GERI S.A.
GEOTECHNICAL STUDY BEFORE PROJECT Rev.: Status:
LAUNCH
Mission G12 Date of Revision: Page :
2927 06-07-2011 1 of 60
J.P Ph. D. xx
00 xx Issued for Review 06-07-2011
NDONG LONDEIX REMICHI
Written Revised Approved Addax
Rev. Status Reason for issue Date of revision
by by by
03-005-AXL-09-REP-
REMBO NKOMI
REV00.
BRIDGE
GERI S.A.
Rev.: Status:
GEOTECHNICAL STUDY BEFORE PROJECT
LAUNCH
Mission G12 Date of Revision: Page
06-07-2011 2 of 60
2927
Revision History
CORRECTION SHEET
Remarks: This sheet has to be filled in with every detail, after the official publication of each correction .The
details must appear on the following description-revision table, indicating the graphs and pages that have been
revised, so as the dates and the approved signatures.
Revision Description Date Approved by
SUMMARY
I. PRESENTATION 3
II. MISSIONS 3
IV. RECONNAISSANCE 7
V. RESULTS OF RECONNAISSANCE 8
5.1 Topography 8
5.2 Penetrometers 9
5.3 Hydrogeology 10
VII. CONCLUSION 15
APPENDIXES
Penetrometrical diagram
ABBREVIATIONS
I. PRESENTATION
After the demand and for the account of the AXIAL bureau, the GERI study bureau has realized the
geotechnical study of the pre-launch, regarding the construction of a bridge on the Rembo Nkomi
River (Nyembe) by the petroleum company ADDAX.
The project is located at approximately 250 km SOUTH-EAST of Port Gentil and will allow to link
the two oil sites of TSIENGUI and OBANGUE.
Reference plan:
The site is relatively flat and partially occupied by the ADDAX installations during our intervention.
II. MISSIONS
GERI is in charge of the mission G12; in respect to the norm NF P94500 of geotechnical missions of
December 2006 presented in the appendix:
Mission G12: Geotechnical study before project launch.
The goal is to contribute to the elaboration of a pre-launched project, by defining the geotechnical
hypothesis and to take into account the general principals of construction, undertaken in geotechnical
activities.
References used:
PART N°62 - Title V December 1993, Technical rules of conception and calculation of foundations by
civil engineering works.
Any changes in implantation or regarding the importance of constructions hypothesis found during
the establishment of this study report, must be communicated to us and receive our written approval,
because these changes could modify the results of our study.
The project manager should make sure that he has given us enough accurate information for the
sounding implantation.
The Project site is located on the Southern Coast of Gabon; at about a hundred kilometers North East
of the city Omboue. The site is identified as being part of the Madila formation group, formed
essentially with fine subordinated sandstone and of marls.
Red detrital soils are essentially present. The relief is not that complex and the ground water is
generally slightly deep.
Extract of the geological map of Gabon: (scale of 1/1000 000), Compilation and synthesis made by:
R.J THOMAS; J.F MAKANGA and L. CHEVALIER 2 2000 edition:
III. RECONNAISSANCE
The reconnaissance program after concerting with the client consists of executing the following
activities:
Twenty six (26) soundings with a penetrometer of heavy dynamic; conducted to a depth of
15 m or by refusal. Their annotation is from SPL1 to SPL26 .
Considering that the trial points 21 to 26 have been added to the original contract following the
project sliding.
Five (5) core drillings at a 20 m depth together with pressiometrical trials on every 1,00 m,
done under high pressure, into bed rock and constant extractions of samples of crumb
formation in the rock eventually.
Considering that a complementary sounding (SC1B) is done as a complement of the 4 that were
programmed on the contract for the same reasons cited previously.
We have to remind
The dynamic penetration trial allows us to measure the appearing dynamic resistance of the
soil in accordance to the depth by dynamic insertion of a drill pipe with a 50 kg mutton. When
refusal is obtained; it indicates a site presenting a resistance to penetrometrical stamping, superior to
50 Mpa.
The geological sounding allows us to establish, with accuracy, the nature and the thickness of
layers of the soil that is being prospected.
For each type of soil encountered; the pressiometrical trial helps us define the following
mechanical characteristics: Pressure limits (P1); Creep pressure (Pf) and pressiometrical module (E).
Observations:
The depth of the different lithological elements is defined according to existing natural level of the
landscape existing at the time of reconnaissance (May 2011).
The thickness of noted resistance is the one measured by the sounding authorization; and can
encounter fluctuations between these points.
Penetrometrical trials can`t give precise lithology; because not done after sampling.
4.1. Topography
On the right bank of the river the site is relatively flat and evolves between dimension 5and 6.
On the left bank of the river; it is also flat and evolves between the dimension 9 and 10 with a slight
lower down on the alignment of points 11; 12 and 13 of dimension 7, 5.
5.2 Penetrometry
Details in the penetrometrical diagram are presented in accordance to the different banks on the
appendix.
The trials have been conducted to a depth of 13 to 15 meters deep; without encountering any refusal.
RIGHT BANK
All the results are presented below and bring us to the following conclusions :
SPL:1à10; Rembo N ko mi River Bridge
21à23 Rive Dro ite We found homogenous results in-depth and also on the
DIAGRAMME PENETROMETRIQUE
Résistance dynamique apparente en Bar surface studied.
0 m
1 10 100 1000
This homogeneousity allows us to distinguish 4 layers
1 m which are the following:
Couche 1
2 m
Layer 1 : from 0,00m to 2,20m deep : medium compact
3 m
Couche 2 material;to very compact material with considerable peaks
4 m
dynamic resistance qd reaching 200bars.It is without a
5 m
Couche 3 doubt a material brought up after backfill and compacted.
6 m
7 m
8 m
Layer 2 : from 2,20m to 4,50m deep : material with little
9 m
compactivity;to decompress and of mediocre bearing.We
Pro fo ndeur
10 m
Couche 4 notice in particular many weak zones characterised by a
11 m
dynamic resistance qd neighbouring 2 bars.This level
could 12 m
be affected by important subsidence.
13 m
14 m
Layer 3 : Located between 4,50m and 9,00m , material
with 15 m
a medium compactivity ;to completely compact ;with a
16 m dynamic resistance qd ranging from 15 to 30 bars.
17 m
Layer 4 : from 9,00m to the end limit of the trial at
18 m
15,00m : Compact material to very compact.The dynamic
19 m
resistance increases regularly from 40 to 80 bars in median
20 m
Affaire 2 9 2 7 / Essai réalisé du 0 9 mai au 1 1 juin 2 0 1 1
values.This level is formed with clear sand; that goes on to
20 m deep (see chapter 5.4).
LEFT BANK
All the results are presented below and brings us to the following conclusions:
0 m
1 10 100 1000
The results are extremely heterogeneous in depth as well as on
1 m the surface studied.
2 m
3 m We have noticed:
4 m
5 m
- Many zones of weakness; particularly between 0 and 7 m
6 m
deep, and precisely above the apparent dynamic resistance
7 m
qd comprised between 1 and 2 bars. The material is totally
8 m
9 m
decompressed and compressible.
Pro fo ndeur
10 m
11 m
- Some peaks of resistance first between 0 and 2 m then
12 m between 5 and 8 m with qd neighboring 100 bars; which
13 m is the characteristic of a very compact material.
14 m
20 m
Affaire 2 9 2 7 / Essai réalisé du 1 3 mai au 1 6 Juin 2 0 1 1
We have also noticed that the formations encountered are
extremely clayey; up to 20 m (see chapter 5.4).
5.3 Hydrogeology:
When it`s measurable from within the cavity left by the penetrometer pipe (sliding can occur
particularly on sandy soils); the level of water raises up.
At present times; that level couldn`t be identified but is on our belief not deep.
Remarks:
The reconnaissance soundings are done on short term duration.
The presence or non-presence of water at a given level at the time of the soundings doesn`t give us
any indications of fluctuations.
The origin of possible fluctuation is of natural source (rise in the water level in relation to the
meteorology); either caused by activities or a modification of the neighboring environment
(pumping, refusals, dam effect…)
We can also note:
- The risk of swimming pool effect linked to a presence of permeable materials in a permeable
environment.
- Circulation strongly conditioned by meteorology.
The definition of the level of the ground water results from the realization of a piezometer and by the
observation of fluctuations over many months concerning the studied case ; presently the use of a
piezometer hasn`t been applied.
Crumb
thickness
N° Cote TN (m)
Right bank
SC1 5,34 20,00
SC1B 5,34 20,00
SC2 - 20,00
Left bank
SC3 - 20,00
SC4 - 20,00
Right bank :
0 to 3m: Clayish sand in backfill to clayish sand
3 to 5/9 m: clayish sand
5/9 m to 11 m: clayish sand to black marn / silty sand
11 to 20 m: clear sand
Left bank:
0 to 20 m: fissured clay
Rive droite
SC 1
Essai pre ssiomé trique Me nard se lon norme NF P 94 110
Pl Pf
Profondeur E (Bars) E/PL Pf/Pl
(Bars) (Bars)
1,0m 218,4 8,3 4,8 26,2 0,58
2,0m 81,2 7,5 4,2 10,8 0,55
3,0m 45,0 4,3 2,6 10,4 0,61
4,0m 38,4 3,8 2,0 10,1 0,54
5,0m 46,2 4,4 2,6 10,6 0,60
6,0m 68,1 5,0 2,9 13,5 0,58
7,0m 52,2 4,3 2,4 12,2 0,55
8,0m 73,4 4,8 2,8 15,2 0,58
9,0m 100,5 5,1 3,9 19,7 0,76
10,0m 110,4 7,1 5,1 15,5 0,72
11,0m 115,9 6,1 4,8 19,0 0,79
12,0m 109,9 5,9 4,1 18,6 0,69
13,0m 109,4 7,5 4,9 14,6 0,65
14,0m 134,3 8,3 5,6 16,2 0,67
15,0m 132,6 9,1 6,3 14,6 0,69
16,0m 142,6 8,9 6,1 16,0 0,69
17,0m 130,0 9,1 6,2 14,3 0,68
18,0m 142,2 10,1 7,1 14,1 0,70
19,0m 169,0 10,4 7,1 16,3 0,68
20,0m 160,0 10,6 6,2 15,1 0,58
2 à 10 m
max 110,4 7,1 5,1
min 38,4 3,8 2,0
moy 66,8 4,9 3,1
11 à 20m
max 169,0 10,6 7,1
min 109,4 5,9 4,1
moy 134,6 8,6 5,8
SC 2
Essai pre ssiomé trique Me nard se lon norme NF P 94 110
Pl Pf
Profondeur E (Bars) E/PL Pf/Pl
(Bars) (Bars)
1,0m 294,8 23,4 13,2 12,6 0,56
2,0m 142,8 8,2 5,4 17,5 0,66
3,0m 72,2 6,9 4,3 10,5 0,62
4,0m 46,6 5,2 3,4 8,9 0,65
5,0m 55,5 5,8 3,7 9,5 0,63
6,0m 49,2 4,5 3,0 11,0 0,66
7,0m 59,1 4,4 2,8 13,6 0,64
8,0m 60,1 4,2 2,7 14,4 0,64
9,0m 100,2 6,9 5,1 14,5 0,74
10,0m 115,9 7,5 5,9 15,5 0,79
11,0m 106,8 8,6 5,9 12,4 0,69
12,0m 130,7 9,5 6,7 13,8 0,71
13,0m 170,8 8,3 4,9 20,5 0,58
14,0m 181,7 9,4 5,0 19,4 0,54
15,0m 161,0 9,1 6,3 17,7 0,69
16,0m 140,9 8,4 6,3 16,8 0,75
17,0m 219,4 9,5 6,9 23,1 0,73
18,0m 238,8 10,5 7,9 22,7 0,75
19,0m 249,5 11,9 8,9 21,0 0,75
20,0m 288,4 12,3 9,1 23,4 0,74
2 à 10 m
max 115,9 7,5 5,9
min 46,6 4,2 2,7
moy 69,9 5,7 3,8
11 à 20 m
max 288,4 12,3 9,1
min 106,8 8,3 4,9
moy 188,8 9,8 6,8
SC 1B
Essai pre ssiomé trique Me nard se lon norme NF P 94 110
Pl Pf
Profondeur E (Bars) E/PL Pf/Pl
(Bars) (Bars)
1,0m 275,4 20,9 12,3 13,2 0,59
2,0m 105,2 8,1 4,9 13,0 0,61
3,0m 65,8 5,3 3,7 12,3 0,69
4,0m 69,7 6,5 4,3 10,7 0,66
5,0m 55,9 4,5 2,6 12,5 0,58
6,0m 56,1 4,3 2,7 13,1 0,63
7,0m 59,8 4,1 2,6 14,7 0,64
8,0m 103,6 6,0 3,9 17,4 0,65
9,0m 100,1 6,9 5,1 14,5 0,74
10,0m 123,0 7,1 5,2 17,3 0,73
11,0m 147,1 8,5 5,4 17,3 0,63
12,0m 113,8 7,0 4,2 16,2 0,59
13,0m 126,1 9,8 6,0 12,9 0,62
14,0m 106,1 8,4 5,1 12,6 0,60
15,0m 149,1 10,1 5,9 14,8 0,58
16,0m 123,0 9,4 6,2 13,1 0,66
17,0m 144,5 10,3 7,2 14,0 0,70
18,0m 158,8 10,0 5,5 15,9 0,55
19,0m 140,4 9,1 5,1 15,4 0,56
20,0m 206,3 12,9 7,1 16,0 0,55
2 à 10 m
max 123,0 7,1 5,2
min 55,9 4,1 2,6
moy 79,3 5,6 3,8
11 à 20m
max 206,3 12,9 7,2
min 106,1 7,0 4,2
moy 141,5 9,5 5,8
Left bank
SC 3
Essai pre ssiomé trique Me nard se lon norme NF P 94 110
Pl Pf
Profondeur E (Bars) E/PL Pf/Pl
(Bars) (Bars)
1,0m 120,8 8,1 5,4 14,8 0,66
2,0m 86,3 6,7 4,2 12,9 0,63
3,0m 92,2 6,6 4,1 14,0 0,63
4,0m 62,7 7,8 4,5 8,1 0,57
5,0m 64,4 5,6 3,3 11,6 0,59
6,0m 87,5 7,5 5,2 11,7 0,69
7,0m 63,1 6,9 4,8 9,1 0,68
8,0m 57,8 4,9 2,7 11,8 0,55
9,0m 57,7 4,5 2,8 12,7 0,62
10,0m 99,4 7,6 4,2 13,1 0,56
11,0m 87,6 4,2 2,9 20,9 0,69
12,0m 109,9 7,2 4,9 15,3 0,68
13,0m 89,9 5,1 3,8 17,6 0,75
14,0m 208,9 8,8 5,2 23,8 0,59
15,0m 136,5 7,9 5,7 17,3 0,72
16,0m 131,0 6,9 4,8 19,0 0,70
17,0m 187,0 9,5 5,7 19,7 0,60
18,0m 110,7 6,4 4,8 17,3 0,75
19,0m 108,0 7,9 5,1 13,7 0,65
20,0m 129,0 8,9 6,8 14,5 0,76
2 à 20 m
max 208,9 9,5 6,8
min 57,7 4,2 2,7
moy 104,6 6,9 4,5
SC 4
Essai pre ssiomé trique Me nard se lon norme NF P 94 110
Pl Pf
Profondeur E (Bars) E/PL Pf/Pl
(Bars) (Bars)
1,0m 100,9 10,1 6,8 10,0 0,67
2,0m 52,1 5,1 3,1 10,2 0,61
3,0m 86,9 6,8 4,3 12,7 0,63
4,0m 38,0 3,5 2,2 10,7 0,63
5,0m 40,7 4,0 2,6 10,3 0,65
6,0m 74,3 6,4 4,2 11,5 0,66
7,0m 65,3 7,0 3,7 9,3 0,52
8,0m 61,3 5,8 3,3 10,6 0,58
9,0m 73,6 5,1 3,4 14,3 0,66
10,0m 51,6 4,3 2,6 12,1 0,61
11,0m 57,6 4,0 2,5 14,5 0,63
12,0m 226,8 6,8 3,8 33,5 0,56
13,0m 154,9 9,0 5,4 17,3 0,61
14,0m 213,8 10,0 5,4 21,4 0,54
15,0m 158,5 9,0 4,9 17,7 0,54
16,0m 99,3 6,5 4,6 15,3 0,71
17,0m 229,1 12,3 7,8 18,6 0,63
18,0m 102,9 7,5 5,9 13,7 0,79
19,0m 102,3 8,1 5,5 12,6 0,68
20,0m 89,9 6,8 4,9 13,2 0,72
2 à 20 m
max 229,1 12,3 7,8
min 38,0 3,5 2,2
moy 107,0 6,8 4,3
Right bank:
We can distinguish the clayish layer to clayish sand to 2 to 10 m and layer of clear sand from 11 to
20 m:
SC1 / SC2 / SC1B
2 à 10 m E Pl Pf E/Pl Pf/Pl
max 123,0 7,5 5,9 19,7 0,79
min 38,4 3,8 2,0 8,9 0,54
moyenne 72,0 5,4 3,6 13,2 0,65
11 à 20 m E Pl Pf E/Pl Pf/Pl
max 288,4 12,9 9,1 23,4 0,79
min 106,1 5,9 4,1 12,4 0,54
moyenne 155,0 9,3 6,1 16,6 0,66
GERI sa SODUCO B.P. 2194 Libreville GABON Tél. 70 42 72 Fax 70 42 82 gerigabon@inet.ga
Reproduction unauthorized without our approval
03-005-AXL-09-REP-
REMBO NKOMI
REV00.
BRIDGE
GERI S.A.
Rev.: Status:
GEOTECHNICAL STUDY BEFORE PROJECT
LAUNCH
Mission G12 Date of Revision: Page
06-07-2011 19 of 60
2927
Right bank :
SC3 / SC4
2 à 20 m E Pl Pf E/Pl Pf/Pl
max 229,1 12,3 7,8 33,5 0,79
min 38,0 3,5 2,2 8,1 0,52
moyenne 105,8 6,9 4,4 15,0 0,64
On the right bank the results are homogeneous; but present poor geotechnical characteristics up to 10 m
deep. Above that; we encounter a sand formation moderately compact to compact.
On the left bank; the encountered formation is exclusively clayish and measured characteristics are very
heterogeneous and generally weak to medium.
We preconize consequently deep foundations of beaten post or drilled post with concrete eventually
reinforced with a big diameter.
The defining of these foundations comes essentially after study of the project (geometry; altimetry) and
of necessary charges.
To illustrate that statement; we would like to demonstrate with a simulation for posts of 20 ml on the
right bank; neutralizing the two first meters and for different diameters.
Thus:
Projected: drilled post = 400 ; 600 ; 800 ; 1000 mm ; tubed with recuperated tubes
Length of post H = 20m
QU = QPU + QSU
QPU = A . qpu
400 A = .2/4 = 0,126 m2
600 = 0,283 m2
800 = 0,503 m2
1000 = 0,785 m2
qpu = Kp (Ple-p0) + q0
p0 et q0 : neglected
Terme de pointe :
f A qpu QPU QPU /3 QPU /2
2 2
mm m KN/m KN KN ELS KN ELU
400 0,126 990 124,7 41,6 62,4
600 0,283 990 280,2 93,4 140,1
800 0,503 990 498,0 166,0 249,0
1000 0,785 990 777,2 259,1 388,6
1200 1,131 990 1119,7 373,2 559,8
On the left bank and considering the heterogeneous geotechnical performances that are modest to a 20
ml depth; it is necessary to do at least one sounding, complementary to a 30 ml depth. It is also
necessary to insert that sounding on the axe of the stump, which has not been done earlier; for logistical
reasons (because of ADDAX installations).
VII .CONCLUSION :
We preconize deep foundations with beaten posts or drilled posts, with reinforced concrete and with a
big diameter.
The defining of these foundations comes essentially after study of the project (geometry; altimetry) and
of necessary charges:
To illustrate that statement; on the right bank and for posts of 20 ml long, it comes according to the
diameter of the posts.
On the left bank it is advisable to make a complementary sounding at at least 30ml deep.
Our proposals are those that sound to be the best considering the data in our possession.
Other solutions could be proposed, if we take into account criteria that weren`t retained; in a
feasibility study and that could appear on the conception phase or execution (environment
modification, any particular characteristics of the project not brought forward to us).
We would advise that, on the execution phase of the project; the realization of mission G3 (study and
geotechnical forwarding of execution) and G4 (geotechnical supervision of execution); distinctive
and simultaneous.
Therefore; it is important to verify the geotechnical data by sampling during the execution and by a
complementary geotechnical program of investigation; if necessary.
We would also advise for the placement of piezometers so as to better observe the phreatic water
fluctuations.
This report and its appendixes are inseparable its bad use that could occur following a
communication or a partial reproduction, shouldn`t be endorsed by Geri.
The soil reconnaissance is done by punctual soundings; the results are not rigorously extrapolable on
the entire site. Unforeseen accounts are inevitable (example: local heterogeneity); it could therefore
lead to conception adaptations and executions that are under the management of geotechnicians.
ANNEXES
Diagrammes pénétrométriques
RIVE DROITE
SPL1 Rembo N ko mi River Bridge SPL2 Rembo N ko mi River Bridge SPL3 Rembo N ko mi River Bridge
Rive Dro ite Rive Dro ite Rive Dro ite
DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE
Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
Arrêt à : 1 3 m Arrêt à : 1 3 m Arrêt à : 1 3 m
14 m 14 m 14 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 0 9 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 0 9 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 0 9 mai 2 0 1 1
SPL4 Rembo N ko mi River Bridge SPL5 Rembo N ko mi River Bridge SPL6 Rembo N ko mi River Bridge
Rive Dro ite Rive Dro ite Rive Dro ite
DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE
Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 1 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 0 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 0 mai 2 0 1 1
Rembo N ko mi River Bridge SPL8 Rembo N ko mi River Bridge SPL9 Rembo N ko mi River Bridge
SPL7
Rive Dro ite Rive Dro ite Rive Dro ite
DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE
Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
Arrêt à : 1 3 m Arrêt à : 1 3 m
14 m Arrêt à : 1 3 m 14 m 14 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai
19 m Niveau piézométrique :pas notoire au moment de l' essai 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 0 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 1 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 1 mai 2 0 1 1
SPL10 Rembo N ko mi River Bridge SPL21 Rembo N ko mi River Bridge SPL22 Rembo N ko mi River Bridge
Rive Dro ite Rive Dro ite Rive Dro ite
DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE DIAGRAMME PENETROMETRIQUE
Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar Résistance dynamique apparente en Bar
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
14 m Arrêt à : 1 3 m 14 m 14 m
15 m 15 m 15 m
Arrêt à : 1 5 m Arrêt à : 1 5 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 0 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 0 juin 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 0 juin 2 0 1 1
1 m 1 m
2 m 2 m
3 m 3 m
4 m 4 m
5 m 5 m
6 m 6 m
7 m 7 m
8 m 8 m
9 m 9 m
Pro fo ndeur
Pro fo ndeur
10 m 10 m
11 m 11 m
12 m 12 m
13 m 13 m
14 m 14 m
15 m 15 m
Arrêt à : 1 5 m
16 m 16 m
17 m 17 m
18 m 18 m
20 m 20 m
Affaire 2 9 2 7 / Essai réalisé du 0 9 mai au 1 1 juin 2 0 1 1
Affaire 2 9 2 7 / Essai réalisé le 1 0 juin 2 0 1 1
RIVE GAUCHE
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique :pas notoire au moment de l' essai Niveau piézométrique :pas notoire au moment de l' essai L' eau est affleurante au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 4 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 5 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 5 mai 2 0 1 1
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique:au moment de l' essai Niveau Piézométrique: pas notoire au moment de l' essai Niveau piézométrique: pas notoire au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 4 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 4 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 4 mai 2 0 1 1
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique au moment de l' essai
19 m 19 m L' eau est affleurante au moment de l' essai
19 m Niveau piézométrique: au moment de l' essai
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 5 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 3 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 3 mai 2 0 1 1
1 m 1 m 1 m
2 m 2 m 2 m
3 m 3 m 3 m
4 m 4 m 4 m
5 m 5 m 5 m
6 m 6 m 6 m
7 m 7 m 7 m
8 m 8 m 8 m
9 m 9 m 9 m
Pro fo ndeur
Pro fo ndeur
Pro fo ndeur
10 m 10 m 10 m
11 m 11 m 11 m
12 m 12 m 12 m
13 m 13 m 13 m
15 m 15 m 15 m
16 m 16 m 16 m
17 m 17 m 17 m
18 m 18 m 18 m
Niveau piézométrique: au moment de l' essai Niveau piézométrique: pas notoire au moment de l' essai Niveau piézométrique: pas notoire au moment de l' essai
19 m 19 m 19 m
20 m 20 m 20 m
Affaire 2 9 2 7 / Essai réalisé le 1 3 mai 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 6 Juin 2 0 1 1 Affaire 2 9 2 7 / Essai réalisé le 1 5 Juin 2 0 1 1
1 m 1 m
2 m 2 m
3 m 3 m
4 m 4 m
5 m 5 m
6 m 6 m
7 m 7 m
8 m 8 m
9 m 9 m
Pro fo ndeur
Pro fo ndeur
10 m 10 m
11 m 11 m
12 m 12 m
13 m 13 m
14 m Arrêt à: 1 3 m 14 m
15 m 15 m
16 m 16 m
17 m 17 m
18 m 18 m
20 m 20 m
Affaire 2 9 2 7 / Essai réalisé du 1 3 mai au 1 6 Juin 2 0 1 1
Affaire 2 9 2 7 / Essai réalisé le 1 6 Juin 2 0 1 1
RIVE DROITE
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC1 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Atterberg ou ES
% récupération
Profondeur (m)
Granulométrie
Teneur en eau
Pressiomètre
Ø carottier
Piézomètre
Ø tubage
Rc en bars
RQ D
Coupe Description O bservation
1 1
Sable fin argileux à
60%
argile sableuse
2 rougeâtre 2
3 3
1
4 1
4
5 5
Carottier BQ Ø 60 pour sonde pressiométrique
Tubage provisoire en HQ Ø89
70 à 75%
7 7
8 8
9 9
10 noir 10
11 11
12 12
propre
18 18
19 19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 1 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLANTATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Pressiomètre Ménard
Profondeur (m)
Coupe Description
Em (Bars) Pf (Bars) Pl (Bars)
10 100 1000 1 10 100
0 0
0 Graveleux latéritique
1 218 1 8,3
1
Sable fin argileux à
argile sableuse
rougeâtre 2 81 2 7,5
2
3 45 3 4,3
3
4 38 4 3,8
1
4
5 46 5 4,4
5
7 52 7 4,3
7
8 73 8 4,8
8
9 101 9 5,1
9
T
11 116 11 6,1
11
12 110 12 5,9
12
13 109 13 7,5
13
14 134 14 8,3
14
15 133 15 9,1
15
Sable fin à moyen, gris,
propre
16 143 16 8,9
16
17 130 17 9,1
17
18 142 18 10,1
18
169
19 19 10,4
19
20 160 20 10,6
20
Arrêt sondage à 20,0m
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 1 B Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Atterberg ou ES
% récupération
Profondeur (m)
Granulométrie
Teneur en eau
Pressiomètre
Ø carottier
Piézomètre
Ø tubage
Rc en bars
RQ D
Coupe Description O bservation
1 1
45 à 50%
3 3
1
4 1
4
55 à 60%
Tubage provisoire en HQ Ø89
6 6
Le niveau d'eau à 3,00m de profondeur au moment du sondage
7 7
75 à 80%
9 9
10 10
11 11
12 12
passages ponctuels
argileux
18 18
19 19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 1 B Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Pressiomètre Ménard
Profondeur (m)
Coupe Description
Em (Bars) Pf (Bars) Pl (Bars)
1 1 275 1 20,9
3 3 66 3 5,3
1
4 4 70 4 6,5
Argile sableuse gris -
beige
5 5 56 5 4,5
6 6 56 6 4,3
7 7 60 7 4,1
8 8 104 8 6,0
Sable argileux à marneux
noir
9 100 9 6,9
9
T
10 123 10 7,1
10
11 147 11 8,5
11
12 114 12 7,0
12
13 126 13 9,8
13
14 106 14 8,4
14
16 123 16 9,4
16
17 145 17 10,3
17
18 159 18 10,0
18
19 140 19 9,1
19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 2 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Atterberg ou ES
% récupération
Profondeur (m)
Granulométrie
Teneur en eau
Pressiomètre
Ø carottier
Piézomètre
Ø tubage
Rc en bars
RQ D
Coupe Description O bservation
1 1
45 à 50%
3 3
Argile pelitique
70%
1
4 sableuse grise - beige 1
4
Tubage provisoire en HQ Ø89
5 5
Carottier BQ Ø 60 pour sonde pressiométrique
6 6
Le niveau d'eau à 3,00m de profondeur au moment du sondage
60 à 70%
8 8
9 9
20 à 25%
11 11
12 12
35 à 40%
18 18
19 19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 2 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLANTATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Pressiomètre Ménard
Profondeur (m)
Coupe Description
Em (Bars) Pf (Bars) Pl (Bars)
10 100 1000 1 10 100
0 0
0 Graveleux latéritique
1 295 1 23,4
1
Sable fin argileux à
argile sableuse
rougeâtre 2 143 2 8,2
2
3 72 3 6,9
3
5 55 5 5,8
5
6 49 6 4,5
6
8 60 8 4,2
8
9 100 9 6,9
9
T
11 107 11 8,6
11
12 131 12 9,5
12
13 171 13 8,3
13
14 182 14 9,4
14
15 161 15 9,1
15
Sables fin, gris propre
8,4
16 141 16
16
17 219 17 9,5
17
18 239 18 10,5
18
249
19 19 11,9
19
20 288 20 12,3
20
Arrêt sondage à 20,0m
RIVE GAUCHE
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 3 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Atterberg ou ES
% récupération
Profondeur (m)
Granulométrie
Teneur en eau
Pressiomètre
Ø carottier
Piézomètre
Ø tubage
Rc en bars
RQ D
1 1
2 2
3 3
55 à 60%
5 5
Carottier BQ Ø 60 pour sonde pressiométrique
6 6
Le niveau d'eau à 2,50m de profondeur au moment du sondage
7 7
8 8
9 9
45 à 55%
11 11
12 12
13 13
beige
19 19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 3 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLANTATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Pressiomètre Ménard
Profondeur (m)
Coupe Description
Em (Bars) Pf (Bars) Pl (Bars)
10 100 1000 1 10
0 0
0 Graveleux latéritique
1 121 1 8,1
1
2 2 86 2 6,7
3 92 3 6,6
3
Argile pelitique sableuse
rougeâtre
1 4 63 4 7,8
4
5 5 64 5 5,6
6 88 6 7,5
6
7 63 7 6,9
7
8 8 58 8 4,9
9 58 9 4,5
9
T
11 11 88 11 4,2
12 110 12 7,2
12
13 90 13 5,1
13
14 209 14 8,8
14
15 137 15 7,9
15
16 131 16 6,9
16
Argile pelitique gris -
beige
17 187 17 9,5
17
18 111 18 6,4
18
108
19 19 7,9
19
8,9
GERI sa SODUCO
20 B.P. 2194 Libreville GABON 20 70 42 72
Tél. Fax 129
70 42 82 20
gerigabon@inet.ga
Arrêt sondage à 20,0m Reproduction unauthorized without our approval
03-005-AXL-09-REP-
REMBO NKOMI
REV00.
BRIDGE
GERI S.A.
Rev.: Status:
GEOTECHNICAL STUDY BEFORE PROJECT
LAUNCH
Mission G12 Date of Revision: Page
06-07-2011 45 of 60
2927
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 4 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLAN TATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Atterberg ou ES
% récupération
Profondeur (m)
Granulométrie
Teneur en eau
Pressiomètre
Ø carottier
Piézomètre
Ø tubage
Rc en bars
RQ D
1 1
2 2
3 3
1
4 1
4
Tubage provisoire en HQ Ø89
5 5
Carottier BQ Ø 60 pour sonde pressiométrique
40 à 45%
7 7
8 8
9 9
10 10
11 11
12 12
13 13
Argile pelitique gris -
55 à 60%
beige
19 19
Sondage N°
CLIENT: ADDAX Chantier : Rembo Nkomi Bridge
SC 4 Travaux exécutés: du 0 7 au 2 7 0 6 2 0 1 1
Affaire N° Équipement et méthode: IMPLANTATIO N
Sondeuse BE 5 0 - Pompe à boue X:
2927 Tubage provisoire en HQ Ø 8 9 - Tricône BQ Ø 6 0 Y:
CPV Géomatech 2 0 0 - Sonde BX Ø 6 0 Z:
Pressiomètre Ménard
Profondeur (m)
Coupe Description
Em (Bars) Pf (Bars) Pl (Bars)
10 100 1000 1 10 100
0 0
0 Graveleux latéritique
1 101 1 10,1
1
2 5,1
2 2 52
3 87 3 6,8
3
38 4 3,5
1
4 4
5 41 5 4,0
5
7 65 7 7,0
7
8 61 8 5,8
8
9 74 9 5,1
9
T
10 52 10 4,3
10
11 58 11 4,0
11
12 227 12 6,8
12
13 155 13 9,0
13
14 214 14 10,0
14
15 158 15 9,0
15
Argile pelitique gris -
beige 16 99 16 6,5
16
17 229 17 12,3
17
18 103 18 7,5
18
102
19 19 8,1
19
20 70 42 72 90 70 42 82 20 6,8
GERI sa SODUCO
20 B.P. 2194 Libreville GABON Tél. Fax gerigabon@inet.ga
Arrêt sondage à 20,0m Reproduction unauthorized without our approval
03-005-AXL-09-REP-
REMBO NKOMI
REV00.
BRIDGE
GERI S.A.
Rev.: Status:
GEOTECHNICAL STUDY BEFORE PROJECT
LAUNCH
Mission G12 Date of Revision: Page
06-07-2011 48 of 60
2927
Missions géotechniques