ESD Cause and Effect For SBC
ESD Cause and Effect For SBC
Owner's Doc.
No.
Contractor's
SONATRACH HASSI R'MEL S-3009-1223-061
Doc. No.
BOOSTING PHASE III PROJECT Sheet 1 OF 38
SONATRACH
Activité E&P
Pôle Exploitation & Production
Division Production
Direction Régionale Hassi-R’mel
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN 1 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
4
1. Deleted.
3009-231
3009-231
3009-800
3009-604
3009-604
Number
ESD LEVEL 0-1 (Station Shutdown)
P&ID
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
Depressuring of ZONE 3
X - ACTIVATED
Z-961-P002A
Z-961-P002B
TAG Number
M - Manual Reset / A - Auto Reset
ESDV-9092
ESD-2-1-2
ESD-2-2-2
UZ-9000
UZ-9000
ESD-2-3
ESD-1
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number 1. Deleted.
HZDS-9000A
Manual push button for depressurized station shutdown (D-
UZ-9000 3009-231
HRS-
2 X X X X X X C SP SP 2
2. Sequential depressuring is achieved ZONE by ZONE by opening BDVs and
ESD) 9000 HVs with depressuring function in predeterminded order. Refer to Flare
3 3 System Design Report (S-3000-1223-004).
PT- HRS-
IA header pressure low low LL UZ-9000 3009-456 2oo3 4 X X X X PS PS C 4
9455A/B/C 9000
HZS: Hand Switch (Depressurized)
5 5 3.
HDS: Hand Switch (Pressurized)
6 6 Refer to Project Numbering Procedure (S-3000-1141-001).
7 7
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 2 OF 38
2 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
1. Deleted.
3009-800
Number
ESD LEVEL 0-2 (Station Shutdown without ZONE 3)
P&ID
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
TAG Number
M - Manual Reset / A - Auto Reset
ESDV-9092
ESD-2-1-2
ESD-2-2-2
ESD-2-3
ESD-1
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number 1. ZONE 3 is isolated automatically after 6 hours from cause initiation.
2 2
HRS-
XS-9000 Total power failure (TPF) UZ-9001 1 3 X X X X C 3
9001
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 3 OF 38
3 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-800
Number
902G/H
273G/H
902C/D
273C/D
902A/B
273A/B
902E/F
273E/F
902I/J
273I/J
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 1 (Boosting Unit Shutdown)
P&ID
902K
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START
Depressuring of ZONE 4
X - ACTIVATED
D - DISCONNECT
HH - HIGH HIGH
LL - LOW LOW
TAG Number
M - Manual Reset / A - Auto Reset
UZ-9301G/H
UZ-9101G/H
UZ-9301C/D
UZ-9101C/D
UZ-9301A/B
UZ-9101A/B
UZ-9301E/F
UZ-9101E/F
ESDV-9091
UZ-9301I/J
UZ-9101I/J
ESD-2-1-1
ESD-2-2-1
UZ-9301K
UZ-9010
UZ-9010
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Delted.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231
9000
1 X X C PS PS PS PS PS PS PS PS PS PS PS PS PS 1 2. To be developed in Step 2 detail engineering stage.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 4 OF 38
4 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
Number
ESD LEVEL 1 (Boosting Unit Shutdown)
P&ID
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
PO - PERMISSIVE TO OPEN for associated downstream LV by UZ activation.
PS - PERMISSIVE TO START
X - ACTIVATED
D - DISCONNECT
HH - HIGH HIGH
LL - LOW LOW
XS-9251GA/HA
XS-9251CA/DA
XS-9251AA/BA
XS-9251EA/FA
XS-9251IA/JA
TAG Number
M - Manual Reset / A - Auto Reset
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number 1. To be developed in Step 2 detail engineering stage.
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 5 OF 38
5 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
901A
901A
901A
902A
902A
902A
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301A
ESDV-9303A
ESDV-9304A
ESDV-9302A
TAG Number
UZ-9301A
FV-9301A
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9859B Confirmed gas detection in ZONE 1 (LP) (FZ-C59) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304AA/AB/AC
LP Compressor discharge high high pressure HH UZ-9301A 3009-902A 2oo3
9301A
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301A 3009-902A 2oo3 OO 2 11 C C C C O X 11
9302AA/AB/AC 9301A
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301A 3009-902A 2oo3 2 12 C C C C O X 12
9304AA/AB/AC 9301A
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301A 3009-902A 2oo3 2 13 C C C C O X 13
9309AA/AB/AC 9301A
HRS-
LT-9303A LP Compressor inlet drum high high level HH UZ-9301A 3009-901A MO 2 14 C C C C O X 14
9301A
HRS-
LT-9303A LP Compressor inlet drum low low level LL UZ-9302A 3009-901A MO 2 15 C 15
9302A
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 6 OF 38
6 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
901B
901B
901B
902B
902B
902B
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301B
ESDV-9303B
ESDV-9304B
ESDV-9302B
TAG Number
UZ-9301B
FV-9301B
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9859B Confirmed gas detection in ZONE 1 (LP) (FZ-C59) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301B
(P-ESD)
UZ-9301B 3009-902B
9301B
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301BA UZ-9301B 3009-902B 2 7 C C C C O X X 7
in field (D-ESD) 9301B
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301BC
(D-ESD)
UZ-9301B 3009-902B
9301B
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304BA/BB/BC
LP Compressor discharge high high pressure HH UZ-9301B 3009-902B 2oo3
9301B
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301B 3009-902B 2oo3 OO 2 11 C C C C O X 11
9302BA/BB/BC 9301B
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301B 3009-902B 2oo3 2 12 C C C C O X 12
9304BA/BB/BC 9301B
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301B 3009-902B 2oo3 2 13 C C C C O X 13
9309BA/BB/BC 9301B
HRS-
LT-9303B LP Compressor inlet drum high high level HH UZ-9301B 3009-901B MO 2 14 C C C C O X 14
9301B
HRS-
LT-9303B LP Compressor inlet drum low low level LL UZ-9302B 3009-901B MO 2 15 C 15
9302B
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 7 OF 38
7 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
901C
901C
901C
902C
902C
902C
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301C
ESDV-9303C
ESDV-9304C
ESDV-9302C
TAG Number
UZ-9301C
FV-9301C
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9860B Confirmed gas detection in ZONE 1 (LP) (FZ-C60) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301C
(P-ESD)
UZ-9301C 3009-902C
9301C
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301CA UZ-9301C 3009-902C 2 7 C C C C O X X 7
in field (D-ESD) 9301C
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301CC
(D-ESD)
UZ-9301C 3009-902C
9301C
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304CA/CB/CC
LP Compressor discharge high high pressure HH UZ-9301C 3009-902C 2oo3
9301C
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301C 3009-902C 2oo3 OO 2 11 C C C C O X 11
9302CA/CB/CC 9301C
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301C 3009-902C 2oo3 2 12 C C C C O X 12
9304CA/CB/CC 9301C
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301C 3009-902C 2oo3 2 13 C C C C O X 13
9309CA/CB/CC 9301C
HRS-
LT-9303C LP Compressor inlet drum high high level HH UZ-9301C 3009-901C MO 2 14 C C C C O X 14
9301C
HRS-
LT-9303C LP Compressor inlet drum low low level LL UZ-9302C 3009-901C MO 2 15 C 15
9302C
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 8 OF 38
8 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
901D
901D
901D
902D
902D
902D
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301D
ESDV-9303D
ESDV-9304D
ESDV-9302D
TAG Number
UZ-9301D
FV-9301D
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9860B Confirmed gas detection in ZONE 1 (LP) (FZ-C60) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301D
(P-ESD)
UZ-9301D 3009-902D
9301D
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301DA UZ-9301D 3009-902D 2 7 C C C C O X X 7
in field (D-ESD) 9301D
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301DC
(D-ESD)
UZ-9301D 3009-902D
9301D
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304DA/DB/DC
LP Compressor discharge high high pressure HH UZ-9301D 3009-902D 2oo3
9301D
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301D 3009-902D 2oo3 OO 2 11 C C C C O X 11
9302DA/DB/DC 9301D
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301D 3009-902D 2oo3 2 12 C C C C O X 12
9304DA/DB/DC 9301D
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301D 3009-902D 2oo3 2 13 C C C C O X 13
9309DA/DB/DC 9301D
HRS-
LT-9303D LP Compressor inlet drum high high level HH UZ-9301D 3009-901D MO 2 14 C C C C O X 14
9301D
HRS-
LT-9303D LP Compressor inlet drum low low level LL UZ-9302D 3009-901D MO 2 15 C 15
9302D
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 9 OF 38
9 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
901E
901E
901E
902E
902E
902E
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301E
ESDV-9303E
ESDV-9304E
ESDV-9302E
TAG Number
UZ-9301E
FV-9301E
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9861B Confirmed gas detection in ZONE 1 (LP) (FZ-C61) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301E
(P-ESD)
UZ-9301E 3009-902E
9301E
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301EA UZ-9301E 3009-902E 2 7 C C C C O X X 7
in field (D-ESD) 9301E
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301EC
(D-ESD)
UZ-9301E 3009-902E
9301E
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304EA/EB/EC
LP Compressor discharge high high pressure HH UZ-9301E 3009-902E 2oo3
9301E
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301E 3009-902E 2oo3 OO 2 11 C C C C O X 11
9302EA/EB/EC 9301E
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301E 3009-902E 2oo3 2 12 C C C C O X 12
9304EA/EB/EC 9301E
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301E 3009-902E 2oo3 2 13 C C C C O X 13
9309EA/EB/EC 9301E
HRS-
LT-9303E LP Compressor inlet drum high high level HH UZ-9301E 3009-901E MO 2 14 C C C C O X 14
9301E
HRS-
LT-9303E LP Compressor inlet drum low low level LL UZ-9302E 3009-901E MO 2 15 C 15
9302E
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 10 OF 38
10 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-901F
3009-901F
3009-901F
3009-902F
3009-902F
3009-902F
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9301F
ESDV-9303F
ESDV-9304F
ESDV-9302F
UZ-9301F
FV-9301F
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9861B Confirmed gas detection in ZONE 1 (LP) (FZ-C61) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301F
(P-ESD)
UZ-9301F 3009-902F
9301F
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301FA UZ-9301F 3009-902F 2 7 C C C C O X X 7
in field (D-ESD) 9301F
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301FC
(D-ESD)
UZ-9301F 3009-902F
9301F
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304FA/FB/FC
LP Compressor discharge high high pressure HH UZ-9301F 3009-902F 2oo3
9301F
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301F 3009-902F 2oo3 OO 2 11 C C C C O X 11
9302FA/FB/FC 9301F
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301F 3009-902F 2oo3 2 12 C C C C O X 12
9304FA/FB/FC 9301F
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301F 3009-902F 2oo3 2 13 C C C C O X 13
9309FA/FB/FC 9301F
HRS-
LT-9303F LP Compressor inlet drum high high level HH UZ-9301F 3009-901F MO 2 14 C C C C O X 14
9301F
HRS-
LT-9303F LP Compressor inlet drum low low level LL UZ-9302F 3009-901F MO 2 15 C 15
9302F
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 11 OF 38
11 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-232
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
901G
901G
901G
902G
902G
902G
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301G
ESDV-9303G
ESDV-9304G
ESDV-9302G
TAG Number
UZ-9301G
FV-9301G
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9862B Confirmed gas detection in ZONE 1 (LP) (FZ-C62) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301G
(P-ESD)
UZ-9301G 3009-902G
9301G
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301GA UZ-9301G 3009-902G 2 7 C C C C O X X 7
in field (D-ESD) 9301G
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301GC
(D-ESD)
UZ-9301G 3009-902G
9301G
2 8 C C C C O X X 8 5.
061)
9 9
PT-
HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304GA/GB/G LP Compressor discharge high high pressure HH UZ-9301G 3009-902G 2oo3
9301G
2 10 C C C C O X 10 6.
C automatically.
PT-
HRS-
9302GA/GB/G LP Compressor suction low low pressure LL UZ-9301G 3009-902G 2oo3 OO 2 11 C C C C O X 11
9301G
C
TT-
HRS-
9304GA/GB/G LP Compressor discharge high high temperature HH UZ-9301G 3009-902G 2oo3 2 12 C C C C O X 12
9301G
C
TT-
HRS-
9309GA/GB/G LP Compressor aftercooler discharge high high temperature HH UZ-9301G 3009-902G 2oo3 2 13 C C C C O X 13
9301G
C
HRS-
LT-9303G LP Compressor inlet drum high high level HH UZ-9301G 3009-901G MO 2 14 C C C C O X 14
9301G
HRS-
LT-9303G LP Compressor inlet drum low low level LL UZ-9302G 3009-901G MO 2 15 C 15
9302G
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 12 OF 38
12 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-232
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
901H
901H
901H
902H
902H
902H
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301H
ESDV-9303H
ESDV-9304H
ESDV-9302H
TAG Number
UZ-9301H
FV-9301H
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9862B Confirmed gas detection in ZONE 1 (LP) (FZ-C62) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301H
(P-ESD)
UZ-9301H 3009-902H
9301H
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301HA UZ-9301H 3009-902H 2 7 C C C C O X X 7
in field (D-ESD) 9301H
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301HC
(D-ESD)
UZ-9301H 3009-902H
9301H
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304HA/HB/HC
LP Compressor discharge high high pressure HH UZ-9301H 3009-902H 2oo3
9301H
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301H 3009-902H 2oo3 OO 2 11 C C C C O X 11
9302HA/HB/HC 9301H
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301H 3009-902H 2oo3 2 12 C C C C O X 12
9304HA/HB/HC 9301H
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301H 3009-902H 2oo3 2 13 C C C C O X 13
9309HA/HB/HC 9301H
HRS-
LT-9303H LP Compressor inlet drum high high level HH UZ-9301H 3009-901H MO 2 14 C C C C O X 14
9301H
HRS-
LT-9303H LP Compressor inlet drum low low level LL UZ-9302H 3009-901H MO 2 15 C 15
9302H
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 13 OF 38
13 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-901I
3009-901I
3009-901I
3009-902I
3009-902I
3009-902I
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9301I
ESDV-9303I
ESDV-9304I
ESDV-9302I
UZ-9301I
FV-9301I
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9863B Confirmed gas detection in ZONE 1 (LP) (FZ-C63) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304IA/IB/IC
LP Compressor discharge high high pressure HH UZ-9301I 3009-902I 2oo3
9301I
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301I 3009-902I 2oo3 OO 2 11 C C C C O X 11
9302IA/IB/IC 9301I
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301I 3009-902I 2oo3 2 12 C C C C O X 12
9304IA/IB/IC 9301I
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301I 3009-902I 2oo3 2 13 C C C C O X 13
9309IA/IB/IC 9301I
HRS-
LT-9303I LP Compressor inlet drum high high level HH UZ-9301I 3009-901I MO 2 14 C C C C O X 14
9301I
HRS-
LT-9303I LP Compressor inlet drum low low level LL UZ-9302I 3009-901I MO 2 15 C 15
9302I
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 14 OF 38
14 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-901J
3009-901J
3009-901J
3009-902J
3009-902J
3009-902J
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9301J
ESDV-9303J
ESDV-9304J
ESDV-9302J
UZ-9301J
FV-9301J
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2 station
shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9863B Confirmed gas detection in ZONE 1 (LP) (FZ-C63) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301J
(P-ESD)
UZ-9301J 3009-902J
9301J
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301JA UZ-9301J 3009-902J 2 7 C C C C O X X 7
in field (D-ESD) 9301J
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301JC
(D-ESD)
UZ-9301J 3009-902J
9301J
2 8 C C C C O X X 8 5. Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304JA/JB/JC
LP Compressor discharge high high pressure HH UZ-9301J 3009-902J 2oo3
9301J
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301J 3009-902J 2oo3 OO 2 11 C C C C O X 11
9302JA/JB/JC 9301J
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301J 3009-902J 2oo3 2 12 C C C C O X 12
9304JA/JB/JC 9301J
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301J 3009-902J 2oo3 2 13 C C C C O X 13
9309JA/JB/JC 9301J
HRS-
LT-9303J LP Compressor inlet drum high high level HH UZ-9301J 3009-901J MO 2 14 C C C C O X 14
9301J
HRS-
LT-9303J LP Compressor inlet drum low low level LL UZ-9302J 3009-901J MO 2 15 C 15
9302J
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 15 OF 38
15 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2, 6
2, 6
2
1. Deleted.
3009-232
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
901K
901K
901K
902K
902K
902K
2. Deleted.
SERVICE DESCRIPTION
ST - START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9301K
ESDV-9303K
ESDV-9304K
ESDV-9302K
TAG Number
UZ-9301K
FV-9301K
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. To be developed in Step 2 detail engineering stage.
XY-9852B Confirmed gas detection in ZONE 1 (LP) (FZ-C52) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9301K
(P-ESD)
UZ-9301K 3009-902K
9301K
2 6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9301KA UZ-9301K 3009-902K 2 7 C C C C O X X 7
in field (D-ESD) 9301K
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9301KC
(D-ESD)
UZ-9301K 3009-902K
9301K
2 8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9304KA/KB/KC
LP Compressor discharge high high pressure HH UZ-9301K 3009-902K 2oo3
9301K
2 10 C C C C O X 10 6.
automatically.
PT- HRS-
LP Compressor suction low low pressure LL UZ-9301K 3009-902K 2oo3 OO 2 11 C C C C O X 11
9302KA/KB/KC 9301K
TT- HRS-
LP Compressor discharge high high temperature HH UZ-9301K 3009-902K 2oo3 2 12 C C C C O X 12
9304KA/KB/KC 9301K
TT- HRS-
LP Compressor aftercooler discharge high high temperature HH UZ-9301K 3009-902K 2oo3 2 13 C C C C O X 13
9309KA/KB/KC 9301K
HRS-
LT-9303K LP Compressor inlet drum high high level HH UZ-9301K 3009-901K MO 2 14 C C C C O X 14
9301K
HRS-
LT-9303K LP Compressor inlet drum low low level LL UZ-9302K 3009-901K MO 2 15 C 15
9302K
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 16 OF 38
16 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
272A
272A
272A
273A
273A
273A
2. Deleted.
Depressuring of MP compressor A
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101A
ESDV-9103A
ESDV-9104A
ESDV-9102A
TAG Number
XS-9251AA
XS-9251AB
XS-9219AB
UZ-9101A
XS-9260A
FV-9101A
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9821B Confirmed gas detection in ZONE 1 (MP) (FZ-C21) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101A
(P-ESD)
UZ-9101A 3009-273A
9101A
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101AA UZ-9101A 3009-273A 7 C C C C O X X 7
in field (D-ESD) 9101A
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101AC
(D-ESD)
UZ-9101A 3009-273A
9101A
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104AA/AB/AC
MP Compressor discharge high high pressure HH UZ-9101A 3009-273A 2oo3
9101A
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101A 3009-273A 2oo3 OO 7 11 C C C C O X 11
9102AA/AB/AC 9101A
TT-
MP Compressor discharge high high temperature HH UZ-9101A 3009-273A 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102AA/AB/AC detects
9104AA/AB/AC 9101A LL pressure. OO shall deactivate when 2oo3 of PT-9102AA/AB/AC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101A 3009-273A 2oo3 13 C C C C O X 13
9109AA/AB/AC 9101A
HRS-
LT-9103A MP Compressor inlet drum high high level HH UZ-9101A 3009-272A MO 14 C C C C O X 14
9101A
HRS-
LT-9103A MP Compressor inlet drum low low level LL UZ-9102A 3009-272A MO 15 C 15
9102A
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 17 OF 38
17 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
272B
272B
272B
273B
273B
273B
2. Deleted.
Depressuring of MP compressor B
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101B
ESDV-9103B
ESDV-9104B
ESDV-9102B
TAG Number
XS-9251BA
XS-9251BB
XS-9219BB
UZ-9101B
XS-9260B
FV-9101B
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9821B Confirmed gas detection in ZONE 1 (MP) (FZ-C21) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101B
(P-ESD)
UZ-9101B 3009-273B
9101B
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101BA UZ-9101B 3009-273B 7 C C C C O X X 7
in field (D-ESD) 9101B
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101BC
(D-ESD)
UZ-9101B 3009-273B
9101B
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104BA/BB/BC
MP Compressor discharge high high pressure HH UZ-9101B 3009-273B 2oo3
9101B
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101B 3009-273B 2oo3 OO 7 11 C C C C O X 11
9102BA/BB/BC 9101B
TT-
MP Compressor discharge high high temperature HH UZ-9101B 3009-273B 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102BA/BB/BC detects
9104BA/BB/BC 9101B LL pressure. OO shall deactivate when 2oo3 of PT-9102BA/BB/BC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101B 3009-273B 2oo3 13 C C C C O X 13
9109BA/BB/BC 9101B
HRS-
LT-9103B MP Compressor inlet drum high high level HH UZ-9101B 3009-272B MO 14 C C C C O X 14
9101B
HRS-
LT-9103B MP Compressor inlet drum low low level LL UZ-9102B 3009-272B MO 15 C 15
9102B
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 18 OF 38
18 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
272C
272C
272C
273C
273C
273C
2. Deleted.
Depressuring of MP compressor C
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101C
ESDV-9103C
ESDV-9104C
ESDV-9102C
TAG Number
XS-9251CA
XS-9251CB
XS-9219CB
UZ-9101C
XS-9260C
FV-9101C
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9820B Confirmed gas detection in ZONE 1 (MP) (FZ-C20) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101C
(P-ESD)
UZ-9101C 3009-273C
9101C
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101CA UZ-9101C 3009-273C 7 C C C C O X X 7
in field (D-ESD) 9101C
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101CC
(D-ESD)
UZ-9101C 3009-273C
9101C
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104CA/CB/CC
MP Compressor discharge high high pressure HH UZ-9101C 3009-273C 2oo3
9101C
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101C 3009-273C 2oo3 OO 7 11 C C C C O X 11
9102CA/CB/CC 9101C
TT-
MP Compressor discharge high high temperature HH UZ-9101C 3009-273C 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102CA/CB/CC detects
9104CA/CB/CC 9101C LL pressure. OO shall deactivate when 2oo3 of PT-9102CA/CB/CC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101C 3009-273C 2oo3 13 C C C C O X 13
9109CA/CB/CC 9101C
HRS-
LT-9103C MP Compressor inlet drum high high level HH UZ-9101C 3009-272C MO 14 C C C C O X 14
9101C
HRS-
LT-9103C MP Compressor inlet drum low low level LL UZ-9102C 3009-272C MO 15 C 15
9102C
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 19 OF 38
19 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-272D
3009-272D
3009-272D
3009-273D
3009-273D
3009-273D
3009-231
Number
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
2. Deleted.
SERVICE DESCRIPTION
EFFECT
SD - SHUTDOWN
Depressuring of MP compressor D
PS - PERMISSIVE TO START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101D
ESDV-9103D
ESDV-9104D
ESDV-9102D
TAG Number
XS-9251DA
XS-9251DB
XS-9219DB
UZ-9101D
XS-9260D
FV-9101D
UZ-9020
-
CAUSE
ESD Loop
NOTES
TAG Number SERVICE DESCRIPTION Trip Type P&ID Number VOTING Override Reset NOTES
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2 station
1.
shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
HRS-
HZS-9020 Manual push button for pressurized Block 1 shutdown (P-ESD) UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104DA/DB/DC
MP Compressor discharge high high pressure HH UZ-9101D 3009-273D 2oo3
9101D
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101D 3009-273D 2oo3 OO 7 11 C C C C O X 11
9102DA/DB/DC 9101D
TT-
MP Compressor discharge high high temperature HH UZ-9101D 3009-273D 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102DA/DB/DC detects LL
9104DA/DB/DC 9101D pressure. OO shall deactivate when 2oo3 of PT-9102DA/DB/DC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101D 3009-273D 2oo3 13 C C C C O X 13
9109DA/DB/DC 9101D
HRS-
LT-9103D MP Compressor inlet drum high high level HH UZ-9101D 3009-272D MO 14 C C C C O X 14
9101D
HRS-
LT-9103D MP Compressor inlet drum low low level LL UZ-9102D 3009-272D MO 15 C 15
9102D
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
IN N-2
DR02A
0
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
21-JABUILTPRINTED
1
SHEET 20 OF 38
AS ED WHEN 20 / 39
T ROLL
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-1 (Process Shutdown Block 1 Compressor)
P&ID
272E
272E
272E
273E
273E
273E
2. Deleted.
Depressuring of MP compressor E
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101E
ESDV-9103E
ESDV-9104E
ESDV-9102E
TAG Number
XS-9251EA
XS-9251EB
XS-9219EB
UZ-9101E
XS-9260E
FV-9101E
UZ-9020
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 1 shutdown (P- HRS-
HZS-9020
ESD)
UZ-9020 3009-231
9020
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9819B Confirmed gas detection in ZONE 1 (MP) (FZ-C19) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101E
(P-ESD)
UZ-9101E 3009-273E
9101E
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101EA UZ-9101E 3009-273E 7 C C C C O X X 7
in field (D-ESD) 9101E
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101EC
(D-ESD)
UZ-9101E 3009-273E
9101E
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104EA/EB/EC
MP Compressor discharge high high pressure HH UZ-9101E 3009-273E 2oo3
9101E
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101E 3009-273E 2oo3 OO 7 11 C C C C O X 11
9102EA/EB/EC 9101E
TT-
MP Compressor discharge high high temperature HH UZ-9101E 3009-273E 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102EA/EB/EC detects
9104EA/EB/EC 9101E LL pressure. OO shall deactivate when 2oo3 of PT-9102EA/EB/EC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101E 3009-273E 2oo3 13 C C C C O X 13
9109EA/EB/EC 9101E
HRS-
LT-9103E MP Compressor inlet drum high high level HH UZ-9101E 3009-272E MO 14 C C C C O X 14
9101E
HRS-
LT-9103E MP Compressor inlet drum low low level LL UZ-9102E 3009-272E MO 15 C 15
9102E
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 21 OF 38
21 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-272F
3009-272F
3009-272F
3009-273F
3009-273F
3009-273F
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
Depressuring of MP compressor F
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9101F
ESDV-9103F
ESDV-9104F
ESDV-9102F
XS-9251FA
XS-9251FB
XS-9219FB
UZ-9101F
XS-9260F
FV-9101F
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9819B Confirmed gas detection in ZONE 1 (MP) (FZ-C19) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101F
(P-ESD)
UZ-9101F 3009-273F
9101F
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101FA UZ-9101F 3009-273F 7 C C C C O X X 7
in field (D-ESD) 9101F
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101FC
(D-ESD)
UZ-9101F 3009-273F
9101F
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104FA/FB/FC
MP Compressor discharge high high pressure HH UZ-9101F 3009-273F 2oo3
9101F
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101F 3009-273F 2oo3 OO 7 11 C C C C O X 11
9102FA/FB/FC 9101F
TT-
MP Compressor discharge high high temperature HH UZ-9101F 3009-273F 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102FA/FB/FC detects LL
9104FA/FB/FC 9101F pressure. OO shall deactivate when 2oo3 of PT-9102FA/FB/FC reach
TT- HRS- above LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101F 3009-273F 2oo3 13 C C C C O X 13
9109FA/FB/FC 9101F
HRS-
LT-9103F MP Compressor inlet drum high high level HH UZ-9101F 3009-272F MO 14 C C C C O X 14
9101F
HRS-
LT-9103F MP Compressor inlet drum low low level LL UZ-9102F 3009-272F MO 15 C 15
9102F
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 22 OF 38
22 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
3009-
3009-
3009-
3009-
3009-
3009-
P&ID
272G
272G
272G
273G
273G
273G
2. Deleted.
SERVICE DESCRIPTION
EFFECT
SD - SHUTDOWN
Depressuring of MP compressor G
PS - PERMISSIVE TO START
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101G
ESDV-9103G
ESDV-9104G
ESDV-9102G
TAG Number
XS-9251GA
XS-9251GB
XS-9219GB
UZ-9101G
XS-9260G
FV-9101G
UZ-9030
-
CAUSE
ESD Loop
NOTES
TAG Number SERVICE DESCRIPTION Trip Type P&ID Number VOTING Override Reset NOTES
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2 station
1.
shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
HRS-
HZS-9030 Manual push button for pressurized Block 2 shutdown (P-ESD) UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104GA/GB/G
MP Compressor discharge high high pressure HH UZ-9101G 3009-273G 2oo3
9101G
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101G 3009-273G 2oo3 OO 7 11 C C C C O X 11
9102GA/GB/G 9101G
TT-
9104GA/GB/G MP Compressor discharge high high temperature HH UZ-9101G 3009-273G 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102GA/GB/GC detects LL
9101G pressure. OO shall deactivate when 2oo3 of PT-9102GA/GB/GC reach
C
TT-
HRS- above LL pressure.
9109GA/GB/G MP Compressor aftercooler discharge high high temperature HH UZ-9101G 3009-273G 2oo3 13 C C C C O X 13
9101G
C
HRS-
LT-9103G MP Compressor inlet drum high high level HH UZ-9101G 3009-272G MO 14 C C C C O X 14
9101G
HRS-
LT-9103G MP Compressor inlet drum low low level LL UZ-9102G 3009-272G MO 15 C 15
9102G
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
D R A 35 35
IN1-JAN- T0
2 0 2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
2 UIL TED
AS LBLED WHEN PRIN SHEET 23 OF 38
23 / 39
T RO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-232
Number
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
272H
272H
272H
273H
273H
273H
2. Deleted.
Depressuring of MP compressor H
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
ESDV-9101H
ESDV-9103H
ESDV-9104H
ESDV-9102H
TAG Number
XS-9251HA
XS-9251HB
XS-9219HB
UZ-9101H
XS-9260H
FV-9101H
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9818B Confirmed gas detection in ZONE 1 (MP) (FZ-C18) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101H
(P-ESD)
UZ-9101H 3009-273H
9101H
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101HA UZ-9101H 3009-273H 7 C C C C O X X 7
in field (D-ESD) 9101H
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101HC
(D-ESD)
UZ-9101H 3009-273H
9101H
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104HA/HB/HC
MP Compressor discharge high high pressure HH UZ-9101H 3009-273H 2oo3
9101H
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101H 3009-273H 2oo3 OO 7 11 C C C C O X 11
9102HA/HB/HC 9101H
TT- HRS-
MP Compressor discharge high high temperature HH UZ-9101H 3009-273H 2oo3 12 C C C C O X 12 7. OO shall automatically activate when 2oo3 of PT-9102HA/HB/HC detects
9104HA/HB/HC 9101H
LL pressure. OO shall deactivate when 2oo3 of PT-9102HA/HB/HC reach
TT- HRS-
9109HA/HB/HC
MP Compressor aftercooler discharge high high temperature HH UZ-9101H 3009-273H 2oo3
9101H
13 C C C C O X 13 above LL pressure.
HRS-
LT-9103H MP Compressor inlet drum high high level HH UZ-9101H 3009-272H MO 14 C C C C O X 14
9101H
HRS-
LT-9103H MP Compressor inlet drum low low level LL UZ-9102H 3009-272H MO 15 C 15
9102H
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 24 OF 38
24 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-272I
3009-272I
3009-272I
3009-273I
3009-273I
3009-273I
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9101I
ESDV-9103I
ESDV-9104I
ESDV-9102I
XS-9251IA
XS-9251IB
XS-9219IB
UZ-9101I
XS-9260I
FV-9101I
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9817B Confirmed gas detection in ZONE 1 (MP) (FZ-C17) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101I
(P-ESD)
UZ-9101I 3009-273I
9101I
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101IA UZ-9101I 3009-273I 7 C C C C O X X 7
in field (D-ESD) 9101I
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101IC
(D-ESD)
UZ-9101I 3009-273I
9101I
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104IA/IB/IC
MP Compressor discharge high high pressure HH UZ-9101I 3009-273I 2oo3
9101I
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101I 3009-273I 2oo3 OO 7 11 C C C C O X 11
9102IA/IB/IC 9101I
TT-
MP Compressor discharge high high temperature HH UZ-9101I 3009-273I 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102IA/IB/IC detects LL
9104IA/IB/IC 9101I pressure. OO shall deactivate when 2oo3 of PT-9102IA/IB/IC reach above
TT- HRS- LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101I 3009-273I 2oo3 13 C C C C O X 13
9109IA/IB/IC 9101I
HRS-
LT-9103I MP Compressor inlet drum high high level HH UZ-9101I 3009-272I MO 14 C C C C O X 14
9101I
HRS-
LT-9103I MP Compressor inlet drum low low level LL UZ-9102I 3009-272I MO 15 C 15
9102I
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 25 OF 38
25 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
2, 3, 4
2, 3, 4
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-272J
3009-272J
3009-272J
3009-273J
3009-273J
3009-273J
3009-232
Number
ESD LEVEL 2-2-1 (Process Shutdown Block 2 Compressor)
P&ID
2. Deleted.
Ready to crank
OO - OPERATIONAL OVERRIDE (Start-up override etc.)
MO - MAINTENANCE OVERRIDE
TAG Number
ESDV-9101J
ESDV-9103J
ESDV-9104J
ESDV-9102J
XS-9251JA
XS-9251JB
XS-9219JB
UZ-9101J
XS-9260J
FV-9101J
UZ-9030
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-1 Boosting unit shutdown UZ-9010 3009-271 1 C C C C O PS PS X 1
9010
Manual push button for pressurized Block 2 shutdown (P- HRS-
HZS-9030
ESD)
UZ-9030 3009-232
9030
1 2 C C C C O PS PS X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
XY-9817B Confirmed gas detection in ZONE 1 (MP) (FZ-C17) 2, 5 4 C C C C O X X X 4 3. Sequence for process valve positioning to be referred to Process Control
Philosophy (S-3000-1222-003) and DCS Control Narrative (S-3000-1371-
5 5 301).
Manual push button for pressurized compressor shutdown HRS-
HZS-9101J
(P-ESD)
UZ-9101J 3009-273J
9101J
6 C C C C O PS X 6 4. For depressurized compressor shutdown case only.
Manual push button for depressurized compressor shutdown HRS-
HZDS-9101JA UZ-9101J 3009-273J 7 C C C C O X X 7
in field (D-ESD) 9101J
Manual push button for depressurized compressor shutdown HRS- Refer to Fire & Gas Alarm System Cause and Effect Chart (S-3009-1241-
HZDS-9101JC
(D-ESD)
UZ-9101J 3009-273J
9101J
8 C C C C O X X 8 5.
061)
9 9
PT- HRS- When the main ESDV with PDT opens, the bypass ESDV closes
9104JA/JB/JC
MP Compressor discharge high high pressure HH UZ-9101J 3009-273J 2oo3
9101J
10 C C C C O X 10 6.
automatically.
PT- HRS-
MP Compressor suction low low pressure LL UZ-9101J 3009-273J 2oo3 OO 7 11 C C C C O X 11
9102JA/JB/JC 9101J
TT-
MP Compressor discharge high high temperature HH UZ-9101J 3009-273J 2oo3
HRS-
12 C C C C O X 12 7.
OO shall automatically activate when 2oo3 of PT-9102JA/JB/JC detects LL
9104JA/JB/JC 9101J pressure. OO shall deactivate when 2oo3 of PT-9102JA/JB/JC reach above
TT- HRS- LL pressure.
MP Compressor aftercooler discharge high high temperature HH UZ-9101J 3009-273J 2oo3 13 C C C C O X 13
9109JA/JB/JC 9101J
HRS-
LT-9103J MP Compressor inlet drum high high level HH UZ-9101J 3009-272J MO 14 C C C C O X 14
9101J
HRS-
LT-9103J MP Compressor inlet drum low low level LL UZ-9102J 3009-272J MO 15 C 15
9102J
17 17
18 18
19 19
20 20
21 21
22 22
23 23
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 26 OF 38
26 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
4
1. Deleted.
3009-231
3009-231
3009-231
3009-231
3009-281
3009-281
3009-292
3009-292
3009-242
3009-252
3009-271
3009-274
3009-274
3009-231
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-1-2 (Process Shutdown Block 1 Inlet Facility)
P&ID
241C
241D
251C
251D
251C
251D
241A
241B
251A
251B
251A
251B
241A
241A
2. Deleted.
EFFECT
SD - SHUTDOWN
ESDV-9061C
ESDV-9061D
ESDV-9071C
ESDV-9071D
ESDV-9072C
ESDV-9072D
ESDV-9061A
ESDV-9061B
ESDV-9071A
ESDV-9071B
ESDV-9072A
ESDV-9072B
ESDV-9086A
ESDV-9084A
ESDV-9085A
TAG Number
ESDV-9051
ESDV-9052
ESDV-9053
ESDV-9054
ESDV-9062
ESDV-9063
ESDV-9082
ESDV-9064
ESDV-9305
ESDV-9105
ESDV-9111
ESDV-9115
UZ-9020
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231 1 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 1
9000
HRS-
ESD-0-2 Station shutdown without ZONE 3 UZ-9001 3009-231
9001
2 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 2 2. Deleted.
Manual push button for pressurized Block 1 shutdown (P- HRS- Activation of Block 1 shutdown will eliminate level signals of LI-9063A/B/C/D in
HZS-9020 UZ-9020 3009-231 1, 3 3 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 3 3.
ESD) 9020 calculation of average PV by LY-9063.
4 4
When the main ESDV with PDT opens, the loading ESDV closes
5 5 4.
automatically.
PDT-9064 Low differential pressure across ESDV9064 3009-242 MO 6 PO 6
HRS-
PT-9055A/B/C Block 2 Inlet high high pressure HH UZ-9056 3009-232 2oo3 11 C C C C 11
9056
HRS-
PT-9051A/B/C Block 1 Inlet high high pressure HH UZ-9055 3009-231 2oo3 12 C C C C C C 12
9055
15 15
HRS-
LT-9062A Inlet separator water low level LL UZ-9061A 3009-241A MO 16 C 16
9061A
HRS-
LT-9062B Inlet separator water low level LL UZ-9061B 3009-241B MO 17 C 17
9061B
HRS-
LT-9062C Inlet separator water low level LL UZ-9061C 3009-241C MO 18 C 18
9061C
HRS-
LT-9062D Inlet separator water low level LL UZ-9061D 3009-241D MO 19 C 19
9061D
20 20
HRS-
LT-9074A Lower gas coalescer condensate low level LL UZ-9072A 3009-251A MO 21 C 21
9072A
HRS-
LT-9074B Lower gas coalescer condensate low level LL UZ-9072B 3009-251B MO 22 C 22
9072B
HRS-
LT-9074C Lower gas coalescer condensate low level LL UZ-9072C 3009-251C MO 23 C 23
9072C
HRS-
LT-9074D Lower gas coalescer condensate low level LL UZ-9072D 3009-251D MO 24 C 24
9072D
25 25
HRS-
LT-9075A Upper gas coalescer condensate low level LL UZ-9071A 3009-251A MO 26 C 26
9071A
HRS-
LT-9075B Upper gas coalescer condensate low level LL UZ-9071B 3009-251B MO 27 C 27
9071B
HRS-
LT-9075C Upper gas coalescer condensate low level LL UZ-9071C 3009-251C MO 28 C 28
9071C
HRS-
LT-9075D Upper gas coalescer condensate low level LL UZ-9071D 3009-251D MO 29 C 29
9071D
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 27 OF 38
27 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
4
1. Deleted.
3009-241F
3009-251F
3009-251F
3009-232
3009-232
3009-232
3009-232
3009-281
3009-281
3009-292
3009-292
3009-242
3009-252
3009-271
3009-275
3009-275
3009-232
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-2-2 (Process Shutdown Block 2 Inlet Facility)
P&ID
241G
251G
251G
241H
251H
251H
241E
251E
251E
241A
241A
2. Deleted.
EFFECT
SD - SHUTDOWN
ESDV-9061G
ESDV-9071G
ESDV-9072G
ESDV-9061H
ESDV-9071H
ESDV-9072H
ESDV-9061E
ESDV-9071E
ESDV-9072E
ESDV-9086B
ESDV-9084B
ESDV-9085B
TAG Number
ESDV-9061F
ESDV-9071F
ESDV-9072F
ESDV-9055
ESDV-9056
ESDV-9057
ESDV-9058
ESDV-9062
ESDV-9063
ESDV-9083
ESDV-9064
ESDV-9305
ESDV-9105
ESDV-9113
ESDV-9116
UZ-9030
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number
1. Activation of both Block 1 and Block 2 shutdown will activate ESD 0-2
station shutdown without ZONE 3.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231 1 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 1
9000
HRS-
ESD-0-2 Station shutdown without ZONE 3 UZ-9001 3009-231
9001
2 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 2 2. Deleted.
Manual push button for pressurized Block 2 shutdown (P- HRS- Activation of Block 2 shutdown will eliminate level signals of LI-9063E/F/G/H in
HZS-9030 UZ-9030 3009-232 1, 3 3 C C C C C C C C C C C C C C C C C C C C C C C C C C C PS 3 3.
ESD) 9030 calculation of average PV by LY-9063.
4 4
When the main ESDV with PDT opens, the loading ESDV closes
5 5 4.
automatically.
PDT-9064 Low differential pressure across ESDV9064 3009-242 MO 6 PO 6
HRS-
PT-9051A/B/C Block 1 Inlet high high pressure HH UZ-9055 3009-231 2oo3 11 C C C C 11
9055
HRS-
PT-9055A/B/C Block 2 Inlet high high pressure HH UZ-9056 3009-232 2oo3 12 C C C C C C 12
9056
15 15
HRS-
LT-9062E Inlet separator water low level LL UZ-9061E 3009-241E MO 16 C 16
9061E
HRS-
LT-9062F Inlet separator water low level LL UZ-9061F 3009-241F MO 17 C 17
9061F
HRS-
LT-9062G Inlet separator water low level LL UZ-9061G 3009-241G MO 18 C 18
9061G
HRS-
LT-9062H Inlet separator water low level LL UZ-9061H 3009-241H MO 19 C 19
9061H
20 20
HRS-
LT-9074E Lower gas coalescer condensate low level LL UZ-9072E 3009-251E MO 21 C 21
9072E
HRS-
LT-9074F Lower gas coalescer condensate low level LL UZ-9072F 3009-251F MO 22 C 22
9072F
HRS-
LT-9074G Lower gas coalescer condensate low level LL UZ-9072G 3009-251G MO 23 C 23
9072G
HRS-
LT-9074H Lower gas coalescer condensate low level LL UZ-9072H 3009-251H MO 24 C 24
9072H
25 25
HRS-
LT-9075E Upper gas coalescer condensate low level LL UZ-9071E 3009-251E MO 26 C 26
9071E
HRS-
LT-9075F Upper gas coalescer condensate low level LL UZ-9071F 3009-251F MO 27 C 27
9071F
HRS-
LT-9075G Upper gas coalescer condensate low level LL UZ-9071G 3009-251G MO 28 C 28
9071G
HRS-
LT-9075H Upper gas coalescer condensate low level LL UZ-9071H 3009-251H MO 29 C 29
9071H
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 28 OF 38
28 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
1
1. Deleted.
3009-201
3009-201
3009-202
3009-202
3009-203
3009-203
3009-204
3009-204
3009-205
3009-205
3009-206
3009-206
3009-207
3009-207
3009-208
3009-208
3009-209
3009-209
3009-210
3009-210
3009-274
Number
ESD LEVEL 2-3 (Process Shutdown Common)
P&ID
2. Deleted.
SERVICE DESCRIPTION
ST - START or timer expired.
EFFECT
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
PO - PERMISSIVE TO OPEN
TAG Number
ESDV-9001
ESDV-9002
ESDV-9003
ESDV-9004
ESDV-9005
ESDV-9006
ESDV-9007
ESDV-9008
ESDV-9009
ESDV-9010
ESDV-9011
ESDV-9012
ESDV-9013
ESDV-9014
ESDV-9015
ESDV-9016
ESDV-9017
ESDV-9018
ESDV-9019
ESDV-9020
ESDV-9112
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number When the main ESDV with PDT opens, the loading ESDV closes
1.
automatically.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231 1 C C C C C C C C C C C C C C C C C C C C C 1
9000
HRS-
ESD-0-2 Station shutdown without ZONE 3 UZ-9001 3009-231 2 2
9001
3 3
4 4
5 5
HRS-
HZS-9031 Manual push button for trunk line isolation-1 UZ-9031 3009-201 6 C C 6
9031
HRS-
HZS-9032 Manual push button for trunk line isolation-2 UZ-9032 3009-202 8 C C 8
9032
HRS-
HZS-9033 Manual push button for trunk line isolation-3 UZ-9033 3009-203 10 C C 10
9033
HRS-
HZS-9034 Manual push button for trunk line isolation-4 UZ-9034 3009-204 12 C C 12
9034
HRS-
HZS-9035 Manual push button for trunk line isolation-5 UZ-9035 3009-205 14 C C 14
9035
HRS-
HZS-9036 Manual push button for trunk line isolation-6 UZ-9036 3009-206 16 C C 16
9036
HRS-
HZS-9037 Manual push button for trunk line isolation-7 UZ-9037 3009-207 18 C C 18
9037
HRS-
HZS-9038 Manual push button for trunk line isolation-8 UZ-9038 3009-208 20 C C 20
9038
HRS-
HZS-9039 Manual push button for trunk line isolation-9 UZ-9039 3009-209 22 C C 22
9039
HRS-
HZS-9040 Manual push button for trunk line isolation-10 UZ-9040 3009-210 24 C C 24
9040
HRS-
HZS-9051 Manual push button for MPP IV isolation UZ-9051 3009-274 26 C 26
9051
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 29 OF 38
29 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
1
1. Deleted.
3009-211
3009-211
3009-212
3009-212
3009-213
3009-213
3009-214
3009-214
3009-215
3009-215
3009-216
3009-216
3009-217
3009-217
3009-218
3009-218
3009-219
3009-219
3009-220
3009-220
3009-275
Number
ESD LEVEL 2-3 (Process Shutdown Common)
P&ID
2. Deleted.
SERVICE DESCRIPTION
ST - START or timer expired.
EFFECT
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
TAG Number
ESDV-9021
ESDV-9022
ESDV-9023
ESDV-9024
ESDV-9025
ESDV-9026
ESDV-9027
ESDV-9028
ESDV-9029
ESDV-9030
ESDV-9031
ESDV-9032
ESDV-9033
ESDV-9034
ESDV-9035
ESDV-9036
ESDV-9037
ESDV-9038
ESDV-9039
ESDV-9040
ESDV-9114
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number When the main ESDV with PDT opens, the loading ESDV closes
1.
automatically.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231 1 C C C C C C C C C C C C C C C C C C C C C 1
9000
HRS-
ESD-0-2 Station shutdown without ZONE 3 UZ-9001 3009-231 2 2
9001
3 3
4 4
5 5
HRS-
HZS-9041 Manual push button for trunk line isolation-11 UZ-9041 3009-211 6 C C 6
9041
HRS-
HZS-9042 Manual push button for trunk line isolation-12 UZ-9042 3009-212 8 C C 8
9042
HRS-
HZS-9043 Manual push button for trunk line isolation-13 UZ-9043 3009-213 10 C C 10
9043
HRS-
HZS-9044 Manual push button for trunk line isolation-14 UZ-9044 3009-214 12 C C 12
9044
HRS-
HZS-9045 Manual push button for trunk line isolation-15 UZ-9045 3009-215 14 C C 14
9045
HRS-
HZS-9046 Manual push button for trunk line isolation-16 UZ-9046 3009-216 16 C C 16
9046
HRS-
HZS-9047 Manual push button for trunk line isolation-17 UZ-9047 3009-217 18 C C 18
9047
HRS-
HZS-9048 Manual push button for trunk line isolation-18 UZ-9048 3009-218 20 C C 20
9048
HRS-
HZS-9049 Manual push button for trunk line isolation-19 UZ-9049 3009-219 22 C C 22
9049
HRS-
HZS-9050 Manual push button for trunk line isolation-20 UZ-9050 3009-220 24 C C 24
9050
HRS-
HZS-9052 Manual push button for MPP O/I isolation UZ-9052 3009-275 26 C 26
9052
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 30 OF 38
30 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
1. Deleted.
3009-241F
3009-281
3009-281
3009-274
3009-274
3009-281
3009-281
3009-281
3009-292
3009-610
3009-281
3009-281
3009-281
3009-457
3009-458
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 2-3 (Process Shutdown Common)
P&ID
241G
241C
241D
241H
282A
282B
241A
241B
241E
282A
282B
2. Deleted.
3009-P-902A/B
3009-P-901C
ESDV-9087A
ESDV-9087B
TAG Number
3009-P-901A
3009-P-901B
3009-K-946A
3009-K-946B
ESDV-9082
ESDV-9083
ESDV-9121
ESDV-9122
ESDV-9617
UZ-9061G
UZ-9061C
UZ-9061D
UZ-9061H
UZ-9084C
UZ-9061A
UZ-9061B
UZ-9061E
UZ-9084A
UZ-9084B
UZ-9082A
UZ-9082B
UZ-9061F
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number When both 3009-ESDV-9082 and 9083 are closed, the effects are
1.
activated.
HRS-
ESD-0-1 Station shutdown UZ-9000 3009-231 1 C C C C SP SP SP C C SP C 1
9000
HRS-
ESD-0-2 Station shutdown without ZONE 3 UZ-9001 3009-231 2 C C C C SP SP SP C C SP 2
9001
3 3
4 4
5 5
HRS-
LT-9064A Inlet separator condensate low level LL UZ-9081 3009-241A MO 6 C C C C X X X 6
9081
HRS-
LT-9064B Inlet separator condensate low level LL UZ-9081 3009-241B MO 7 C C C C X X X 7
9081
HRS-
LT-9064C Inlet separator condensate low level LL UZ-9081 3009-241C MO 8 C C C C X X X 8
9081
HRS-
LT-9064D Inlet separator condensate low level LL UZ-9081 3009-241D MO 9 C C C C X X X 9
9081
HRS-
LT-9064E Inlet separator condensate low level LL UZ-9081 3009-241E MO 10 C C C C X X X 10
9081
HRS-
LT-9064F Inlet separator condensate low level LL UZ-9081 3009-241F MO 11 C C C C X X X 11
9081
HRS-
LT-9064G Inlet separator condensate low level LL UZ-9081 3009-241G MO 12 C C C C X X X 12
9081
HRS-
LT-9064H Inlet separator condensate low level LL UZ-9081 3009-241H MO 13 C C C C X X X 13
9081
14 14
HRS-
LT-9082A Liquid coalescer water low level LL UZ-9082A 3009-282A MO 15 C 15
9082A
HRS-
LT-9082B Liquid coalescer water low level LL UZ-9082B 3009-282B MO 16 C 16
9082B
17 17
HRS-
LT-9084 Condensate drain drum condensate low level LL UZ-9083 3009-292 MO 18 SP 18
9083
HRS-
LT-9617 Offline pigging degassing drum high level HH UZ-9602 3009-610 MO 23 C 23
9602
HRS-
FT-9082A Condensate rundown pump discharge flow low LL UZ-9084A 3009-281 MO / OO 24 SP 24
9084A
HRS-
FT-9082B Condensate rundown pump discharge flow low LL UZ-9084B 3009-281 MO / OO 25 SP 25
9084B
HRS-
FT-9082C Condensate rundown pump discharge flow low LL UZ-9084C 3009-281 MO / OO 26 SP 26
9084C
27 27
HRS-
XS-9000 Total power failure (TPF) UZ-9401 34 ST ST 34
9401
HRS-
PT-9455A/B/C IA header low pressure L UZ-9401 3009-456 2oo3 35 ST ST 35
9401
23
24
10
11
12
13
14
15
16
17
18
19
20
21
22
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 31 OF 38
31 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
6
1. Deleted.
3009-902F
3009-273F
3009-902J
3009-273J
3009-902I
3009-273I
3009-231
3009-801
3009-274
3009-274
3009-274
3009-274
3009-275
3009-275
3009-275
3009-275
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 3 (Emergency Depressurization)
P&ID
902G
273G
902C
902D
902H
273C
273D
273H
902A
902B
902E
902K
273A
273B
273E
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
TAG Number
M - Manual Reset / A - Auto Reset
BDV-9301G
BDV-9101G
BDV-9111C
BDV-9111D
BDV-9113C
BDV-9113D
BDV-9301C
BDV-9301D
BDV-9301H
BDV-9101C
BDV-9101D
BDV-9101H
BDV-9111A
BDV-9111B
BDV-9113A
BDV-9113B
BDV-9301A
BDV-9301B
BDV-9301E
BDV-9301K
BDV-9101A
BDV-9101B
BDV-9101E
BDV-9301F
BDV-9101F
BDV-9301J
BDV-9101J
BDV-9301I
BDV-9101I
BDV-9091
HV-9051
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number 1 When the zone depressuring is activated, timer will start for prescribed
minutes. Any other depressurization buttons can not be activated until timer
Depressuring of all ZONEs (STATION) by D-ESD of is expired. Refer to Flare System Design Report (S-3000-1223-004).
UZ-9000 UZ-9000 3009-231 1, 3, 8 1 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 1
STATION
UZ-9301A/B Depressuring of ZONE 1 (FZ-C59) by fire and gas detection UZ-9301A/B 3009-902A/B 4, 6 2 O O 2
2 Deleted.
UZ-9301C/D Depressuring of ZONE 1 (FZ-C60) by fire and gas detection UZ-9301C/D 3009-902C/D 4, 6 3 O O 3
UZ-9301E/F Depressuring of ZONE 1 (FZ-C61) by fire and gas detection UZ-9301E/F 3009-902E/F 4, 6 4 O O 4
UZ-9301G/H Depressuring of ZONE 1 (FZ-C62) by fire and gas detection UZ-9301G/H 3009-902G/H 4, 6 5 O O 5
3 Sequential depressuring is achieved ZONE by ZONE by opening BDVs and
HVs with depressuring function in predeterminded order. Refer to Flare
UZ-9301I/J Depressuring of ZONE 1 (FZ-C63) by fire and gas detection UZ-9301I/J 3009-902I/J 4, 6 6 O O 6 System Design Report (S-3000-1223-004).
UZ-9301K Depressuring of ZONE 1 (FZ-C52) by fire and gas detection UZ-9301K 3009-902K 4, 6 7 O 7
UZ-9101A/B Depressuring of ZONE 1 (FZ-C21) by fire and gas detection UZ-9101A/B 3009-273A/B 4 8 O O 8
4 In case of confirmed fire or gas by the detector around gas turbine
compressors, the compressor trains which are exposed to fire are tripped
UZ-9101C/D Depressuring of ZONE 1 (FZ-C20) by fire and gas detection UZ-9101C/D 3009-273C/D 4 9 O O 9 and depressurized automatically.
UZ-9101E/F Depressuring of ZONE 1 (FZ-C19) by fire and gas detection UZ-9101E/F 3009-273E/F 4 10 O O 10
UZ-9101G/H Depressuring of ZONE 1 (FZ-C18) by fire and gas detection UZ-9101G/H 3009-273G/H 4 11 O O 11 5. Manual push bottun can be activated after receiving Permissive for
Depressuring.
UZ-9101I/J Depressuring of ZONE 1 (FZ-C17) by fire and gas detection UZ-9101I/J 3009-273I/J 4 12 O O 12
HDS-9000B Manual push button for all ZONEs depressuring (STATION) UZ-9000 3009-231 1, 3, 5, 8 14 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 14
HDS-9010A Manual push button for ZONE 1 (Block 1, 2) depressuring UZ-9010 3009-271 5 15 O O O O O O O O O O O O O O O O O O O O O 15 7. Sequence and timer are stopped. All BDVs to be closed position.
HDS-9020A Manual push button for ZONE 1, 2 (Block 1) depressuring UZ-9020 3009-231 1, 3, 5, 8 16 O O O O O O O O O O O O O O O 16
HDS-9030B Manual push button for ZONE 2 (Block 2) depressuring UZ-9030 3009-232 5, 8 19 O O O O 19 9. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
22 22
23 23
25 25
27 27
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 32 OF 38
32 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
8
1. Deleted.
Number
ESD LEVEL 3 (Emergency Depressurization)
P&ID
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
PO - PERMISSIVE TO OPEN for associated downstream LV by UZ activation.
PS - PERMISSIVE TO START
X - ACTIVATED
D - DISCONNECT
HH - HIGH HIGH
LL - LOW LOW
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
MO - MAINTENANCE OVERRIDE
TAG Number
M - Manual Reset / A - Auto Reset
XS-9251GB
XS-9251CB
XS-9251DB
XS-9251HB
XS-9251AB
XS-9251BB
XS-9251EB
XS-9251FB
XS-9251JB
XS-9251IB
-
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number 1 When the zone depressuring is activated, timer will start for prescribed
minutes. Any other depressurization buttons can not be activated until timer
Depressuring of all ZONEs (STATION) by D-ESD of is expired. Refer to Flare System Design Report (S-3000-1223-004).
UZ-9000 UZ-9000 3009-231 1, 3, 7 1 X X X X X X X X X X X X X X X X X X X X X 1
STATION
2 2
2 Deleted.
3 3
4 4
5 5
3 Sequential depressuring is achieved ZONE by ZONE by opening BDVs and
HVs with depressuring function in predeterminded order. Refer to Flare
6 6 System Design Report (S-3000-1223-004).
7 7
10
12 12
HDS-9000B Manual push button for all ZONEs depressuring (STATION) UZ-9000 3009-231 1, 3, 4, 7 14 X X X X X X X X X X X X X X X X X X X X X 14
HDS-9020B Manual push button for ZONE 2 (Block 1) depressuring UZ-9020 3009-231 4, 7 17 17 8. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
HDS-9030A Manual push button for ZONE 1, 2 (Block 2) depressuring UZ-9030 3009-232 1, 4, 7 18 X X X X X X X X X X 18
19 19
20 20
21 21
22 22
23 23
25 25
27 27
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 33 OF 38
33 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-902F
3009-902J
3009-902I
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 3 (Emergency Depressurization)
P&ID
902G
902C
902D
902H
902A
902B
902E
902K
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
PO - PERMISSIVE TO OPEN for associated downstream LV by UZ activation.
PS - PERMISSIVE TO START
X - ACTIVATED
D - DISCONNECT
HH - HIGH HIGH
LL - LOW LOW
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
(LP)
MO - MAINTENANCE OVERRIDE
TAG Number
M - Manual Reset / A - Auto Reset
BDV-9301G
BDV-9301C
BDV-9301D
BDV-9301H
BDV-9301A
BDV-9301B
BDV-9301E
BDV-9301K
BDV-9301F
BDV-9301J
BDV-9301I
-
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number Manual push bottun can be activated after receiving Permissive for
1.
Depressuring.
UZ-9301A Depressuring of LP compressor A by D-ESD UZ-9301A 3009-902A 2 1 O X 1
UZ-9301B Depressuring of LP compressor B by D-ESD UZ-9301B 3009-902B 2 2 O X 2 2. To be developed in Step 2 detail engineering stage.
12 12
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 34 OF 38
34 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
NOTES
CAUSE AND EFFECT CHART - SBC GENERAL NOTES
2
1. Deleted.
3009-273F
3009-273J
3009-273I
Number
3009-
3009-
3009-
3009-
3009-
3009-
3009-
ESD LEVEL 3 (Emergency Depressurization)
P&ID
273G
273C
273D
273H
273A
273B
273E
2. Deleted.
SERVICE DESCRIPTION
automatically depressurize the isolated ZONE after completion of isolation
EFFECT
ST - START or timer expired.
SD - SHUTDOWN
B - BYPASS 5. DCS logic design to input the 0% output and change the mode to manual
PO - PERMISSIVE TO OPEN for associated downstream LV by UZ activation.
PS - PERMISSIVE TO START
X - ACTIVATED
D - DISCONNECT
HH - HIGH HIGH
LL - LOW LOW
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
(MP)
MO - MAINTENANCE OVERRIDE
TAG Number
M - Manual Reset / A - Auto Reset
BDV-9101G
XS-9251GB
BDV-9101C
BDV-9101D
BDV-9101H
BDV-9101A
BDV-9101B
BDV-9101E
XS-9251CB
XS-9251DB
XS-9251HB
XS-9251AB
XS-9251BB
XS-9251EB
BDV-9101F
XS-9251FB
BDV-9101J
XS-9251JB
BDV-9101I
XS-9251IB
CAUSE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
9
Number Manual push bottun can be activated after receiving Permissive for
1.
Depressuring.
UZ-9101A Depressuring of MP compressor A by D-ESD UZ-9101A 3009-902A 1 O X 1
UZ-9101B Depressuring of MP compressor B by D-ESD UZ-9101B 3009-902B 2 O X 2 2. Refer to CAUSE/EFFECT CHART (V-2158-201-A-024).
11 11
12 12
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
1
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 35 OF 38
35 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
P-ESD D-ESD
IA header
pressure low low HZS HZDS HDS HDS
9000 9000A 9000B 9000C
ESD 0-1
(Station shutdown)
P-ESD Station Depressuring Zone 3 Depressuring
Total power
ESD 0-1 failure (All Zones)
HZS
9001 NOTE 6
ESD 0-2
(Station shutdown ESD 0-2
without Zone 3)
P-ESD
HZS HDS HDS
P-ESD P-ESD
HZS Permissive HZS Permissive HDS HDS HDS HDS
ESD 2-1-1 9020 9030 9020A 9020B 9030A 9030B
(Process shutdown Block 1 E SD2-1
compressor) E SD2-2
ESD 2-2-1 D-ESD from From confirmed fire & gas detection (NOTE 1)
Permissive
(Process shutdown Block 2 MARK VI
compressor) D-ESD P-ESD from Confirmed fire &
D-ESD P-ESD D-ESD from
in field MARK VI gas detection in
Zone MARK VI Permissive
HZDS HZDS HZS D-ESD
ぅ ぅ ぅ D-ESD P-ESD HDS HDS
9101AC 9101AA 9101A in field NOTE 6
P-ESD from 9101AB 9101FB
NOTE 2 MARK VI ぅ ぅ ぅ ぅ ぅ ぅ
HZDS HZDS HZS
9101FC 9101FA 9101F
ぅ ぅ ぅ
NOTE 2 NOTE 4
ESD 2-1-2 Train A shutdown
(Process shutdown Block 1 (MP, Block 1) To each compressor train depressuring NOTE 4 Train A depressuring Train F depressuring
(NOTE 1) (MP, Block 1) (MP, Block 2)
Inlet Facility)
Train F shutdown
(MP, Block 2)
Confirmed fire &
gas detection in
Zone From confirmed fire & gas detection (NOTE 1)
D-ESD from
Permissive
MARK VI
D-ESD
D-ESD P-ESD P-ESD from D-ESD from
in field Confirmed fire &
MARK VI MARK VI Permissive
gas detection in
HZDS HZDS HZS Zone D-ESD
9301AC 9301AA 9301A ぅ ぅ ぅ D-ESD P-ESD HDS HDS
ESD 2-2-2 in field P-ESD from
9301AB 9301GB
(Process shutdown Block 2 NOTE 3 HZDS HZDS HZS
MARK VI ぅ ぅ ぅ ぅ ぅ ぅ
Inlet Facility) 9301GC 9301GA 9301G
NOTE 3 NOTE 5
Train A shutdown ぅ ぅ ぅ
(LP, Block 1)
NOTE 5
Train G shutdown
(LP, Block 2) Train A depressuring Train G depressuring
(LP, Block 1) (LP, Block 2)
NOTES
UZ-9055 UZ-9061A~D UZ-9071A~D UZ-9072A~D UZ-9056 UZ-9061E~H UZ-9071E~H UZ-9072E~H
1. Fire Zone (FZ) where fire or gas is detected will be depressurized automatically.
Inlet separator Upper gas coalescer Lower gas coalescer Inlet separator Upper gas coalescer Lower gas coalescer 2. Same configuration from Train A to Train E.
B lock 1 Inlet HH Block 2 Inlet HH
pressure shutdown
water low level vapor breakthrough vapor breakthrough
pressure shutdown
water low level vapor breakthrough vapor breakthrough 3. Same configuration from Train A to Train F.
protection protection protection protection protection protection
4. Same configuration from Train F to Train J.
5. Same configuration from Train G to Train K.
ESD 2-3 ESD 2-3 6. Sequential depressuring
ESD 2-3 7. Manual push buttons for compressor:
(Process shutdown common) HZDS-9X01YA : Isolation and depressuring automatically (D-ESD in field)
ESD 2-3 UZ-9081 UZ-9082A/B UZ-9083 UZ-9601 UZ-9602 UZ-9051 UZ-9401 HDS-9X01YB : Depressuring
Condensate
Liquid coales cer Condensate return P WT HH level
Degassing drum
Diesel driven I A HZDS-9X01YC : Isolation and depressuring automatically (D-ESD)
rundown pump high liquid level MPP I V is olation
protection
water low level pump protection protection
protection
compressor start HZS-9X01Y : Isolation (P-ESD)
X: LP(3) MP(1) Y: Train No.
UZ-9031~9050 UZ-9052
UZ-9084A~C
Trunk line isolation MPP O /I isolation
Condensate
rundown pump
protection A~C
D R A
IN1-JAN- T0
2
2 0 2
UIL TED
AS LBLED WHEN PRIN SHEET 36 OF 38
36 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
D R A 3009-ESDV-9115
3009-ESDV-9116
HC Gas
HC Gas
D-3009-1225-274
D-3009-1225-275
PS
PS
PS
PS
PS
PS
IN1-JAN- T0
3009-ESDV-9617 HC Gas / Liquid D-3009-1225-610 PS
2 0 2
2 UIL TED
AS LBLED WHEN PRIN SHEET 37 OF 38
37 / 39
TRO
NCON
SONATRACH HASSI R'MEL JOB CODE: 0-7577-20
BOOSTING PHASE III PROJECT DOC. No.: S-3009-1223-061 Rev.3
Note1: If confirmed fire/gas is detected during the station depressuring (D-ESD Station), the station depressuring is continued because compressor zone(Zone-1) is firstly depressurized in station depressuring sequence.
Note2: Any other compressor depressurings by HZDS-9101XA/XC, HZDS-9301XA/XC can be activated during the two compressor depressuring by fire scenario.
Note3: If confirmed fire/gas is detected, related two compressors are automatically depressurized. During the depressuirng, any other depressuring in other zones cannot activated until timer is expired. Timer is set as 30 seconds for preliminary information.
Note4: BDV position is not limitation for UZ Reset. If the cause is solved, UZ can reset by operator in spite of BDV position.
Note5: Depressuring of other zone cannot be activated until timer(20 minutes) is expired or all related BDVs are closed.
IN1-JAN- T0
2
2 0 2
UIL TED
General Note: The time interval between adjacent Zones is 20 minutes.
<Page 31> This document does not describe DCS, but indicate ESD
refer to Owner'<reply regarding DCS and ESD system.
system separation>.
2 If Owner needs details of DCS system, it can be referred to
DCS Control Narrative (S-3002/3003/3009-1371-301).