Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

BQS 402 1

BQS 402: COST PLANNING & COST


CONTROL
45 HOURS

Dates: 20th February 2023 to 22nd May 2023


TOPICS
2

 Approximate estimating methods


 Cost evaluation of projects

 Cost planning

 Cost control

 Cost-in-use

 Design methods

 Cost advise

 Methods of preparation and use of cost plans


BQS 402
TOPICS
3

 Sources of cost information during design


and construction periods
 Collection, processing, retrieval and use of
building cost indices
 Application of cost planning principles from
inception to completion of a building project

BQS 402
References:
4

 Building Design Cost Management by


Andrew Ross et al (1991)
 Building Cost Control Techniques &
Economics by Bathurst et al (1973)
 Building Economics by Ivor Seeley (1996)

 Cost Planning of Building by Doughlas J


(1996)
BQS 402
References:
5

 Building Cost Planning for Design Team by J.


Smith (2006)
 Cost Control in Building Design by Roger
Hanagan (1997)

BQS 402
CONTINOUS ASSESSMENT
6

GROUP PROJECT TOPICS: 30 MARKS


1. Prepare and contrast the cost plan of a 5 star hotel vis a vis a
hospital. Using relevant examples, prepare the budget, financial
statement and cash flow projections for each of the projects.
2. Discuss the sources of cost information during design and
construction periods clearly indicating its collection, processing
and retrieval. Also discuss their merits and demerits.
3. With the aid of relevant examples, discuss building cost indices,
types, their construction/compilation and uses. Also discuss the
application and sources of building indices in Kenya.

BQS 402
CONTINUOUS ASSESSMENT
7

4.Discuss the approximate estimating methods clearly ranking


them in order of accuracy including their merits, demerits and their
application.
5.Using relevant examples, discuss the application of cost planning
principles from inception to completion of a building project. Cite
reasons for cost overruns during the pre and post contract stages
that may result from the failure to carry out proper cost planning
of construction projects.

BQS 402
Requirements for the report:
8

 Typewritten clearly indicating the names and registration


numbers of the contributors
 Contents to include abstract, introduction, body, conclusion,
references
 Presentation in class will account for marks
 Project to be handed in on or before 17th April 2023
 Presentation in class on 24th April 2023

BQS 402
CONTINOUS ASSESSMENT
9

 Test – 30 marks
 Group Assignment – 30 marks

 CAT MARKS – Max 30


= [(Test + Group Assignment)/60] X 30
 EXAM = Max 70

BQS 402

You might also like