Rawabi speclalized contracting QTY 3,462.

31
owner : AL QIDDIYA N.O.C 2
cantractor : = SAHARI AL-KHAUR TOTal QTY 6,924.62
project name : Al Qiddiya Pump station, KSA Duration of project per day
FIRE RATED 1 HRS N.O. Equipments

Rate / Day per m2 200


N.O . Equipments /day -
price of Equipment 35,000.00
TOTal cost of Equipments -
cost / unit SAR 5.05
Sr. Building QTY m2' QTY LITER rate lit/ m2 N.O.C Material cost Manpower Equipments Direct cost FACTOR UNIT PRICE (SR./UNIT) AMOUNT (SR.)

surface prapration Cleaning fireproofing (4*250)/200= 5


Fireproofing (26 *1.15* rate lit/m2) Equipments 1-23
by water + air comp s.r * N.O.C

1 PUMP STATION (Steel master 600 wf ) 3,435.010 2,162.02 0.629 1.000 18.819 5.00 5.000 1.00 29.819 38.765 39.000 133,965.390

2 PUMP STATION (Steel master 1200 wf ) 27.300 69.57 2.548 3.000 76.196 5.00 15.000 1.00 97.196 126.354 127.000 3,467.100

TOTAL 3,462.310 137,432.490

AVERAGE 40.000
6

1/2
Rawabi speclalized contracting QTY 3,462.31
owner : AL QIDDIYA N.O.C 2
cantractor : = SAHARI AL-KHAUR TOTal QTY 6,924.62
project name : Al Qiddiya Pump station, KSA Duration of project per day
FIRE RATED 1 HRS N.O. Equipments

Rate / Day per m2


N.O . Equipments /day
price of Equipment 35,000.00
TOTal cost of Equipments
cost / unit SAR 5.05
Sr. Building QTY m2' rate m2/lit N.O.C Material cost manpower Equipments Direct cost FACTOR UNIT PRICE (SR./UNIT) AMOUNT (SR.)

140 MIC WFT


TOP COAT (45*1.15* rate 9.733 ) top coat Equipments 1-23
=7.3 M2/LIT

1 top coat 75 mic wft -105 mic 3,435.010 9.733 1.000 5.32 5.000 1.00 11.32 14.71 15.000 51,525.150

2 top coat 75 mic wft -105 mic 27.300 9.733 1.000 5.32 5.000 1.00 11.32 14.71 15.000 409.500

TOTAL 3,462.310 51,934.650