be specified as "Dry" or
"Lubricated". If lubricated, the type of lubrication is to be specified on
the cross section drawing and/or in the manual.
6.3.3.1 All connections to the primary casing shall be butt welded. Openings for
auxiliary connections shall not be placed in high-speed flow areas. All
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 12 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.3.3.4 The first segment of the pressure casing connection shall be terminated
with a flange or an elbow followed immediately by a flange. Butt-welds
shall be subjected to 100% radiographic examination. If radiographic
examination is not practical, it may be substituted by ultrasonic
examination. In addition, all welds for pressure casing connections shall
be subjected to a fluorescent magnetic particle examination
(ferromagnetic material) or a liquid penetrant examination (non-
ferromagnetic material).
Note:
The aim of the above first sentence is to have the flanges on pressure casing
connections located very close to the pump casing. This will reduce dead leg
length, ensure stiff connection with short guesting, and simplify pump
handling during shipping and overhaul.
6.3.3.5 Piping less than 2 inch shall be gusseted in two orthogonal planes to
increase the rigidity of the piped connection. Piping shall terminate in a
flanged connection as close as possible to the pump casing.
6.3.3.12 (Addition) All pumps shall be provided with vent (except self-venting pumps)
and drain connections. Pump casing vent and drain connections shall be braced
and shall be provided with flanged valves.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 13 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.4.5 (Clarification) Annex F clause F.1.2 shall not be used without Company
written approval. Acceptance by the pump vendor to allow forces and
moments exceeding those show in Table 1A & 1B shall not be used by the
piping designer to exceed the values shown in the table without Company
written approval
6.5 Rotors
6.5.3 Dimple in the shaft for positive mechanical locking is not allowed.
6.6.1 (Exception to third sentence) Renewable impeller wear rings are required
and may be omitted if any of the following conditions apply:
a) Impellers are of the hydraulically unbalanced semi-open design;
b) The impeller head exceeds 275 m (900 ft);
c) The peripheral velocity of the impeller wear surface exceeds 45 m/s
(150 ft/s);
d) Operating temperature or severe transients could result in loosening
of the wear ring fit.
If impeller wear rings are omitted, the wear surfaces of closed design
impellers shall be overlaid with hard materials and shall be approved by
Company. Manufacturer standard materials are acceptable provided that
the proposed materials are used in similar service and are operating
successfully.
6.6.2 Stationary mating wear part can be non-metallic type for clean light
hydrocarbon where the specific gravity is less than 0.7.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 14 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.7.4 (Clarification) The vendor shall provide, in the proposal, the maximum
flow rate from the secondary control system in the event of a containment
shell or stator liner failure.
6.7.9 (Substitute) Drain connections D2 per Annex E shall be provided that
completely drain and provide capability to flush all internal areas of the
secondary pressure casing. For CMP this may require a drain at each end
of the stator, vendor to confirm two drains or advise how liquid passes
through the windings.
6.8 Dynamics
6.8.1 (Clarification) For all pumps, any available critical speed data measured
on identical pumps operating under similar conditions shall be included
in the proposal. In the absence of previous measured data, the Vendor
shall provide the critical speed values calculated taking into account
hydraulic effects.
6.8.3 Vibration
6.8.3.2.1 The FFT plotted spectra 5Hz to 2Z times running speed shall be included
in the pump test results.
6.8.3.2 For workshop testing, the pump shall be well fastened to the test bench
so that vibration measurements shall be valid and may be used as
acceptance criteria. In the event that a pump fails to meet the vibration
requirements due to the test bench installation, the Vendor shall
demonstrate this by running the test again with an improved installation.
6.8.4.2 Impellers, balance pistons, motor rotor of CMP, inner and outer magnet
assemblies for MDP and similar rotating components shall be
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 15 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.9.7 (Clarification) The vendor shall provide axial position curves and
restoring forces magnitude as a function of flow rate and in both
directions.
6.10 Materials
6.10.1.1 The pump materials shall be as per the specified material code in the
pump data sheet. Equivalent materials listed in table H.2 are acceptable
and doesn’t require a review or approval by Company. Other alternative
materials complying with other national standards are acceptable
provided that their mechanical and chemical properties are equivalent to
or exceed those of the specified materials. Alternative materials shall be
sent for the review and approval by Company.
6.10.1.7 Material Test Reports for pressure containing parts impeller and shaft
shall be provided in accordance with EN 10204, 3.1; and EN 10204, 2.1
for other wetted components. Parts exposed to sour service must meet
ANSI/NACE MR0103/ISO 17945.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 16 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.10.1.8 In the event that the data sheet specifies an erosive fluid the vendor shall
propose an erosion allowance, coating or cladding or other technique to
avoid degradation of the mechanical strength or integrity of the rotating
parts due to erosion.
6.10.2.3 All weld repairs and post weld heat treatment at foundry and pump
vendor shop shall conform to the original material specification of the
casting.
All welding procedure specifications, performance qualification records,
and weld map documents must be available for the purchaser inspector
review upon his request.
When the pressure casting has a through hole or the casting has more than
three major defects, the weld repair procedures, including the welding
procedure specifications (WPS), with supporting documentation shall be
prepared and submitted to the Buyer Representative for review and
concurrence prior to any repairs being conducted.
If the defect does not fully penetrate the casing but the repair will require
making a through hole in the casting; then, this defect shall also be treated as
a through hole defect.
Page 17 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.10.2.5 Welded or brazed repairs on ductile or Ni resist cast iron castings are
prohibited. Pressure containing, ductile or Ni resist cast iron parts shall not
be repaired by plugging. Repair procedures shall be submitted for
Company approval and each defect shall be located on a weld map before
proceeding with repair
6.10.3 Welding
Page 18 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
6.10.3.4.5 100% radiographic examination is required for the welded areas of the
suction and discharge nozzles and any casing welds. Radiographic
examination may be substituted by ultrasonic examination if approved by
Company. Suction and discharge nozzle welds shall be inspected by
magnetic particle or liquid penetrant examination after back chipping or
gouging and again after post-weld heat-treatment or, for austenitic
stainless steels, after solution annealing. The Purchaser will specify if the
following additional inspection methods are required:
• a) magnetic particle or liquid penetrant inspection of auxiliary
connection welds;
• b ultrasonic or radiographic inspection of any casing welds.
6.10.4.1 (Clarification) Refer to pump data sheet and site data. When material is being
selected for low temperature applications, the Purchaser shall take into
consideration the temperature resulting from transient operations such as:
line filling, first start up and draining of liquids that may be vaporized.
6.11.2 Pump nameplate data shall also include the purchase order number, year
of the pump manufacture, pump shaft train weight, Manufacturer’s name
and address
7 Accessories
7.1.2 Motors
7.1.2.1 (Clarification) Electric motors shall comply with the project specifications.
The Vendor shall clearly indicate any limitations or any special start
up procedures resulting from the selection of supply elements. Electric
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 19 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
motor start up shall always be direct on line. The data sheet shall specify
those cases in which the pump starts up on an open circuit. Unless
otherwise specified, start up on an “open valve” shall assume start up on
an open circuit and motors shall be sized accordingly. The separation
between the motor and pump speed torque curve shall never be less than
10% of the rated torque under 80% of the nominal motor voltage. The
nameplate rated power including service factor (if any) of electric
motors shall be the greater of the two following values considering the
maximum operating temperature:
• power determined as per API STD 685 table 8. The Rated power of the
pump to be taken into account being the power absorbed at the rated
point, plus the API allowances per Table 11,
• maximum power absorbed by the pump with the selected impeller at the
maximum specified specific gravity (including cold start on viscous
fluid, up to and including the end of curve.
7.3 (clarification) Fabricated steel baseplate shall be supplied. All joints shall
be continuously seal welded to prevent crevice corrosion Baseplate design
shall allow filling with non shrink mortar to prevent liquid retention inside
and improve stiffness. Drip pan with drain connection is not required The
bottom of the baseplate shall be in one plan to permit single level
foundation. For motors over 45 kW or over, base plates shall be fitted with
horizontal positioning jackscrews (alignment setting for motor) as
specified below:
• four lateral horizontal jackscrews,
• four longitudinal horizontal jackscrews,
• four vertical leveling jackscrews for motors with a shaft height exceeding
315 mm (12 in) (110kW, 150 hp).
These screws shall have a fine SI thread. They shall be designed
and disposed to enable insertion of adjusting shims.
Base plates shall include at least:
• four jackscrews to adjust base plate level before fixing anchor bolts,
• four lugs for package lifting.
The base plate shall include appropriate surfaces so that a level can be
used for installation on the foundation block
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 20 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
7.4.1.3 For CMP, bearing wear detector or shaft position sensor shall be provided
unless the pump is fitted with ceramic type bearing such as solid silicon
carbide.
7.4.1.4 (Addition) Instrumentation systems and connections shall be in accordance
with AMIMS-J-4831. Terminals installed outside the control panel shall
be mounted in terminal boxes.
If the specified shutdown function will result in major plant process upset,
the shutdown function may be reduced to alarm with concurrence of the
proponent and Company.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 21 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
7.5.1 (Clarification) Piping and appurtenances shall comply with project piping
classes or with data sheet requirements. If such components are not
specified, they must be submitted to Company’s approval before order.
Regardless of piping specification or class, the minimum wall thickness
for piping DN 40 (1½”) shall be schedule 160 for carbon steel piping
and schedule 80S for stainless steel piping. Threaded vent and drain
connections shall not be used. Drains and vents shall be equipped with a
gate valve. If the specification for the piping connected to the pump calls
for double block valves, this requirement shall apply to vent and drain
valves. If a pump has several drains or vents each shall have a separate
valve. After the gate valve, pump casing drains shall be run to the skid
edge terminating with a flanged connection. Drain and vent shall be
reinforced by means of gussets or pipe supports or a combination of both.
Unless otherwise specified, for pumps specified for liquids that are
classified as Group I, II or III in accordance with Annex B or have a
pumping temperature greater than 80°C (176°F), each vent shall have a
flanged connection after the gate valve. This connection shall be routed to
a closed drain or flare system. For other liquids, each vent shall have a
connection after the gate valve for disassembly and then be run to the
drain pan. The end of the pipe shall be fitted with a flange and blind flange
in accordance with the applicable piping specification. If screwed
connections are acceptable to the applicable piping specification they shall
be sealed welded except for connections that require disassembly.
Screwed piping damaged by self-gripping wrenches will be refused.
7.5.2 In addition to the plans in Annex D, the plans in ASME B73.3 and the
Hydraulic Institute HI 5.1-5.6 may also be used. Other manufacturer
plans may also be used subject to review and approval of Company.
7.5.3 (Modification to the second sentence) If this requirement causes difficulty
in shipping and handling, piping shall be packed in a wooden box or
crate and shall be shipped together with the mechanical equipment.
7.5.6 (Exception) Equivalent material listed in table H.2 are acceptable and
does not required a review or concurrence from the Company.
Union connectors may be used only for piping containing liquids that are
classified Group IV if it can be demonstrated that flanges cannot be
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 22 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
7.5.8 (Addition) Auxiliary piping shall meet all the below requirements:
a) Vent, drain, external flush and cooling water piping shall be routed
to the edge of the baseplate and shall terminate with flanged
connections.
b) The minimum wall thickness of auxiliary piping and butt welding
fittings shall be Schedule 40 for sizes larger than 2-inch and
Schedule 80 for sizes 2-inch and smaller.
c) Flanges, socket welding and threaded fittings shall be the class,
rating or wall thickness to match the pipe ratings. Threaded
connections are only permitted for instrumentation connection.
Unions are not allowed.
d) Tubing is not allowed for auxiliary process piping (i.e., auxiliary
piping that is subjected to process fluid). Tubing is permitted only
for instrumentation piping. Instrumentation piping and tubing shall
be per AMIMS-J-4831.
Tubing may be used instead of pipe beyond the first valve in non-
process auxiliary piping.
The maximum allowable pressure and temperature limits for tubing
are 3400 kPa (500 psig) and 120°C (250°F).
e) The minimum size of auxiliary piping and tubing for mechanical
equipment shall be ½-inch NPS.
f) For cooling water piping, a closed sight flow indicators shall be
furnished in each cooling water outlet.
g) All piping systems shall be provided with vent valves at highest
points and drain valves at lowest points. Horizontal runs in pressure
piping shall slope gradually towards drain points. The minimum
slope of drain lines shall be 1:50.
h) Pipe bends shall have surfaces free of cracks and buckles. Flattening
of the cross section of bends shall not exceed 8 percent of the
nominal pipe diameter. Bending procedures and heat treatment
requirements shall be in accordance with ASME B31.3.
7.5.9 Pump casing vent (except self-venting pumps) and drain piping shall be
provided with block valves immediately after the casing connection
flange. If this location is not practical due to space limitation or other
reasons, the valves may be moved to the nearest possible location to the
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 23 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
casing.
Note:
The valve material shall be as required for the service but as a minimum
shall be similar to the auxiliary piping material. A block valve, ¾-inch
NPS minimum, shall be installed in each instrument take-off connection
from the casing or other piping and shall be located as close as feasible
to the connection.
Exception:
Valves shall be in accordance with API STD 602 Class 800 or ASME
B16.34 with rating as required.
7.5.10 (Addition) All welds must meet the minimum quality requirements of
ASME B31.3 together with the following additional requirements:
a) For pipe sizes 2 inch and smaller the first pass of butt welded joints
shall be made with Gas Tungsten Arc Welding (GTAW) process.
b) Permanent backing rings are prohibited, but consumable inserts of
the same chemistry as the remaining weld metal may be used.
8.1 General
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 24 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
8.1.6 (Clarification) This section applies. The checklist shall be signed and
dated by both the Vendor and Company representatives prior to release
of the equipment for expedition.
Page 25 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
two girth welds shall be radiographed, regardless of the lot size. One
hundred percent (100%) radiography is required for auxiliary piping in
hydrocarbon service on offshore platforms.
8.3 Testing
8.3.1 General
8.3.1.2 (Exception to Table 11, Note 1) The head rise from rated capacity to
shut-off shall not be less than 10% for pumps in parallel operation. The
head rise from rated capacity to shut-off shall not be less than 8% for
pumps not in parallel operation as specified in paragraph 6.1.15. Lower
values require Company approval. When pumps are intended for parallel
operation, the criteria specified in § 6.1.15 shall be checked during
performance test.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 26 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
8.3.2.10 (Clarification) The duration of the hydrostatic test shall be one (1) hour.
8.3.3.1 All pumps shall be performance and mechanical run tested. Witness
testing on one pump per set of identical pumps, selected in random, is
required. The performance test shall be carried out with all the sealing
equipment and accessories called for in the order connected including any
bearing oilers.
8.3.3.3.1 (Exception) Test data shall be taken at shut-off (no vibration data
required), minimum continuous stable flow, normal flow, rated flow and
120% of rated flow. If normal flow is not specified, the pump shall also
be tested at
mid-point between the minimum continuous stable flow and rated flow.
For Pumps with heads greater than 200 m (650 ft) and with power more
than 225 kW (300 HP), the shut-off test may be substituted by testing at
10% of best efficiency point capacity, respectively.
8.3.3.3.3 (Exception) Test speed shall be within 3% of the rated speed. For low
specific gravity pump application, reduced test speed may be accepted and
it requires the review and approval by Company. The vibration acceptance
criteria contained in this specification are not applicable to reduced test
speed. The vendor shall propose the vibration acceptance levels at the
reduced speed for review and approval by Company.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 27 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
• impeller diameters,
An air test at 1.7 barg (25 psig) for 5 minutes shall be carried out to
prove successful reassembly. No pressure drop shall be acceptable
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 28 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
8.3.4.4.6 (Addition) NPSH3 testing shall be performed for all pumps where the
NPSH margin (NPSHA over NPSH3) at 120% of the rated flow is less
than 1 meter (3 feet). Only one pump of a set of identical pumps is
required to be witnessed and the remaining pumps shall be certified.
If the NPSH3 margin at 120% is more than 1 meter (3 feet), only one pump
of a set of identical pumps shall be NPSH3 tested and witnessed. The
remaining pumps shall not have NPSH3 test.
8.4.2.2 (Clarification) Unless otherwise specified, the paint system shall be the
vendor’s standard for an ISO 12944 category C5-I corrosive
environment. The paint system shall be supplied for approval by
Company.
8.4.5 The corrosion resistant metal tag shall be stamped in accordance with the
purchase order.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 29 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
8.4.8 (Addition) All loose materials and mill scale shall be removed by blasting
to Sa 2 or by pickling from reservoirs, tanks, coolers, filters, bearing
housings and other components with which lube oil comes into contact.
9.1.1.5 The design shall provide for the removal of the power end assembly
bearing without disturbing the pressure casing or driver..
9.1.1.8 Other circulation and cooling schemes listed in ASME B73.3 and HI 5.1-
5.6 may also be used. Other manufacturer plans may also be used subject
to review and approval of Company.
9.1.2.2.2 (Exception) All MDP shall have secondary control system with exception
of pumps that have dual shell with leak detection. The only allowable
secondary control system (bearing protector) are mechanical seals or IP66
bearing isolators. The secondary control system (bearing protector) for
process liquid with lower vapor pressure than atmospheric shall be
designed for the maximum suction pressure. For liquids with maximum
vapor pressure above atmospheric, the secondary control system (bearing
protector) shall be designed for 40 barg (60 psig) or the MAWP,
whichever is less.
9.1.3.7 a) Torque required to accelerate the rotor assembly during start-up with
the job driver and specified fluid. Starting conditions shall be based
on fully open discharge valve with maximum liquid viscosity.
Across-the-line starting is to be assumed for motor drives unless
otherwise specified.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 30 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
9.1.3.8 (Addition to first sentence) for molten sulfur application, the factor shall
be 1.5.
9.1.3.9 The vendor shall submit a torque versus temperature curve that covers
the entire design temperature range of the magnetic coupling.
9.1.3.10 The vendor shall submit a speed-torque curve defining capability of the
synchronous magnetic coupling during start-up and operation at the rated
temperature. The torque requirements of 9.1.3.7 (a) and 9.1.3.7 (b) are to
be shown as well as the rating factor defined in 9.1.3.8. The speed-torque
curve shall be presented in the format shown in Figure 9.
9.1.4.1.3 e) Axial and radial fits and clearances, as well as any pre-load, shall be
clearly indicated on the section drawing and in the manual.
9.1.4.1.4 Roller bearings cage or retainer shall be machined from brass. Synthetic
materials (Polyamide, nylon or phenolic resin) are not allowed for cages.
Pressed steel cages are not acceptable. (Modification to last sentence)
The vendor shall ensure that values for temperature rise (9.1.4.2.3) and
vibration (6.8.3.4) meet the requirements of this specification.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 31 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
9.1.4.2.2 An oil sump collection container shall be provided. This container shall
be transparent and shall be located on the bottom of the oil sump to
collect bearing housing contaminants such as water. It shall be fitted with
a spring loaded drain pet cock. The collector materials of construction
shall be suitable for the lubricant used.
9.1.4.2.3 The oiler should vent to atmosphere. Constant level oilers shall be of the
balanced or non-vented type.
9.1.4.2.9 (Addition) Based on the specified site conditions, the Vendor shall
indicate if oil heating is necessary. The Vendor shall provide any
necessary oil heating system and bearing insulation. If the Vendor
believes that such a heating system is not necessary, the Vendor will not
be granted an operating limit due to low ambient temperature.
9.1.4.3.1 The Vendor Rolling element bearings for pumps shall be oil lubricated.
Grease lubricated bearings may be proposed only as an option and only if
accompanied by a complete technical and commercial argument.
“TOTAL” brand lubricants shall be used.
9.1.5 Accessories
9.1.5.1 Drivers
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 32 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
9.1.5.1.1 For pumps equipped with variable frequency drive system, the motor
power rating shall be 110% of the pump break horse power at the highest
speed required to meet the process conditions specified in the pump data
sheet.
9.1.5.1.3 (Modification to first sentence) Steam turbines shall comply with the
standard specified on the turbine data sheet.
9.1.5.2.2 Lubricated couplings are not acceptable. Flexible disc pack or diaphragm
type couplings shall be supplied for horizontal pumps and vertical in-line
pumps. Elastomeric couplings or couplings having a comparable torsional
stiffness are required for pumps driven by reciprocating engines.
Elastomeric members shall not deteriorate due to exposure to
hydrocarbon environment.
Spacer type couplings shall be furnished for all horizontal and flexibly
coupled vertical in-line pumps. Flexible couplings shall be capable of
accepting parallel misalignment of not less than 1,270 micrometers (50
mils) between shaft ends and shall be capable of absorbing twice the
maximum axial growth plus twice the axial magnetic centering force of
the electric motor.
9.1.5.2.11 All coupling guards for pumps in hydrocarbon service shall be of a non-
sparking material such as aluminum or brass. If totally enclosed coupling
guard is provided, drain connection shall be provided for the coupling
guard.
9.1.5.3 Baseplates
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 33 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
The baseplate shall extend under the pump and drive train components so
that any leakage is contained within the baseplate. To minimize
accidental damage to components, all pipe joints and pipe flange faces,
including pump suction and discharge flanges, shall be within the drain-
pan or drain-rim collection area. All other projections of the equipment
supplied shall fall within the maximum perimeter of the baseplate.
The manufacturer shall pre align the train in the factory, with the
baseplate clamped in position and level at each of the machined surfaces.
Clamps will be at the anchor bolt positions. Baseplate shall be made of
welded structural steel.
9.1.5.3.13 For offshore installations, the baseplate and pedestal support assembly
shall be sufficiently rigid to be mounted without grouting.
9.1.5.3.21 The vendor shall be responsible for the proper design of the baseplate and
for the elimination of any unacceptable characteristics such as harmonic
vibration.
9.1.6 Testing
9.1.6.1 Magnetic couplings shall be given a static torque test to verify the rated
torque (see 9.1.3.8) and certification shall be provided.
Page 34 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
9.2.2 Unless otherwise specified, the use of tie rods for stator assembly shall
not be acceptable.
9.2.2.12 (Addition) The motor termination box and stator chamber shall be
suitable for the environment where the pump will be installed.
9.2.7 Windings resistance measurements test and dielectric test are required
and shall be performed in accordance with IEEE 252. Alternative tests or
standards shall be submitted for review and concurrence by Company.
10.1.3 A coordination meeting shall be held as per API STD 685. The Vendor
shall be aware that there may be pre-commitment, coordination and design
audit meetings as deemed necessary by Company. These meetings shall be
considered part of any purchase order.
10.2.3 P (Addition) The temperature versus pressure profiles throughout the pump
for minimum stable flow, design conditions, and maximum rated flow at
the maximum specified operating temperature.
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 35 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
Annex I
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.
Page 36 of 37
SAUDI ARAMCO TOTAL PETROCHEMICAL COMPLEX
Issuer: PMT
July 2021
Sealless Centrifugal Pumps Rev: 2
AMIMS-G-3105
The present document or drawing is property of SAUDI ARABIAN OIL COMPANY and TOTAL RAFFINAGE CHIMIE S.A. and
shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or
used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or
outside the extent of the agreed upon right of use.