This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 2 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
INDEX
1. GENERAL ....................................................................................................................... 3
2. CODES, STANDARD AND SPECIFICATIONS............................................................... 3
3. PROCESS BASIS OF DESIGN ....................................................................................... 4
3.1 UNIT CAPACITY ....................................................................................................... 4
3.1.1 Design Capacity ................................................................................................. 4
3.1.2 Turn Down Ratio ................................................................................................ 4
3.2 PROCESS FEEDSTOCK .......................................................................................... 4
3.2.1 Definitions of various design cases ................................................................. 4
3.2.2 Modes of Operation............................................................................................ 4
3.2.3 Feedstock Definition .......................................................................................... 5
3.3 PROCESS PRODUCT ............................................................................................ 11
3.4 BATTERY LIMIT CONDITIONS FOR PROCESS STREAMS ................................. 24
3.4.1 Feed Streams.................................................................................................... 24
3.4.2 Product Streams .............................................................................................. 25
3.5 BATTERY LIMIT CONDITIONS FOR UTILITY STREAMS ..................................... 26
3.6 ADDITIONAL CONSIDERATIONS ......................................................................... 26
3.6.1 Design pressure for Recycle Gas Compressor Circuit ................................. 26
3.6.2 Reactor Theoretical Yields .............................................................................. 26
4. GUARANTEED YIELDS AND PRODUCT INFORMATION........................................... 29
5. PROCESS ENERGY RECOVERY ................................................................................ 29
6. CATALYST INFORMATION ......................................................................................... 30
7. UNIT RUN LENGTH ...................................................................................................... 30
8. ENVIRONMENTAL EMISSIONS ................................................................................... 30
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 3 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
1. GENERAL
The VCC™ process licensed by KBR is a residue upgrading technology used for processing
residuum into premium quality products. The JPRC VCCTM unit converts VR to lighter
product, sending an untreated VGO product OSBL to the Unicracker unit and then treats the
Naphtha and Diesel fractions such that the low Sulfur Diesel Product is sent to Diesel
product blending and Naphtha OSBL to the NHT unit.
In general, the Plant will be designed in accordance with internationally recognized codes
and standards, such as API, ASME, ANSI, IEC, ISA, NFPA, PIP. Jordanian Codes and
Standards, as well as local Laws and Safety Norms will also be considered where applicable.
The following project specification shall be also considered:
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 4 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
The VCC Unit (415) will be designed for processing 18902 BPSD for the Basrah Case and
18418 BPSD for the Arab Light Case. Design capacity is 110% of indicated capacity.
The feed to the Refinery Complex will be Basrah Crude or Arab Light Crude coming from
floating roaf tanks. VCC Unit (415) will process the vacuum residue from existing VDU 2 Unit,
New VDU 3 Unit, Storage, and slurry from existing FCC Unit. Thus, it will consider two
possible feedstock compositions depending on the crude fed to the refinery. See Section
3.2.3 for each Feedstock composition.
Additionally, VCC Unit (415) will require a make-up of hydrogen, necessary for hydrocracking
reactions involved in the reactors, lean amine for treating the recycle gas and H2 rich gas,
and wash water to remove H2S and Ammonia from the process.
VCC Unit will have different modes of operation depending on the kind of crude fed to the
Refinery and the catalyst life time:
Additional check cases will be considered, as required by KBR to ensure operability of the
unit, and may affect the equipment design; examples include start-up case, low conversion
case, etc.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 5 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
The feed characterization for the Arab Light Design Case is shown in table below:
Referenc VR 1 VR 2 Existing
Parameters e UOM (Existing (New FCC BLEND 1
Method VDU 2) VDU3) Slurry
Total Feed Rate MTPD 527 2457 34 3018
Volumetric Feed Rate 4 Calc m3/hr 21.62 99.4 1.31 122.3
Volumetric Feed Rate 4 Calc bpsd 3255 14966 197 18418
Specific Gravity @
Calc - 1.015 1.030 1.071 1.028
15ºC
ASTM
Sulfur wt% 4.144 4.35 3.315 4.302
D4294
ASTM
Nitrogen ppmw 2961 3386 1900 3295
D4629
Oxygen ppmw 3000 3 3000 3 1190 3 2980 3
ASTM
CON Carbon wt% 17.62 21 2.7 20.2
D4530
UOP K Calc 11.59 11.58 N/A
Nickel IP 501 ppmw 21.25 26 0.8 24.6
Vanadium IP 501 ppmw 55.93 67 2.8 65.4
Iron ppmw 7.36 3 8.95 3 0.28 3 8.57 3
Asphaltenes (heptane
IP 143 wt% 5.93 7.2 0.12 6.90
insoluble asphaltene)
ASTM
Hydrogen Content wt% 10.52 3 10.44 3 7.20 3 10.42 3
D5291
Chloride Content5 Calc ppmw 40 27 N/A
Arsenic2 IP 501 ppmw Nil Nil Nil Nil
2
Silicon IP 501 ppmw Nil Nil Nil Nil
Solids wt% N/A N/A N/A
Viscosity @ 104 ºF
cSt 62979.7 389175.7 142.4 79265.3
(40ºC)
Viscosity @ 122 ºF
cSt 10131.5 40202.3 72.4 28003.5
(50ºC)
Viscosity @ 212ºF
cSt 380.9 938.9 7.2 741.2
(100ºC)
Viscosity @ 284ºF
cSt 77.2 151.1 1.4 124.4
(140ºC)
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 6 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
VR 1 VR 2 Existing
Reference
Parameters UOM (Existing (New FCC BLEND1
Method
VDU 2) VDU3) Slurry
ASTM Distillation D2887/ TBP @ 760
D2887 D2887 D1160
Method D1160/TBP mmHg
Initial Boiling Point ºC 449.6 478.1 306 451
5% Point ºC 508.9 538.6 351 525
10% Point ºC 527.4 557.1 356 547
20% Point ºC 553.1 584.5 364
30% Point ºC 576.4 613.7 373 604
50% Point ºC 642.5 672.3 406 666
70% Point ºC 721.4 749.6 442 743
80% Point ºC 780.5 811.2 467
85% Point ºC 835.7 862.1 N/A
90% Point ºC 888.3 911.4 508 907
95% Point ºC 957.6 970.1 N/A 967
End Point ºC 1031.3 1031.3 541 1031
Notes:
1. Blend information by KBR.
2. Arsenic and Silicon are “non-detectable”, as confirmed via communication RE: H122-
KJ-L-0007 KBR / JPRC questions to UOP, dated 9-Nov-2017.
3. Estimated values.
4. Volumetric flowrate is slightly different from the UOP estimates due to conversion
factor.
5. Chloride based on 1ptb residual salt in new crude unit and 3 ptb in existing CDU III
desalted crude.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 7 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
The feed characterization for the Basrah Design Case is shown in table below:
VR 1 VR 2 Existing
Referenc
Parameters UOM (Existing (New FCC BLEND 1
e Method
VDU 2) VDU3) Slurry
Total Feed Rate MTPD 556 2547 34 3137
Volumetric Feed Rate 4 Calc m3/hr 22.59 101.65 1.31 125.6
Volumetric Feed Rate 4 Calc bpsd 3401 15304 197 18902
Specific Gravity @
Calc - 1.026 1.044 1.071 1.041
15ºC
ASTM
Sulfur wt% 4.72 5.06 3.315 4.984
D4294
ASTM
Nitrogen ppmw 3542 3985 3500 3901
D4629
Oxygen ppmw 2200 3 2343 3 1190 3 2305 3
ASTM
CON Carbon wt% 19.57 23.8 2.7 22.8
D4530
UOP K Calc 11.4 11.42 N/A
Nickel IP 501 ppmw 26.97 34 0.8 32.2
Vanadium IP 501 ppmw 95.42 119 2.8 113.7
Iron ppmw 8.39 10.2 0.25 3 9.77 3
Asphaltenes (heptane
IP 143 wt% 9.19 11.5 0.12 10.99
insoluble asphaltene)
ASTM
Hydrogen Content wt% 10.08 9.99 7.20 9.98
D5291
Chloride Content5 Calc ppmw 40 25 N/A
Arsenic2 IP 501 ppmw Nil Nil Nil Nil
Silicon2 IP 501 ppmw Nil Nil Nil Nil
Solids wt% N/A N/A N/A
Viscosity @ 104 ºF
cSt 102136.2 1005319.6 142.4 2714020.8
(40ºC)
Viscosity @ 122 ºF
cSt 88969 859623.2 72.4 544123.7
(50ºC)
Viscosity @ 212ºF
cSt 1176.2 3309.2 7.2 2447.9
(100ºC)
Viscosity @ 284ºF
cSt 122.5 275.4 1.4 217.8
(140ºC)
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 8 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
VR 1 VR 2 Existing
Reference
Parameters UOM (Existing (New FCC BLEND1
Method
VDU 2) VDU3) Slurry
ASTM Distillation D2887/ TBP @ 760
D2887 D2887 D1160
Method D1160/TBP mmHg
Initial Boiling Point ºC 453.6 477 306 456
5% Point ºC 509.3 536.5 351 524
10% Point ºC 525.1 552.2 356 543
20% Point ºC 548.6 574.5 364
30% Point ºC 566.3 600.6 373 593
50% Point ºC 626.8 672.9 406 663
70% Point ºC 725.1 756.4 442 750
80% Point ºC 780.3 803.4 467
85% Point ºC 825.7 852.4 N/A
90% Point ºC 869.2 896.4 508 892
95% Point ºC 947.9 970.4 N/A 965
End Point ºC 1093.3 1093.3 541 1092
Notes:
1. Blend information by KBR.
2. Arsenic and Silicon are “non-detectable”, as confirmed via communication RE: H122-
KJ-L-0007 KBR / JPRC questions to UOP, dated 9-Nov-2017.
3. Estimated values.
4. Volumetric flowrate is slightly different from the UOP estimates due to conversion
factor.
5. Chloride based on 1ptb residual salt in new crude unit and 3 ptb in existing CDU III
desalted crude.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 9 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Makeup Hydrogen is required to convert and treat the unit feed to clean transportation fuels.
The makeup rate depends on unit feed rates, properties and catalyst life time. The table
below lists the makeup hydrogen composition for the different cases.
MDEA will be used in the amine treating of the recycle gas and H2 rich gas. The amine
quality and loadings will be as follows.
Amine Information
Type MDEA
Concentration 35% wt
Lean Loading Max, mol H2S / mol Amine 0.01
Rich Loading Max, mol H2S / mol Amine 0.41
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 10 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Wash Water is required in the VCCTM process to remove H2S and Ammonia from the
process before they form salts in the equipment and pipe lines which could lead to corrosion
and eventual loss of containment. The wash water rates vary depending on various process
parameters including Nitrogen, Sulfur and Chlorides in the feed, treat gas rate. The
controlling parameter for this unit is salt concentration in the resulting sour water. The unit is
designed for less than 3.5 wt% salt concentration.
At least 25% of the total wash water to the unit should be clean fresh water (including DHT
Stripper and DHT fractionator condensate). A maximum of 75% of the total wash water may
be Non-Phenolic stripped water from a sour water stripper that handles sour water produced
from hydroprocessing units only (i.e., no FCC sour water should be processed in the sour
water stripper). The Fresh Water line needs to be sized to handle 100% of the wash water
requirement in case the Non-Phenolic stripped sour water is not available.
The recommended wash water requirements are listed below:
Maximum
Parameter UOM Allowable
Limits
Total Dissolved Solids ppmw 25
Chlorides ppmw 5
Oxygen ppbw 50
NH3 ppmw 100
H2S ppmw 100
pH 7-9
To achieve the quality specified above cold condensate will be used as clean fresh water.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 11 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
The VCC Unit will be designed to recover the products listed below:
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 12 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 13 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
RICH AMINE
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 14 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 15 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 16 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
LPG
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 17 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
NAPHTHA
1% 71 71 72 71
5% 84 84 82 83
10% 87 87 84 84
30% 100 100 97 98
50% 110 110 108 108
70% 117 117 114 114
90% 128 129 129 129
95% 134 134 135 135
98% 137 137 137 137
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 18 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
NAPHTHA (Cont.)
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 19 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
DIESEL
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 20 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
DIESEL (Cont.)
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 21 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
VGO
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 22 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
VGO (Cont.)
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 23 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
PITCH
Notes:
1. Pitch Properties to be confirmed by Pilot Plant Testing.
2. Oil only specific gravity
3. Pitch will be solidified within the VCCTM Unit.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 24 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Next table shows operating and design conditions of all Feeds to VCC Unit (415) at the
battery limit of the unit, with pressure at grade.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 25 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Next table shows operating and design conditions of all products generated in VCC Unit
(415).
Notas:
1. Normal pressure and temperature at Battery Limit of VCCTM Unit.
2. Estimated shut-off pressure. To be confirmed by DEC.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 26 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Utility supply conditions are included in the Basic Engineering Design Data (Doc. Nº: 10180-
000-120-GE-0001).
For the Recycle Gas Compressor high pressure loop (RGC, 415-C-01), the following design
guideline has been applied by Licensor to specify design pressures:
The design pressure profile for the individual equipment in this system is based on the
settling out pressure (SOP) estimated by Licensor and considers the normal operating
pressure drops of the circuit.
Theoretical Reactor Yields are given in the tables below based on perfect square cuts of
products. In the design of the unit, these were adjusted as a result of imperfect separation of
the materials in the fractionation towers and separation drums.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 27 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
Basrah Case
The operating conditions for the reactors of the unit and for each design case are as follow.
SOR EOR
No. of Vessels 3 3
Overall WHSV, h-1 0.5 0.5
Inlet Pressure, kg/cm2(g) 219.3 219.3
Weighted Average Bed Temperature, °C 470 470
Chemical H2 Consumption, Nm3/ton 235 235
Inlet Treat Gas Rate, Nm3/MT Fresh Feed 750 750
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 28 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
SOR EOR
No. of Vessels 1 1
Overall SV, ton/m3/hr 1.51 1.51
Inlet Pressure, kg/cm2(g) 195.9 195.9
Weighted Average Bed Temperature, °C 355 404
Chemical H2 Consumption, Nm3/ton 140.3 119.5
Treat Gas Rate 1, Nm3/ton 1593 1596
Cycle Length, months > 48
Note 1: This treat gas rate is resultant from the LPH Reactor treat and quench gas and the
DHT oil feed. During Start-up, the minimum recommended treat gas rate is 800 Nm3/ton.
SOR EOR
No. of Vessels 3 3
Overall WHSV, h-1 0.5 0.5
Inlet Pressure, kg/cm2(g) 219.3 219.3
Weighted Average Bed Temperature, °C 470 470
Chemical H2 Consumption, Nm3/ton 264 264
Inlet Treat Gas Rate, Nm3/MT Fresh Feed 750 750
SOR EOR
No. of Vessels 1 1
Overall SV, ton/m3/hr 1.54 1.54
Inlet Pressure, kg/cm2(g) 195.9 195.9
Weighted Average Bed Temperature, °C 365 404
Chemical H2 Consumption, Nm3/ton 165.1 147.6
Treat Gas Rate 1, Nm3/ton 1737 1736
Cycle Length, months > 48
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 29 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
KBR and OWNER expect to enter into a Guarantee Agreement which will contain the
following performance guarantee parameters for VCC unit:
- Capacity
- Turndown
- Hydrogen consumption
- Products specification
- Catalyst Cycle Length
- Utility Consumption
The VCC unit will be heat integrated as per Licensor design to an extent consistent with
technical limitations and OWNER´s economic preferences relating to the tradeoff between
capital and utilities. The treat gas stream that joins downstream of the LPH Reactor Effluent /
Fresh Feed Exchanger (415-E-01A/B) is a clear example of process heat recovery in the
unit.
During the BEP Licensor has evaluated fired heater heat recovery schemes such as pre-
heating cold streams, generating and superheating steam and air pre-heat. Licensor has
also looked at combining the flue gas from several heaters together to allow more
economical heat recovery for generating steam. As a result of the economic feasibility study
performed by Licensor, a combined Waste Heat Boiler Package (415-ME-50) has been
specified.
In order to maintain the required purity of hydrogen in the gas recycle loop a continuous
purge is carried out. Hydrogen Production is an expensive process from an energy point of
view. Therefore, a Membrane (415-ME-02) is used to increase the purity of the purge stream.
Thus, part of the recycle gas purge is fed back to the intermediate stage of the OSBL
Makeup Gas Compressor package. Membrane Non Permeate Gas goes to the OSBL ROG
PSA Unit.
This document is property of Técnicas Reunidas. Its reproduction without previous permission in writing is strictly forbidden.
Refinery Fourth Expansion Project RFP-04-2018
KBR RESIDUE UPGRADING UNIT (VCC)
PAGE 30 OF 30
PROCESS DESIGN BASIS
10180-415-120-DB-0001 REV.: 01
6. CATALYST INFORMATION
The unit 415 shall have an on-stream factor of 8400 hours per year (350 days/year). Catalyst
cycle length is four years.
8. ENVIRONMENTAL EMISSIONS
Rich amine will be routed to the Amine Treating Unit. Sour water containing H2S and NH3 will
be routed to the non-phenolic Sour Water Unit and phenolic sour water will be routed to the
Phenolic Sour Water Unit.
For other effluents refer to KBR RESIDUE UPGRADING UNIT (VCC) EFFLUENTS
SUMMARY (Document No. 10180-415-120-AC-0001).