ALL DIMENSIONS MUST BE CHECKED ON

SITE AND NOT BE SCALED FROM THIS


DRAWING.

PLEASE NOTE PIPE WORK & EQUIPMENT


MAY BE SHOWN DISPLACED FOR CLARITY.
Riser to under seating Riser to under seating
0.05e 0.05d

PAR-41MAA
Controller

Existing condenser units


shall be made safe and
disposed of.
0.05c
0.05a control rm
The electrical connection Plant Fuse brd
0.05b
shall be made safe and AV store room
removed.

BEDE ISLAND ROAD


LMO01
BIN COMPOUND
BIZ0.04 LECTURE
New containment to be created. THEATRE LOBBY
Cables run down wall and below
ground under footpath

Existing boiler plant shall be


LV

de-energized, drained down and


made safe including all ancillaries
0.04 and all components to be removed
FRIDGE
TEA from the room.
Trench to be
excavated and all Control box

redundant MAIN WATER Approximate location of existing


equipment to be refrigerant tray, tray to be reused
0.03 BOILER RM GAME ART where practical. Otherwise to be
removed. Acc/GN WC 0.14
DB1/B8 0.06 LAB 2 removed and disposed of.
HAND-
DRIER
20 WORKSTATIONS
HAND-
DRIER
GAME ART
LAB 1
0.07 LIFT 20 WORKSTATIONS

0.13 MOTOR ROOM


0.15
S&VP
STUDIO S&VP E Estimated Location of
ANIMATION STUDIO 0.02 refrigerant tray to be
cap 42 FEMALE
WC 0.08 confirmed on site
HAND-
MALE
Ca Acc HAND-
DRIER
WC
DRIER

0.01
LECTURER
S&VP
RISER 0.09
riser
SOAP
DISPENSER S&VP
BI Z0.03 EAST CORRIDOR
Ca Acc

WEST L0.01 L0.02


DIGITAL ART STUDIO CORRIDOR LB1 LB2 Redundant vertical
26 Z0.01 0.16 pipework within riser to
WORKSTATIONS OFFICE SEMINAR ROOM 1 be stripped out and
CENTRAL CORRIDOR 0.17 disposed of.
0.12
Z0.02

OFFICE
0.11
STORE STORE
CLEANING CAMPUS CAMPUS cap 19 P01 FIRST ISSUE PML 22.08.23 -
0.10 SERVICES SERVICES REV DESCRIPTION BY DATE CHK
C ROOM
0.18 DRAWING STATUS:
0.19 PROVISIONAL

CCTV room

0.19b 0.19a MAIN SWITCH RM


All radiators, valves and
MAIN ELECTRIC
pipework to floor level to ELECTRICS
STAIR 1
be removed to floor level
and floor penetrations to
be made good.
Refrigeration & Air Conditioning Ltd
Flamefast (CO2M) 240V Airco House, Goulton Street, Hull, HU3 4DL
CO2, Temp & RH Monitor T: 01482 587038
W: www.airco.co.uk

CLIENT:

WESTERN BOULEVARD
DE MONTFORT UNIVERSITY

PROJECT:

DE MONTFORT UNIVERSITY
BEDE ISLAND LEICESTER
MEDIA SCHOOL
TITLE:

PROPOSED AC WORKS
GROUND FLOOR
DATE: DRAWN: APPROVED:
22.08.23 PML -
SHEET NUMBER: SCALE:
1 of 3 1:100 @ A1
JOB No.: DRAWING No.: REV:

C0001449 M001 P01


© COPYRIGHT - THIS DRAWING IS CONFIDENTIAL AND MAY NOT BE REPRODUCED NOR DISCLOSED TO A
THIRD PARTY WITHOUT PRIOR WRITTEN PERMISSION OF AIRCO LTD. THIS IS A COMPUTER GENERATED
DRAWING. ANY DRAWINGS THAT ARE TRANSMITTED ELECTRONICALLY ARE UNSIGNED.

You might also like