The Client The Consultant The Contractor

Project : Construction Work For Power Supply To New


Package No :
Jetty At Al Yassat Al Soflah Island
Ref. : P742-RCC-SO-0001
DOCUMENT SUBMITTAL Revision : 00

Originator : Engr. Khaled Jamal Date : 27 November 2023


Signature : :
✓ For Approval For Information For Review Others

TYPE OF SUBMITTAL

Discipline Architectural Struct./Civil ✓ Electrical Plumbing Mechanical Others

✓ TECHNICAL SEQUENCE OF OPERATION & CONTROL PHILOSOPHY FOR AMF SYSTEM


MODIFICATION FOR PS 1 & PS2

Enclosure
M. Statement Test Results ✓ Pre Qualification Certificate Others

Signed by the Contractor : Date :


Received by the Engineer : Date :

Status
Consultant Comments: A : No Objection

B : No Objection with Comments

C : Objection/ Rejected, Resubmit

Signed by the Consultants : Date : …………………………………………….

Client Date : …………………………………………….

Issue 1, Revision 0
Page 1 of 1 Document Submittal
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

INFRASTRUCTURE SERVICES FOR NEW JETTY AL YASAT


Project Title
AL YASAT AL SOFLAH ISLAND
Client THE PRIVATE DEPARTMENT OF PRESIDENT OF THE UNITED ARAB EMIRATES
Contractor Power Economy, Abu Dhabi, U.A.E

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 1 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Contents
1. Introduction ................................................................................................................................................................................................... 3
2. System construction ....................................................................................................................................................................................... 3
3. General Control Philosophy ........................................................................................................................................................................... 4

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 2 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

1. Introduction
The new modification in AMF system is designed to integrate additional new load (New Jetty) in Power Station 1 & 2. In the existing
system, Generators fulfilled the complete load demand when there is no utility Power supply are connected. The system consist of one utility
power supply in each bus of existing system and Utility incomers will supply complete load if load is less than 12MW. If the load increase
more than 12MW, the generators in bus section will start , synchronize with incomer 1 and disconnect the incomer 1 in bus section 1 and
feed only new jetty feeder. Upon failure of all incomers, generators will be started, synchronize with bus and supply the load demands except
New jetty. If the load demand is more than connected generators capacity, the least priority outgoing feeders will be disconnected. The
detailed sequence of operation is given below.

2. System construction
AMF/LMS & GCP
The Existing AMF/LMS panel consist of Major components like Siemens Make S7-1500 Redundant CPU with Simplex IOs, Panel PC for
HMI for local monitoring, Woodward LS-5 controllers for incomers and bus couplers etc. AMF/LMS panel interfaced with local generator
control panel. The LS-5 will be communicated with Woodward Easygen 3500 controllers in GCP, which enable the utility supply to
synchronize with generator supply. Existing I/O module in Common Control Panel is interfaced with the Redundant CPU in the AMF/LMS
panel .

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 3 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

3. General Control Philosophy

Pre-conditions

1 AMF selector switch in Auto position

2. Mode selector switch in all GCPs. are in Auto position

3. Local/Remote selector in switchgear panels are in Remote position

4. No fault in Generators and switchgear

Sl.
No. Component Action/Result Remarks
Pre-condition
AMF Mode selector AMF Mode

RGCP Mode Selector In Auto


11kVSwitch gear In Remote

Generator Local panel In Auto


1 Normal Operation-Load is Less than 12MVA
Incomer – 1 [K02] CB Close

Incomer – 2 [K21] CB Close

Bus Coupler [-] CB Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 4 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 3,4,5 – Bus 1 Ready in Auto


Gen 1,7,8 – Bus 2 Ready in Auto

Gen 3,4,5 Incomer – Bus 1 CB Open

Gen 1,7,8 Incomer – Bus 2 CB Open


Bus 1 Feeders CB Close

Bus 2 Feeders CB Close

Bus 1 –Jetty Feeders CB Close

All Spare Feeders CB Open

2 If Load is More than 12MVA

Gen 3,4,5– Bus 1 Generators Start Generator-3,4&5 Start

Gen Synchronize with Bus -01,Then close Generators Breaker


Gen 3,4,5Incomer – Bus 1 Synchronize & CB Close
3, 4&5.

After closing bus-01 Generator Breakers then Open Incomer-


Incomer – 1 [K02] CB Open
01 Breaker.

Incomer – 2 [K21] CB Remains Close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 5 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus Coupler [-] CB Remains Open

Gen 1,7,8– Bus 2 Ready in Auto

Gen 1,7,8 Incomer – Bus 2 CB Remain Open

All bus-01 outgoing feeders opens, except New jetty feeder


Bus 1 Feeders All bus-01 feeders will open.
breaker.

Bus 2 Feeders CB Remain Close

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

3 Restoration of Incomer01 If Load is less than 12MVA

Bus Coupler [-] CB Close with Sync Check with Bus - 2

Incomer-01 Momentary synchronization with bus-01 and


Incomer – 1 [K02] CB Closes
incomer 01 CB close.

Gen 3,4,5 Incomer - Bus 1 CB Open’s And open Bus-01 generator breaker.

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 6 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

After open generator’s breaker, the generators will go to cool


Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

New Jetty Feeder remains close &


Bus 1 Feeders remaining feeder will close one by one HOW PRIORITY FEEDERS ARE DECIDED?
depend upon priority.

Bus 2 Feeders CB Remains Close

Bus 1 –Jetty Feeders CB Remains Close WHY THIS IS REPEATED?


All Spare Feeders CB Remain Open

After closing, the all bus-01 outgoing feeders Then open the
Bus Coupler [-] CB Open
bus coupler breaker.

Incomer – 2 [K21] CB Remains Close

Gen 1,7,8– Bus 2 Ready in Auto

Gen 1,7,8 Incomer – Bus 2 CB Remain Open

4 Incomer - 1 Fails

Incomer – 1 [K02] CB Opens

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 7 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer – 2 [K21] CB Remains Close


Bus Coupler [-] CB Remains Open

Bus 1 Feeders All bus-01 feeders will open.

Gen 3,4,5– Bus 1 Generators Start Generator-3,4&5 Start

Gen Synchronize with Bus -01,Then close Generators Breaker


Gen 3,4,5Incomer – Bus 1 Synchronize & CB Close
3, 4&5.

Gen 1,7,8– Bus 2 Ready in Auto

Gen 1,7,8Incomer – Bus 2 CB Remain Open

Bus 2 Feeders CB Close

Only Jetty Feeder Breaker will close , other feeders in Bus 1


Bus 1 –Jetty Feeders CB Close
remain open.

All Spare Feeders CB Remain Open

5 Incomer - 1 Restores after Failure


Bus Coupler [-] CB Close Bus coupler breaker will close then bus-01 sync-up with
incomer-02.

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 8 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer-01 Momentary synchronization with bus-01


Incomer – 1 [K02] CB Closes
Generator’s then closes the Incomer-01 breaker.
Gen 3,4,5 Incomer – Bus 1 CB Open’s And open Bus-01 generator breaker.

After open generator’s breaker, the generators will go to cool


Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.
New Jetty Feeder remains close &
Bus 1 Feeders remaining feeder will close one by one
PRIORITY FEEDERS?
depend upon priority.
Bus 2 Feeders CB Remains Close

Bus 1 –Jetty Feeders CB Remains Close

All Spare Feeders CB Remain Open


After closing, the all bus-01 outgoing feeders Then
Bus Coupler [-] CB Open
automatically bus coupler breaker will open.

Incomer – 2 [K21] CB Remains Close

Gen 1,7,8 Incomer – Bus 2 CB Remain Open

6 Incomer - 2 Fails

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 9 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer – 1 [K02] CB Remains Close

Incomer – 2 [K21] CB Opens

Bus Coupler [-] CB Opens IS BC NORMALLY OPEN? FIRST CB SHOULD CLOSE

All bus01 outgoing feeders will open


Bus 1 Feeders
except New jetty feeder

Bus 2 Feeders All bus02 outgoing feeders will open DG SHOULD START, AND SYCHRONISE THEN BC SHOULD OPEN

Gen 1,7,8– Bus 2 Generators Start Generator-1,7&8 Start

Gen Synchronize with Bus -02, Then close Generators


Gen 1,7,8 Incomer – Bus 2 Synchronize & CB Close
Breaker 1, 7&8.
Bus 2 Feeders CB Close Then All bus02 outgoing feeders will close on priority base.

Gen 3,4,5– Bus 1 Ready in Auto

Gen 3,4,5 Incomer – Bus 1 CB Remain Open


Bus 1 –Jetty Feeders CB Remain Close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 10 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

All Spare Feeders CB Remain Open

7 Incomer - 2 Restores after Failure

Bus Coupler [-] CB Close When incomer-02 power supply restores, then close the bus-
coupler breaker.
Gen 1,7,8-Bus 2 Synchronize in Auto Generators-1,7&8 Synchronize with incomer-01

Incomer-02 CB Momentary synchronization with bus-and


Incomer –2 [K21] CB Closes
closes
After closing the incomer-02 breaker, open all bus-02
Gen 1,7,8Incomer – Bus 2 CB Open
generator breaker’s

After open generator’s breaker, the generators will go to cool


Gen 1,7,8– Bus 2 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

All bus01 outgoing feeders will close


Bus 1 Feeders PRIORITY?
depend upon priority base
Bus 2 Feeders CB Remain Close
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 11 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

Bus Coupler [-] CB Open After closing both side outgoing feeder, bus coupler will open
automatically.
8 Both Incomers Fails

Incomer – 1 [K02] CB Opens

Incomer – 2 [K21] CB Opens

Bus Coupler [-] CB Closes

Bus 1 Feeders All bus01 outgoing feeders will open


Bus 2 Feeders All bus02 outgoing feeders will open

Gen 3,4,5– Bus 1 Generators Start & Synchronize in Auto

Gen 1,7,8– Bus 2 Generators Start & Synchronize in Auto

Gen 3,4,5Incomer – Bus 1 CB Closes

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 12 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 1,7,8Incomer – Bus 2 CB Closes

Bus-01 Feeders will close one by one


depend upon the priority, except New
Bus 1 Feeders
Jetty Feeder. Least priority breaker will
open when load is increases.

Bus-02 Feeders will close one by one


Bus 2 Feeders depend upon the priority. Least priority
breaker will open when load is increases.

Bus 1 –Jetty Feeders CB Opens

All Spare Feeders CB Opens

9 Only Incomer - 1 Restores after Both incomer Failure


Incomer – 1 [K02] CB Closes With synchronization between Mains and Generators

Incomer – 2 [K21] CB Remains Open


All bus01 outgoing feeders will open and
Bus 1 Feeders
New jetty feeder will close

Bus 2 Feeders All bus02 outgoing feeders remains close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 13 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 1,7,8– Bus 2 Bus02 Generator will run continuously


Gen 1,7,8Incomer – Bus 2 CB Remains Close

Bus 2 Feeders CB Close

After open generator’s breaker, the generators will go to cool


Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

Gen 3,4,5Incomer – Bus 1 CB Open

Bus 1 –Jetty Feeders CB Remain Close


All Spare Feeders CB Remain Open

Bus coupler will open automatically if above conditions are


Bus Coupler [-] CB Open
satisfied.

10 Only Incomer - 2 Restores after Both incomers Failure

Incomer – 1 [K02] CB Remains Open

Incomer – 2 [K21] CB Closes Synchronization with Bus 02

Gen 1,7,8 Incomer – Bus 2 CB Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 14 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

All bus01 outgoing feeders will open and


Bus 1 Feeders
New jetty feeder CB close
Bus 2 Feeders All bus02 outgoing feeders remains close

Gen 3,4,5– Bus 1 Bus01 Generator will run continuously


Gen 3,4,5Incomer – Bus 1 CB Remains Close

After open generator’s breaker, the generators will go to cool


Gen 1,7,8– Bus 2 Ready in Auto down conditions and then all bus-02 generators will stop
automatically after completing cool down time.

All Spare Feeders CB Remain Open

Bus coupler will open automatically if above conditions are


Bus Coupler [-] CB Open
satisfied.

11 Both Incomers Restore if load is less than 12MW


Incomer – 1 [K02] CB Closes

Incomer – 2 [K21] CB Closes With synchronization between Mains and Generators

Bus Coupler [-] CB Opens

Gen 3,4,5Incomer – Bus 1 CB Opens After soft transfer of load from Generator to Mains

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 15 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 1,7,8Incomer – Bus 2 CB Opens After soft transfer of load from Generator to Mains
After open generator’s breaker, the generators will go to cool
Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

After open generator’s breaker, the generators will go to cool


Gen 1,7,8– Bus 2 Ready in Auto down conditions and then all bus-02 generators will stop
automatically after completing cool down time.

Bus 1 Feeders CB Remain Close


Bus 2 Feeders CB Remain Close

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

12 Both Incomers Restore if load is greater than 12MW


Gen 3,4,5– Bus 1 Bus01 Generator will run continuously

Gen 1,7,8– Bus 2 Bus02 Generator will run continuously

Incomer 1 Voltage available & CB


Incomer – 1 [K02]
Remains Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 16 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer 2 Voltage available & CB Sync


Incomer – 2 [K21]
and close

Gen 1,7,8 Incomer – Bus 2 CB Opens

Bus Coupler [-] CB Opens

Gen 1,7,8– Bus 2 Ready in Auto

All bus01 outgoing feeders will open and


Bus 1 Feeders
New jetty feeder CB close

Bus 2 Feeders CB Remain Close

All Spare Feeders CB Remain Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 17 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

INFRASTRUCTURE SERVICES FOR NEW JETTY AL YASAT


Project Title
AL YASAT AL SOFLAH ISLAND
Client THE PRIVATE DEPARTMENT OF PRESIDENT OF THE UNITED ARAB EMIRATES
Contractor Power Economy, Abu Dhabi, U.A.E

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 1 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Contents
1. Introduction ................................................................................................................................................................................................... 3
2. System construction ....................................................................................................................................................................................... 3
3. General Control Philosophy ........................................................................................................................................................................... 4

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 2 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

1. Introduction
The new modification in AMF system is designed to integrate additional new load (New Jetty) in Power Station 1 & 2. In the existing
system, Generators fulfilled the complete load demand when there is no utility Power supply are connected. The system consist of one utility
power supply in each bus of existing system and Utility incomers will supply complete load if load is less than 12MW. If the load increase
more than 12MW, the generators in bus section will start , synchronize with incomer 1 and disconnect the incomer 1 in bus section 1 and
feed only new jetty feeder. Upon failure of all incomers, generators will be started, synchronize with bus and supply the load demands except
New jetty. If the load demand is more than connected generators capacity, the least priority outgoing feeders will be disconnected. The
detailed sequence of operation is given below.

2. System construction
AMF/LMS & GCP
The Existing AMF/LMS panel consist of Major components like Siemens Make S7-1500 Redundant CPU with Simplex IOs, Panel PC for
HMI for local monitoring, Woodward LS-5 controllers for incomers and bus couplers etc. AMF/LMS panel interfaced with local generator
control panel. The LS-5 will be communicated with Woodward Easygen 3500 controllers in GCP, which enable the utility supply to
synchronize with generator supply. Existing I/O module in Common Control Panel is interfaced with the Redundant CPU in the AMF/LMS
panel .

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 3 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

3. General Control Philosophy

Pre-conditions

1 AMF selector switch in Auto position

2. Mode selector switch in all GCPs. are in Auto position

3. Local/Remote selector in switchgear panels are in Remote position

4. No fault in Generators and switchgear

Sl.
No. Component Action/Result Remarks
Pre-condition
AMF Mode selector AMF Mode

RGCP Mode Selector In Auto


11kVSwitch gear In Remote

Generator Local panel In Auto


1 Normal Operation-Load is Less than 12MVA
Incomer – 1 [K02] CB Close

Incomer – 2 [K21] CB Close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 4 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus Coupler [-] CB Open


Gen 3,4,5 – Bus 1 Ready in Auto

Gen 1,2,7 – Bus 2 Ready in Auto

Gen 3,4,5 Incomer CB Open

Gen 1,2,7 Incomer CB Open

Bus 1 Feeders CB Close


Bus 2 Feeders CB Close

Bus 1 –Jetty Feeders CB Close

All Spare Feeders CB Open

2 If Load is More than 12MVA

Gen 3,4,5 – Bus 1 Generators Start Generator-3,4&5 Start

Gen 3,4,5Incomer Synchronize & CB Close Gen Sync with Bus 01 Then close Generators Breaker 3, 4&5.

After closing bus-01 Generator Breakers then Open Incomer-


Incomer – 1 [K02] CB Open
01 Breaker.

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 5 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer – 2 [K21] CB Remains Close

Bus Coupler [-] CB Remains Open

Gen 1,2,7 – Bus 2 Ready in Auto

Gen 1,2,7 Incomer CB Remain Open

All bus-01 outgoing feeders opens, except New Jetty feeder


Bus 1 Feeders All bus-01 feeders will open.
breaker.

Bus 2 Feeders CB Remain Close


Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

3 Restoration of Incomer01 If Load is less than 12MVA

Bus Coupler [-] CB Close with Sync check with Bus -2

Incomer-01 Momentary synchronization with bus-01 and


Incomer – 1 [K02] CB Closes
incomer 01 CB close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 6 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 3,4,5 Incomer CB Open’s And open Bus-01 generator breaker.

After open generator’s breaker, the generators will go to cool


Gen 3,4,5 – Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

New Jetty Feeder remains close &


Bus 1 Feeders remaining feeder will close one by one
depend upon priority.

Bus 2 Feeders CB Remains Close

Bus 1 –Jetty Feeders CB Remains Close


All Spare Feeders CB Remain Open

After closing, the all bus-01 outgoing feeders Then open the
Bus Coupler [-] CB Open
bus coupler breaker.

Incomer – 2 [K21] CB Remains Close

Gen 1,2,7 – Bus 2 Ready in Auto

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 7 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 1,2,7 Incomer CB Remain Open

4 Incomer - 1 Fails
Incomer – 1 [K02] CB Opens
Incomer – 2 [K21] CB Remains Close
Bus Coupler [-] CB Remains Open

Bus 1 Feeders All bus-01 feeders will open.

Gen 3,4,5 – Bus 1 Generators Start Generators-3,4&5 Start

Gen Synchronize with Bus -01 Then close generators breaker


Gen 3,4,5 Incomer – Bus 1 Synchronize & CB close
3,4,5
Gen 1,2,7 – Bus 2 Ready in Auto

Gen 1,2,7Incomer CB Remain Open

Bus 2 Feeders CB Close

Only jetty feeder breaker will close ,other feeders in bus 1


Bus 1 –Jetty Feeders CB Close
remains open.

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 8 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

All Spare Feeders CB Remain Open

5 Incomer - 1 Restores after Failure


Bus Coupler [-] CB Close Bus coupler breaker will close then bus-01 sync-up with
incomer-02.
Incomer-01 Momentary synchronization with bus-01
Incomer – 1 [K02] CB Closes
Generator’s then closes the Incomer-01 breaker.

Gen 3,4,5 Incomer CB Open’s And open Bus-01 generator breaker.

After open generator’s breaker, the generators will go to cool


Gen 3,4,5 – Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

New Jetty Feeder remains close &


Bus 1 Feeders remaining feeder will close one by one
depend upon priority.
Bus 2 Feeders CB Remains Close

Bus 1 –Jetty Feeders CB Remains Close


All Spare Feeders CB Remain Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 9 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

After closing, the all bus-01 outgoing feeders Then


Bus Coupler [-] CB Open
automatically bus coupler breaker will open.

Incomer – 2 [K21] CB Remains Close

Gen 1,2,7 Incomer – Bus 2 CB Remain Open

6 Incomer - 2 Fails

Incomer – 1 [K02] CB Remains Close

Incomer – 2 [K21] CB Opens

Bus Coupler [-] CB Opens

All bus01 outgoing feeders will open


Bus 1 Feeders
except New jetty feeder

Bus 2 Feeders All bus02 outgoing feeders will open

Gen 1,2,7 – Bus 2 Generators Start Generators-1,2&7 Start

Gen Synch with bus 02 and close the generator breaker 1,2 &
Gen 1,2,7 incomer – Bus 2 Synchronize & CB closd
7

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 10 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus 2 Feeders CB Close Then All bus02 outgoing feeders will close on priority base.
Gen 3,4,5 – Bus 1 Ready in Auto

Gen 3,4,5Incomer CB Remain Open

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

7 Incomer - 2 Restores after Failure

When incomer-02 power supply restores, then close the bus-


Bus Coupler [-] CB Close
coupler breaker.

Gen 1,2,7 – Bus 2 Synchronize in Auto Generators-1,2&7 Synchronize with incomer-01

Incomer –2 [K21] CB Closes Incomer-02 CB Momentary synchronization with bus-and


close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 11 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Gen 1,2,7Incomer CB Open After closing the incomer-02 breaker, open all bus-02
generator breaker’s

After open generator’s breaker, the generators will go to cool


Gen 1,2,7 – Bus 2 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

All bus01 outgoing feeders will close


Bus 1 Feeders
depend upon priority base
Bus 2 Feeders CB Remain Close

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

Bus Coupler [-] CB Open After closing both side outgoing feeder, bus coupler will open
automatically.
8 Both Incomers Fails
Incomer – 1 [K02] CB Opens

Incomer – 2 [K21] CB Opens

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 12 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus Coupler [-] CB Closes


Bus 1 Feeders All bus01 outgoing feeders will open

Bus 2 Feeders All bus02 outgoing feeders will open

Gen 3,4,5 – Bus 1 Generators Start & Synchronize in Auto

Gen 1,2,7 – Bus 2 Generators Start & Synchronize in Auto

Gen 3,4,5Incomer CB Closes

Gen 1,2,7Incomer CB Closes

Bus-01 Feeders will close one by one


depend upon the priority, except New
Bus 1 Feeders
Jetty Feeder. Least priority breaker will
open when load is increases.

Bus-02 Feeders will close one by one


Bus 2 Feeders depend upon the priority. Least priority
breaker will open when load is increases.

Bus 1 –Jetty Feeders CB Opens

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 13 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

All Spare Feeders CB Opens

9 Only Incomer - 1 Restores after Both incomer Failure


Incomer – 1 [K02] CB Closes With synchronization between Mains and Generators

Incomer – 2 [K21] CB Remains Open


All bus01 outgoing feeders will open and
Bus 1 Feeders
Jetty feeder close

Bus 2 Feeders All bus02 outgoing feeders remains close

Gen 1,2,7 – Bus 2 Bus02 Generator will continuously run

Gen 1,2,7Incomer CB Remains Close

Bus 2 Feeders CB Close

After open generator’s breaker, the generators will go to cool


Gen 3,4,5 – Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.
Gen 3,4,5Incomer CB Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 14 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Bus 1 –Jetty Feeders CB Remain Close


All Spare Feeders CB Remain Open

Bus coupler will open automatically if above conditions are


Bus Coupler [-] CB Open
satisfied.

10 Only Incomer - 2 Restores after Both incomers Failure

Incomer – 1 [K02] CB Remains Open

Incomer – 2 [K21] CB Closes With synchronization between Mains and Generators

Gen 1,2,7 Incomer - Bus 2 CB Open

All bus01 outgoing feeders will open and


Bus 1 Feeders
New jetty feeder wil close

Bus 2 Feeders All bus02 outgoing feeders remains close


Gen 3,4,5 – Bus 1 Bus01 Generator will continuously

Gen 3,4,5Incomer CB Remains Close

Bus 2 Feeders CB Close

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 15 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

After open generator’s breaker, the generators will go to cool


Gen 1,2,7 – Bus 2 Ready in Auto down conditions and then all bus-02 generators will stop
automatically after completing cool down time.

Gen 1,2,7Incomer CB Open

Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

Bus coupler will open automatically if above conditions are


Bus Coupler [-] CB Open
satisfied.

11 Both Incomers Restore if load is less than 12MW


Incomer – 1 [K02] CB Closes
With synchronization between Mains and Generators
Incomer – 2 [K21] CB Closes

Bus Coupler [-] CB Opens

Gen 3,4,5Incomer – Bus 1 CB Opens After soft transfer of load from Generator to Mains
Gen 1,2,7 Incomer – Bus 2 CB Opens After soft transfer of load from Generator to Mains

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 16 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

After open generator’s breaker, the generators will go to cool


Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.

After open generator’s breaker, the generators will go to cool


Gen 1,2,7– Bus 2 Ready in Auto down conditions and then all bus-02 generators will stop
automatically after completing cool down time.

Bus 1 Feeders CB Remain Close

Bus 2 Feeders CB Remain Close


Bus 1 –Jetty Feeders CB Remain Close

All Spare Feeders CB Remain Open

12 Both Incomers Restore if load is greater than 12MW


Gen 3,4,5– Bus 1 Bus01 Generator will run continuously

Gen 1,2,7– Bus 2 Bus02 Generator will run continuously

Incomer 1 Voltage available & CB


Incomer – 1 [K02]
Remains Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 17 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND

Sl.
No. Component Action/Result Remarks

Incomer 2 Voltage available & CB Sync


Incomer – 2 [K21]
and close

Gen 1,2,7 Incomer – Bus 2 CB Opens

Bus Coupler [-] CB Opens

Gen 1,2,7– Bus 2 Ready in Auto

All bus01 outgoing feeders will open and


Bus 1 Feeders
New jetty feeder CB close

Bus 2 Feeders CB Remain Close

All Spare Feeders CB Remain Open

Ref. Title:
Originator VB Sequence of Operation for New proposed Modification

Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 18 of 18