PVsyst TRIAL
PVsyst - Simulation report
Standalone system
Project: TUNGURAGUA
Variant: Nueva variante de simulación
Standalone system with batteries
System power: 17.55 kWp
PVsyst TRIAL
TUNGURAGUA(Izamba) - Ecuador
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
Project summary
Geographical Site Situation Project settings
TUNGURAGUA(Izamba) Latitude -1.25 °S Albedo 0.20
Ecuador Longitude -78.58 °W
Altitude 2496 m
Time zone UTC-5
Meteo data
TUNGURAGUA(Izamba)
NREL NSRDB Typ. Met. Year PSMv3_1998 to 2020 - TMY
System summary
PVsyst TRIAL
Standalone system Standalone system with batteries
System information
PV Array Battery pack
Nb. of modules 65 units Technology Lead-acid, sealed, Gel
Pnom total 17.55 kWp Nb. of units 408 units
Voltage 96 V
Capacity 2703 Ah
Results summary
PVsyst TRIAL
Useful energy from solar
Missing Energy
Excess (unused)
19954.56 kWh/year
252.57 kWh/year
3012.04 kWh/year
Table of contents
Solar Fraction SF
69.07 %
98.75 %
2
General parameters, PV Array Characteristics, System losses 3
Detailed User's needs 4
Main results 5
Loss diagram 6
Predef. graphs 7
PVsyst TRIAL
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 2/7
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
General parameters
Standalone system Standalone system with batteries
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Imported
Circumsolar separate
User's needs
Daily household consumers
Constant over the year
Average 55 kWh/Day
PVsyst TRIAL
PV module
Manufacturer
Model
(Original PVsyst database)
Unit Nom. Power 270 Wp
PV Array Characteristics
Generic
END-60-270P
Battery
Manufacturer
Model
Technology
Nb. of units
Generic
12V 1 RES OPzV 65
Lead-acid, sealed, Gel
51 in parallel x 8 in series
Number of PV modules 65 units Discharging min. SOC 20.0 %
Nominal (STC) 17.55 kWp Stored energy 207.6 kWh
Modules 13 Strings x 5 In series Battery Pack Characteristics
At operating cond. (50°C) Voltage 96 V
Pmpp 15.58 kWp Nominal Capacity 2703 Ah (C10)
U mpp 137 V Temperature Fixed 20 °C
I mpp 113 A
PVsyst TRIAL
Controller
Universal controller
Technology
Temp coeff.
Converter
Maxi and EURO efficiencies
MPPT converter
-5.0 mV/°C/Elem.
97.0 / 95.0 %
Battery Management control
Threshold commands as
Charging
approx.
Discharging
approx.
SOC calculation
SOC = 0.90 / 0.75
107.5 / 100.3 V
SOC = 0.20 / 0.45
93.7 / 97.7 V
Total PV power
Nominal (STC) 18 kWp
Total 65 modules
Module area 106 m²
Cell area 95.6 m²
Array losses
PVsyst TRIAL
Thermal Loss factor
Module temperature according to irradiance
Uc (const)
Uv (wind)
-0.8 %
DC wiring losses
Global array res.
Loss Fraction
2.0 % at MPP
Serie Diode Loss
Voltage drop
Loss Fraction
0.2 %
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 3/7
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 4/7
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
Main results
System Production
Useful energy from solar 19954.56 kWh/year Perf. Ratio PR 69.07 %
Available solar energy 24271.08 kWh/year Solar Fraction SF 98.75 %
Excess (unused) 3012.04 kWh/year
Loss of Load Battery aging (State of Wear)
Time Fraction 1.2 % Cycles SOW 96.5 %
Missing Energy 252.57 kWh/year Static SOW 93.3 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
January
February
March
April
GlobHor
kWh/m²
152.1
142.1
152.5
145.6
GlobEff
kWh/m²
109.2
112.6
136.1
140.7
E_Avail
kWh
1669
1709
2058
2112
EUnused
kWh
0.0
22.8
199.4
342.6
E_Miss
kWh
0.0
129.7
0.0
0.0
E_User
kWh
1716
1420
1716
1661
E_Load
kWh
1716
1550
1716
1661
SolFrac
ratio
1.000
0.916
1.000
1.000
May 146.0 153.4 2338 492.7 0.0 1716 1716 1.000
June 128.2 137.0 2082 300.0 0.0 1661 1661 1.000
July 142.8 153.8 2330 491.2 0.0 1716 1716 1.000
August 150.1 151.2 2302 449.7 0.0 1716 1716 1.000
September 149.7 136.0 2070 282.4 0.0 1661 1661 1.000
October 172.6 141.0 2137 298.5 0.0 1716 1716 1.000
November 162.0 120.2 1831 132.7 0.0 1661 1661 1.000
PVsyst TRIAL
December 150.1 106.9 1634 0.0 122.8 1593 1716 0.928
Year 1793.7 1598.1 24271 3012.0 252.6 19955 20207 0.988
Legends
GlobHor Global horizontal irradiation E_User Energy supplied to the user
GlobEff Effective Global, corr. for IAM and shadings E_Load Energy need of the user (Load)
E_Avail Available Solar Energy SolFrac Solar fraction (EUsed / ELoad)
EUnused Unused energy (battery full)
E_Miss Missing energy
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 5/7
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
Loss diagram
1794 kWh/m² Global horizontal irradiation
PVsyst TRIAL
-0.57% PV loss due to irradiance level
PVsyst TRIAL
-4.35% Converter Loss during operation (efficiency)
20207 kWh
Energy supplied to the user
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 6/7
Project: TUNGURAGUA
Variant: Nueva variante de simulación
PVsyst V7.4.0
VC0, Simulation date:
21/08/23 23:04
PVsyst TRIAL
with v7.4.0
Predef. graphs
Diagrama entrada/salida diaria
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
21/08/23 PVsyst Evaluation mode Page 7/7