Bar schedule ref : 202 01 Rev: -

The Concrete Centre


Site ref : Spreadsheets to Eurocode 2 Date prepared : 4-Dec-23

Job no : FB625 Prepared by : Rod Checked by : -

No. of Length A* B* C* D* E/R *


No.
Type and bars Total of each Shape
Member Bar mark of
size in No. bar † code
mbrs mm mm mm mm mm
each mm

Double 01 H 16 4 7 28 2375 21 130 2175


Pilecaps 02 H8 4 4 16 2175 00
03 H8 4 11 44 2075 51 270 695 115
04 H8 4 22 88 500 31 115 50 270 115
3-Pile Caps 05 H 16 3 7 21 2475 21 320 1890
06 H 12 3 4 12 1875 00
07 H8 3 8 24 1975 51 270 650 115
08 H8 3 16 48 500 31 115 50 270 115
09 H 16 3 5 15 1975 21 155 1715
10 H 12 3 4 12 1700 00
11 H8 3 8 24 1825 51 240 600 115
12 H8 3 16 48 475 31 115 50 240 115
4-Pile
13 H 16 5 18 90 2225 21 145 1975
Caps
14 H8 5 10 50 1975 00
15 H 16 5 18 90 2225 21 145 1975
16 H8 5 10 50 1975 00
17 H 10 5 100 500 600 31 120 60 345 120
5-Pile
18 H 12 2 19 38 2625 21 125 2410
Caps
19 H8 2 10 20 2400 00
21 H 12 2 20 40 2625 21 125 2410
22 H8 2 11 22 2400 00
20 H 10 2 80 160 700 31 120 60 450 120
6-Pile
23 H 12 1 28 28 2100 21 125 1890
Caps
24 H 12 1 14 14 1875 00
26 H 12 1 17 17 3400 21 125 3175
27 H 12 1 9 9 3175 00
28 H 10 1 84 84 750 31 120 60 495 120
This schedule complies with BS 8666. 1,770 kg on this schedule
PILECAP DESIGN to EN 1992-1: 2004 (without UK NA)

* Specified in multiples of 5mm. † Specified in multiples of 25mm. © 2003-2006 TCC