PIA PW and PWPBM
PIA PW and PWPBM
Note: The gaps that the SPT have identified in the Gap Analysis Template and in other data-gathering templates will serve as inputs to the Priority
Improvement Area (PIA) Rubric.
Instruction: Using the matrix on the next page, please rate each improvement area on five criteria using 5-point scale as described below:
Afterwards, compute the average rating of each improvement area and interpret the results as follows;
35
IMPROVEMENT STRATEGIC
URGENCY MAGNITUDE FEASIBILITY AVERAGE INTERPRETATION
AREAS IMPORTANCE
Replacement of
dilapidated roofs
4 3 4 5 4 High Priority
for Grade 1 and 2
classrooms
Installation of
ceilings for Grade
4 3 4 5 4 High Priority
1 and 2
classrooms
Installation of
electrical system
5 5 5 5 5 Very High Priority
for Grade 1 and 2
classrooms
Construction of a
built-in hand
washing facility
and comfort room
in the temporary 5 5 4 5 4.75 Very High Priority
learning space
used as
Kindergarten
classroom
Procurement of
health and 5 5 5 5 5 Very High Priority
sanitary supplies
Acquisition of
school supplies 5 5 4 5 4.75 Very High Priority
and equipment
Establishment of
school-based
program for
5 5 4 5 4.75 Very High Priority
Science,
Mathematics and
Languages
36
Repair and
improvement of
4 3 4 3 3.5 High Priority
School Activity
Center
PLANNING WORKSHEET
Instruction: Align your input into the appropriate learning stage and intermediate outcomes. Root Cause/s Column shall only be filled in after the SPT
has conducted Root Cause Analysis and Voice of the Customers. PIAs on Infrastructure and Physical Facilities from other data gathering
templates MAY NO LONGER REQUIRE Root Cause Analysis. Fill in with color the expected time frame for the school to address a specific PIA.
Remember though that some PIAs may also be addressed in less than three years. Examples are provided for below:
37
room to
serve as
temporary
kindergarten
classroom
To construct
hand
Water, Sanitation
washing
and Hygiene
facility at the
(WASH) Facilities
entrance of
the school
To procure 3
units printer
and other
Other learning
office
facilities
supplies for
module
printing
To procure
health
equipment
and supplies
Secure Children’s such as
Health and Well- thermal
being scanner, foot
bath/dip,
face masks,
IO3: Learners enjoy learner-
face shields
friendly environment
and alcohol
To construct
school
Guarantee safe waiting area
and protective To repair
spaces for and improve
children the School
Activity
Center
IO4: Learners actively
38
participate in their learning
environment
IO5: Learners attain learning
standards
IO6: Learners are well-rounded,
happy and smart
PLANNING WORKSHEET for ACCESS and QUALITY
PRIORITY TIME FRAME
LEARNING DEPED INTERMEDIATE GENERAL ROOT
IMPROVEMENT
STAGE OUTCOMES OBJECTIVE/S CAUSE/S 2019- 2020 2020- 2021 2021- 2022
AREA
IO1: Learners are in school and
learning centers
IO2: Learners access programs To procure
responsive to their needs and prepaid wifi
consistent with their interests devices to
and aptitude be used in
downloading
4-6 Availability of modules,
basic social preparation
infrastructure and and
services: Internet submission
Connectivity of reports,
etc.
To provide
internet load
allowance to
teachers
To develop a
makeshift
room into a
Classroom and concrete
Seats room to
serve as
temporary
kindergarten
classroom
39
hand
washing
and Hygiene facility at the
(WASH) Facilities entrance of
the school
To procure 3
units printer
and other
Other learning
office
facilities
supplies for
module
printing
To procure
health
equipment
and supplies
Secure Children’s such as
Health and Well- thermal
being scanner, foot
bath/dip,
face masks,
IO3: Learners enjoy learner-
face shields
friendly environment
and alcohol
To construct
school
Guarantee safe waiting area
and protective To repair
spaces for and improve
children the School
Activity
Center
IO4: Learners actively
participate in their learning
environment
IO5: Learners attain learning
standards
IO6: Learners are well-rounded,
happy and smart
40
PROJECT WORK PLAN AND BUDGET MATRIX
PIA: Implementation of the Distance Learning Delivery Mode, Modular Print
PROBLEM STATEMENT: Strong and stable internet connection is one of the necessities nowadays. Since, face-to-
face encounters are discouraged due to COVID-19, internet provides a way for people to communicate faster and
share real-time information. This helps us to continue with our functions in the education system while being
protected from the transmission of the virus.
PROJECT OBJECTIVE STATEMENT: To procure prepaid WIFI devices and provide internet load allowance to
teachers to aid them in carrying out their functions in the new normal set-up of education
PROBLEM STATEMENT: Since kindergarten classroom is not yet available, the school intends to provide a
temporary learning space by developing a makeshift room that used to be a storage room into a concrete classroom.
This will ensure learners’ access to a safe and child-friendly environment and facilities.
PROJECT OBJECTIVE STATEMENT: To develop a makeshift room into a concrete room to serve as temporary
kindergarten classroom
Installation of
1 concrete
ceiling to the June 2019 – P16,956.00 MOOE/PTA/Other
room with School Head
Kindergarten March 2020 Materials – P12,560.00 Donations
ceiling Labor – P4,396.00
classroom
Painting of Painted walls June 2019 – School Head
walls and roof and roof of March 2020 P12,879.00 MOOE/PTA/Other
Materials – P9,540.00
of the Kindergarten Donations
42
Kindergarten
classroom Labor – P3,339.00
classroom
Electrical
Electrical
Installation on June 2021 – P10,887.75 MOOE/PTA/Other
wiring and School Head
Kindergarten March 2022 Materials – P8,065.00 Donations
lights Labor – P2,822.75
room
PROJECT WORK PLAN AND BUDGET MATRIX
PIA: Compliance to Health Protocol
PROBLEM STATEMENT: To ensure safety of teachers, visitors and household partners whenever they are at school,
preventive measures and basic health protocol must be implemented. To realize these, health equipment, supplies and
facilities must be readily available in school.
PROJECT OBJECTIVE STATEMENT: To construct an additional handwashing facility at the school entrance.
Construction of
Additional Hand Hand Washing September 2020 School Head P27,000.00 MOOE
Washing Facility Facility
43
PROJECT WORK PLAN AND BUDGET MATRIX
PIA: Implementation of the Distance Learning Delivery Mode, Modular Print
PROBLEM STATEMENT: Due to the pandemic Covid-19, the Department of Education declared that there will be
no face-to-face classes for the SY 2020-2021. Maganda Elementary School will be adapting the most feasible
distance learning delivery mode for its learners, which is the modular print.
PROJECT OBJECTIVE STATEMENT: To procure equipment and supplies to ensure uninterrupted printing and
delivery of modules to learners
*Purchase of additional book paper is expected, depending on the duration of the Distance Learning Delivery Mode – Modular,
Print.
PROBLEM STATEMENT: To ensure safety of teachers, visitors and household partners whenever they are at school,
preventive measures and basic health protocol must be implemented. To realize these, health equipment, supplies and
facilities must be readily available in school.
PROBLEM STATEMENT: To ensure safety of teachers, visitors and household partners whenever they are at school,
preventive measures and basic health protocol must be implemented. To realize these, health equipment, supplies and
facilities must be readily available in school.
Construction of
School Waiting School Waiting August 2020 School Head P30,000.00 MOOE
Area Area
46
PROJECT WORK PLAN AND BUDGET MATRIX
PIA: Compliance to Health Protocol
PROBLEM STATEMENT: Though the school is now implementing a distance learning delivery mode, it is being hoped
for that the COVID-19 pandemic will end soon and face-to-face classes will resume. In preparation for this, the school
must prepare the physical facilities to ensure the students’ safety within the school premises.
PROJECT OBJECTIVE STATEMENT: To repair and improve the School Activity Center
P47,142.00
Repair and
Repaired and Materials –
Improvement of June 2021 – MOOE / PTA/
Improved School School Head P34,920.00
School Activity December 2022 Other Donations
Activity Center
Center
Labor –
P12,222.00
47
PROJECT TEAMS
PROJECT TEAM A
Assigned PIA: Internet Connectivity
PROJECT TEAM B
Assigned PIA: Temporary Kindergarten Classroom
PROJECT TEAM C
Assigned PIA: Construction of WASH Facility
PROJECT TEAM D
Assigned PIA: Provide S.M.I.L.Es amidst Pandemic
Students’ Modules to Introduce new Learning Experiences
(Implementation of the Distance Learning Delivery Mode, Modular Print)
49
and office supplies for module printing
PROJECT TEAM E
Assigned PIA: Compliance to Health Protocol
PROJECT TEAM F
Assigned PIA: Construction of WASH Facility
50
DOLORES A. AROY Assistant Team Leader To check completion of procurement
process
PROJECT TEAM G
Assigned PIA: Construction of WASH Facility
51