PROJECT : LTA CONTRACT J101


BORED PILING WORKS

CLIENT : TPW ENGINEERING PTE LTD

Certificate of Inspection

for

Machinery Access For Crane & Boring Rig


From A2 to A6, Lighting Gantry

Date : 05 Jun 2023


Reference: LMCPL-P2023-02-COS-12
Revision: -
Prepared by: LLF

Landmark Consultant Pte. Ltd.


International Merchandise Mart Post Office
PO Box. 1025
Singapore916011
CONSULTANT PTE LTD

CERTIFICATE OF INSPECTION

I, Lee Ee Hui, hereby certify that the Machinery Access for Crane & Boring Rig
from A2 to A6, Lighting Gantry has been properly constructed and structurally
sound.

_______________________________ 05 Jun 2023__


Professional Engineer Date
Signature and Stamp

LMCPL-P2023-02-COS-12
CONSULTANT PTE LTD

APPENDIX : SITE AS-BUILT PHOTOS

LMCPL-P2023-02-COS-12
SAF SW SM SC 02 Sheet of 03
89950 97200 89450

PTP-04 BUILDING AND CONSTRUCTION


AUTHORITY
APPROVED UNDER SECTION 5/ SECTION 5A
OF THE BUILDING CONTROL ACT (CHAPTER 29)

Project Ref No: A1430-45800-2020-ST10

for Commisioner of Building Control

PTP-02

S20 RJ/G033/WSP

I ON A L EN
ACCREDITED CHECKER
SS G
E
I N

NO. 1136
O
E E

PR

CIVIL
R

HO CHONG LEONG
in AC Organisation

R=100.000m
TAN CHUAN BOON

R=100.000m
R=100.000m
RJ/G052 Registration No. A069

R=100.000m

R=100.000m
4698 BUILDING CONTROL ACT
SI E

R=100.0
R SINGAPORE

R=100.0
NGA
P O

R=100.000m
R=100.00
R=100

00m
R=100.000m
R=100.000m

R=100.0

00m
0m

50527
R=100.000m

00m
.000m

R=100.0

R=100.000m
R=100.

R=100
R=100.0
00m
R=100.0

R=100.000
00m
000m

R=100.000
R=100.

.000m
00m

m
R=10

R=120

R=100.0
R=100.000m

R=100.0
000m

R=100
R=100.0
RJ/G051

00m
0.000

.000m

00m
m

R=10
R=1
56200 59410 36840 46330 58100 9769

00m

.000m

R=10
R=10
00.0

0.000
R=1

R=10

R=1
m
0

R=400.000m
00m

R=10

0.000

R=1
0.000
00.0

R=100.0
1300 1300 3 47

00.0

m
130 5 1300 4575

0.000
13 4588 7

0.00

00.0
2995

R=10
2587 13 00

m
00m

00m
3568

R=140.000m
8 3

00m
0m
J101-262 292 2864

00m
0.00
R=1

81
76


°


.7

0m
R=140.0
68.0

.58
00.0

.15 0-1:7

°

J101-335

69.0
6 4 .7
79

360
RJ/G032/PLS

60E1-140-1:7

60E1-14 00m
36 00

36 00
0
00m

3600

3600
R=140.000m
3600
LG1A J101-115

R=1
TO140
A6-P08

R=140.0

R=1
R=140

00.0
COL +5.275 3219 J101-228 A5-P08 J101-177 A4-P08 A3-P08 A2-P08 A1-P08

00.0
00m

R=140
J101-168

00m
.000m
COL +5.275 COL +5.275 COL +5.275 COL +5.275 COL +5.275

00m
RJ/G126

.000m
60E1-140-1:7
1300

R=100.000m
TO144
R=14

R=14

R=14
0.00

0.00
0m

0m

0.00
0m
R = 14
0.0 0
RJ/G125

R=1

R=400.000m
0m

40000
60E1-140-1:7
Machinery Access

4 0 .0
R=14

TO138
0 0m
R=

60E

R=14
0. 000
140

60 E
m
.0 0

1-1

0.000
0m
35280 43080 44140 31100 48240 37089

R=140.000m

m
7

R=
1-14 TO
60

14
E1

0-1: 146
40-1 T O 15
-1 40

0 .0
1300

:7 4
40 T 63

98

00
2056 130
3500 0

m
-1 O 1

33
:7 7 1300
2865
J101-281A 6 591 13

00
3 00

°
60E17 2

13


36

6 2 .6
36

.04
00

°
RJ/G050 00


45.95

70.2
00
°

R=100
36

42.50
R=14

1:7
360

42 .1
R=

R=100.000m

3600

R= 6
3600
14

R =1
LG1B RJ/G124

14 0E
0.00
J101-87

-140- TO143
J101-179 J101-133

0 .0

00
.000m
J101-230A

0 .0 1 -1
RJ/G007/PRM,PZS

40 .0
00

0m
A12-P08

33
00 40
m
A11-P08

R=140.000m
A7-P08

TO
A9-P08 A8-P08

6 0E 0 0m

m -1 :7
A10-P08

17
COL +5.275 J101-169

4
R=10
COL +5.275 COL +5.275

7
COL +5.275 COL +5.275

1-14 T O
COL +5.275

R=

60E1-140-1:7

00
R=
0.00

R=
R=300.0

13
0-1: 15 0

14 0

0m

TO137

140.
140.
.0 0
R=

00m
14

0m

0 00m
0 00

60
m
0 .0

E1
R= RJ/G031/WSP

00
m

-1 4
14

R=
0 .0

60

0 -1
14

T O :7
17
00

E1

2
m

0 .0
-1 4

0 0m
0 -1 T O

R=
R=1
:7 1 5 2
RJ/G123

14
60E1-140-1:7

0 .0
00
TO136
R=

m
R=140

40.000
14

R=140

m
0 .0

60

R=140.000m
00

E1
m

.000m

.000m
-1 4
0 -1 T O
:7 1 7 5

R=140.000m
R=1
40.0

60E1-140-1:7
00m

TO139

R=
14 0
.00
0m
60
E1
-1 4

R=
R=
R=

60E
14
14

140
0 .0

1 -1
0.0

00
:7 1 5 5

.0 0
00

m
0 -1 T O m

0m

4 0-1 TO 1
F1 F44 B1 B24 G1 G25

:7 4 9

R=100.0
FA

00m
SC

R=1
00.0
R=140.000m
PTP-05

60E1-140-1:7

00m
TO135
R=140
SAF

.000m
R=1

60E1-140-1:7
0 0.0

R=100

N
TO142

R=140.000m
0 0m

.000

S2 S20 W5 W29
m

R=14
KEY PLAN

0.00
0m
LIGHTING GANTRY TYPE 1 PILING LAYOUT PLAN

R=1
0 5 10 20 Meters

00.0
SCALE 1 : 500

00m
60

R=
FOR APPROVAL
TO

Scale 1:500
NOTES: Qualified Person Endorsement : Contractor : Contractor's C&S and M&E Engineer:
1. ALL DIMENSIONS ARE IN MILIMETERS (mm) AND ELEVATIONS ARE IN METERS (m).
2. FOR PILING GENERAL NOTES, REFER TO DRAWINGS J101/DPT/GN/1033 & J101/DPT/GN/1034.
3. FOR STRUCTURAL CONCRETE WORKS GENERAL NOTES, REFER TO DRAWINGS J101/DPT/GN/0013,
J101/DPT/GN/0014 & J101/DPT/GN/0015. WSP Consultancy Pte. Ltd.
LEGEND: CHINA RAILWAY 11 BUREAU GROUP CORPORATION
A1 - P08 #08-07 Nordcom One, 3 Gambas Crescent, Singapore 757088
Project Title: Drawing Title:

PILING SCHEDULE CONTRACT J101 LIGHTING GANTRY TYPE 1


DENOTE PILE TYPE DESIGN AND CONSTRUCTION OF
LEGEND PILE TYPE SIZE ( ) mm
DENOTE PILE AREA LTA Endorsement : Contractor's Architect: TENGAH DEPOT AND ASSOCIATED PILING LAYOUT PLAN
P08 800 - BOREHOLE LOCATION FACILITIES FOR JURONG REGION LINE
Designed: Checked: Approved: Drawing Number: Rev. Sheet
- BOREHOLE LOCATION FOR PTP TYX/HJM TCB TCB
ONG&ONG Pte Ltd
Z/J101/DPT/CGS/3400 - 1 of 1
#11-00 SLF Building, 510 Thomson Rd, Singapore 298135
Tel : +65 6258 8666 Fax : +65 6259 8648 Email: info@ong-ong.com Scale: Drawn: Date:
- 21/10/2022 SG ISSUED FOR BCA SUBMISSION - ST10 WW TCB TCB
Model File Name: J101---_Z_S_WSPSG_LG_SHEET_C&S_S0_--_R20 Rev. Date Drawn By Description Designed By Chk'd App'd
As indicated SG JUL 2022 Cad File Name: ZJ101DPT-CGS3400- A1
CONSULTANT PTE LTD

LMCPL-P2023-02-COS-12
CONSULTANT PTE LTD

LMCPL-P2023-02-COS-12
CONSULTANT PTE LTD

LMCPL-P2023-02-COS-12

You might also like