Fireproofing - QIDDIYA
Fireproofing - QIDDIYA
Fireproofing - QIDDIYA
31
owner : AL QIDDIYA N.O.C 2
cantractor : = SAHARI AL-KHAUR TOTal QTY 6,924.62
project name : Al Qiddiya Pump station, KSA Duration of project per day
FIRE RATED 1 HRS N.O. Equipments
1 PUMP STATION (Steel master 600 wf ) 3,435.010 2,162.02 0.629 1.000 18.819 5.00 5.000 1.00 29.819 38.765 39.000 133,965.390
2 PUMP STATION (Steel master 1200 wf ) 27.300 69.57 2.548 3.000 76.196 5.00 15.000 1.00 97.196 126.354 127.000 3,467.100
AVERAGE 40.000
6
1/2
Rawabi speclalized contracting QTY 3,462.31
owner : AL QIDDIYA N.O.C 2
cantractor : = SAHARI AL-KHAUR TOTal QTY 6,924.62
project name : Al Qiddiya Pump station, KSA Duration of project per day
FIRE RATED 1 HRS N.O. Equipments
1 top coat 75 mic wft -105 mic 3,435.010 9.733 1.000 5.32 5.000 1.00 11.32 14.71 15.000 51,525.150
2 top coat 75 mic wft -105 mic 27.300 9.733 1.000 5.32 5.000 1.00 11.32 14.71 15.000 409.500