>> QUANTITY SHEET FOR PROPOSED PCCP WIDENING (LEFT SIDE) COMPUTATION

FILL AREA CUT AREA FILL VOL. CUT VOL. CUM. FILL CUM. CUT
STATION
(SQ.M.) (SQ.M.) (CU.M.) (CU.M.) (CU.M.) (CU.M.)
40.06 0.00 0.41 0.00 0.00 0.00 0.00
60.00 0.00 0.41 0.00 8.18 0.00 8.18
71.09 0.00 0.41 0.00 4.55 0.00 12.72
80.00 0.00 0.56 0.00 4.32 0.00 17.04
89.73 0.00 0.56 0.00 5.45 0.00 22.49
100.00 0.00 0.41 0.00 4.98 0.00 27.47
118.06 0.00 0.41 0.00 7.40 0.00 34.88 34.88

Note: SEE "REMOVAL OF PAVEMENT" FOR THICKNESS OF EXISTING CONCRETE PAVEMENT,


LEFTS SIDE (L/S)

>> QUANTITY SHEET FOR PROPOSED PCCP WIDENING (RIGHT SIDE) 8.0106
FILL AREA CUT AREA FILL VOL. CUT VOL. CUM. FILL CUM. CUT 69.1280 69.1280
STATION
(SQ.M.) (SQ.M.) (CU.M.) (CU.M.) (CU.M.) (CU.M.)
40.06 0.00 0.58 0.00 0.00 0.00 0.00 0.0000
46.50 0.00 0.41 0.00 3.19 0.00 3.19
60.00 0.00 0.42 0.00 5.60 0.00 8.79
64.40 0.00 0.42 0.00 1.85 0.00 10.64
80.00 0.00 0.58 0.00 7.80 0.00 18.44
81.39 0.00 0.42 0.00 0.70 0.00 19.13
100.00 0.00 0.41 0.00 7.72 0.00 26.86
118.06 0.00 0.41 0.00 7.40 0.00 34.25 34.25

Note: SEE "REMOVAL OF PAVEMENT" FOR THICKNESS OF EXISTING CONCRETE PAVEMENT,


RIGHT SIDE (R/S)
QUANTITY SHEET FOR EARTHWORKS SEGMENT-1
FILL AREA CUT AREA FILL VOL. CUT VOL. CUM. FILL CUM. CUT
STATION
(SQ.M.) (SQ.M.) (CU.M.) (CU.M.) (CU.M.) (CU.M.)
492.60 0.00 3.12 0.00 0.00 0.00 0.00
500.00 0.00 2.25 0.00 19.87 0.00 19.87
520.00 0.00 3.33 0.00 55.80 0.00 75.67
540.00 0.21 2.02 2.10 53.50 2.10 129.17
560.00 0.13 1.96 3.40 39.80 5.50 168.97
580.00 0.09 2.13 2.20 40.90 7.70 209.87
600.00 0.00 5.06 0.90 71.90 8.60 281.77
604.43 EXISTING 36"Ø R.C.P.C.
606.83 0.00 3.51 0.00 29.27 8.60 311.04

QUANTITY SHEET FOR EARTH WORKS SEGMENT-2


FILL AREA CUT AREA FILL VOL. CUT VOL. CUM. FILL CUM. CUT
STATION
(SQ.M.) (SQ.M.) (CU.M.) (CU.M.) (CU.M.) (CU.M.)
1750.23 0.00 1.99 0.00 0.00 0.00 0.00
1770.23 0.00 1.88 0.00 38.70 0.00 38.70
1790.23 0.00 1.57 0.00 34.50 0.00 73.20
1810.23 0.00 2.02 0.00 35.90 0.00 109.10
1830.23 0.00 1.57 0.00 35.90 0.00 145.00
1850.23 0.00 1.56 0.00 31.30 0.00 176.30
1870.23 0.00 1.14 0.00 27.00 0.00 203.30
1890.23 0.00 1.13 0.00 22.70 0.00 226.00
1910.23 0.00 1.01 0.00 21.40 0.00 247.40
1930.23 0.00 0.93 0.00 19.40 0.00 266.80
1950.23 0.11 0.25 1.10 11.80 1.10 278.60
1970.23 0.03 0.16 1.40 4.10 2.50 282.70
1990.23 0.02 0.33 0.50 4.90 3.00 287.60
2010.23 0.00 3.43 0.20 37.60 3.20 325.20

SCHEDULE FOR REMOVAL OF CONCRETE DRAINAGE STRUCTURE


STATION LENGTH HEIGHT THICKNESS POSITION VOLUME
START END (METERS) (METERS) (METERS) L/S R/S (CU.M.)
WALL OF WALL OF
0.80 1.00 0.10 / 0.08
CANAL CANAL
TOTAL VOLUME (CU.M.) 0.080

SCHEDULE FOR REMOVAL OF INDIVIDUAL TREES


STATION (BETWEEN) CODE OTHERS THICKNESS POSITION UNIT
START END (METERS) (METERS) (DIAMETER) L/S R/S (EACH)
520 540 TREE Large (b) 751-900 / 1
QUANTITY SHEET FOR DRAINAGE EXCAVATION (LEFT SIDE)
FILL AREA CUT AREA FILL VOL. CUT VOL. CUM. FILL CUM. CUT
STATION
(SQ.M.) (SQ.M.) (CU.M.) (CU.M.) (CU.M.) (CU.M.)
590.48 0.47 1.65 0.00 0.00 0.00 0.00
604.43 0.47 1.65 7.01 24.60 7.01 24.60

SCHEDULE FOR LINE CANAL


STATION HEIGHT WIDTH POSITION LENGTH
LABEL
START END (METERS) (METERS) L/S R/S (METERS)
OPEN
590.48 604.43 1.00 0.80 / 14.91
CANAL
TOTAL LENGTH (LN.M.) 14.91

SEGMENT - 1:

SEGMENT - 2:
ITEM NO. DESCRIPTION

B.5 BILLBOARD
B.7.2 CONSTRUCTION SAFETY & HEALTH PROGRAM
B.9 MOBILIZATION/ DEMOBILIZATION
100 CLEARING & GRUBBING (W/ STRIPPING)
100(3)b INDIVIDUAL REMOVAL OF TREES (LARGE b 751-900mm Ø)
101(2) REMOVAL OF CONCRETE DRAINAGE STRUCTURES (INCL. WASTE DISPOSAL = 3KM.)
101(2)c REMOVAL OF R.C.P.C. 36"Ø - 910mm
101(3)a.1 REMOVAL OF EXISTING CONCRETE PAVEMENT (INCL. WASTE DISPOSAL = 3KM.)
102(2)a ROADWAY EXCAVATION
103(6) DRAINAGE EXCAVATION
104(1)a EMBANKMENT
104(1)b BACKFILL (USED EXCAVATED MATERIALS)
105 SUB-GRADE PREPARATION
201 AGGREGATES BASE COARSE
311(1)a.1 PCC PAVEMENT (PLAIN) - CONVENTIONAL METHOD 200mm THK.
404(a) REINFORCING CONCRETE CLASS A (BOX CULVERT)
405(a) STRUCTURAL CONCRETE CLASS A (BOX CULVERT)
SPL-1 LINED CANAL (OPEN 0.80mx0.80m)

BACKUP COMPUTATION
100 CLEARING & GRUBBING (W/ STRIPPING)

101(2) REMOVAL OF CONCRETE DRAINAGE STRUCTURES (INCL. WASTE DISPOSAL = 3KM.)

102(2)a ROADWAY EXCAVATION


104(1)a EMBANKMENT

104(1)b BACKFILL (USED EXCAVATED MATERIALS)

105 SUB-GRADE PREPARATION

201 AGGREGATES BASE COARSE

311(1)a.1 PCC PAVEMENT (PLAIN) - CONVENTIONAL METHOD 200mm THK.


ORIGINAL CONTRACT VARIATION
QTY. UNIT UNIT COST AMOUNT QTY. UNIT UNIT COST
2.00 units 10,968.75 21,937.50 - units 10,968.75
1.00 l.s. 20,000.00 20,000.00 - l.s. 20,000.00
1.00 l.s. 44,875.00 44,875.00 - l.s. 44,875.00
2,624.98 sq.m. 21.43 56,253.32 (82.60) sq.m. 21.43
2.00 each 3,656.25 7,312.50 (1.00) each 3,656.25
0.84 cu.m. 56,547.62 47,500.00 (0.76) cu.m. 56,547.62
8.00 ln.m. 2,429.69 19,437.52 (8.00) ln.m. 2,429.69
8.00 sq.m. 3,906.25 31,250.00 (8.00) sq.m. 3,906.25
332.16 cu.m. 394.28 130,964.04 257.48 cu.m. 394.28
24.60 cu.m. 4,121.95 101,399.97 - cu.m. 4,121.95
151.99 cu.m. 1,016.33 154,472.00 (142.29) cu.m. 1,016.33
7.01 cu.m. 7,792.44 54,625.00 - cu.m. 7,792.44
2,137.70 sq.m. 109.61 234,313.30 61.91 sq.m. 109.61
477.07 cu.m. 488.13 232,872.18 131.77 cu.m. 488.13
1,493.84 sq.m. 1,305.65 1,950,432.20 193.54 sq.m. 1,305.65
857.81 kgs. 83.65 71,755.81 (857.81) kgs. 83.65
7.68 cu.m. 14,264.97 109,554.97 (7.68) cu.m. 14,264.97
14.91 ln.m. 12,642.79 188,504.00 - ln.m. 12,642.79

STATION (SEGMENT-1)
START END LENGTH WIDTH S. AREA
492.6 606.83 114.23 8.60 982.38
STATION (SEGMENT-2)
START END LENGTH WIDTH S. AREA
1750.23 1950.23 200.00 7.80 1,560.00
TOTAL S.AREA 2,542.38
VAR. (82.60)

STATION
START END LENGTH HEIGHT THICKNESS VOLUME
WALL WALL 0.80 1.00 0.10 0.08
TOTAL VOL. 0.08
VAR. (0.76)

STATION (SEGMENT-1)
CUT 311.04
STATION (SEGMENT-2)
CUT 278.60
TOTAL 589.64
VAR. 257.48
STATION (SEGMENT-1)
FILL 8.60
STATION (SEGMENT-2)
FILL 1.10
9.70
VAR. (142.29)

STATION (SEGMENT-1)
START END LENGTH WIDTH S. AREA
492.6 606.83 114.23 7.00 799.61
STATION (SEGMENT-2)
START END
1750.23 1950.23 200.00 7.00 1,400.00
TOTAL S.AREA 2,199.61
VAR. 61.91

STATION (SEGMENT-1)
START END LENGTH S. AREA VOLUME
1.20 137.08 PCCP
114.23
0.40 45.69 SHOULDER
492.6 606.83
111.83 0.16 17.89 SIDE DITCH R/S NOTE FOR SIDE DITC
101.10 0.16 16.18 SIDE DITCH L/S WIDTH OF CHAFL
STATION (SEGMENT-2)
START END LENGTH S. AREA VOLUME
1.00 200.00 PCCP
1750.23 1950.23 200.00 0.80 160.00 SHOULDER
0.16 32.00 SIDE DITCH R /S ONLY
TOTAL VOL. 608.84
VAR. 131.77

STATION (SEGMENT-1)
START END LENGTH WIDTH UNITS S. AREA
492.6 606.83 114.23 6.00 - 685.38 PCCP
605.83 606.83 1.00 2.00 2.00 2.00 CHAFLAN SEE DETAILS
STATION (SEGMENT-2)
START END LENGTH WIDTH UNITS S. AREA
1750.23 1950.23 200.00 5.00 - 1000 PCCP
TOTAL S.AREA 1,687.38
VAR. 193.54
ION NEW CONTRACT
AMOUNT QTY. UNIT UNIT COST AMOUNT BOQ
- 2.00 units 10,968.75 21,937.50
- 1.00 l.s. 20,000.00 20,000.00 86,812.50
- 1.00 l.s. 44,875.00 44,875.00
(1,770.12) 2,542.38 sq.m. 21.43 54,483.20
(3,656.25) 1.00 each 3,656.25 3,656.25 111,065.82
(42,976.19) 0.08 cu.m. 56,547.62 4,523.81
(19,437.52) - ln.m. 2,429.69 -
(31,250.00) - sq.m. 3,906.25 - 181,651.56
101,519.21 589.64 cu.m. 394.28 232,483.26
- 24.60 cu.m. 4,121.95 101,399.97
(144,613.60) 9.70 cu.m. 1,016.33 9,858.40 310,496.97
- 7.01 cu.m. 7,792.44 54,625.00
6,785.96 2,199.61 sq.m. 109.61 241,099.25
64,320.89 608.84 cu.m. 488.13 297,193.07 2,417,617.68
252,695.50 1,687.38 sq.m. 1,305.65 2,203,127.70
(71,755.81) - kgs. 83.65 -
(109,554.97) - cu.m. 14,264.97 - 369,814.78
- 14.91 ln.m. 12,642.79 188,504.00

3,477,766.41 3,477,459.31

(307.1000)
NOTE FOR SIDE DITCH:
WIDTH OF CHAFLAN 1.00 L&R
WIDTH OF BOX 1.4 L&R
LENGTH OF CANAL 10.73 L ONLY

N SEE DETAILS