Progress Mapping Tunnel End Portal Maret 2022

Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 1-Apr-2022 08+291,91 - 08+288,197 Sandy tuff, Polemix Breaksi 55 III ( fair rock)
2 2-Apr-2022 08+288,197 - 08+ …........ Sandy tuff, Polemix Breaksi III ( fair rock)
3 3-Apr-2022 08+ …........ - 08+283,870 Sandy tuff, Polemix Breaksi III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
34 III ( fair rock)
III ( fair rock)
51 III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
III ( fair rock)
0.00
Keterangan
Progress Mapping Bulan April
2022
Progress Mapping Tunnel End Portal Maret 2022
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 1-Mar-2022 08+473,138 - 08+468,942 4.20 Sandy tuff III ( fair rock)
2 2-Mar-2022 08+468,942 - 08+465.000 3.94 Sandy tuff III ( fair rock)
3 2-Mar-2022 08+465,000 - 08+460,863 4.14 Sandy tuff III ( fair rock)
4 3-Mar-2022 08+460,863 - 08+457,450 3.41 Sandy tuff III ( fair rock)
5 3-Mar-2022 08+457,450 - 08+453,906 3.54 Sandy tuff III ( fair rock)
6 4-Mar-2022 08+453,906 - 08+449,940 3.97 Sandy tuff III ( fair rock)
7 4-Mar-2022 08+449,940 - 08+446,592 3.35 Sandy tuff III ( fair rock)
8 5-Mar-2022 08+446,592 - 08+442,876 3.72 Sandy tuff III ( fair rock)
9 5-Mar-2022 08+442,876 - 08+439,015 3.86 Sandy tuff III ( fair rock)
10 6-Mar-2022 08+439,015 - 08+434,774 4.24 Sandy tuff III ( fair rock)
11 7-Mar-2022 08+434,774 - 08+431,246 3.53 Sandy tuff III ( fair rock)
12 8-Mar-2022 08+431,246 - 08+427,670 3.58 Sandy tuff III ( fair rock)
13 8-Mar-2022 08+427,670 - 08+424,004 3.67 Sandy tuff III ( fair rock)
14 9-Mar-2022 08+424,004 - 08+420,330 3.67 Sandy tuff III ( fair rock)
15 9-Mar-2022 08+420,330 - 08+416,549 3.78 Sandy tuff III ( fair rock)
16 10-Mar-2022 08+416,549 - 08+412,540 4.01 Sandy tuff III ( fair rock)
17 11-Mar-2022 08+412,540 - 08+408,822 3.72 Sandy tuff III ( fair rock)
18 12-Mar-2022 08+408,822 - 08+405,429 3.39 Sandy tuff III ( fair rock)
19 12-Mar-2022 08+405,429 - 08+401,810 3.62 Sandy tuff III ( fair rock)
20 13-Mar-2022 08+401,810 - 08+398,074 3.74 Sandy tuff III ( fair rock)
21 14-Mar-2022 08+398,074 - 08+394,850 3.22 Sandy tuff III ( fair rock)
22 15-Mar-2022 08+394,850 - 08+391,280 3.57 Sandy tuff III ( fair rock)
23 16-Mar-2022 08+391,280 - 08+387,891 3.39 Sandy tuff III ( fair rock)
24 17-Mar-2022 08+387,891 - 08+383,620 4.27 Sandy tuff III ( fair rock)
25 17-Mar-2022 08+383,891 - 08+379,310 4.58 Sandy tuff III ( fair rock)
26 18-Mar-2022 08+379,310 - 08+375,408 3.90 Sandy tuff III ( fair rock)
27 19-Mar-2022 08+375,408 - 08+372,390 3.02 Sandy tuff III ( fair rock)
28 19-Mar-2022 08+372,390 - 08+369,160 3.23 Sandy tuff III ( fair rock)
29 20-Mar-2022 08+369,160 - 08+364,640 4.52 Sandy tuff III ( fair rock)
30 22-Mar-2022 08+364,640 - 08+361,271 3.37 Sandy tuff III ( fair rock)
31 22-Mar-2022 08+361,271 - 08+357,690 3.58 Sandy tuff III ( fair rock)
32 23-Mar-2022 08+357,690 - 08+354,405 3.29 Sandy tuff III ( fair rock)
33 23-Mar-2022 08+354,405 - 08+350,51 3.90 Sandy tuff III ( fair rock)
34 24-Mar-2022 08+350,510 - 08+346,422 4.09 Sandy tuff III ( fair rock)
35 24-Mar-2022 08+346,422 - 08+342,180 4.24 Sandy tuff III ( fair rock)
36 25-Mar-2022 08+342,180 - 08+338,568 3.61 Sandy tuff III ( fair rock)
37 25-Mar-2022 08+338,568 - 08+334,740 3.44 Sandy tuff III ( fair rock)
38 26-Mar-2022 08+334,740 - 08+330,540 4.20 Sandy tuff, Polemix Breaksi III ( fair rock)
39 26-Mar-2022 08+330,540 - 08+326,690 3.85 Sandy tuff, Polemix Breaksi III ( fair rock)
40 27-Mar-2022 08+326,690 - 08+322,990 3.70 Sandy tuff, Polemix Breaksi III ( fair rock)
41 27-Mar-2022 08+322,990 - 08+319,700 3.29 Sandy tuff, Polemix Breaksi III ( fair rock)
42 28-Mar-2022 08+319,700 - 08+315,190 4.51 Sandy tuff, Polemix Breaksi III ( fair rock)
43 29-Mar-2022 08+315,190 - 08+311,144 4.05 Sandy tuff, Polemix Breaksi III ( fair rock)
44 29-Mar-2022 08+311,144 - 08+307,585 3.56 Sandy tuff, Polemix Breaksi III ( fair rock)
45 30-Mar-2022 08+307,585 - 08+303,740 3.85 Sandy tuff, Polemix Breaksi III ( fair rock)
46 30-Mar-2022 08+303,740 - 08+299,617 4.12 Sandy tuff, Polemix Breaksi III ( fair rock)
47 31-Mar-2022 08+299,617 - 08+295,680 3.94 Sandy tuff, Polemix Breaksi III ( fair rock)
48 31-Mar-2022 08+295,680 - 08+291,91 3.77 Sandy tuff, Polemix Breaksi III ( fair rock)
181.10
Keterangan
Progress Mapping Bulan Maret
2022
Progress Mapping Tunnel End Portal Okt 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 5-Oct-2021 08+847,30 - 08+845,40 1.90 Slate, sandstone intercolated slate III ( fair rock)
2 6-Oct-2021 08+845,40 - 08+842,37 3.03 Slate, sandstone intercolated slate 42 III ( fair rock)
3 6-Oct-2021 08+842,37 - 08+840,15 2.22 Slate, sandstone intercolated slate III ( fair rock)
4 7-Oct-2021 08+840,15 - 08+837,18 2.97 Slate, sandstone intercolated slate III ( fair rock)
5 8-Oct-2021 08+837,18 - 08+835,16 2.02 Slate, sandstone intercolated slate III ( fair rock)
6 8-Oct-2021 08+835,16 - 08+832,09 3.07 Slate, sandstone intercolated slate III ( fair rock)
7 9-Oct-2021 08+832,09 - 08+828,61 3.48 Slate, sandstone intercolated slate III ( fair rock)
8 9-Oct-2021 08+828,61 - 08+826,59 2.02 Slate, sandstone intercolated slate III ( fair rock)
9 10-Oct-2021 08+826,59 - 08+823,37 3.22 Slate, sandstone intercolated slate 42 III ( fair rock)
10 14-Oct-2021 08+823,37 - 08+819,58 3.79 Slate, sandstone intercolated slate 42 III ( fair rock)
11 14-Oct-2021 08+819,58 - 08+817,07 2.51 Slate, sandstone intercolated slate III ( fair rock)
12 15-Oct-2021 08+817,07 - 08+813,72 3.35 Slate, sandstone intercolated slate III ( fair rock)
13 15-Oct-2021 08+813,72 - 08+810,50 3.22 Slate, sandstone intercolated slate III ( fair rock)
14 16-Oct-2021 08+810,50 - 08+806,51 3.99 Slate, sandstone intercolated slate 45 III ( fair rock)
15 16-Oct-2021 08+806,51 - 08+803,56 2.95 Slate, sandstone intercolated slate 45 III ( fair rock)
16 18/10/2021 08+803,56 - 08+799,82 3.74 Slate, sandstone intercolated slate III ( fair rock)
17 18/10/2021 08+799,82 - 08+795,85 3.97 Slate, sandstone intercolated slate III ( fair rock)
18 19/10/2021 08+795,85 - 08+792,57 3.28 Slate, sandstone intercolated slate III ( fair rock)
19 20/10/2021 08+792,57 - 08+788,96 3.61 Slate, sandstone intercolated slate III ( fair rock)
20 20/10/2021 08+788,96 - 08+785,78 3.18 Slate, sandstone intercolated slate 34 III ( fair rock)
21 21/10/2021 08+785,78 - 08+782,30 3.48 sandstone intercolated slate III ( fair rock)
22 22/10/2021 08+782,30 - 08+778,74 3.56 sandstone intercolated slate 51 III ( fair rock)
22/10/2021 08+778,74 - 08+774,91 3.83 sandstone intercolated slate III ( fair rock)
23/10/2021 08+774,91 - 08+771,88 3.03 sandstone intercolated slate III ( fair rock)
25/10/2021 08+771,88 - 08+768,86 3.02 sandstone intercolated slate III ( fair rock)
25/10/2021 08+768,86 - 08+765,27 3.59 sandstone intercolated slate III ( fair rock)
82.03
Keterangan
Progress Mapping Bulan Okt 2021
Progress Mapping Tunnel End Portal Sept 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/09/2021 08+910,34 - 08+906,56 3.78 Slate, sandstone intercolated slate 42 III ( fair rock)
2 02/09/2021 08+906,56 - 08+902,44 4.12 Slate, sandstone intercolated slate III ( fair rock)
3 02/09/2021 08+902,44 - 08+899,25 3.19 Slate, sandstone intercolated slate III ( fair rock)
4 03/09/2021 08+899,25 - 08+895,26 3.99 Slate, sandstone intercolated slate III ( fair rock)
5 04/09/2021 08+895,26 - 08+890,60 4.66 Slate, sandstone intercolated slate 41 III ( fair rock)
6 04/09/2021 08+890,60 - 08+886,57 4.03 Slate, sandstone intercolated slate 31 III ( fair rock)
7 06/09/2021 08+886,57 - 08+883,59 2.98 Slate, sandstone intercolated slate III ( fair rock)
8 09/09/2021 08+883,59 - 08+879,70 3.89 Slate, sandstone intercolated slate III ( fair rock)
9 10/09/2021 08+879,70 - 08+876,71 2.99 Slate, sandstone intercolated slate III ( fair rock)
10 11/09/2021 08+876,71 - 08+873,26 3.45 Slate, sandstone intercolated slate III ( fair rock)
11 11/09/2021 08+873,26 - 08+869,21 4.05 Slate, sandstone intercolated slate 38 IV ( poor rock)
12 13/09/2021 08+869,21 - 08+866,23 2.98 Slate, sandstone intercolated slate 38 IV ( poor rock)
13 14/09/2021 08+866,23 - 08+863,39 2.84 Slate, sandstone intercolated slate 38 IV ( poor rock)
14 15/09/2021 08+863,39 - 08+860,26 3.13 Slate, sandstone intercolated slate IV ( poor rock)
15 16/09/2021 08+860,26 - 08+856,95 3.31 Slate, sandstone intercolated slate IV ( poor rock)
16 22/16/2021 08+856,95 - 08+855,52 1.43 Slate, sandstone intercolated slate V ( very poor rock)
17 23/16/2021 08+855,52 - 08+854,68 0.84 Slate, sandstone intercolated slate V ( very poor rock)
18 27/16/2021 08+854,68 - 08+853,67 1.01 Slate, sandstone intercolated slate V ( very poor rock)
19 28/16/2021 08+853,67 - 08+852,30 1.37 Slate, sandstone intercolated slate V ( very poor rock)
20 28/16/2021 08+852,30 - 08+850,74 1.56 Slate, sandstone intercolated slate V ( very poor rock)
21 30/16/2021 08+850,74 - 08+847,30 3.44 Slate, sandstone intercolated slate III ( fair rock)
63.04
Keterangan
Progress Mapping Bulan Sept 2021

CH. 1.325,63
CH. 1.328,61

CH. 1.342,99 2.98


CH. 1.347,04 860.26 2.84
856.95 3.13
CH. 1.352,86 3.31 3.31
12.26
CH. 1.359,30
3.42
4.00
4.46
11.88
Progress Mapping Tunnel End Portal Agus 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 02/08/2021 09+034,68 - 09+031,42 3.26 Slate, sandstone intercolated slate III ( fair rock)
2 03/08/2021 09+031,42 - 09+028,19 3.23 Slate, sandstone intercolated slate 41 III ( fair rock)
3 03/08/2021 09+028,19 - 09+024,29 3.90 Slate, sandstone intercolated slate III ( fair rock)
4 04/08/2021 09+024,29 - 09+020,75 3.54 Slate, sandstone intercolated slate III ( fair rock)
5 05/08/2021 09+020,75 - 09+016,42 4.33 Slate, sandstone intercolated slate III ( fair rock)
6 05/08/2021 09+016,42 - 09+013,15 3.27 Slate, sandstone intercolated slate III ( fair rock)
7 06/08/2021 09+013,15 - 09+009,40 3.75 Slate, sandstone intercolated slate 41 III ( fair rock)
8 06/08/2021 09+009,40 - 09+005,09 4.31 Slate, sandstone intercolated slate III ( fair rock)
9 06/08/2021 09+005,09 - 09+000,87 4.22 Slate, sandstone intercolated slate III ( fair rock)
10 07/08/2021 09+000,87 - 08+997,36 3.51 Slate, sandstone intercolated slate III ( fair rock)
11 09/08/2021 08+997,36 - 08+993,68 3.68 Slate, sandstone intercolated slate III ( fair rock)
12 10/08/2021 08+993,68 - 08+989,79 3.89 Slate, sandstone intercolated slate III ( fair rock)
13 11/08/2021 08+989,79 - 08+986,52 3.27 Slate, sandstone intercolated slate III ( fair rock)
14 12/08/2021 08+986,52 - 08+982,99 3.53 Slate, sandstone intercolated slate III ( fair rock)
15 13/08/2021 08+982,99 - 08+979,07 3.92 Slate, sandstone intercolated slate III ( fair rock)
16 13/08/2021 08+979,07 - 08+974,77 4.30 Slate 18 V ( very poor rock)
17 18/08/2021 08+974,77 - 08+972,65 2.12 Slate V ( very poor rock)
18 19/08/2021 08+972,65 - 08+971,08 1.57 Slate V ( very poor rock)
19 19/08/2021 08+971,08 - 08+969,62 1.46 Slate V ( very poor rock)
20 20/08/2021 08+969,62 - 08+968,10 1.52 Slate V ( very poor rock)
21 20/08/2021 08+968,10 - 08+966,59 1.51 Slate V ( very poor rock)
22 21/08/2021 08+966,59 - 08+965,10 1.49 Slate V ( very poor rock)
23 21/08/2021 08+965,10 - 08+963,60 1.50 Slate V ( very poor rock)
24 23/08/2021 08+963,60 - 08+960,18 3.42 Slate 42 III ( fair rock)
25 23/08/2021 08+960,18 - 08+957,98 2.20 Slate 42 III ( fair rock)
26 24/08/2021 08+957,98 - 08+954,18 3.80 Slate III ( fair rock)
27 24/08/2021 08+954,18 - 08+950,92 3.26 Slate 43 III ( fair rock)
28 25/08/2021 08+950,92 - 08+946,91 4.01 Slate III ( fair rock)
29 25/08/2021 08+946,91 - 08+943,49 3.42 Slate III ( fair rock)
30 26/08/2021 08+943,49 - 08+940,50 2.99 Slate III ( fair rock)
31 26/08/2021 08+940,50 - 08+937,14 3.36 Slate III ( fair rock)
32 27/08/2021 08+937,14 - 08+933,42 3.72 Slate III ( fair rock)
33 27/08/2021 08+933,42 - 08+929,58 3.84 Slate 41 III ( fair rock)
34 28/08/2021 08+929,58 - 08+925,94 3.64 Slate 41 III ( fair rock)
35 30/08/2021 08+925,94 - 08+922,52 3.42 Slate III ( fair rock)
36 30/08/2021 08+922,52 - 08+918,52 4.00 Slate 43 III ( fair rock)
37 31/08/2021 08+918,52 - 08+914,06 4.46 Slate III ( fair rock)
38 31/08/2021 08+914,06 - 08+910,34 3.72 Slate III ( fair rock)
124.34
Keterangan
Progress Mapping Bulan Agus
2021

CH. 1.211,657

CH. 1.226,75

instal steelrib 8+978,55

CH. 1.251,75
CH. 1.266,24

CH. 1.286,26
CH. 1.289,68

CH. 1.298,14
Progress Mapping Tunnel End Portal Juli 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/07/2021 09+082,28 - 09+078,80 3.48 Slate IV ( poor rock)
2 01/07/2021 09+078,80 - 09+075,47 3.33 Slate IV ( poor rock)
3 02/07/2021 09+075,47 - 09+071,06 4.41 Slate 36 IV ( poor rock)
4 03/07/2021 09+071,06 - 09+067,06 4.00 Slate 38 IV ( poor rock)
5 04/07/2021 09+067,06 - 09+063,26 3.80 Slate IV ( poor rock)
6 05/07/2021 09+063,26 - 09+060,09 3.17 Slate 26 IV ( poor rock)
7 12/07/2021 09+060,09 - 09+056,69 3.40 Slate 25 V (very poor rock)
8 14/07/2021 09+056,69 - 09+055,83 0.86 Slate IV ( poor rock)
9 14/07/2021 09+055,83 - 09+053,80 2.03 Slate IV ( poor rock)
10 15/07/2021 09+053,80 - 09+051,81 1.99 Slate 31 IV ( poor rock)
11 16/07/2021 09+051,81 - 09+049,82 1.99 Slate 31 IV ( poor rock)
12 16/07/2021 09+049,82 - 09+047,73 2.09 Slate IV ( poor rock)
13 17/07/2021 09+047,73 - 09+045,66 2.07 Slate 31 IV ( poor rock)
14 18/07/2021 09+045,66 - 09+043,78 1.88 Slate 31 IV ( poor rock)
15 19/07/2021 09+043,78 - 09+041,18 2.60 Slate IV ( poor rock)
16 20/07/2021 09+041,18 - 09+039,80 1.38 Slate IV ( poor rock)
17 26/07/2021 09+039,80 - 09+034,68 5.15 Slate 42 III ( fair rock)
18

47.63
Keterangan
Progress Mapping Bulan Juli 2021

pembuatan elargement
Progress Mapping Tunnel End Portal Juni 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 02/06/2021 09+195,47- 09+191,53 3.94 Slate IV ( poor rock)
2 03/06/2021 09+191,53- 09+188,02 3.51 Slate 30 IV ( poor rock)
3 04/06/2021 09+188,02 - 09+184,02 4.00 Slate IV ( poor rock)
4 04/06/2021 09+184,02 - 09+182,16 1.86 Slate 28 IV ( poor rock)
5 05/06/2021 09+182,16 - 09+180,10 2.06 Slate IV ( poor rock)
6 06/06/2021 09+180,10 - 09+178,14 1.96 Slate V (very poor rock)
7 07/06/2021 09+178,14 - 09+176,16 1.98 Slate V (very poor rock)
8 08/06/2021 09+176,16 - 09+174,05 2.11 Slate 25 IV ( poor rock)
9 09/06/2021 09+174,05 - 09+172,01 2.04 Slate IV ( poor rock)
10 09/06/2021 09+172,01 - 09+170,04 1.97 Slate 18 V (very poor rock)
11 09/06/2021 09+170,04 - 09+168,59 1.45 Slate V (very poor rock)
12 10/06/2021 09+168,59 - 09+166,53 2.06 Slate 26 IV ( poor rock)
13 11/06/2021 09+166,53 - 09+164,51 2.02 Slate IV ( poor rock)
14 11/06/2021 09+164,51 - 09+162,50 2.01 Slate 31 IV ( poor rock)
15 11/06/2021 09+162,50 - 09+160,48 2.02 Slate IV ( poor rock)
16 12/06/2021 09+160,48 - 09+158,40 2.08 Slate 31 IV ( poor rock)
17 12/06/2021 09+158,40 - 09+156,51 1.89 Slate IV ( poor rock)
18 13/06/2021 09+156,51 - 09+154,40 2.11 Slate IV ( poor rock)
19 14/06/2021 09+154,40 - 09+152,49 1.91 Slate 22 IV ( poor rock)
20 14/06/2021 09+152,49 - 09+150,38 2.11 Slate IV ( poor rock)
21 15/06/2021 09+150,38 - 09+148,46 1.92 Slate 20 V (very poor rock)
22 15/06/2021 09+148,46 - 09+146,39 2.07 Slate V (very poor rock)
23 16/06/2021 09+146,39 - 09+144,49 1.90 Slate 20 V (very poor rock)
24 16/06/2021 09+144,49 - 09+142,43 2.06 Slate V (very poor rock)
25 17/06/2021 09+142,43 - 09+140,48 1.95 Slate, metasandstone 23 IV ( poor rock)
26 19/06/2021 09+140,48 - 09+138,91 1.57 Slate, metasandstone IV ( poor rock)
27 19/06/2021 09+138,91 - 09+137,47 1.44 Slate, metasandstone IV ( poor rock)
28 19/06/2021 09+137,47 - 09+135,87 1.60 Slate, metasandstone IV ( poor rock)
29 20/06/2021 09+135,87 - 09+133,99 1.88 Slate, metasandstone IV ( poor rock)
30 21/06/2021 09+133,99 - 09+132,35 1.64 Slate, metasandstone IV ( poor rock)
31 22/06/2021 09+132,35 - 09+130,49 1.86 Slate, metasandstone IV ( poor rock)
32 22/06/2021 09+130,49 - 09+128,36 2.13 Slate, metasandstone 20 V (very poor rock)
33 23/06/2021 09+128,36 - 09+126,35 2.01 Slate, metasandstone IV ( poor rock)
34 23/06/2021 09+126,35 - 09+124,43 1.92 Slate, metasandstone IV ( poor rock)
35 23/06/2021 09+124,43 - 09+122,33 2.10 Slate, metasandstone IV ( poor rock)
36 24/06/2021 09+122,33 - 09+120,39 1.94 Slate, metasandstone IV ( poor rock)
37 24/06/2021 09+120,39 - 09+115,89 4.50 slate 39 IV ( poor rock)
38 25/06/2021 09+115,89 - 09+111,87 4.02 slate IV ( poor rock)
39 26/06/2021 09+111,87 - 09+108,30 3.57 slate IV ( poor rock)
40 26/06/2021 09+108,30 - 09+105,29 3.01 slate IV ( poor rock)
41 28/06/2021 09+105,29 - 09+101,28 4.01 slate IV ( poor rock)
42 28/06/2021 09+101,28 - 09+098,08 3.20 slate IV ( poor rock)
43 29/06/2021 09+098,08 - 09+093,93 4.15 slate 34 IV ( poor rock)
44 29/06/2021 09+093,93 - 09+090,07 3.86 slate IV ( poor rock)
45 30/06/2021 09+090,07 - 09+087,17 2.90 slate IV ( poor rock)
46 30/06/2021 09+087,17 - 09+082,28 4.89 slate IV ( poor rock)
113.19
Keterangan
Progress Mapping Bulan Juni 2021

515
516
517
518
519
Progress Mapping Tunnel End Portal (Access junction vertical shaft) May 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 20/05/2021 0+000,00- 0+002,51 2.51 Slate III ( fair rock)
2 21/05/2021 0+002,51- 0+005,32 2.81 Slate 37 III( fair rock)
3 23/05/2021 0+005,32- 0+007,71 2.39 Slate III( fair rock)
4 24/05/2021 0+007,71- 0+010,35 2.64 Slate III( fair rock)
5 25/05/2021 0+010,35- 0+012,82 2.47 Slate III( fair rock)
6 25/05/2021 0+012,82- 0+014,90 2.08 Slate III( fair rock)
7 26/05/2021 0+014,90- 0+019,30 4.40 Slate III( fair rock)
19.30

Progress Mapping Tunnel End Portal May 2021


Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 27/05/2021 09+212,99- 09+212,62 0.37 Slate IV ( poor rock)
2 28/05/2021 09+212,62- 09+209,13 3.49 Slate IV ( poor rock)
3 29/05/2021 09+209,13- 09+205,39 3.74 Slate 31 IV ( poor rock)
4 30/05/2021 09+205,39- 09+201,39 4.00 Slate IV ( poor rock)
5 31/05/2021 09+201,39- 09+195,47 5.92 Slate IV ( poor rock)
17.52
021
Keterangan
Progress Mapping Bulan May 2021

Keterangan
Progress Mapping Bulan May 2021
Progress Mapping Tunnel End Portal April 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/04/2021 09+284,04 - 09+282,02 2.02 Slate IV ( poor rock)
2 01/04/2021 09+282,02 - 09+280,12 1.90 Slate IV ( poor rock)
3 01/04/2021 09+280,12 - 09+278,09 2.03 Slate IV ( poor rock)
4 02/04/2021 09+278,09 - 09+276,13 1.96 Slate IV ( poor rock)
5 02/04/2021 09+276,13 - 09+274,14 1.99 Slate IV ( poor rock)
6 03/04/2021 09+274,14 - 09+272,07 2.07 Slate IV ( poor rock)
7 04/04/2021 09+272,07 - 09+270,10 1.97 Slate IV ( poor rock)
8 05/04/2021 09+270,10 - 09+268,09 2.01 Slate 26 IV ( poor rock)
9 05/04/2021 09+268,09 - 09+265,99 2.10 Slate IV ( poor rock)
10 06/04/2021 09+265,99 - 09+264,51 1.48 Slate 23 IV ( poor rock)
11 07/04/2021 09+264,51 - 09+263,07 1.44 Slate 31 IV ( poor rock)
12 07/04/2021 09+263,07 - 09+261,47 1.60 Slate IV ( poor rock)
13 08/04/2021 09+261,47 - 09+260,06 1.41 Slate 31 IV ( poor rock)
14 09/04/2021 09+260,06 - 09+251,98 8.08 Slate, sandstone intercolated slate 43 III ( fair rock)
15 09/04/2021 09+251,98 - 09+248,71 3.27 Slate, sandstone intercolated slate III ( fair rock)
16 12/04/2021 09+248,71 - 09+247,49 1.20 Slate 23 IV ( poor rock)
17 13/04/2021 09+247,49 - 09+245,46 2.03 Slate IV ( poor rock)
18 14/04/2021 09+245,46 - 09+243,87 1.59 Slate IV ( poor rock)
19 15/04/2021 09+243,87 - 09+242,37 1.50 Slate 24 IV ( poor rock)
20 15/04/2021 09+242,37 - 09+240,92 1.45 Slate IV ( poor rock)
21 16/04/2021 09+240,92 - 09+239,47 1.45 Slate 24 IV ( poor rock)
22 16/04/2021 09+239,47 - 09+237,94 1.53 Slate IV ( poor rock)
23 17/04/2021 09+237,94 - 09+236,42 1.52 Slate 26 IV ( poor rock)
24 19/04/2021 09+236,42 - 09+235,47 0.95 Slate V (very poor rock)
25 20/04/2021 09+235,47 - 09+234,50 0.97 Slate V (very poor rock)
26 20/04/2021 09+234,50 - 09+233,35 1.15 Slate V (very poor rock)
27 21/04/2021 09+233,35 - 09+232,50 0.85 Slate V (very poor rock)
28 21/04/2021 09+232,35 - 09+231,17 1.18 Slate V (very poor rock)
29 22/04/2021 09+231,17 - 09+230,43 0.74 Slate V (very poor rock)
30 23/04/2021 09+230,43 - 09+229,51 0.92 Slate V (very poor rock)
31 24/04/2021 09+229,51 - 09+228,54 0.97 Slate V (very poor rock)
32 24/04/2021 09+228,54 - 09+227,28 1.26 Slate V (very poor rock)
33 26/04/2021 09+227,28 - 09+226,44 0.84 Slate 23 IV ( poor rock)
34 26/04/2021 09+226,44 - 09+225,44 1.00 Slate IV ( poor rock)
35 27/04/2021 09+225,44 - 09+224,49 0.95 Slate 24 IV ( poor rock)
36 28/04/2021 09+224,49 - 09+222,86 2.63 Slate 31 IV ( poor rock)
37 29/04/2021 09+222,86 - 09+220,94 1.92 Slate IV ( poor rock)
38 30/04/2021 09+220,94 - 09+215,90 5.04 Slate IV ( poor rock)
39 30/04/2021 09+215,90 - 09+212,99 2.91 Slate IV ( poor rock)
71.88
Keterangan
Progress Mapping Bulan April
2021
Progress Mapping Tunnel End Portal Maret 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/03/2021 09+358,15 - 09+357,18 0.97 Slate IV ( poor rock)
2 02/03/2021 09+357,18 - 09+356,11 1.07 Slate 23 IV (poor rock)
3 03/03/2021 09+356,11 - 09+355,09 1.02 Slate IV (poor rock)
4 10/03/2021 09+355,09 - 09+354,15 0.94 Slate IV (poor rock)
5 11/03/2021 09+354,15 - 09+353,07 1.08 Slate IV (poor rock)
6 11/03/2021 09+353,07 - 09+352,10 0.97 Slate IV (poor rock)
7 12/03/2021 09+352,10 - 09+350,59 1.51 Slate IV (poor rock)
8 12/03/2021 09+350,59 - 09+349,08 1.51 Slate IV (poor rock)
9 13/03/2021 09+349,08 - 09+347,57 1.51 Slate IV (poor rock)
10 14/03/2021 09+347,57 - 09+345,57 2.00 Slate IV (poor rock)
11 14/03/2021 09+345,57 - 09+343,59 1.98 Slate IV (poor rock)
12 15/03/2021 09+343,59 - 09+342,04 1.55 Slate IV (poor rock)
13 16/03/2021 09+342,04 - 09+339,96 2.08 Slate IV (poor rock)
14 16/03/2021 09+339,96 - 09+338,06 1.90 Slate IV (poor rock)
15 17/03/2021 09+338,06 - 09+335,98 2.08 Slate IV (poor rock)
16 17/03/2021 09+335,98 - 09+334,05 1.93 Slate IV (poor rock)
17 18/03/2021 09+334,05 - 09+332,00 2.05 Slate IV (poor rock)
18 18/03/2021 09+332,00 - 09+330,54 1.46 Slate IV (poor rock)
19 19/03/2021 09+330,54 - 09+328,53 2.01 Slate IV (poor rock)
20 20/03/2021 09+328,53 - 09+323,04 5.49 Slate IV (poor rock)
21 20/03/2021 09+323,04 - 09+321,05 2.35 Slate IV (poor rock)
22 23/03/2021 09+321,05 - 09+315,57 5.48 Slate 28 IV (poor rock)
23 23/03/2021 09+315,57 - 09+313,47 2.10 Slate 32 IV (poor rock)
24 24/03/2021 09+313,47 - 09+311,59 1.88 Slate IV (poor rock)
25 24/03/2021 09+311,59 - 09+309,59 2.00 Slate IV (poor rock)
26 24/03/2021 09+309,59 - 09+307,59 2.00 Slate, sandstone intercolated slate 32 IV (poor rock)
27 25/03/2021 09+307,59 - 09+303,64 3.95 Slate, sandstone intercolated slate IV (poor rock)
28 26/03/2021 09+303,64 - 09+301,50 2.14 Slate, sandstone intercolated slate 32 IV (poor rock)
29 26/03/2021 09+301,50 - 09+299,55 1.95 Slate, sandstone intercolated slate IV (poor rock)
30 27/03/2021 09+299,55 - 09+297,60 1.95 Slate, sandstone intercolated slate 33 IV (poor rock)
31 27/03/2021 09+297,60 - 09+295,51 2.09 Slate, sandstone intercolated slate IV (poor rock)
32 29/03/2021 09+295,51 - 09+293,52 1.99 Slate, sandstone intercolated slate IV (poor rock)
33 29/03/2021 09+293,52 - 09+291,60 1.92 Slate, sandstone intercolated slate IV (poor rock)
34 30/03/2021 09+291,60 - 09+289,55 2.05 Slate, sandstone intercolated slate IV (poor rock)
35 30/03/2021 09+289,55 - 09+287,66 1.89 Slate 29 IV (poor rock)
36 30/03/2021 09+287,66 - 09+285,62 2.04 Slate IV (poor rock)
37 31/03/2021 09+285,62 - 09+284,04 1.58 Slate IV (poor rock)
74.47
Keterangan
Progress Mapping Bulan Maret
2021
Progress Mapping Tunnel End Portal februari 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 02/02/2021 09+392,19 - 09+386,76 5.43 Slate 23 IV ( poor rock)
2 03/02/2021 09+386,76 - 09+385,40 1.36 Slate 33 IV (poor rock)
3 04/02/2021 09+385,40 - 09+383,31 2.09 Slate, sandstone intercolated slate 38 IV (poor rock)
4 04/02/2021 09+383,31 - 09+380,86 2.45 Slate, sandstone intercolated slate IV (poor rock)
5 05/02/2021 09+380,86 - 09+378,56 2.30 Slate, sandstone intercolated slate 43 III (fair rock)
6 05/02/2021 09+378,56 - 09+375,40 3.16 Slate, sandstone intercolated slate III (fair rock)
7 06/02/2021 09+375,40 - 09+371,40 4.00 Slate 20 V (very poor rock)
8 21/02/2021 09+371,40 - 09+368,07 3.33 Slate V (very poor rock)
9 24/02/2021 09+368,07 - 09+364,69 3.38 Slate V (very poor rock)
10 25/02/2021 09+364,69 - 09+363,66 1.03 Slate V (very poor rock)
11 26/02/2021 09+363,66 - 09+362,21 1.45 Slate 23 IV (poor rock)
12 27/02/2021 09+362,21 - 09+361,22 0.99 Slate IV (poor rock)
13 27/02/2021 09+361,22 - 09+359,16 2.06 Slate IV (poor rock)
14 28/02/2021 09+359,16 - 09+358,15 1.01 Slate IV (poor rock)
15
16
17
18
19
20
21
22
23
24
25

34.04
Keterangan
Progress Mapping Bulan Februari
2021
Progress Mapping Tunnel End Portal Januari 2021
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/01/2021 09+502,95 - 09+499.81 3.14 Slate III (Fair rock)
2 02/01/2021 09+499,81 - 09+496.36 3.45 Slate III (Fair rock)
3 02/01/2021 09+496,36 - 09+493.17 3.19 Slate III (Fair rock)
4 03/01/2021 09+493,17 - 09+491.05 2.12 Slate III (Fair rock)
5 04/01/2021 09+491,05 - 09+487.87 3.18 Slate III (Fair rock)
6 04/01/2021 09+487,87 - 09+484.89 2.98 Slate III (Fair rock)
7 05/01/2021 09+484,89 - 09+480.68 4.21 Slate III (Fair rock)
8 06/01/2021 09+480,68 - 09+476.88 3.80 Slate III (Fair rock)
9 07/01/2021 09+476,88 - 09+473.91 2.97 Slate 41 III (Fair rock)
10 07/01/2021 09+473,91 - 09+470.53 3.38 Slate 42 III (Fair rock)
11 08/01/2021 09+470,53 - 09+467.63 2.90 Slate III (Fair rock)
12 08/01/2021 09+467,63 - 09+464.55 3.08 Slate III (Fair rock)
13 09/01/2021 09+464,55 - 09+460.82 3.73 Slate III (Fair rock)
14 09/01/2021 09+460,82 - 09+457.82 3.00 Slate III (Fair rock)
15 10/01/2021 09+457,82 - 09+454.90 3.13 Slate III (Fair rock)
16 11/01/2021 09+454,90 - 09+451.92 2.98 Slate III (Fair rock)
17 11/01/2021 09+451,92 - 09+449.26 2.66 Slate III (Fair rock)
18 12/01/2021 09+449,26 - 09+446.08 3.18 Slate 48 III (Fair rock)
19 13/01/2021 09+446,08 - 09+442.91 3.17 Slate III (Fair rock)
20 14/01/2021 09+442,91 - 09+439.76 3.15 Slate, sandstone intercolated slate 42 III (Fair rock)
21 15/01/2021 09+439,76 - 09+436.27 3.49 Slate, sandstone intercolated slate III (Fair rock)
22 16/01/2021 09+436,27 - 09+433.39 2.88 Slate, sandstone intercolated slate III (Fair rock)
23 16/01/2021 09+433,39 - 09+429.46 3.93 Slate, sandstone intercolated slate 43 III (Fair rock)
24 17/01/2021 09+429,46 - 09+426.16 3.30 Slate, sandstone intercolated slate III (Fair rock)
25 18/01/2021 09+426,16 - 09+422.62 3.54 Slate, sandstone intercolated slate III (Fair rock)
26 19/01/2021 09+422,62 - 09+420.83 1.79 Slate, sandstone intercolated slate 18 V (very poor rock)
27 21/01/2021 09+420,83 - 09+418.99 1.84 slate V (very poor rock)
28 21/01/2021 09+418,99 - 09+417.41 1.58 slate V (very poor rock)
29 23/01/2021 09+417,41 - 09+415.81 1.60 slate 16 V (very poor rock)
30 25/01/2021 09+415,81 - 09+414.27 1.54 slate V (very poor rock)
31 26/01/2021 09+414,27 - 09+412.78 1.49 slate 23 IV (Poor rock)
32 26/01/2021 09+412,78 - 09+411.27 1.51 slate IV (Poor rock)
33 27/01/2021 09+411,27 - 09+407.56 3.71 slate IV (Poor rock)
34 28/01/2021 09+407.56 - 09+404.55 3.01 Slate, sandstone intercolated slate 30 IV (Poor rock)
35 28/01/2021 09+404.55 - 09+402.16 2.39 Slate, sandstone intercolated slate IV (Poor rock)
36 29/01/2021 09+402.16 - 09+399.60 2.56 Slate, sandstone intercolated slate 32 IV (Poor rock)
37 29/01/2021 09+399.60 - 09+397.45 2.15 Slate, sandstone intercolated slate IV (Poor rock)
38 30/01/2021 09+397.45 - 09+394.60 2.85 slate 25 IV (Poor rock)
30/01/2021 09+394.60 - 09+392.19 2.41 slate V (very poor rock)
110.97
Keterangan
Progress Mapping Bulan Januari
2021

CH . 755,04
Progress Mapping Tunnel End Portal Desember 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/12/2020 09+647,41 - 09+645.94 1.47 Slate 24 IV (poor rock)
2 01/12/2020 09+645,94 - 09+643.91 2.03 Slate IV (poor rock)
3 02/12/2020 09+643,91 - 09+641.93 1.98 Slate, sandstone intercolated slate 24 IV (poor rock)
4 02/12/2020 09+641,93 - 09+639.92 2.01 Slate, sandstone intercolated slate IV (poor rock)
5 03/12/2020 09+639,92 - 09+637.93 1.99 Slate, sandstone intercolated slate IV (poor rock)
6 03/12/2020 09+637,93 - 09+635.91 2.02 Slate, sandstone intercolated slate 27 IV (poor rock)
7 03/12/2020 09+635,91 - 09+633.69 2.22 Slate, sandstone intercolated slate IV (poor rock)
8 04/12/2020 09+633,69 - 09+630.45 3.24 Slate, sandstone intercolated slate 37 IV (poor rock)
9 05/12/2020 09+630,45 - 09+627.02 3.43 Slate, sandstone intercolated slate 43 III (Fair rock)
10 05/12/2020 09+627,02 - 09+624.31 2.71 Slate, sandstone intercolated slate III (Fair rock)
11 06/12/2020 09+624,31 - 09+621.41 2.90 Slate, sandstone intercolated slate III (Fair rock)
12 07/12/2020 09+621,41 - 09+617.28 4.13 Slate, sandstone intercolated slate III (Fair rock)
13 08/12/2020 09+617,28 - 09+613.69 3.59 Slate, sandstone intercolated slate 43 III (Fair rock)
14 09/12/2020 09+613,69 - 09+610,90 2.79 Slate, sandstone intercolated slate III (Fair rock)
15 09/12/2020 09+610,90 - 09+607,88 3.02 Slate, sandstone intercolated slate III (Fair rock)
16 10/12/2020 09+607,88 - 09+605,90 1.98 Slate, sandstone intercolated slate III (Fair rock)
17 11/12/2020 09+605,90 - 09+603,91 1.99 Slate, sandstone intercolated slate III (Fair rock)
18 12/12/2020 09+603,91 - 09+598,87 5.04 Slate, sandstone intercolated slate 42 III (Fair rock)
19 12/12/2020 09+598,87 - 09+595,88 2.99 Slate, sandstone intercolated slate III (Fair rock)
20 13/12/2020 09+595,88 - 09+592,90 2.98 Slate, sandstone intercolated slate III (Fair rock)
21 14/12/2020 09+592,90 - 09+589,47 3.43 Slate, sandstone intercolated slate III (Fair rock)
22 15/12/2020 09+589,47 - 09+585.51 3.96 Slate, sandstone intercolated slate 48 III (Fair rock)
23 15/12/2020 09+585,51 - 09+582.18 3.33 Slate, sandstone intercolated slate III (Fair rock)
24 16/12/2020 09+582,18 - 09+578.05 4.13 Slate, sandstone intercolated slate III (Fair rock)
25 16/12/2020 09+578,05 - 09+574,52 3.53 Slate, sandstone intercolated slate III (Fair rock)
26 17/12/2020 09+574,52 - 09+570,99 3.53 Slate, sandstone intercolated slate 45 III (Fair rock)
27 17/12/2020 09+570,99 - 09+567,43 3.56 Slate, sandstone intercolated slate III (Fair rock)
28 18/12/2020 09+567,43 - 09+564,02 3.41 Slate 45 III (Fair rock)
29 18/12/2020 09+564,02 - 09+560,89 3.13 Slate III (Fair rock)
30 19/12/2020 09+560,89 - 09+558,28 2.61 Slate IV (poor rock)
31 19/12/2020 09+558,28 - 09+555,77 2.51 Slate IV (poor rock)
32 20/12/2020 09+555.77 - 09+548,45 7.32 Slate IV (poor rock)
33 21/12/2020 09+548.45 - 09+545,31 3.14 Slate IV (poor rock)
34 22/12/2020 09+545.31 - 09+541,87 3.44 Slate III (Fair rock)
35 23/12/2020 09+541.87 - 09+538,34 3.53 Slate III (Fair rock)
36 24/12/2020 09+538.34 - 09+532,47 5.87 Slate III (Fair rock)
37 24/12/2020 09+532.47 - 09+529,44 3.03 Slate III (Fair rock)
38 25/12/2020 09+529.44 - 09+525,70 3.74 Slate III (Fair rock)
39 26/12/2020 09+525.70 - 09+521,74 3.96 Slate III (Fair rock)
40 28/12/2020 09+521.74 - 09+514,89 6.85 Slate III (Fair rock)
41 29/12/2020 09+514.89 - 09+512,08 2.81 Slate III (Fair rock)
42 30/12/2020 09+512.08 - 09+508,89 3.19 Slate III (Fair rock)
43 30/12/2020 09+508.89 - 09+507,55 1.34 Slate III (Fair rock)
44 31/12/2020 09+507.55 - 09+505,31 2.24 Slate III (Fair rock)
45 31/12/2020 09+505.31 - 09+502,95 2.36 Slate III (Fair rock)
144.46
Keterangan
Progress Mapping Bulan Des 2020

3.43
2.71
2.90
4.13
3.59
2.79
3.02
1.98
1.99
5.04
2.99
2.98
3.43
3.96
3.33
4.13
3.53
3.53
3.56
63.02
class IV (GOB)
class IV (GOB)
class IV (GOB)
class IV (GOB)
Progress Mapping Tunnel End Portal Nopember 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/11/2020 09+723,73 - 09+722.67 1.06 Slate V (very poor rock)
2 02/11/2020 09+722,67 - 09+721.69 0.98 Slate 18 V (very poor rock)
3 03/11/2020 09+721,69 - 09+720.63 1.06 Slate V (very poor rock)
4 04/11/2020 09+720,63 - 09+719.69 0.94 Slate V (very poor rock)
5 04/11/2020 09+719,63 - 09+718.66 0.97 Slate V (very poor rock)
6 05/11/2020 09+718,66 - 09+717.66 1.00 Slate V (very poor rock)
7 05/11/2020 09+717,66 - 09+716.64 1.02 Slate V (very poor rock)
8 06/11/2020 09+716,64 - 09+715.55 1.09 Slate 18 V (very poor rock)
9 06/11/2020 09+715,55 - 09+714.38 1.17 Slate, sandstone intercolated slate V (very poor rock)
10 06/11/2020 09+714,38 - 09+713.35 1.04 Slate, sandstone intercolated slate 26 IV (poor rock)
11 07/11/2020 09+713,35 - 09+712.32 1.03 Slate, sandstone intercolated slate IV (poor rock)
12 07/11/2020 09+712,32 - 09+711.29 1.03 Slate, sandstone intercolated slate 28 IV (poor rock)
13 08/11/2020 09+711,29 - 09+709.77 1.52 Slate, sandstone intercolated slate IV (poor rock)
14 08/11/2020 09+709,77 - 09+706.61 3.16 Slate, sandstone intercolated slate IV (poor rock)
15 09/11/2020 09+706,61 - 09+703.25 3.36 Slate, metasandstone 57 III (Fair rock)
16 10/11/2020 09+703,25 - 09+698.69 4.56 Slate, metasandstone 46 III (Fair rock)
17 10/11/2020 09+698,69 - 09+695.39 3.30 Slate, metasandstone III (Fair rock)
18 11/11/2020 09+695,39 - 09+691.67 3.72 Slate, sandstone intercolated slate 32 IV (poor rock)
19 11/11/2020 09+691,67 - 09+687.87 3.80 Slate, sandstone intercolated slate IV (poor rock)
20 12/11/2020 09+687,87 - 09+683.89 3.98 Slate IV (poor rock)
21 12/11/2020 09+683,89 - 09+683.12 0.77 Slate 19 V (very poor rock)
22 14/11/2020 09+683,12 - 09+681.25 1.87 Slate V (very poor rock)
23 16/11/2020 09+681,25 - 09+680.22 1.03 Slate 16 V (very poor rock)
24 17/11/2020 09+680,22 - 09+678.66 1.56 Slate 20 V (very poor rock)
25 18/11/2020 09+678,66 - 09+675.67 2.99 Slate 24 IV (poor rock)
26 19/11/2020 09+675,67 - 09+674.16 1.50 Slate 23 IV (poor rock)
27 20/11/2020 09+674,16 - 09+671.15 3.01 Slate 21 IV (poor rock)
28 20/11/2020 09+671,15 - 09+669.61 1.54 Slate IV (poor rock)
29 21/11/2020 09+669,61 - 09+668.065 1.55 Slate 21 IV (poor rock)
30 21/11/2020 09+668,065 - 09+666.09 1.55 Slate IV (poor rock)
31 23/11/2020 09+666,09 - 09+664.58 1.51 Slate 21 IV (poor rock)
32 24/11/2020 09+664,58 - 09+663.05 1.53 Slate 21 IV (poor rock)
33 24/11/2020 09+663,05 - 09+661,57 1.48 Slate IV (poor rock)
34 25/11/2020 09+661,57 - 09+660,04 1.53 Slate IV (poor rock)
35 26/11/2020 09+660,04 - 09+658,53 1.51 Slate IV (poor rock)
36 27/11/2020 09+658,53 - 09+657,00 1.53 Slate 24 IV (poor rock)
37 27/11/2020 09+657,00 - 09+655,48 1.52 Slate IV (poor rock)
38 27/11/2020 09+655,48 - 09+653,965 1.52 Slate IV (poor rock)
39 28/11/2020 09+653,965 - 09+652.24 1.73 Slate 31 IV (poor rock)
40 28/11/2020 09+652,24 - 09+650.50 1.74 Slate IV (poor rock)
41 30/11/2020 09+650,50 - 09+648.95 1.55 Slate IV (poor rock)
42 30/11/2020 09+648,95 - 09+647.41 1.55 Slate 28 IV (poor rock)
75.86
Keterangan
Progress Mapping Bulan Nov 2020

3.16 3.36
3.36 4.56
4.56 3.30
3.30 3.72
3.72 3.80
3.80 3.98
3.98 0.77
0.77 1.87
26.65 25.36
Progress Mapping Tunnel End Portal Oktober 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/10/2020 09+761,631 - 09+759.874 2.30 Slate IV (poor rock)
2 02/10/2020 09+759,874 - 09+758.276 1.59 Slate IV (poor rock)
3 03/10/2020 09+758,276 - 09+756.677 1.59 Slate 25 IV (poor rock)
4 04/10/2020 09+756,68 - 09+752.10 3.10 Slate IV (poor rock)
5 12/10/2020 09+752,10 - 09+751.01 1.09 Slate 16 V (very poor rock)
6 13/10/2020 09+751,01 - 09+749.93 1.08 Slate V (very poor rock)
7 14/10/2020 09+749,93 - 09+748.95 0.98 Slate V (very poor rock)
8 15/10/2020 09+748,95 - 09+747.98 0.97 Slate V (very poor rock)
9 16/10/2020 09+747,98 - 09+746.92 1.06 Slate V (very poor rock)
10 17/10/2020 09+746,92 - 09+745.84 1.08 Slate V (very poor rock)
11 19/10/2020 09+745,843 - 09+743.79 2.05 Slate V (very poor rock)
12 20/10/2020 09+743,79 - 09+740.86 2.93 Slate V (very poor rock)
13 21/10/2020 09+740,86 - 09+735.30 5.56 Slate V (very poor rock)
14 22/10/2020 09+735,30 - 09+733.54 1.76 Slate V (very poor rock)
15 23/10/2020 09+733,54 - 09+728.40 5.14 Slate V (very poor rock)
16 27/10/2020 09+728,40 - 09+726.84 1.56 Slate 13 V (very poor rock)
17 28/10/2020 09+726,84 - 09+725.83 1.01 Slate V (very poor rock)
18 30/10/2020 09+725,83 - 09+724.82 1.01 Slate V (very poor rock)
19 31/10/2020 09+724,82 - 09+723.73 1.09 Slate V (very poor rock)
36.95
Keterangan
Progress Mapping Bulan Okt 2020
Progress Mapping Tunnel End Portal September 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/09/2020 09+839,00 - 09+835.90 3.10 Slate, sandstone intercolated slate IV (poor rock)
2 01/09/2020 09+835,90 - 09+832,94 2.96 Slate, sandstone intercolated slate IV (poor rock)
3 02/09/2020 09+832,94 - 09+830,08 2.86 Slate, sandstone intercolated slate IV (poor rock)
4 03/09/2020 09+830,08 - 09+826,73 3.35 Slate, sandstone intercolated slate IV (poor rock)
5 04/09/2020 09+826,73 - 09+823,96 2.77 Slate, sandstone intercolated slate IV (poor rock)
6 04/09/2020 09+823,96 - 09+821,12 2.84 Slate, sandstone intercolated slate IV (poor rock)
7 05/09/2020 09+821,12 - 09+817,46 3.66 Slate, sandstone intercolated slate IV (poor rock)
8 06/09/2020 09+817,46 - 09+814,28 3.18 Slate, sandstone intercolated slate IV (poor rock)
9 11/09/2020 09+814,28 - 09+811,13 3.15 Slate, sandstone intercolated slate IV (poor rock)
10 14/09/2020 09+811,13 - 09+809,35 1.78 Slate, sandstone intercolated slate IV (poor rock)
11 15/09/2020 09+809,35 - 09+806,55 2.80 Slate, sandstone intercolated slate IV (poor rock)
12 16/09/2020 09+806,55 - 09+802,95 3.60 Slate, sandstone intercolated slate IV (poor rock)
13 16/09/2020 09+802,95 - 09+800,15 2.80 Slate, sandstone intercolated slate IV (poor rock)
14 17/09/2020 09+800,15 - 09+797,65 2.50 Slate, sandstone intercolated slate IV (poor rock)
15 20/09/2020 09+797,65 - 09+795,15 2.50 Slate, sandstone intercolated slate IV (poor rock)
16 21/09/2020 09+795,15 - 09+793,15 2.00 Slate, sandstone intercolated slate 35 IV (poor rock)
17 22/09/2020 09+793,15 - 09+791,15 2.00 Slate, sandstone intercolated slate 33 IV (poor rock)
18 23/09/2020 09+791,15 - 09+787,65 3.50 Slate, sandstone intercolated slate 33 IV (poor rock)
19 23/09/2020 09+787,65 - 09+784,65 3.00 Slate, sandstone intercolated slate IV (poor rock)
20 24/09/2020 09+784,65 - 09+781,65 3.00 Slate, sandstone intercolated slate 33 IV (poor rock)
21 24/09/2020 09+781,65 - 09+778,65 3.00 Slate, sandstone intercolated slate IV (poor rock)
22 25/09/2020 09+778,65 - 09+775,65 3.00 Slate, sandstone intercolated slate IV (poor rock)
23 25/09/2020 09+775,65 - 09+772,65 3.00 Slate, sandstone intercolated slate 34 IV (poor rock)
24 26/09/2020 09+772,65 - 09+771,15 1.50 Slate, sandstone intercolated slate IV (poor rock)
25 27/09/2020 09+771,15 - 09+768,15 3.00 Slate, sandstone intercolated slate 34 IV (poor rock)
26 28/09/2020 09+768,15 - 09+764,85 3.30 Slate, sandstone intercolated slate 34 IV (poor rock)
27 30/09/2020 09+764,85 - 09+761,63 3.20 Slate, sandstone intercolated slate 21 IV (poor rock)
77.35
Keterangan
Progress Mapping Bulan Sept 2020
Progress Mapping Tunnel End Portal August 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR Kelas Batuan
No. (m)
1 01/08/2020 09+867,173 - 09+865.085 2.09 Slate, sandstone intercolated slate V (very poor rock)
2 01/08/2020 09+865,085 - 09+863,616 1.47 Slate, sandstone intercolated slate V (very poor rock)
3 03/08/2020 09+863,616 - 09+859,560 4.06 Slate, sandstone intercolated slate V (very poor rock)
4 04/08/2020 09+859,560 - 09+857,600 1.96 Slate, sandstone intercolated slate 24 IV (poor rock)
5 05/08/2020 09+857,600 - 09+856,050 1.55 Slate, sandstone intercolated slate IV (poor rock)
6 14/08/2020 09+856,050 - 09+855,210 0.84 Slate, sandstone intercolated slate 15 V (very poor rock)
7 14/08/2020 09+855,210 - 09+854,210 1.00 Slate, sandstone intercolated slate V (very poor rock)
8 15/08/2020 09+854,210 - 09+853,320 0.89 Slate, sandstone intercolated slate V (very poor rock)
9 18/08/2020 09+853,320 - 09+852,490 0.83 Slate, sandstone intercolated slate V (very poor rock)
10 21/08/2020 09+852,490 - 09+851,700 0.79 Slate, sandstone intercolated slate V (very poor rock)
11 21/08/2020 09+851,700 - 09+850,630 1.07 Slate, sandstone intercolated slate V (very poor rock)
12 22/08/2020 09+850,630 - 09+849,650 0.89 Slate, sandstone intercolated slate V (very poor rock)
13 27/08/2020 09+849,650 - 09+847,633 2.02 Slate, sandstone intercolated slate V (very poor rock)
14 28/08/2020 09+847,633 - 09+846,580 1.05 Slate, sandstone intercolated slate 24 V (very poor rock)
15 29/08/2020 09+846,580 - 09+844,662 1.92 Slate, sandstone intercolated slate 27 V (very poor rock)
16 30/08/2020 09+844,662 - 09+841,300 3.36 Slate, sandstone intercolated slate V (very poor rock)
17 31/08/2020 09+841,300 - 09+839,900 1.40 Slate, sandstone intercolated slate V (very poor rock)
27.18
Keterangan
Progress Mapping Bulan August
2020
Progress Mapping Tunnel End Portal Juli 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan
No. (m)
1 01/07/2020 10+000,553 - 09+998.501 2.05 Slate, sandstone intercolated slate
2 01/07/2020 09+998,501 - 09+997.374 1.13 Slate, sandstone intercolated slate
3 03/07/2020 09+997,374 - 09+996.500 0.80 Slate, sandstone intercolated slate
4 04/07/2020 09+996,500 - 09+995.825 0.60 Slate, sandstone intercolated slate
5 05/07/2020 09+995,825 - 09+994.758 1.07 Slate, sandstone intercolated slate
6 06/07/2020 09+994,758 - 09+993.697 1.06 Slate, sandstone intercolated slate
7 07/07/2020 09+993,697 - 09+992.695 1.00 Slate
8 07/07/2020 09+992,695 - 09+991.193 1.50 Slate
9 07/07/2020 09+991,193 - 09+989.141 2.05 Slate
10 08/07/2020 09+989,141 - 09+987.202 1.94 Slate
11 09/07/2020 09+987,202 - 09+985.747 1.46 Slate
12 10/07/2020 09+985,747 - 09+983.758 1.99 Slate
13 11/07/2020 09+983,758 - 09+982.203 1.38 Slate
14 13/07/2020 09+982,203 - 09+980.701 1.50 Slate
15 13/07/2020 09+980,701 - 09+979.119 1.58 Slate
16 15/07/2020 09+979,119 - 09+977.525 1.59 Slate
17 16/07/2020 09+977,525 - 09+976.033 1.49 Slate, sandstone intercolated slate
18 16/07/2020 09+976,033 - 09+974.521 1.51 Slate, sandstone intercolated slate
19 16/07/2020 09+974,521 - 09+973.023 1.50 Slate, sandstone intercolated slate
20 16/07/2020 09+973,023 - 09+971.489 1.53 Slate, sandstone intercolated slate
21 17/07/2020 09+971,489 - 09+969.959 1.53 Slate, sandstone intercolated slate
22 17/07/2020 09+969,959 - 09+968.413 1.55 Slate, sandstone intercolated slate
23 18/07/2020 09+968,413 - 09+966.900 1.51 Slate
24 19/07/2020 09+966,900 - 09+965.330 1.57 Slate
25 20/07/2020 09+965,330 - 09+963.387 1.94 Slate
26 20/07/2020 09+963,387 - 09+961.323 2.06 Slate
27 21/07/2020 09+961,323 - 09+959.265 2.06 Slate
28 21/07/2020 09+959,265 - 09+957.286 1.98 Slate
29 22/07/2020 09+957.286 - 09+955,280 2.01 Slate
30 22/07/2020 09+955,280 - 09+952,033 3.25 Slate
31 23/07/2020 09+952,033 - 09+948,963 3.07 Slate
32 24/07/2020 09+948,963 - 09+945,763 3.20 Slate
33 28/07/2020 09+945,763 - 09+942,475 3.29 Slate
36 29/07/2020 09+942,475 - 09+940,441 2.03 Slate
37 29/07/2020 09+940,441 - 09+938, 911 1.53 Slate
38 30/07/2020 09+938, 911 - 09+937,611 1.30 Slate
39 30/07/2020 09+937,611 - 09+936,098 1.51 Slate
40 30/07/2020 09+936,098 - 09+934,133 1.97 Slate
66.09
ortal Juli 2020
RMR Kelas Batuan Keterangan
Progress Mapping Bulan Juli 2020
V (very poor rock)
V (very poor rock)
V (very poor rock)
18 V (very poor rock)
V (very poor rock)
18 V (very poor rock)
V (very poor rock)
V (very poor rock)
18 V (very poor rock)
18 V (very poor rock)
18 V (very poor rock)
V (very poor rock)
19 V (very poor rock)
18 V (very poor rock)
V (very poor rock)
V (very poor rock)
20 V (very poor rock)
V (very poor rock)
V (very poor rock)
V (very poor rock)
V (very poor rock)
V (very poor rock)
24 IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
IV (very poor rock)
20 IV (very poor rock)
20 V (very poor rock)
V (very poor rock)
20 V (very poor rock)
21 IV (very poor rock)
IV (very poor rock)
Progress Mapping Tunnel End Portal Juni 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan
No. (m)
1 15/06/2020 10+032,450 - 10+029.440 3.01 Slate,
2 16/06/2020 10+029.440- 10+028.950 0.49 Slate,
3 17/06/2020 10+028.950 - 10+027,450 1.50 Slate,
4 17/06/2020 10+027.450 - 10+026,000 1.14 Slate,
5 18/06/2020 10+026.000 - 10+024,500 1.50 Slate,
6 18/06/2020 10+024.500 - 10+023,000 1.50 Slate,
7 19/06/2020 10+023.000 - 10+021,490 1.51 Slate,
8 20/06/2020 10+021.490 - 10+020,000 1.49 Slate,
9 22/06/2020 10+020.000 - 10+018.400 1.60 Slate,
10 22/06/2020 10+018.400 - 10+017.034 1.40 Slate,
11 23/06/2020 10+017.034 - 10+015.005 2.00 Slate,
12 24/06/2020 10+015.005 - 10+013.953 1.10 Slate,
13 25/06/2020 10+013.953 - 10+012.447 1.50 Slate,
14 26/06/2020 10+012.447 - 10+010.412 2.00 Slate,
15 26/06/2020 10+010.412 - 10+008.445 2.00 Slate,
16 27/06/2020 10+008.445 - 10+006.448 2.00 Slate,
17 27/06/2020 10+006.448 - 10+004.442 2.00 Slate,
18 29/06/2020 10+004.442 - 10+002.585 1.80 Slate, sandstone intercolated slate
19 30/06/2020 10+002.585 - 10+000.553 2.00 Slate, sandstone intercolated slate
31.54
ortal Juni 2020
RMR Kelas Batuan Keterangan
Progress Mapping Bulan Juni 2020
26 IV (poor rock)
25 IV (poor rock)
22 IV (poor rock)
IV (poor rock)
IV (poor rock)
22 IV (poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
20 V (verry poor rock)
14 V (verry poor rock)
V (verry poor rock)
16 V (verry poor rock)
V (verry poor rock)
19 V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
Progress Mapping Tunnel End Portal May 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan
No. (m)

0.00
ortal May 2020
RMR Kelas Batuan Keterangan
Progress Mapping Tunnel End Portal April 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan
No. (m)

0.00
rtal April 2020
RMR Kelas Batuan Keterangan
Progress Mapping Tunnel End Portal Maret 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan
No. (m)
1 01/03/2020 10+183,706- 10+182,506 1.20 Slate, sandstone intercolated slate
2 01/03/2020 10+182,506 - 10+181,288 1.20 Slate, sandstone intercolated slate
3 02/03/2020 10+181,288 - 10+180,083 1.20 Slate, sandstone intercolated slate
4 02/03/2020 10+180,083 - 10+178,810 1.20 Slate, sandstone intercolated slate
5 03/03/2020 10+178,810 - 10+177,574 1.20 Slate, sandstone intercolated slate
6 03/03/2020 10+177,574 - 10+176,306 1.20 Slate, sandstone intercolated slate
7 05/03/2020 10+176,306 - 10+175,051 1.20 Slate, sandstone intercolated slate
8 05/03/2020 10+175,051- 10+173,732 1.20 Slate, sandstone intercolated slate
9 06/03/2020 10+173,732- 10+172,508 1.20 Slate, sandstone intercolated slate
10 06/03/2020 10+172,508 - 10+171,190 1.20 Slate, sandstone intercolated slate
11 07/03/2020 10+171,190 - 10+169,935 1.20 Slate, sandstone intercolated slate
12 07/03/2020 10+169,935 - 10+168,595 1.20 Slate, sandstone intercolated slate
13 08/03/2020 10+168,595 - 10+167,362 1.20 Slate, sandstone intercolated slate
14 08/03/2020 10+167,362 - 10+166,124 1.20 Slate, sandstone intercolated slate
15 09/03/2020 10+166,124 - 10+164,833 1.20 Slate, sandstone intercolated slate
16 09/03/2020 10+164,833 - 10+163,558 1.20 Slate, sandstone intercolated slate
17 10/03/2020 10+163,558 - 10+162,345 1.20 Slate, sandstone intercolated slate
18 10/03/2020 10+162,345 - 10+160,993 1.20 Slate, sandstone intercolated slate
19 11/03/2020 10+160,993 - 10+159,748 1.20 Slate, sandstone intercolated slate
20 11/03/2020 10+159,748 - 10+158,468 1.20 Slate, sandstone intercolated slate
21 11/03/2020 10+158,468 - 10+157,219 1.20 Slate
22 12/03/2020 10+157,219 - 10+155,907 1.20 Slate
23 13/03/2020 10+155,907 - 10+154,692 1.20 Slate
24 13/03/2020 10+154,692 - 10+153,414 1.20 Slate
25 14/03/2020 10+153,414 - 10+152,197 1.20 Slate
26 16/03/2020 10+152,197 - 10+151,077 1.20 Slate
27 16/03/2020 10+151,077 - 10+150,076 1.00 Slate
28 17/03/2020 10+150,076 - 10+149,054 1.00 Slate
29 17/03/2020 10+149,054 - 10+148,050 1.00 Slate
30 19/03/2020 10+148,050 - 10+146,994 1.00 Slate
31 20/03/2020 10+146,994 - 10+146,005 1.00 Slate
32 21/03/2020 10+146,005 - 10+145,000 1.00 Slate
37.20
rtal Maret 2020
RMR Kelas Batuan Keterangan
Progress Mapping Bulan Maret
V (verry poor rock) 2020
19 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
19 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
19 V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
20 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
19 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
16 V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
17 V verry poor rock
Progress Mapping Tunnel End Portal Januari 2020
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR
No. (m)
1 02/01/2020 19+60 -20+80 1.20 Slate 20
2 03/01/2020 20+80 - 22+00 1.20 Slate 20
3 04/01/2020 22+00 - 23+20 1.20 Slate 21
4 05/01/2020
5 06/01/2020 23+20 - 24+40 1.20 Slate 20
6 07/01/2020
7 08/01/2020 24+40 - 26+80 1.20 Slate 20
8 09/01/2020 26+80 - 28+00 1.20 Slate 20
9 10/01/2020 28+00 - 29+20 1.20 Slate 21
10 11/01/2020 29+20 - 30+40 1.20 Slate 18
11 12/01/2020
12 13/01/2020 30+40 - 32+80 2.20 Slate 18
13 14/01/2020 32+80 - 34+00 1.20 Slate 20
14 15/01/2020 34+00 - 35+20 1.20 Slate 18
15 16/01/2020 35+20 - 36+40 1.20 Slate 18
16 17/01/2020 36+40 - 37+60 1.20 Slate 18
17 18/01/2020 37+60 - 38+80 1.20 Slate 18
18 19/01/2020
19 20/01/2020 38+80 - 41+20 1.20 Slate 20
20 21/01/2020
21 22/01/2020 41+20 - 42+40 1.20 Slate 20
22 23/01/2020 42+40 - 43+60 1.20 Slate 20
23 24/01/2020 43+60 - 44+80 1.20 Slate 20
24 25/01/2020
25 26/01/2020
26 27/01/2020 10+229,3 - 10+230,55 1.20 Slate 19
27 28/01/2020 10+230,55 - 10+226,87 1.20 Slate 19
28 29/01/2020 10+226,87 - 10+225,62 1.20 Slate 19
29 30/01/2020 10+225,62 - 10+224,38 1.20 Slate 19
30 31/01/2020 10+224,38 - 10+223,16 1.20 Slate 19
Total 28.60
nuari 2020
Kelas Batuan Keterangan
Progress Mapping Bulan Januari
V (verry poor rock) 2020
V (verry poor rock)
IV (poor rock)

V (verry poor rock)


V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
IV (poor rock)
V (verry poor rock)

V (verry poor rock)


V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)

V (verry poor rock)

V (verry poor rock)


V (verry poor rock)
V (verry poor rock)

V (verry poor rock)


V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
Progress Mapping Tunnel End Portal November dan Desember 2019
Sheet Excavation
Tanggal Sta. Jenis Batuan RMR
No. (m)
1 27/11/2019 - 2.20 Slate 20
2 28/11/2019 - 3.20 Slate 21
3 30/11/2019 - 4.20 Slate 20
4 02/12/2019 - 5.20 Slate 20
5 03/12/2019 - 6.20 Slate 20
6 04/12/2019 - 7.20 Slate 20
7 05/12/2019 - 8.00 Slate 20
8 14/12/2019 10+205,3 -10+204,3 9.00 Slate 20
9 17/12/2019 10+204,3 -10+203,3 10.00 Slate 21
10 18/12/2019 10+203,3 -10+202,3 11.00 Slate 20
11 19/12/2019 10+202,3 -10+201,3 12.00 Slate 20
13 21/12/2019 10+201,3 -10+200,3 13.00 Slate 20
15 23/12/2019 10+200,3 -10+199,3 14.00 Slate 20
16 24/12/2019 - 15.00 Slate 20
18 26/12/2019 - 16.00 Slate 20
20 28/12/2019 - 17.20 Slate 21
21 29/12/2019 - 18.40 Slate, Metasandstone 23
22 30/12/2019 - 19.60 Slate, Metasandstone 22
23 31/12/2019 - 20.80 Slate, Metasandstone 22
Total
dan Desember 2019
Kelas Batuan Keterangan
Progress Mapping Bulan November
V (verry poor rock) dan Desember 2019
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
IV (poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
V (verry poor rock)
IV (poor rock)
IV (poor rock)
IV (poor rock)
IV (poor rock)