The document lists various vessel documents needed for assessing the feasibility of ballast water management plan (BWMP) modifications and basic design (BD) upgrades. It includes machinery layouts, piping diagrams, tank arrangements, stability data, electrical diagrams, control systems, and existing BWMP documentation to understand the current ballast system and compliance requirements. Approval of the existing BWMP or provision of additional vessel data would be needed if the current BWMP is not available.
The document lists various vessel documents needed for assessing the feasibility of ballast water management plan (BWMP) modifications and basic design (BD) upgrades. It includes machinery layouts, piping diagrams, tank arrangements, stability data, electrical diagrams, control systems, and existing BWMP documentation to understand the current ballast system and compliance requirements. Approval of the existing BWMP or provision of additional vessel data would be needed if the current BWMP is not available.
The document lists various vessel documents needed for assessing the feasibility of ballast water management plan (BWMP) modifications and basic design (BD) upgrades. It includes machinery layouts, piping diagrams, tank arrangements, stability data, electrical diagrams, control systems, and existing BWMP documentation to understand the current ballast system and compliance requirements. Approval of the existing BWMP or provision of additional vessel data would be needed if the current BWMP is not available.
1 Machinery Room /Engine Room Arrangement FEASIBILITY/ BD 2 Pump Room Arrangement Drawing FEASIBILITY/ BD 3 FEASIBILITY/ BD/BWMP Ballast Piping System- Cargo Area and Engine Room 4 Fire/GS System FEASIBILITY/ BD 5 FW Cooling System FEASIBILITY/ BD 6 SW Cooling System FEASIBILITY/ BD 7 Compressed Air Piping System FEASIBILITY/ BD 8 FW Potable System/FW Domestic System FEASIBILITY/ BD 9 Existing Ballast water managemaent plan BWMP/FEASIBILITY 10 Nitrogen line (for optimarin system) FEASIBILITY/ BD Ballast Pump Manufacturer Details and Pump Curve 11 FEASIBILITY/ BD Details Driving Pump for ejector manufacturer details and 12 FEASIBILITY/ BD pump curve details 13 Ejector Specification and Details FEASIBILITY/ BD 14 Pipe yard standard booklet (if available) FEASIBILITY/ BD Structure Drawings iwo of Engine Room/Machinery 15 FEASIBILITY/ BD Room 16 Structure drawings iwo equipment installation FEASIBILITY/ BD 17 Tank Capacity Plan FEASIBILITY/ BD/BWMP 18 General Arrangement of Vessel FEASIBILITY/ BD/BWMP 19 Engine room construction plan FEASIBILITY/ BD Transverse and longi. Sections of engine room 20 FEASIBILITY/ BD construction 21 Existing electrical load analysis/electrical balance FEASIBILITY/ BD 22 Single line diagram of 440C main switchboard SLD FEASIBILITY/ BD 23 Main switch board manufacturers drawing FEASIBILITY/ BD 24 Single line diagram of 440V ac distribution boards FEASIBILITY/ BD Single line diagram of 220V/100V AC switch board 25 FEASIBILITY/ BD boards(lighting& power) 26 Single line diagram of 440V emergency switchboard FEASIBILITY/ BD 27 Short circuit analysis FEASIBILITY/ BD 28 Main & emergency lighting layout and SLD FEASIBILITY/ BD 29 Cable tray routing drawing DETAILED DESIGN 24 V dc distribution diagram[ in cargo/ballast control 30 FEASIBILITY/ BD room] 31 Alarm monitoring system block diagram & i/o list FEASIBILITY/ BD 32 Alarm monitoring system manual FEASIBILITY/ BD 33 GPS block diagram FEASIBILITY/ BD 34 GPS interface diagram FEASIBILITY/ BD 35 Power management system ( main switch board) FEASIBILITY/ BD Cargo/ballast control console drawing (inside console 36 FEASIBILITY/ BD 24V DC & 220V AC board dwg.) 37 Existing valve control system drawing and manual FEASIBILITY/ BD 38 Fire detection system layout, SLD and manual DETAILED DESIGN 39 Gas detection system layout, SLD and manual DETAILED DESIGN 40 Ballast system valve control block diagram FEASIBILITY/ BD DOCUMENTS FROM VESSEL S.No. DESCRIPTION SCOPE YES/NO/ Remarks 41 Ballast system valve control detailed schematic & P&ID DD
Stability Booklet (with Approved Longitudinal strength If existing BWMP not
42 calculation with Permissible Bending Moment & Shear FEASIBILITY/ BD/BWMP available then Stability Force Values & Lightship Weight Distribution) Booklet required for BWMP
42 Loading Software (Setup File) BWMP
43 Details of ports frequently visited. BWMP 45 Any log book, existing, for vessel ballasting etc BWMP 46 Crew List of vessel (manning certificate) BWMP Air vent & Sounding Pipe Location drawing for all BWMP 47 ballast tanks 48 Manhole Location of Ballast Tanks BWMP 49 Profile & Deck Construction Plan drawing BWMP 50 Lines Plan BWMP If existing BWMP not 51 Midship Section Drawing BWMP available then to ask these 52 Sectional drawing from Aft to Fwd of vessel BWMP data 53 Longitudinal sectional drawing BWMP Approved Ballast water Treatment system manual (Complete specification of each unit, working BWMP 54 methods) 55 Hazardous Area Aplan FEASIBILITY/ BD