TYPE OF SUBMITTAL
Enclosure
M. Statement Test Results ✓ Pre Qualification Certificate Others
Status
Consultant Comments: A : No Objection
Issue 1, Revision 0
Page 1 of 1 Document Submittal
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 1 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Contents
1. Introduction ................................................................................................................................................................................................... 3
2. System construction ....................................................................................................................................................................................... 3
3. General Control Philosophy ........................................................................................................................................................................... 4
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 2 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
1. Introduction
The new modification in AMF system is designed to integrate additional new load (New Jetty) in Power Station 1 & 2. In the existing
system, Generators fulfilled the complete load demand when there is no utility Power supply are connected. The system consist of one utility
power supply in each bus of existing system and Utility incomers will supply complete load if load is less than 12MW. If the load increase
more than 12MW, the generators in bus section will start , synchronize with incomer 1 and disconnect the incomer 1 in bus section 1 and
feed only new jetty feeder. Upon failure of all incomers, generators will be started, synchronize with bus and supply the load demands except
New jetty. If the load demand is more than connected generators capacity, the least priority outgoing feeders will be disconnected. The
detailed sequence of operation is given below.
2. System construction
AMF/LMS & GCP
The Existing AMF/LMS panel consist of Major components like Siemens Make S7-1500 Redundant CPU with Simplex IOs, Panel PC for
HMI for local monitoring, Woodward LS-5 controllers for incomers and bus couplers etc. AMF/LMS panel interfaced with local generator
control panel. The LS-5 will be communicated with Woodward Easygen 3500 controllers in GCP, which enable the utility supply to
synchronize with generator supply. Existing I/O module in Common Control Panel is interfaced with the Redundant CPU in the AMF/LMS
panel .
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 3 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Pre-conditions
Sl.
No. Component Action/Result Remarks
Pre-condition
AMF Mode selector AMF Mode
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 4 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 5 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 3,4,5 Incomer - Bus 1 CB Open’s And open Bus-01 generator breaker.
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 6 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
After closing, the all bus-01 outgoing feeders Then open the
Bus Coupler [-] CB Open
bus coupler breaker.
4 Incomer - 1 Fails
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 7 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 8 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
6 Incomer - 2 Fails
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 9 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Bus 2 Feeders All bus02 outgoing feeders will open DG SHOULD START, AND SYCHRONISE THEN BC SHOULD OPEN
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 10 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Bus Coupler [-] CB Close When incomer-02 power supply restores, then close the bus-
coupler breaker.
Gen 1,7,8-Bus 2 Synchronize in Auto Generators-1,7&8 Synchronize with incomer-01
Sl.
No. Component Action/Result Remarks
Bus Coupler [-] CB Open After closing both side outgoing feeder, bus coupler will open
automatically.
8 Both Incomers Fails
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 12 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 13 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 14 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 3,4,5Incomer – Bus 1 CB Opens After soft transfer of load from Generator to Mains
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 15 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 1,7,8Incomer – Bus 2 CB Opens After soft transfer of load from Generator to Mains
After open generator’s breaker, the generators will go to cool
Gen 3,4,5– Bus 1 Ready in Auto down conditions and then all bus-01 generators will stop
automatically after completing cool down time.
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 16 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -01 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification.
Checked TPE
Approved TPE
Date 25.11.2023 Doc. No 02-0253-6664-01R0 Sheet 17 of 17
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 1 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Contents
1. Introduction ................................................................................................................................................................................................... 3
2. System construction ....................................................................................................................................................................................... 3
3. General Control Philosophy ........................................................................................................................................................................... 4
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 2 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
1. Introduction
The new modification in AMF system is designed to integrate additional new load (New Jetty) in Power Station 1 & 2. In the existing
system, Generators fulfilled the complete load demand when there is no utility Power supply are connected. The system consist of one utility
power supply in each bus of existing system and Utility incomers will supply complete load if load is less than 12MW. If the load increase
more than 12MW, the generators in bus section will start , synchronize with incomer 1 and disconnect the incomer 1 in bus section 1 and
feed only new jetty feeder. Upon failure of all incomers, generators will be started, synchronize with bus and supply the load demands except
New jetty. If the load demand is more than connected generators capacity, the least priority outgoing feeders will be disconnected. The
detailed sequence of operation is given below.
2. System construction
AMF/LMS & GCP
The Existing AMF/LMS panel consist of Major components like Siemens Make S7-1500 Redundant CPU with Simplex IOs, Panel PC for
HMI for local monitoring, Woodward LS-5 controllers for incomers and bus couplers etc. AMF/LMS panel interfaced with local generator
control panel. The LS-5 will be communicated with Woodward Easygen 3500 controllers in GCP, which enable the utility supply to
synchronize with generator supply. Existing I/O module in Common Control Panel is interfaced with the Redundant CPU in the AMF/LMS
panel .
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 3 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Pre-conditions
Sl.
No. Component Action/Result Remarks
Pre-condition
AMF Mode selector AMF Mode
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 4 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 3,4,5Incomer Synchronize & CB Close Gen Sync with Bus 01 Then close Generators Breaker 3, 4&5.
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 5 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 6 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
After closing, the all bus-01 outgoing feeders Then open the
Bus Coupler [-] CB Open
bus coupler breaker.
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 7 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
4 Incomer - 1 Fails
Incomer – 1 [K02] CB Opens
Incomer – 2 [K21] CB Remains Close
Bus Coupler [-] CB Remains Open
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 8 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 9 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
6 Incomer - 2 Fails
Gen Synch with bus 02 and close the generator breaker 1,2 &
Gen 1,2,7 incomer – Bus 2 Synchronize & CB closd
7
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 10 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Bus 2 Feeders CB Close Then All bus02 outgoing feeders will close on priority base.
Gen 3,4,5 – Bus 1 Ready in Auto
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 11 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 1,2,7Incomer CB Open After closing the incomer-02 breaker, open all bus-02
generator breaker’s
Bus Coupler [-] CB Open After closing both side outgoing feeder, bus coupler will open
automatically.
8 Both Incomers Fails
Incomer – 1 [K02] CB Opens
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 12 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 13 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 14 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 15 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Gen 3,4,5Incomer – Bus 1 CB Opens After soft transfer of load from Generator to Mains
Gen 1,2,7 Incomer – Bus 2 CB Opens After soft transfer of load from Generator to Mains
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 16 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 17 of 18
Sequence of Operation for AMF System Modification
EXT.11KV POWER STATION -02 AL YASAT AL SOFLAH ISLAND
Sl.
No. Component Action/Result Remarks
Ref. Title:
Originator VB Sequence of Operation for New proposed Modification
Checked TPE
Approved STS
Date 25.11.2023 Doc. No 02-0253-6664-02R0 Sheet 18 of 18