Professional Documents
Culture Documents
Gass Room
Gass Room
A B C D (BCC) JAKARTA
BVR ARCHITECTURE
AND MASTER PLANNING
E E'
SECURITY
± 0.00
± 0.00
GAS PUCHASING/RECEIVING STORAGE
± 0.00
planting Gas bottle
RECEIVING ROOM
F - 0.150 - 0.050 - 0.030 ± 0.00 F'
TOILET
- 0.100
NN
-
NN
HM -
BVR.
BALI COFFEE CLUB
-Calciboard ceiling. (BCC) JAKARTA
-Cement Polish finishing
BVR ARCHITECTURE
AND MASTER PLANNING
GAS PUCHASING/RECEIVING STORAGE
Gas bottle
-Concrete floor
-Waterproofing
-Screed & wall plastering. -Ceramic floor (exiting)
-Cement Polish for wall -Waterproofing
finishing -Screed & wall plastering.
-Cement Polish for wall finishing
± 0.00 ± 0.00 ± 0.00
- 0.50
SECTION E-E
GAS
09/08/2023
± 0.00 ± 0.00 ± 0.00 - 0.050 NN
-
SECTION F-F NN
HM -
BVR.
BALI COFFEE CLUB
(BCC) JAKARTA
BVR ARCHITECTURE
AND MASTER PLANNING
-Metalroof w soundproof&heat
insulation -Metalroof w soundproof&heat
-light galvanize roof frame insulation
-calciboard ceiling. -light galvanize roof frame
-Cement Polish finishing -calciboard ceiling.
-Cement Polish finishing
GAS
Gas
Gas bottle -galvanize frame
Corridor -reinforced dia 16
or wiremesh M12
(diagonal
composition)
-anti rust finishing
-black color
-Concrete floor w. reinforced M10
thk.10
-Waterproofing
-Screed & wall plastering.
± 0.00 - 0.050
-Cement Polish for wall finishing
09/08/2023
NN
-
NN
HM -
BVR.