Simply Supported One-Way Slab

Slab Mark = Mumty [Continuous]

Max Span (l) = 3.00 m Thickness (D) = 125 mm


Max UDL (w) = 8.00 Kn/m2 Eff Cover = 28 mm

Concrete Grade = 20 N/mm2 Eff Depth (d) = 97 mm


Reinf Grade = 500 N/mm2 Load Factor = 1.5

Main Reinforcement Distribution Reinforcement


Max B.M = 9.00 Kn-m wL2 @ 0.12 %
Mu = 13.50 Kn-m 8 Dist Reinf Rqd = 1.16 cm2
k = 1.43 N/mm2 Dist Reinf pvdd Area (cm2)
Required Main Reinforcement Area (cm2) Dist Bar dia = 10 mm ( 3.93 )
Tension Rft. (pt) = #VALUE! % #VALUE! Spacing = 200 mm (OK)
Compression Rft. (pc) = #VALUE! % #VALUE! Check for Deflection
pvdd area Actual l/d (ra) = 30.93
Main Tension reinf dia = 10 mm Permissible l/d = 26.00 (Unmodified)
Spacing = 200 mm 3.93 Tension rft pvdd = 0.40 %
#VALUE! Comp rft pvdd = 0.00 %
IS456-2k,Cl: 23.2.1c&d (Permissible L/d)
Main Com reinf dia = N/A Service Stress, fs = ### N/mm2
Spacing = N/A
Modification factor (Mf)
Mf Tension = ### (IS:456-2k, fig. 4)
Summary for Mumty (125 Thk) One Way S/S Slab Mf Compression = 1.00 (IS:456-2k, fig. 5)
Main Rft = 10 Tor @200 c/c (bottom)
Perm' l/d (rp) = ### (Modified)
Dist Rft = 10 Tor @200 c/c (bottom) #VALUE!
MODIFICATION FACTOR FOR COMP STEEL

MF 1 1.08 1.15 1.2 1.25 1.3 1.33


%age 0 0.25 0.5 0.75 1 1.25 1.5

%pvdd 0.00 0 0.25


mf 1.00 1 1.08
1.37 1.4 1.42 1.46 1.48 1.5
1.75 2 2.25 2.5 2.75 3