GENERAL NOTES:
CONTRACTOR'S REVIEW
CHECKED / COORDINATED
DISCIPLINE
DATE SIGNATURE
AR - ARCHITECTURAL
CV -CIVIL
ST - STRUCTURAL
EL - ELECTRICAL
ME - MECHANICAL
4 - 14 Ø HOLES LS - LANDSCAPE
ID - INTERIOR DESIGN
OT - OTHERS
1
D - REJECTED
0(?) Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
drawings and specifications. This review is only in respect of the general
conformance with the design intent of the project and general compliance with
the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
DESIGN DRAWING
Contract.
CLIENT:
MAIN CONSULTANT:
2
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
SUPERVISION CONSULTANT:
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
A 3
MAIN CONTRACTOR:
Veolia Water, Systems (QATAR)
P.O. Box 200445, Midmac R/A, Building No.
474, Street 250, Zone 40, Doha-Qatar.
Tel.: +974 44553296, Fax: +974 44553407
Cell: +974 50503843
www.veoliawatertechnologies.com
B PROJECT TITLE:
BALADNA FARM 2
TSE POLISHING PLANT
LOCATION:
DRAWING TITLE:
or
th RO SKID 3D VIEW RO SKID 3D VIEW
N 1:10
JOB NO : SEZ 21-22-IP-053 Paper Size: A1 Rev.
Drawing Number: BAFI-VWT-M-DW-ZZ-0116 0
KEY PLAN:
A B
1260
383 222
20
95 20
95
CL
FR15
234
175
EA75*75*8
BOBP EL.+ 18.950 25 63 63 25
95
DETAIL 2
95 20 GENERAL NOTES:
38 30 115 30
25
20
1.ALL THE DIMENSIONS ARE IN MM UNLESS
30
FR14 OTHERWISE SPECIFIED.
2.ALL LEVELS ARE IN METERS.
20
EA75*75*8 3.HOT ROLLED STRUCTURAL SECTIONS AND
818
100
BOBP EL.+ 18.950 PLATES SHALL BE GRADE S235 CONFIRMING
DETAIL 2 TO EN10025.
4.BOLTS CONFIRMING TO ASTM A307M SHALL
250
175
115
CL BE USED.
95
584
5.ALL ANCHOR BOLTS SHALL COMPLY ASTM
100
F1554 GRADE 36.
62 63 FR11 FR11 6.ANCHOR BOLTS SHALL BE GALVANIZED IN
62 63 ACCORDANCE WITH ASTM A123 / ASTM A143.
PFC150*75*18 PFC150*75*18 7.ALL STEEL IS PAINTED WITH EPOXY COATED
30
BOBP EL.+ 18.950 BOBP EL.+ 18.950 95 20 TO 250 MICRONS.
DETAIL 1 DETAIL 1 8.ALL PROJECTED BOLTS SHALL BE GREASED AND
25
PLAN SUITABLY COVERED BY PVC CAPS THAT CAN
100
100
PLAN RESIST WEATHER CONDITIONS.
9.ALL STEEL LOCATED FROM CENTER LINE .
1
100
BASEPLATE
BASEPLATE
826
4-M16-HILTI HSA-BW-EXPANSION ANCHOR FRAME 4-M16-HILTI HSA-BW-EXPANSION ANCHOR
GROUT
GROUT
EFFECTIVE ANCHORAGE DEPTH - 150 EFFECTIVE ANCHORAGE DEPTH - 125
(TENSION CAPACITY 50KN) (TENSION CAPACITY 50KN)
EL.+18.950m (SHEAR CAPACITY 51KN)
(SHEAR CAPACITY 51KN) EL.+18.950m
BOBP
EL.+18.925m EL.+18.925m BOBP 0 ISSUED FOR CONSTRUCTION 13-05-22 NP VI
10
10
75 75
25
25
T.O.C. T.O.C. REV DESCRIPTION DATE DRWN CHKD APD
50
125
CONTRACTOR'S REVIEW
2868
CHECKED / COORDINATED
DISCIPLINE
DATE SIGNATURE
50
AR - ARCHITECTURAL
CV -CIVIL
345 FR17 ST - STRUCTURAL
PFC100*50*10 EL - ELECTRICAL
BOBP EL.+ 18.950
DETAIL 3 ELEVATION ELEVATION ME - MECHANICAL
LS - LANDSCAPE
ID - INTERIOR DESIGN
FR13
DETAIL-1 DETAIL-2 OT - OTHERS
100
100
Corrections or comments made relative to submittals during this review does not
200 relieve the contractor from compliance with the requirements of his Contract,
drawings and specifications. This review is only in respect of the general
conformance with the design intent of the project and general compliance with
25 75 75 25 the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
25
trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
DESIGN DRAWING
Contract.
2862
75
CLIENT:
150
100
CL
FR12
62 63 FR12 62 63
25
PFC150*75*18
PFC150*75*18 BOBP EL.+ 18.950
25
BOBP EL.+ 18.950 DETAIL 1
DETAIL 1 PLAN
100
100
3 MAIN CONSULTANT:
100
100
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
BASEPLATE
TEL : (974) 402037 77 / 88 / 99
FRAME FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
GROUT
743
68
25
45 T.O.C.
FR16
57 AL-JAZEERA ST.,
EA75*75*8 BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
BOBP EL.+ 18.950 TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
DETAIL 2
20
20
95
FR16
EA75*75*8 MAIN CONTRACTOR:
Veolia Water, Systems (QATAR)
BOBP EL.+ 18.950 P.O. Box 200445, Midmac R/A, Building No.
474, Street 250, Zone 40, Doha-Qatar.
95 20 DETAIL 2 Tel.: +974 44553296, Fax: +974 44553407
95 20 ELEVATION Cell: +974 50503843
www.veoliawatertechnologies.com
PROJECT TITLE:
DETAIL-3
BASE PLATE LAYOUT AT EL+18.950 (BOBP)UNO BALADNA FARM 2
TSE POLISHING PLANT
LOCATION:
DRAWING TITLE:
BASE PLATE LAYOUT AT EL+18.950
(BOBP)UNO
50
50
50
EA75*75*8 PFC150*75*18 PFC150*75*18 EA75*75*8
EA
*8
713 550 678
728
75
5
*7
*7 EA75*75*8
75
EL.+20.725m 5*
EA
8
T.O.S. B17 B12
1025
PFC150*75*18 PFC150*75*18
EA75*75*8
EA75*75*8
EA75*75*8
EA75*75*8
750
EL.+19.975m
M6
GENERAL NOTES:
M6
M6
B13
EA
T.O.S.
75
PFC150*75*18 1.ALL THE DIMENSIONS ARE IN MM UNLESS
*7
5*
OTHERWISE SPECIFIED.
8
2.ALL LEVELS ARE IN METERS.
EA75*75*8
3.HOT ROLLED STRUCTURAL SECTIONS AND
PLATES SHALL BE GRADE S235 CONFIRMING
TO EN10025.
PFC150*75*18
PFC150*75*18
*8
4.BOLTS CONFIRMING TO ASTM A307M SHALL
PFC150*75*18
75
1025
BE USED.
*
75
5.ALL ANCHOR BOLTS SHALL COMPLY ASTM
EA
EA75*75*8 EL.+19.092m
F1554 GRADE 36.
EL.+18.950m T.O.S. 6.ANCHOR BOLTS SHALL BE GALVANIZED IN
142
ACCORDANCE WITH ASTM A123 / ASTM A143.
B.O.B.P. EA75*75*8 7.ALL STEEL IS PAINTED WITH EPOXY COATED
TO 250 MICRONS.
8.ALL PROJECTED BOLTS SHALL BE GREASED AND
SUITABLY COVERED BY PVC CAPS THAT CAN
FR16 RESIST WEATHER CONDITIONS.
780
EA75*75*8 9.ALL STEEL LOCATED FROM CENTER LINE .
FRAMING ELEVATION ON GRID - A CL CENTER LEVEL (B) BELOW FGL FINISHED GROUND
ALL CONNECTION BOLTS ARE M16 DIA. A325M (UNO) FFL FINISH FLOOR LVL. SSL STRUCT'L SLAB LVL. EL ELEVATION
FL ARCH'L FINISH LVL. SL STRUCT'L CONC. LVL. (A) ABOVE
50
50
PFC150*75*18 PFC150*75*18 EA75*75*8
*8
75
*
75
978
EL.+20.650m
EA
1025 CONTRACTOR'S REVIEW
T.O.S.
CHECKED / COORDINATED
DISCIPLINE
EA75*75*8 DATE SIGNATURE
B19 B11 AR - ARCHITECTURAL
PFC150*75*18 PFC150*75*18 CV -CIVIL
EA ST - STRUCTURAL
75 EL - ELECTRICAL
*7
5* ME - MECHANICAL
8
LS - LANDSCAPE
PFC150*75*18
PFC150*75*18
1014
ID - INTERIOR DESIGN
EA75*75*8 OT - OTHERS
511
EA75*75*8 T.O.S.
484
142
D - REJECTED
EL.+18.950m PL10*175 Corrections or comments made relative to submittals during this review does not
B.O.B.P. relieve the contractor from compliance with the requirements of his Contract,
drawings and specifications. This review is only in respect of the general
conformance with the design intent of the project and general compliance with
the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
FR16 projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
780
FRAMING ELEVATION ON GRID - B EA75*75*8 processes and techniques of construction, coordinating his work with that of other
trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
ALL CONNECTION BOLTS ARE M16 DIA. A325M (UNO) Contract.
DESIGN DRAWING
CLIENT:
A B EA75*75*8 A B
1260 A B 1260
EL.+21.453m EL.+21.453m
EL.+21.453m FR13
220
50
T.O.S. PFC150*75*18
PFC150*75*18 EA75*75*8
PFC150*75*18 MAIN CONSULTANT:
408
EL.+21.045m
408
408
EL.+21.045m T.O.S. EL.+21.045m
57 AL-JAZEERA ST.,
T.O.S. 219 PFC100*50*10 T.O.S. BIN-MAHMOUD / BEHZAD
PFC100*50*10 PFC100*50*10
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
EL.+20.722m
323
323
T.O.S.
T.O.S. PFC100*50*10 T.O.S.
PFC100*50*10 PFC100*50*10
EL.+20.399m
323
EL.+20.399m EL.+20.399m
323
T.O.S.
323
303 T.O.S. SUPERVISION CONSULTANT:
T.O.S. 405 PFC100*50*10 EA75*75*8
PFC100*50*10 PFC100*50*10
EA75*75*8 EL.+20.076m
323
T.O.S.
323
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
T.O.S. PFC100*50*10 T.O.S. TEL : (974) 402037 77 / 88 / 99
PFC100*50*10 EA75*75*8 PFC100*50*10 FAX : (974) 402037 66
323
207 T.O.S.
T.O.S. EA75*75*8 EA75*75*8 PFC100*50*10 T.O.S.
PFC100*50*10 PFC100*50*10
EL.+19.430m
MAIN CONTRACTOR:
323
EL.+19.430m EL.+19.430m
323
323
T.O.S. EA75*75*8
PFC150*75*18
407
480
400 EL.+18.950m
480
480
EL.+18.950m
B.O.B.P. B.O.B.P.
PFC150*75*18 B.O.B.P.
PFC150*75*18 BALADNA FARM 2
TSE POLISHING PLANT
PFC150*75*18 EA75*75*8
408
LOCATION:
FRAMING ELEVATION ON GRID - 1 FRAMING ELEVATION ON GRID - 2 FRAMING ELEVATION ON GRID - 3 DRAWING TITLE:
ALL CONNECTION BOLTS ARE M16 DIA. A325M (UNO) ALL CONNECTION BOLTS ARE M16 DIA. A325M (UNO) ALL CONNECTION BOLTS ARE M16 DIA. A325M (UNO) FRAMING ELEVATIONS
A B
1260 A B
A B EA75*75*8
EL.+ 20.650 1260
1260
FR15 383
291
EA75*75*8 EA75*75*8 GENERAL NOTES:
FR14 EL.+ 20.650
EA75*75*8 EA75*75*8 222
EA75*75*8 1.ALL THE DIMENSIONS ARE IN MM UNLESS
50
1025
1028
OTHERWISE SPECIFIED.
EA75*75*8
2.ALL LEVELS ARE IN METERS.
3.HOT ROLLED STRUCTURAL SECTIONS AND
640
PFC100*50*10 PLATES SHALL BE GRADE S235 CONFIRMING
EA75*75*8
818
EA75*75*8 TO EN10025.
677
PFC100*50*10 FR11
627
584
35 300
PFC150*75*18 BE USED.
EA75*75*8 1 1 5.ALL ANCHOR BOLTS SHALL COMPLY ASTM
F1554 GRADE 36.
1 EA75*75*8
405 6.ANCHOR BOLTS SHALL BE GALVANIZED IN
ACCORDANCE WITH ASTM A123 / ASTM A143.
A B 7.ALL STEEL IS PAINTED WITH EPOXY COATED
TO 250 MICRONS.
851
EA75*75*8 8.ALL PROJECTED BOLTS SHALL BE GREASED AND
851
FR17 1260 405 PFC100*50*10
SUITABLY COVERED BY PVC CAPS THAT CAN
PFC100*50*10 PFC100*50*10 EL.+ 20.783 RESIST WEATHER CONDITIONS.
9.ALL STEEL LOCATED FROM CENTER LINE .
2868
1
PFC150*75*18
PFC150*75*18
345 CL CENTER LEVEL (B) BELOW FGL FINISHED GROUND
PFC100*50*10 EA75*75*8 FL ARCH'L FINISH LVL. SL STRUCT'L CONC. LVL. (A) ABOVE
2868
B15
B20
PFC100*50*10
851
DRAWING REFERENCE DRAWING TITLE REV
2868
EA75*75*8
200
1A
EA75*75*8 408
PFC150*75*18
FR17
PFC100*50*10 2
49
FR13
B18
EA75*75*8 PFC150*75*18
EA75*75*8
407 A A PFC100*50*10 EA75*75*8
5730
EA75*75*8 EA75*75*8 345 0 ISSUED FOR CONSTRUCTION 13-05-22 NP VI
EA75*75*8
EA75*75*8 408
PFC150*75*18
408 REV DESCRIPTION DATE DRWN CHKD APD
PFC150*75*18
5730
EL.+ 20.475
2868
2
EL.+ 20.725
EA75*75*8 408
CONTRACTOR'S REVIEW
B19
5730
B17
PFC100*50*10 CHECKED / COORDINATED
DISCIPLINE
DATE SIGNATURE
EL.+ 20.722
EA75*75*8
2862
AR - ARCHITECTURAL
2
PFC150*75*18
CV -CIVIL
ST - STRUCTURAL
5730
EL - ELECTRICAL
EA75*75*8 EA75*75*8
EA75*75*8 EA75*75*8 407 ME - MECHANICAL
B16
PFC150*75*18
2862
EA75*75*8
PFC150*75*18
303 LS - LANDSCAPE
PFC150*75*18
ID - INTERIOR DESIGN
OT - OTHERS
FR18
200
249
PFC150*75*18 A - APRROVED
2862
EA75*75*8 EA75*75*8 PFC100*50*10
407 3 B - APPROVED AS NOTED
260
EA75*75*8 EA75*75*8 C - REVISED & RE-SUBMIT
3 EA75*75*8
EA75*75*8
EA75*75*8
EA75*75*8
D - REJECTED
Corrections or comments made relative to submittals during this review does not
PFC150*75*18
215 relieve the contractor from compliance with the requirements of his Contract,
2862
PFC150*75*18
PFC150*75*18
1025
conformance with the design intent of the project and general compliance with
408 the information given in the Contract documents. The contractor remains respo
743
743
EL.+ 20.725
EL.+ 20.475
408 nsible, among other things, for the design of the project or such parts of the
EA75*75*8
EA75*75*8
EA75*75*8
45 69 projects he has design responsibility for (if design forms part of the Contract),
FR16 for confirming and correlating all quantities and dimensions, selecting fabrication
B13
processes and techniques of construction, coordinating his work with that of other
B12
B11
EA75*75*8 trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
DESIGN DRAWING
Contract.
EA75*75*8 EA75*75*8
FR16 3 3 EA75*75*8
CLIENT:
EA75*75*8
PFC100*50*10 PFC100*50*10 908 352
EL.+ 20.722
FRAMING PLAN AT EL+19.461 (TOS)UNO FRAMING PLAN AT EL+19.975 (TOS)UNO FRAMING PLAN AT EL+21.453 (TOS)UNO
ALL CONNECTION BOLTS ARE M16 DIA. A325M(UNO) ALL CONNECTION BOLTS ARE M16 DIA. A325M(UNO) FRAMING PLAN AT EL+20.725 (TOS)UNO ALL CONNECTION BOLTS ARE M16 DIA. A325M(UNO)
ALL CONNECTION BOLTS ARE M16 DIA. A325M(UNO)
MAIN CONSULTANT:
B
PFC100*50*10 57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
273 450 EL.+20.783m FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
73 377 T.O.S.
SUPERVISION CONSULTANT:
8
0*
*5
50
SA
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
R
MAIN CONTRACTOR:
Veolia Water, Systems (QATAR)
P.O. Box 200445, Midmac R/A, Building No.
474, Street 250, Zone 40, Doha-Qatar.
Tel.: +974 44553296, Fax: +974 44553407
Cell: +974 50503843
www.veoliawatertechnologies.com
PFC100*50*10
PROJECT TITLE:
FR17
LOCATION:
345 DRAWING TITLE:
FRAMING PLANS
1307
1556
2113
B16 1 PFC150*75*18 8'-10 1/8" 106 S235
0
a28 1 EA75*75*8 6 11/16" 3 S235
a15
p13 1 FLT10*75 8 1/4" 3 A36
a36
407
408
B17 1 BEAM EPOXY 250µm
208
ch41 1 PFC100*50*10 1'-3 11/16" 9 S235
38
p11 2 FLT10*75 9 13/16" 6 A36
765
915
1443
1593
1993
2143
B18 1 PFC150*75*18 8'-10 1/8" 106 S235
40
25
38
38
B16
25
B20 1 BEAM EPOXY 250µm
150
B20 1 PFC150*75*18 8'-10 1/8" 106 S235
100
75 60
320
a15 1 EA75*75*8 1'-3 13/16" 8 S235
245
4 p11 4
175
95
p11 2 FLT10*75 9 13/16" 6 A36
320
p13 4 4
100
4
4
A
408
a28
a15
TOTAL WEIGHT THIS DRAWING 644
3 *Ø 18 HOLES 4 C
25
75
SECTION A - A a36 4
208
B 2 *Ø 18 HOLES
1307 1388 SECTION B - B SECTION C - C
0
1307
2695
864 1831
864
2695
No. 1, Marked B16
2715 (PFC150*75*18 x 2695)
10 2695 10
37 38
SQ. CUT SQ. CUT
2715 (PFC150*75*18 x 2695) SIM
EL20475
p11
F F
25
50
50
10 2695 10
25
a15
50
B19
100
37 38 SQ. CUT SQ. CUT 4
175
SIM 4
EL20725
ch45
100
p11 D p11 p11
D
25
4
ch44
25
ch41
38
23
23
B17 F
F
25
100
4
2 *Ø 18 HOLES
175
4
SECTION F - F
100
4 p11 p11
4
4
2 *Ø 18 HOLES D
SECTION D - D
1443
1593
1993
2143
765
915
2715
405
407
407
ch41
ch45
ch44
408
a15
0 ISSUED FOR FABRICATION 13-05-22 NP VI
REV DESCRIPTION DATE DRWN CHKD APD
867 676 550 602
0
867
1543
2093
2695
CONTRACTOR'S REVIEW
864 1831
864
2695
DATE SIGNATURE
AR - ARCHITECTURAL
CV -CIVIL
ST - STRUCTURAL
2715 (PFC150*75*18 x 2695)
EL - ELECTRICAL
ME - MECHANICAL
10 2695 10 LS - LANDSCAPE
ID - INTERIOR DESIGN
37 38
SQ. CUT SQ. CUT OT - OTHERS
SIM
EL21453
p11 CMCS CONSULTANT'S REVIEW & APPROVAL:
G G
25
50
50
25
REVIEW STATUS DRAWING REVIEW STAMP
a15
43
B20 A - APRROVED
100
B - APPROVED AS NOTED
4 C - REVISED & RE-SUBMIT
175
4
D - REJECTED
100
4 p11 p11 Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
drawings and specifications. This review is only in respect of the general
2715 G conformance with the design intent of the project and general compliance with
G
25
4 the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
2 *Ø 18 HOLES projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
SECTION G - G trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
Contract.
TYP DESIGN DRAWING
TYP
4 4
No. 1, Marked B20 CLIENT:
408
408
a15
a38
340
1646
2695
10 2695 10 3. REMOVE ALL SHARP CORNERS, WELD SPATTERS & BURRS ETC.
37 38 SHARP CORNER TO A SMOOTH RADIUS.
SQ. CUT SQ. CUT
SIM SUPERVISION CONSULTANT:
4. FABRICATION TOLERANCE (+/-) 3MM FOR OVER ALL DIMENSION.
EL19461
p11 E E
25
a38 a15
25
57 AL-JAZEERA ST.,
27
BIN-MAHMOUD / BEHZAD
B18 5. ALL FABRICATION AND WELDING WORKS TO BE CARRIED OUT AS PER BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
100
4
p11
100
p11
4 6. HOT ROLLED STRUCTURAL SECTIONS AND PLATES SHALL BE GRADE S235
E CONFIRMING TO EN10025. MAIN CONTRACTOR:
E
25
1335
1028
552
C 400
1185
A B
485 38 37
51
50
50
2543 2543
2518 2518
2493
200
200
2 *Ø 18 HOLES
a24 a24 FR11
398
4 2318 2318
TYP
408
4
488
4
2 *Ø 18 HOLES 411
2145
a26
ch40
816
26 D
853
32
a CTR'D 2085
528
ch42 1025
778
765
950
323
455
405 138
565 291
4 1790 ch40
32
CTR'D 1762 667
1727 ch41
330 1690
200
ch46 ch41 1590
323
a43 a19
1540
a43
100 50 ch40
2 *Ø 18 HOLES
32
CTR'D 1439
200
4
2203
658
1340
4
550
2543
2543
2553
D
2553
TYP
2553
323
4
957
2 *Ø 18 HOLES
2
ch40 a4
32
2 *Ø 18 HOLES CTR'D 1116
a25
1040
1185
323
200
814
448
a35
1690
113 38 4
1690
840 ch40
32
4 CTR'D 793
770
ch37
a35
228
207
ch37
323
a2
112
7
322 470
a14 38
200
840
a37
a13 4 400
4 a13 326
38 113 a17
542
ch34
2 *Ø 18 HOLES
252
470
4 a17
ch34
326
290
552 50
C E bp1 bp1 E
10
10
a17 0 0 0 0 0
10
10
bp1 A B
SECTION C - C SECTION B - B 0
REV
ISSUED FOR FABRICATION
DESCRIPTION
13-05-22
DATE
NP
DRWN CHKD
VI
APD
25
a43 CV -CIVIL
ST - STRUCTURAL
100 100
100 100
4 *Ø 18 HOLES 4 *Ø 18 HOLES EL - ELECTRICAL
250
250
ME - MECHANICAL
a19
p20 LS - LANDSCAPE
5 5 ID - INTERIOR DESIGN
25
25
100 25 3 SIDE 4 4 OT - OTHERS
25 100
4
1185 CMCS CONSULTANT'S REVIEW & APPROVAL:
REVIEW STATUS DRAWING REVIEW STAMP
A - APRROVED
SECTION E - E SECTION D - D
B - APPROVED AS NOTED
C - REVISED & RE-SUBMIT
1:10 1:6 D - REJECTED
Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
5. ALL FABRICATION AND WELDING WORKS TO BE CARRIED OUT AS PER BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
7. ALL STEELWORK SHALL BE CUT AND FABRICATED TO A TOLERANCE IN Tel.: +971 6 5570703, Fax: +971 6 5570704
www.veoliawatersystems.com
1175
1025
1100
ch39 1 PFC150*75*18 8'-4 1/8" 100 S235
330
ch40 5 PFC100*50*10 3'-10 5/8" 133 S235
a19
a19
a19
a20
2 a32
SECTION F - F
75
1:10 1339
SECTION H - H
1:10
1175 1175
50
50
2543 a32
4 4 2518 2518 a30 4
a19 FR12 2493 a19
a29
103
103
a23
200
200
2318
G TYP 315
G 2318
4 4
a2
4 4 4
408
2
471
471
185 2 *Ø 18 HOLES 185
TYP
a2
4 4 4
a30
2
100
ch40
32
CTR'D 2085
100
528
100
100
1213
778
323
4 4
1790 ch40
32
CTR'D 1762
200
2 *Ø 18 HOLES
1590
1608
323
1608
1540
405 ch40
32
CTR'D 1439
200
F F
1330 a15 1340
550
2543
2543
2553
2553
2553
323
4 2 *Ø 18 HOLES
100 332 ch40
32
CTR'D 1116
100
a20
546
1040
2 *Ø 18 HOLES
323
200
ch39
814
4
185
840
J J
4 ch40 a29
32
CTR'D 793
a31
1330
323
4
500 TYP 38
38 4 526
600 470
ch39
200
840
782
782
a13 a13 2 *Ø 18 HOLES a13
326
ch36
ch36
470
408 38 0 ISSUED FOR FABRICATION 13-05-22 NP VI
REV DESCRIPTION DATE DRWN CHKD APD
326
a15 a15
bp1 E E
134
bp1 bp1 CONTRACTOR'S REVIEW
10
0 0 0 0
CHECKED / COORDINATED
DISCIPLINE
10
10
10
DATE SIGNATURE
A B AR - ARCHITECTURAL
CV -CIVIL
SECTION A - A 2000
SECTION B - B
ST - STRUCTURAL
EL - ELECTRICAL
1:10 1:10 ME - MECHANICAL
25
100 100
250
a29 A - APRROVED
a29
260
260
TYP
260
B - APPROVED AS NOTED
4
185
185
a30
185
a31 C - REVISED & RE-SUBMIT
5 5 D - REJECTED
25
25
100 25 25 100 Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
1250 215 TYP
675
1185 drawings and specifications. This review is only in respect of the general
4 conformance with the design intent of the project and general compliance with
the information given in the Contract documents. The contractor remains respo
1260 215 nsible, among other things, for the design of the project or such parts of the
SECTION G - G projects he has design responsibility for (if design forms part of the Contract),
415
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
a20
1475
SECTION J - J
a40
220
37 37
25
25
a33 3 EA75*75*8 7 7/8" 12 S235
50
50
2543 bp2
25
25
2518 2518
EL19092
2518 2518 95 20 4 a34 1 EA75*75*8 8 3/8" 4 S235
2493 63 138
4
60 65
2 *Ø 18 HOLES
30
2453 a35 1 EA75*75*8 7 15/16" 4 S235
216
4
200
200
20
200
8
2393 FR13
a40 1 EA75*75*8 8 11/16" 4 S235
175
115
2318
75
75
3 *Ø 18 HOLES 4
408
bp1 2 FLT10*250 6 7/8" 15 S235
124
FR16
EL18950
a34 ch35 1 PFC150*75*18 8'-4 1/8" 100 S235
J J 4 *Ø 14 HOLES
57
30
124 26 a33 ch38 1 PFC150*75*18 8'-4 1/8" 100 S235
TYP
4 ch40 2085 30 115 30 ch40 5 PFC100*50*10 3'-10 5/8" 133 S235
603
10
528
175
bp2 FR14 1 FRAME EPOXY 250µm
778
778
SECTION J - J
323
FR14 1 EA75*75*8 1'-6 11/16" 9 S235
1000
1790 1790 ch40 1762 No. 2, Marked FR16 bp2 1 PL10*175 6 7/8" 5 S235
200
2 *Ø 18 HOLES 2 *Ø 18 HOLES FR15 1 EA75*75*8 3 3/4" 2 S235
323
1590 1590
1540 1540 a45 1 EA75*75*8 11 13/16" 6 S235
1439
200
200
ch40
303
FR16 2 FRAMES EPOXY 250µm
124 26 a33 1340 1340
1327 FR16 2 EA75*75*8 4 7/8" 5 S235
550
2543
2553
2553
323
2543
615
2553
250
bp2 2 PL10*175 6 7/8" 11 S235
124 26 a16
2 *Ø 18 HOLES ch40 1116
1077 450 FR17 1 FRAME EPOXY 250µm
a16
1040 73 377 FR17 1 PFC100*50*10 5'-7 13/16" 39 S235
EL20783
975 a46 1 RSA50*50*8 1'-3 3/16" 5 S235
323
125
814
814
TYP ch47
307
200
75 60
100
100
770 ch40
a35
3 *Ø 18 HOLES TOTAL WEIGHT THIS DRAWING
ch38
582
100
a15
228
323
100
a35 113 38 207
202
23 4
542 TYP 526 526
6
4
a4
470
a15
200
200
840
840
ch35
2 *Ø 18 HOLES
ch38
470
ch35
326
326
10
0 0 0 0
10
10
A B
1833
SECTION B - B
1723
SECTION A - A 1:10
1521
1:10
175 175
43 133
25 125 25 25 125 25
a41
25
25
bp1 bp1
a40
100 100
100 100
4 *Ø 18 HOLES 4 *Ø 18 HOLES
220
250
250
4 4
FR17
5 5
FR17
25
25
100 25 25 100
FR13
1185
SECTION F - F
EL18950
K K
SECTION E - E
1:10
10
bp3
25 75 75 25
25
0 ISSUED FOR FABRICATION 13-05-22 NP VI
75
150
100
REV DESCRIPTION DATE DRWN CHKD APD
25
25
CONTRACTOR'S REVIEW
4 bp3 DISCIPLINE
CHECKED / COORDINATED
4 *Ø 18 HOLES DATE SIGNATURE
AR - ARCHITECTURAL
SECTION K - K CV -CIVIL
EL19434
OT - OTHERS
30
a44
TYP CMCS CONSULTANT'S REVIEW & APPROVAL:
4
REVIEW STATUS DRAWING REVIEW STAMP
474
465
95
175
115
FR14
A - APRROVED
B - APPROVED AS NOTED
20
30
20 95 D - REJECTED
Corrections or comments made relative to submittals during this review does not
G G 4 relieve the contractor from compliance with the requirements of his Contract,
10
30
4
8
SUPERVISION CONSULTANT:
175
115
75
FR15
95
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
H H 4 *Ø 14 HOLES
5. ALL FABRICATION AND WELDING WORKS TO BE CARRIED OUT AS PER BUILDING, 6th FLOOR
30
a45
30 115 30
STANDARD. P.O. BOX1876, DOHA-QATAR
www.ehaf .com
28
10
175
bp2
6. HOT ROLLED STRUCTURAL SECTIONS AND PLATES SHALL BE GRADE S235
SECTION H - H
CONFIRMING TO EN10025. MAIN CONTRACTOR:
Veolia Water Systems
, (Gulf) FZC
No. 1, Marked FR15 7. ALL STEELWORK SHALL BE CUT AND FABRICATED TO A TOLERANCE IN
P.O. Box 8206 SAIF Zone, Sharjah, U.A.E.
Tel.: +971 6 5570703, Fax: +971 6 5570704
www.veoliawatersystems.com
2709
a15
408
10
TYP 10
4
38
38
p11 ch48 p11
2000
1185
a13
a13
TYP
4
38
38
FR18
408
408
a15
a15
341 435
0
341
775
1623 928
0
1623
2551
2709 (PFC150*75*18 x 2689)
10 2689 10
SQ.CUT
A SIM
A
SQ.CUT
EL21453
FR18
50
50
a13
43
48
48
p11
p11
CONTRACTOR'S REVIEW
a15 a15 CHECKED / COORDINATED
a15 A DISCIPLINE
DATE SIGNATURE
AR - ARCHITECTURAL
A CV -CIVIL
ST - STRUCTURAL
EL - ELECTRICAL
ME - MECHANICAL
LS - LANDSCAPE
ID - INTERIOR DESIGN
38 1185 37
OT - OTHERS
p11
ch48 CMCS CONSULTANT'S REVIEW & APPROVAL:
FR18 p11
25
25
REVIEW STATUS DRAWING REVIEW STAMP
25
25
A - APRROVED
B - APPROVED AS NOTED
C - REVISED & RE-SUBMIT
4 4 D - REJECTED
200
200
4
175
175
4 Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
drawings and specifications. This review is only in respect of the general
4 conformance with the design intent of the project and general compliance with
4 the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
25
25
trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
2 *Ø 18 HOLES 2 *Ø 18 HOLES Contract.
1335
DESIGN DRAWING
CLIENT:
SECTION A - A
5. ALL FABRICATION AND WELDING WORKS TO BE CARRIED OUT AS PER BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
EL20573
p19 SIM
p19 A A
10
38 38
25
p19
113 38
597
577
TYP
4
25
M6
2 *Ø 18 HOLES
M6
EL19976
A A SECTION A - A
10
p19
p19
No. 3, Marked M6
0 ISSUED FOR FABRICATION 13-05-22 NP VI
REV DESCRIPTION DATE DRWN CHKD APD
CONTRACTOR'S REVIEW
CHECKED / COORDINATED
DISCIPLINE
DATE SIGNATURE
AR - ARCHITECTURAL
CV -CIVIL
ST - STRUCTURAL
EL - ELECTRICAL
ME - MECHANICAL
LS - LANDSCAPE
ID - INTERIOR DESIGN
OT - OTHERS
7. ALL STEELWORK SHALL BE CUT AND FABRICATED TO A TOLERANCE IN Tel.: +971 6 5570703, Fax: +971 6 5570704
www.veoliawatersystems.com
100
100
100
100
45
°
45
45
°
°
45
°
1185
75
75
170
75
75
75
75 75
75 75
75
633
1185
707
a13 170
633
75
707 a28
a27
75
a21
75
No. 5, Marked a13
75
No. 1, Marked a27 No. 2, Marked a28
No. 1, Marked a21
395 402
75
75
737
177
395 1457
402 103 10 57 110
75
8 75
a14 a15
8
8
67 1390
75
75
10
75
57
75
67
No. 1, Marked a14 No. 16, Marked a15 83 226 224 226 224 226 248
100
°
45
100
45
177
R 136
R 136
R 136
100 100 67 110
75
57
60
8 10
a29
a22
a30
75
10 57
75
1457
297 602 28
No. 2, Marked a29 No. 1, Marked a30
737
75
75
a16 a17
1467
75
75
185
75
No. 2, Marked a16
75
No. 1, Marked a17 67 1400
185 1467
75
57
a23 a31
8 10
75
10
67 1400
953
600 1339
a18
75
75
75
75
CV -CIVIL
ST - STRUCTURAL
EL - ELECTRICAL
57
75
D - REJECTED
8 10
Corrections or comments made relative to submittals during this review does not
relieve the contractor from compliance with the requirements of his Contract,
950 drawings and specifications. This review is only in respect of the general
75
conformance with the design intent of the project and general compliance with
2128 57 10 the information given in the Contract documents. The contractor remains respo
nsible, among other things, for the design of the project or such parts of the
a19 projects he has design responsibility for (if design forms part of the Contract),
for confirming and correlating all quantities and dimensions, selecting fabrication
processes and techniques of construction, coordinating his work with that of other
200 trades and performing his work in a safe and satisfactory manner, all in
75
a25
75
No. 1, Marked a25 No. 5, Marked a33
MAIN CONSULTANT:
57 AL-JAZEERA ST.,
1703 BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
764 213 FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
75
737 28
1636 67
75
8
SUPERVISION CONSULTANT:
58
75
a20 99 100
75
8 10
99
°
100
764
57
45
45
MAIN CONTRACTOR:
1636 57 10
°
PROJECT TITLE:
BALADNA FARM 2
8
10
75
2543
75
2 *Ø 18 HOLES
10
ch39
p11
10
202
10
133
38 38
75
a35 a36
4 *Ø 14 HOLES
4 *Ø 18 HOLES 200
bp2
75
25 200 25
75
bp1
30
25
25 150 25 2543
250
175
115
No. 2, Marked a36 326 200 814 200 778 200 25
175
125
No. 22, Marked p11
25
38
30
150
100
25
37
402 2 *Ø 18 HOLES 2 *Ø 18 HOLES 2 *Ø 18 HOLES
30 115 30
25
25 200 25
210
250
175
4 *Ø 18 HOLES No. 1, Marked ch39
10
75
No. 6, Marked bp1 No. 4, Marked bp2 No. 1, Marked bp3 3 *Ø 18 HOLES
p12
38 38
18
322 70 333
50
75
R 158
R 158
R 158
60 60 65 25
75
402
71 148 299 148 299 148 71 210
a38 2543
322
No. 1, Marked p12
50
15
ch34
75
1185
a37
10
ch40
75
15 55 333 210
10
2543
No. 1, Marked a37 No. 3, Marked a38 840 200 550 200 528 200 25 3 *Ø 18 HOLES
71 148 299 148 299 147 73 p13
37
75
38 38
R 158
75
R 158
R 158
38
2 *Ø 18 HOLES 2 *Ø 18 HOLES 2 *Ø 18 HOLES
18
402 25 75 60 50
50
220
No. 1, Marked ch34 210
15 55 333
406
75
840 75 615 200 603 60 25
75
15
a40 60 65
53
38
10
50
50
75
402
37
2 *Ø 18 HOLES 399 2 *Ø 18 HOLES
3 *Ø 18 HOLES 3 *Ø 18 HOLES 406
25
ch41 ch42
2543
10
100
100
ch35
200
150
p19 67
133
p20
25
75
55
2543
38 38
10
840 200 550 200 528 200 25
330 402 75 10
38
133
a41
No. 6, Marked p19 No. 1, Marked p20
37
2 *Ø 18 HOLES 2 *Ø 18 HOLES
50
50
2 *Ø 18 HOLES
75
100
100
1012 2543
27
840 200 550 200 528 200 25
No. 1, Marked ch43 No. 1, Marked ch44 0 ISSUED FOR FABRICATION 13-05-22 NP VI
8
37
75
CONTRACTOR'S REVIEW
67
CHECKED / COORDINATED
DISCIPLINE
38
DATE SIGNATURE
65 2 *Ø 18 HOLES 402
2 *Ø 18 HOLES 2 *Ø 18 HOLES AR - ARCHITECTURAL
330 CV -CIVIL
ST - STRUCTURAL
50
EL - ELECTRICAL
2543
a42 ME - MECHANICAL
50
ch36 LS - LANDSCAPE
402
75
75
ID - INTERIOR DESIGN
8
330 OT - OTHERS
98 8 ch45
100
CMCS CONSULTANT'S REVIEW & APPROVAL:
73 ch46
No. 1, Marked ch36
100
104
98
100
90
° REVIEW STATUS DRAWING REVIEW STAMP
44
44
A - APRROVED
°
1012
10
100
B - APPROVED AS NOTED
C - REVISED & RE-SUBMIT
processes and techniques of construction, coordinating his work with that of other
trades and performing his work in a safe and satisfactory manner, all in
accordance with the Contract.
Contract.
DESIGN DRAWING
38
63
75
291 300
50
2543
a43 a44
ch37 450
75
75
MAIN CONSULTANT:
ch47
100
No. 1, Marked ch37 57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 / 99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
386 2543
No. 1, Marked ch47
100 100 326 200 814 200 778 200 25 SUPERVISION CONSULTANT:
100
100
37
50 50
°
45
45
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
°
50
70
2543
75
50
ch48
BALADNA FARM 2
326 200 814 200 778 200 25 TSE POLISHING PLANT
150
38
DRAWING TITLE:
2 *Ø 18 HOLES 2 *Ø 18 HOLES 2 *Ø 18 HOLES
DETAILS OF SINGLE PARTS