CLINKERING
1 CP.L4.4211.BC02 HIGH
2 CP.L4.4241.BE01 HIGH
3 CP.L4.4241.BE01M2 HIGH
4 CP.L4.4241.BE02M2 HIGH
5 CP.L4.4241.BE02M2 HIGH
6 CP.L4.4262.KL01 HIGH
7 CP.L4.4262.KL01 HIGH
8 CP.L4.4263.RB02 HIGH
9 CP.L4.4263.RB01 HIGH
10 CP.L4.4263.CV05 HIGH
11 CP.L4.4301.NG02 HIGH
12 CP.L4.4263.FN07 HIGH
13 CP.L4.4263.KM01
14 CP.L4.4230.HO01 HIGH
CEMENTING
CBM
DAILY RCM INSPECTION FINDINGS
Line-4
ISSUES
CLINKERING AREA
DE side hood one liner plate bolt found missing, need to be install.
Fluid coupling safety cover touching with the coupling elements both sides (M1, M2), need proper
adjustment.
DE side Motor Output shaft seal found came out, need to be rectified.
DE side Motor Output shaft seal found came out, need to be rectified.
Fluid coupling safety cover touching with the element, need to be adjust properly.
Kiln tyre 2 bearing 3 water inlet pipe rubber sealing has gap with the casing, need proper sealing
Kiln burner gun door one nut missing toward mountain side need to install.
Heat exchanger drag chain need two inspection windows as per standard design (not bolted, lever
opening) on top cover for proper internal inspection
To avoid rain water ingress, portable frame made of SS (with castable inside) is required on kiln
hood top hole covering (for bridge hanging).
CEMENTING AREA
CBM
Monday, November 20, 2023
EXECUTION
FEEDBACK
DEPARTMENT
MECH.L4
MECH.L4
ELEC.L4
ELEC.L4
MECH.L4
MECH.L4
MECH.L4
UTY.L4
UTY.L4
MECH.L4
MECH.L4
MECH.L4
MECH.L4
MECH.L4