CYCLE TIME

MERANGIN HYDRO POWER PROJECT

Headrace Adit 1 Activity


Tim
Upstream 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill

Setting Normed for


Date Jan 4 Charge + Blast
Chainage Muck Waiting Shotcrete

Shotcrete
Breaker Material & Fill Sandbag

Break
Steel Support For Shoring
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 5 Charge + Blast
Chainage Muck
Scal
Steel Support
Shotcre
Wiremesh te 6
Shotcrete 6 Kubik
Rockbolt/Forepole Kubik
Shotcrete
Day Wed Drill
Date Jan 6 Charge + Blast
Chainage Muck
Scal
No Acti
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Tue Drill
Mixing Material Shotcrete

6
Date Jan 7 Charge + Blast
Chainage Muck Setting K
Cleaning

Mixing
u
Break

Scal Normed +
Material
Waiting b
Steel Support Shotcrete
Material i
Wiremesh Shotcrete 6 k
Rockbolt/Forepole Kubik
Shotcrete
Day Fri Drill
Date Jan 8 Charge + Blast
Cleaning Normed

Chainage Muck
Scal
Break Cleaning Normed
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Sat Drill
Date Jan 9 Charge + Blast
Chainage Muck Repair

Break
Scal Normed &
Steel Support Setting
Legdrill
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date Jan 10 Charge + Blast
Chainage Muck Install RRS

BREAK
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete Rebar 36 Btg

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Diversion Activity
Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 4 Charge + Blast Fabrikasi Rebar
Chainage Muck
BREAK

Scal / Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Concrete Invert
Shotcrete
Day Thu Drill
Date Jan 5 Charge + Blast
Cleaning Lantai

Chainage Muck
BREAK

Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete Concrete STA 240 - 267
Day Wed Drill Concrete Invert STA 208.9 -
Fabrikasi Rebar
Date Jan 6 Charge + Blast 220.1
Chainage Muck
BREAK

Breaker
Steel Support
Wiremesh JI Survey KMH
BREAK
Rockbolt/Forepole
Shotcrete
Day Tue Drill
Date Jan 7 Charge + Blast
Chainage Muck Breaker Crown STA 280 Breaker Wall STA 280

BREAK
Breaker
Steel Support
Wiremesh Rebar STA 220,1 - 231.3
Rockbolt
Shotcrete
Day Fri Drill
Date Jan 8 Charge + Blast
Chainage Muck Breaker Crown STA 290

BREAK
Scal/Breaker
Steel Support JI Survey KMH
Wiremesh Concrete Invert STA 220.1 -
Finishing Invert
Rockbolt 231.3
Shotcrete
Day Sat Drill Cleaning Lantai + Lansir
Date Jan 9 Charge + Blast Material to Tunnel Pasang Stop Cor + Water stop
Chainage Muck

BREAK
Breaker
Steel Support Breaker STA 300
Wiremesh
Rockbolt
Elevation Shotcrete Install Rebar 231.3 - 242.5
Day Sun Drill
Date Jan 10 Charge + Blast
Chainage Muck
BREAK

Breaker
Steel Support Breaker Wall STA 30 - 20
Cleaning Lantai +
Wiremesh Persiapan Concrete + JI
Rockbolt Survey Finishing Invert + Fabrikasi
Shotcrete Concrete Invert STA 231.3 - 242.5 Rebar

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Upstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 4 Charge + Blast
Prepare Shotcrete

Chainage Muck
Scal
Steel Support
Prepare Shotcret
Wiremesh
Rockbolt/Forepole Shotcrete 12 Kubik

Shotcrete
Day Thu Drill Survey
Date Jan 5 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Survey
Date Jan 6 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Tue Drill
Survey
Date Jan 7 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill Survey
Date Jan 8 Charge + Blast
Chainage Muck
Scal
Break
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Sat Drill Survey &
Date Jan 9 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill Survey & Survey &
Date Jan 10 Charge + Blast Marking Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Downstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill Survey &

Dewatering + Survey
Date Jan 4 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 5 Charge + Blast
Chainage Muck
Scal
Cr
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Jan 6 Charge + Blast
Chainage Muck
Survey

Scal
Crew Focused On Upstream
Steel Support
Wiremesh
Rockbolt Safety Sh
Shotcrete
Day Tue Drill
Date Jan 7 Charge + Blast
Chainage Muck
Scal
Crew Fo
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date Jan 8 Charge + Blast
Chainage Muck
Break

Break
Break
Scal
Break
Steel Support
Wiremesh Survey &
Rockbolt Marking
Shotcrete
Day Sat Drill
Date Jan 9 Charge + Blast
Chainage Muck
Scal Dewatering & Dew
Steel Support Crew Focused On Upstream Crew Focu
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date Jan 10 Charge + Blast
Chainage Muck
Dewatering &
Scal Dewatering &
Crew Focused On
Steel Support Crew Focused On Upstre
Upstream
Wiremesh
Rockbolt/Forepole
Shotcrete
IME f
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Waiting Shotcrete
erial & Fill Sandbag
For Shoring No Activity

Evaluasi

No Activity

Shotcrete 6
Kubik

Evaluasi

No Activity

Evaluasi

Mixing
Material No Activity
Shotcrete

Evaluasi
Shotcrete tertunda
Mucking terhenti
aning Normed No Activity
Evaluasi

BREAK
Repair
No Activity
Hose Air

Evaluasi
Drilling Dihentikan
Install RRS

BREAK
No Activity

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00 Kegiatan Concrete lebuh lama

Finishing Invert No Activity

Concrete Invert

Evaluasi
Install Water Stop &
Breaker Wall

No Activity

Evaluasi
abrikasi Rebar

No Activity
No Activity

Evaluasi

ker Wall STA 280 Breaker Crown 290

BREAK
No Activity
Pasang
Stop Cor
&
Waterstop

Evaluasi

aker Crown STA 290


No Activity

Finishing Invert

Evaluasi
top Cor + Water stop
BREAK

No Activity

Evaluasi
BREAK

No Activity
er Wall STA 30 - 20

ng Invert + Fabrikasi
Rebar

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Survey & Marking

Survey & Marking


Survey & Markin

Survey & Markin


Shotcrete 12 Kubik

Evaluasi
Survey

Evaluasi
Survey
Survey & Marking

Evaluasi

Scalling + Survey & Marking


Survey & Marking

Survey
Evaluasi
Survey

Survey & Survey & Evaluasi


Marking Marking

Survey & Survey & Evaluasi


Marking Marking
IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Cres Focused On Upstream

Evaluasi

Cres Focused On Upstream

Evaluasi

Crew Focused On
Upstream

Safety Shotcrete 12 Kubik

Evaluasi

Crew Focused On Upstream

Evaluasi

Dewatering
Dewatering

Survey & Evaluasi


Marking

Dewatering &
Crew Focused On Upstream

Survey Evaluasi

Dewatering &
rew Focused On Upstream Dewatering &
Crew Focused On Upstream
Shotcrete 6 Kubik
Evaluasi Kendala Headrace Adit 1 Activity
Downstream
Day Mon Drill
Date Jan 4 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 5 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 6 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 7 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Shotcrete tertunda Normed Rusak Date Jan 8 Charge + Blast
Mucking terhenti Kegiatan Mucking Downstream Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 9 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Drilling Dihentikan Water Pomp Jumbo Trouble Date Jan 10 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala
Adit 2 Activity
atan Concrete lebuh lama Batching Plan Sempat Trouble
Day Mon Drill
Date Jan 4 Charge + Blast
Chainage Muck
Scal/Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 5 Charge + Blast
Chainage Muck
Scal/Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 6 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 7 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Date Jan 8 Charge + Blast
Chainage Muck
Scal/ Ekskavasi
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 9 Charge + Blast
Chainage Muck
Excavation/Scal
Steel Support
Wiremesh
Forepole
Elevation Shotcrete/Grouting
Evaluasi Kendala Day Sun Drill
Date Jan 10 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala
End Portal Activity

Day Mon Drill


Date Jan 4 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 5 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 6 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 7 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Forepoling
Shotcrete
Evaluasi Kendala Day Fri Drill
Date Jan 8 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 9 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date Jan 10 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala
Evaluasi Kendala

Evaluasi Kendala
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Survey+ Setting Legdrill

+ Survey&+&
Charge + Blast

Manual &
Andhang
Install

Marking
Marking
Pipa
Steel Support Angin &

Scaling
Scalling
Air

Setting
Wiremesh
Rockbolt/Forepole
Shotcrete

Survey+ Setting Legdrill


Survey+ Setting Legdrill
Charge + Blast

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Survey+ Setting Legdrill

Survey+ Setting Legdrill

Charge + Blast
+ Moving Andang

+ Moving Andang

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
+ Marking Setting Legdrill
Moving Andang + Setting

Moving Andang + Survey

Charge + Blast
Clearing Smoke
Legdrill

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang + Marking

Charge + Blast
Moving
+ Setting Legdrill

Andang &
Survey +
Steel Support Marking +
Setting
Wiremesh
Legdrill
Rockbolt/Forepole
Shotcrete
ang + Survey +
etting Legdrill
Moving An
+ Setti
Moving Andang + Survey +

Moving Andang + Marking


Marking + Setting Legdrill
Charge + Blast

+ Setting Legdrill
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Moving Andang + Survey +


Moving Andang + Survey +

Marking + Setting Legdrill


Marking + Setting Legdrill
Charge + Blast

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Charge + Blast Install Tie


Rod,
Scal/Excavation WIremesh,
Break

Prepare Maintenance
Steel lagging Jumbo Drill Access
Steel Support + Prepare
Wiremesh Shotcrete Shotcrete 5
Rockbolt/Forepole Kubik
Shotcrete

Charge + Blast

Prepare
Break

Scal/Excavation Trouble Panel Pompa


Dewatering

for
Steel Support & Dewatering
Shotcrete Dewatering
Wiremesh Shotcrete 5
Rockbolt/Forepole Kubik
Shotcrete

Ekskavasi & Install


Charge + Blast
Prepare Shotcrete

Steelrib Kaki Kiri


Tambah
Galian
Break

Excavation
untuk
Steel Support Kaki
Wiremesh Shotcrete Steelrib
Scalling crown
4 Kubik
+ Install Steelrib
Tambah
Galian

Prepare Shot

Break
untuk
Kaki
Shotcrete Steelrib
Scalling crown
4 Kubik
Rockbolt/Forepole + Install Steelrib
Shotcrete

Charge + Blast
Repair Ducting
Install Steelrib 1

BREAK
Set
Steel Support
Shotcrete
Wiremesh Shotcrete 6
2 Kubik
Rockbolt/Forepole Kubik
Shotcrete

4
Charge + Blast
K
Scal/ Ekskavasi Prepare Wet u
Oper Shift Shotcrete b
Steel Support
i
Wiremesh k

Shotcrete

Charge + Blast
BREAK

Excavation/Scal Prepare
Steel Support Shotcrete Shotcret
e6
Wiremesh Kubik

Shotcrete/Grouting

Charge + Blast

Timbun lantai depan Persiapan


BREAK

Prepare
face + Mobilisasi Drilling
Steel Support Shotcrete
Shotcrete Material dari Mahor Forepoling
Wiremesh 6 Kubik
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00
Preparation Mucking

Charge + Blast
Drilling Face &
Rockbolt 7 Pcs
Cleaning

Cleaning

Cleaning

Scal/ Excavation
Preparatio
Steel Support n Mucking
7 Kubik
Preparation Muck
Rockbolt 7 Pc
Drilling Face
Cleaning

Cleaning

Cleaning
Preparatio
n Mucking
Wiremesh 7 Kubik
Rockbolt/Forepole
Shotcrete

Mucking
Preparation Mucking
Charge + Blast

Rockbolt 13 Pcs
Drilling Face &
Cleaning

Cleaning
Excavation
Preparatio

Preparation
Steel Support n Mucking
Wiremesh 7 Kubik
Rockbolt/Forepole
Shotcrete

Repair Vent Ducting


Preparatio Shotcrete

Charge + Blast
Survye & Top Up
Hydraulic Oil

Prepar
Excavation ation
Steel Support Mucki
ng
Wiremesh 3 Kubik 3 Kubik

Shotcrete

Prepartion Mucking
Preparation Mucking

Charge + Blast Drilin


g&
Install
Break

Scal/ Excavation
Rockb
Steel Support olt 6
Shotcrete
Wiremesh Pcs
3 Kubik
Forepoling
Shotcrete
Survey
Preparation Mucking

Charge + Blast Preparation Mucking


Break

Excavation
Steel Support
Wiremesh 3 Kubik
Rockbolt/Forepole
Shotcrete
Repair Compressor Genset

Drillin
Preparation Mucking

Charge + Blast S Drillin


g Face
u g Face
+
Cleaning

Cleaning

r +
BREAK

Excavation Rockb
v Rockb
Steel Support olt 13
e olt 13
Pcs
Wiremesh y Pcs 3 Kubik
Rockbolt/Forepole
Shotcrete

Drillin
Charge + Blast
g Face
+
Cleaning

Rockb
No Activity
olt 6
Pcs
leaning
Drillin
g Face
+

Cleaning
Excavation Rockb
No Activity
Steel Support olt 6
Pcs
Wiremesh

Cleaning
3 Kubik
Rockbolt/Forepole
Shotcrete
Moving Andang + Survey
+ Marking Setting Legdrill
Moving Material to Side
Wall

Survey+ Setting Legdrill


+ Moving Andang

Moving Scafolding
Setting Andhang & &
Scaling Manual &
Marking
24.00 01.00 02.00 03.00 04.00 05.00 06.00

Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi

Mucking Terhenti

Drilling Lebih Lama


Evaluasi

Moving Andang & Survey


+ Setting Legdrill
Evaluasi
Moving Andang + Survey +
Marking + Setting Legdrill

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Welding Forepoling
Break

welding Besi 32 Untuk Kaki Steelrib

Evaluasi
Gali & Pasang Kaki
Pekerjaan Terhambat
Steelrib + Steel
Legging
Break

Evaluasi
Scalling dan Instal R Steelrib Terhenti
Break

Shotcrete 5
Kubik
Break
Shotcrete 5
Kubik

Evaluasi

Cleaning
Housekeeping, buat lantai
sumpit & Moving Untuk
Pompa Persiapan
Concrete

Evaluasi
Shotcrete Terhambat
Break

Shotcrete 10 Kubik

Evaluasi
prepare Shotcrete lama
Shotcrete Terhambat

Evaluasi
Shocrete Machine
Prepare & Setting

Welding
Break

Forepoling for
Steelrib

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Rockbolt 13 Pcs
Drilling Face &
Cleaning

3
Kubik
Rockbolt 13 P
Drilling Face
Cleaning
3
Kubik

Evaluasi

Cleaning
Drilling & Instal Rockbolt
Break

15 Pcs

Evaluasi
Preparation Drilling &

Driling
&
Install
Survey
Break

Rockbo
lt 26
Pcs

Evaluasi
Driling
&
Install
Rockb
olt 13
3 Kubik Pcs

Evaluasi
Pengupasan Lantai Untuk Pemasangan
Precast
Break

6 Kubik

Evaluasi
Prepare Mucking

Evaluasi
BREAK

No Activity
No Activity BREAK
Kendala

Kendala

Kendala
Pelindung Ban Lepas

Kendala
Howo 29,16,19 Trouble

Kendala
Hose water supply broken
Hose water supply terlepas 2 x
Kendala

Kendala

Kendala

Kendala
Kondisi air tinggi di depan face

Kendala
Ukuran R Rib lebih besar erhalang pipa
forepoling
Kendala

Kendala
Saluran Accelerator tersumbat material
Shotcrete

Kendala
Seal Sanchin Robek

Selang Additive menuju Nozzle Tersumbat

Kendala

Kendala
Kendala

Kendala

Kendala

Kendala

Kendala

Kendala
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Headrace Adit 1 Activity


Tim
Upstream 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill

Shotcrete Full RRS 6


Date Jan 11 Charge + Blast
Chainage Muck
Mixing
Scal

Kubik
Material
Steel Support Shotcrete
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
Setting Normed &
Scal
Waiting Material
Steel Support Shotcrete
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Setting Grouting Machine

Date Jan 13 Charge + Blast


Chainage Muck
Breaker

Breaker
Shotcrete 12
Steel Support
Kubik
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Tue Drill
6
Setting Normed for

Date Jan 14 Charge + Blast


Chainage Muck Wait
K
Shotcrete

ing Cleaning
Scal u
Mate Normed +
b
Steel Support rial Break
i
Wiremesh Fro
k
BP
Rockbolt/Forepole Grouting Rockbolt
Shotcrete
Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck
Break

Breaker
Steel Support
Wiremesh
Shotcrete 18 Kubik
Rockbolt
Shotcrete
Prepare Jumbo for Drilling
Day Sat Drill
Date Jan 16 Charge + Blast
Chainage Muck Driling Rockbolt 493
- 497 ( 11 Hole) Driling Rockbolt 210 - 245

Break
Scal Install Install 68 Pcs STA 332 -
Install 17 Pcs STA
Steel Support 303 - 308 350
Wiremesh
Rockbolt
Elevation Shotcrete
Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
Scal
No Acti
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Tim
Diversion Activity
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 11 Charge + Blast
Chainage Muck
BREAK

Scal / Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
BREAK

Breaker
No Activ
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Jan 13 Charge + Blast
Chainage Muck
Breaker Demonstrasi
Steel Support Warga
Wiremesh
Demonstrasi
Warga

Rockbolt/Forepole
Concrete Invert STA 242.3 - 253
Shotcrete
Day Tue Drill
Date Jan 14 Charge + Blast
Chainage Muck

BREAK
Breaker
Steel Support Breaker Wall STA 240 -
Wiremesh 260
Rockbolt
Shotcrete Instal Rebar STA 30
Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck

BREAK
Scal/Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Sat Drill
Date Jan 16 Charge + Blast
Chainage Muck

BREAK
Breaker
Concete Invert STA 30
Steel Support Breaker Bottom STA
Wiremesh 250 + Pasang Stop Cor
Rockbolt/Forepole & Waterstop + JI
Survey
Elevation Shotcrete
Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
BREAK

Breaker
No Acti
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Upstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill Survey & Survey &
Date Jan 11 Charge + Blast Marking Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill Survey &
Date Jan 12 Charge + Blast Marking
Chainage Muck
Scal
Preparation Shotcrte
Steel Support
Wiremesh
Shotcrete 12 Kubik
Rockbolt/Forepole
Shotcrete
Day Wed Drill Survey &
Date Jan 13 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Wiremesh Shotcrete 6
Rockbolt Kubik
Shotcrete
Day Tue Drill Survey &
Date Jan 14 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill Survey &
Date Jan 15 Charge + Blast Marking
Chainage Muck
Scal Break Jumat
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Sat Drill Survey &
Date Jan 16 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Survey &
Wiremesh Marking
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill Survey &
Date Jan 17 Charge + Blast Marking
Survey + Marking

Chainage Muck
Survey + Marking
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Downstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 11 Charge + Blast
Chainage Muck
Scal
Dewatering
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
Scal Dewatering & Dewatering &
Steel Support UPstream Activity UPstream Activity

Survey &
Marking
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Jan 13 Charge + Blast
Chainage Muck
Scal
Crew
Steel Support
Wiremesh
Rockbolt
Shotcrete
Survey & Marking

Day Tue Drill


Date Jan 14 Charge + Blast
Chainage Muck
Scal
Crew Focused On Upstre
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck

Standby Crew Focused On Upstream & Dewatering


Scal
Standby Crew Focused On Upstream & Dewatering
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Sat Drill
Date Jan 16 Charge + Blast
Chainage Muck

Survey & Marking


Scal Dewatering &
Standby
Steel Support Standby
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
Scal
Dewatering + Standby
Steel Support
Shotcrete 6
Wiremesh Kubik
Rockbolt/Forepole
Shotcrete
IME f
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00 Kegiatan Terhambat

No Activity

Evaluasi

No Activity

Evaluasi
Shotcrete Lebih Lama

Shotcrete 12 No Activity
Kubik

Evaluasi

Cleaning
Grouting No Activity
Machine

Evaluasi

No Activity

Shotcrete 18 Kubik

No Activity
Evaluasi
Drilling Terhambat
Rockbolt 210 - 245

BREAK
tall 68 Pcs STA 332 - No Activity
350

Evaluasi

No Activity BREAK

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
BREAK

No Activity

Evaluasi
BREAK

No Activity

Evaluasi

No Activity
No Activity

e Invert STA 242.3 - 253.5

Evaluasi

BREAK
No Activity

Evaluasi

No Activity

Evaluasi
BREAK

Concete Invert STA 30 -39 No Activity

Evaluasi
BREAK

No Activity

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Survey &
Marking
Survey + Marking
Survey + Markin
Survey & Survey & Evaluasi
Marking Marking

hotcrete 12 Kubik

Survey & Evaluasi


Marking
Survey & Marking

Survey & Evaluasi


Marking
Survey & Marking

Survey & Evaluasi


Marking

Survey & Evaluasi


Marking

Survey & Evaluasi


Marking
IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Survey & Marking

Dewateri
Dewatering ng &
Standby

Evaluasi
Survey & Marking

Dewatering

Evaluasi
Survey & Marking

Crew Focused On Upstream

Evaluasi
Survey & Marking

Crew Focused On Upstream

Evaluasi
ey & Marking

Crew Focused On
m & Dewatering Upstream &
Dewatering
Survey & Marking
Crew Focused On
m & Dewatering Upstream &
Dewatering

Evaluasi

Survey + Marking
Dewatering & Standby

Evaluasi
Survey + Marking

Dewaterin Dewaterin
g+ g+
Shotcrete 6 Standby Standby
Kubik
Evaluasi Kendala Headrace Adit 1 Activity
Kegiatan Terhambat Demonstrasi Warga Downstream
Day Mon Drill
Date Jan 11 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Shotcrete Lebih Lama Nozzle tersumbat batu Date Jan 13 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 14 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Drilling Terhambat Engine Jumbo Drill Trouble Date Jan 16 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala
Adit 2 Activity

Day Mon Drill


Date Jan 11 Charge + Blast
Chainage Muck
Scal/Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
Scal/Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 13 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 14 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck
Scal/ Ekskavasi
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 16 Charge + Blast
Chainage Muck
Excavation/Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala
End Portal Activity

Day Mon Drill


Date Jan 11 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 12 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 13 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 14 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Rockbolt
Shotcrete
Evaluasi Kendala Day Fri Drill
Date Jan 15 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 16 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date Jan 17 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt
Shotcrete

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala
Evaluasi Kendala

Evaluasi Kendala
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Moving Andang + Survey


Moving Andang & Marking

Charge + Blast
+ Survey

No Activity
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Moving Andang & Marking


Charge + Blast

rem Loader
+ Survey
No Activity ( Demonstrasi Warga)
Steel Support

Repair
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang & Marking

Moving Andang & Marking


Charge + Blast
+ Survey

+ Survey
Warga
Steel Support Demonstrasi
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang & Marking +

Survey + Stting Legdrill


Moving Andhang +

Charge + Blast
Survey

O
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Marking + Setting Legdrill
Setting Andang & Survey

Charge + Blast
Setting Andang &
Marking
Break

Oper Shift
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Setting Andang & Survey Marking + Setting Legdrill

Marking + Setting Legdrill


Setting Andang & Survey

Setting Andang & Survey


Charge + Blast

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Marking + Setting Legdrill

Marking + Setting Legdrill


Setting Andang & Survey

Charge + Blast

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Time
Activity
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Charge + Blast

Prepare
Scal/Excavation
Break

Shotcrete + Aktifitas Terhenti Akibat Demonstrasi


Steel Support Mixing
Shotcrete
Wiremesh
6 Kubik
Rockbolt/Forepole
Shotcrete
Dewatering & Tarik

Charge + Blast
Material

Scal/Excavation Demo
Steel Support nstrasi
Wiremesh Shotcrete 6
Rockbolt/Forepole Kubik
Shotcrete

Charge + Blast
BREAK

Excavation
Steel Support
Wiremesh Shotcrete 6
Kubik
BREAK
Shotcrete 6
Rockbolt/Forepole Kubik
Shotcrete

Charge + Blast
Setting Compressor
Dewatering Install Shotcrete trouble
Survey + Timbun

BREAK
Lantai Untuk Forepolin
Steel Support Dudukan Jumbo g
Wiremesh
Rockbolt/Forepole
Shotcrete

Gali & Install Steelrib


Charge + Blast

Scal/ Ekskavasi
Oper Shift
Steel Support
Wiremesh Dewatering

Shotcrete

Charge + Blast

Excavation/Scal
Brea
Steel Support k
Wiremesh Shotcrete 6 1 Set
Rockbolt/Forepole Kubik
Shotcrete
Timbun Lantai
Untuk Dudukan
Jumbo drill Ban Pecah

Charge + Blast Jumbo

Timbun
Steel Support Lantai
Wiremesh Preparation & 6 Kubik
Rockbolt/Forepole Shotcrete 6 Kubik
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00
Preparation Mucking
Preparation Mucking

Charge + Blast

Scal/ Excavation
Steel Support
Shotcrete
Shotcrete
Shotcrete
Shotcrete
Shotcrete
Shotcrete

Wiremesh
Wiremesh
Wiremesh
Wiremesh
Wiremesh
Wiremesh

Excavation
Excavation
Excavation
Excavation

Steel Support
Steel Support
Steel Support
Steel Support
Steel Support

Charge + Blast
Charge + Blast
Charge + Blast
Charge + Blast
Charge + Blast
Charge + Blast

Scal/ Excavation
Rockbolt/Forepole
Drilling & Install Drilling & Install
Rockbolt 23 Pcs Rockbolt 6 Pcs Preparation Mucki

Cleaning & Preparation


Drilling Preparation Mucking
Cleaning + Prepare
Shocrete

Preparation Mucking
Break BREAK

4 Kubik
Drilling & Install Cleaning

Break +

Mucking
Rockbolt 17 Pcs

Preparation
3 Kubik

Cleaning

3 Kubik
3 Kubik

Cleaning + Prepare
Drilling Preparation Mucking
Survey
6 Kubik

Drilling & Install


Rockbolt 9 Pcs
Drilling & Install Preparation Mucki
Rockbolt 6 Pcs
Cleaning

Cleaning

3 Kubik
3 Kubik
Drilling & Install Preparation Mucking
3 Kubik

BREAK Rockbolt 6 Pcs

No Activity
Drilling & Install
Rockbolt 17 Pcs
Break
Excavation
No Activity
Steel Support
Wiremesh
3 Kubik

Shotcrete
Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00 Mucking Lebih Lama
drilling Terhambat

No Activity

Evaluasi
Moving Andang + Survey
+ Setting Legdrill

Evaluasi

Evaluasi

Oper Shift

Evaluasi
Marking + Setting Legdrill
Setting Andang & Survey
Evaluasi

Evaluasi
Moving Andang Survey +

Drilling Lama
setting Legdrill

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Shotcrete Lebih Lama

Demonstrasi

Evaluasi
Cleaning Equipment

Shotcrete Terhambat
Break

Shotcrete 6
Kubik

Evaluasi
Break

Shotcrete 6
Kubik
Break
Shotcrete 6
Kubik

Evaluasi
Install Stelrib Terganggu
Welding Forepoling
Break

Cleaning Equipment Evaluasi


Break

Shotcre
te 6
Kubik

Evaluasi
Break

Kaki Steel Rib

Evaluasi
Break

Forepoling 47 Pcs

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Shotcrete terhambat
Break
Break
3 Kubik

Evaluasi
Shotcrete terhambat
Kegiatan Terhenti

3 Kubik

Evaluasi
Kegiatan Terhenti

Tyre
BREAK

Howo
Problem

3 Kubik

Evaluasi
Cleaning
BREAK

3 Kubik

Evaluasi
Preparation Mucking
Drilling & Install
Rockbolt 6 Pcs

BREAK

Evaluasi
Preparation Mucking

Evaluasi
BREAK

No Activity
BREAK
No Activity
Kendala
Menggunakan 2 Howo + Mucking Material Sisa
Pipa Angin Pecah

Kendala

Kendala

Kendala

Kendala
Kendala

Kendala
V Cut 3.5 M dan Cut Hole 3 Metr

Cycle Tercepat
Week 46
Adit 1 Down
Drilling 90 Minutes
Charging + Blasting 60 Minutes
Mucking 150 Minutes
Scaling 30 Minutes
Survey + marking 40 Minutes
Mapping 30 Minutes
Kendala
Trouble Aliva
Normed Repairing

Kendala

Trouble Sanchin ( Akselerator terlalu banyak

Kendala
Kendala
Galian Bannyak Air

Kendala
Kondisi air banyak

Kendala

Kendala

Kendala
Aliva Machine Problem
Hose Shotcrete Problem
Kendala
Fuel Sistem trouble
Solar Habis

Kendala
Solar Habis

Kendala

Kendala

Kendala

Kendala
Cycle Tercepat Cycle Terlama
Adit 3 Up Adit 3 Down Adit 1 Down Adit 3 Up Adit 3 Down
90 80 180 Minutes 330 330
20 20 120 Minutes 40 40
90 90 320 Minutes 330
30 30 90 Minutes 40 40
30 30 60 Minutes 30 30
20 20 30 Minutes 30 30
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Headrace Adit 1 Activity


Tim
Upstream 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00

Cleaning Material Breaker


Day Mon Drill

Setting Jumbo + Mesin


Date Jan 18 Charge + Blast
Chainage Muck Install

Grouting
Scal

Break
Rockbolt STA
Steel Support 350 - 380( 111
Wiremesh Pcs)
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 19 Charge + Blast
Chainage Muck

Break
Breaker
Steel Support Rockbolt STA 380 - 407 ( 76
Wiremesh Pcs)

Setting Griuting Machine 6 Kubik


6 kubik
Rockbolt
Shotcrete
Day Wed Drill
Prepare Install Rockbolt

Date Jan 20 Charge + Blast


Chainage Muck
Install Rockbolt STA
Break

Scal 407 - 425 ( 68 Pcs)


6 Kubik
Steel Support Grouting
Wiremesh Rockbolt
Rockbolt
Shotcrete 12 Kubik
Prepare grouting Rockbolt

Day Tue Drill


Date Jan 21 Charge + Blast
Grouting Rockbolt
Chainage Muck Grouting Rockbolt STA
STA 425 - 431 ( 17
425 - 431 ( 17 Btg)
Btg)
Break

Scal
Shotcrete 6 Kubi STA 151 -
Steel Support Shotcrete 6 Kubi
154
STA 151 - 154
Wiremesh
Rockbolt
Shotcrete
Day Fri Drill
Prepare Install Rockbolt

Date jan 22 Charge + Blast


Chainage Muck
Breaker
Break
Steel Support 6 Kubik +
6 Kubik + Grouting
Wiremesh Grouting
Rockbolt
Shotcrete
Day Sat Drill
Date Jan 23 Charge + Blast
Chainage Muck

6 Kubik

Break
Breaker
Steel Support
Wiremesh
Rockbolt 18 Kubik STA 161 - 182
Elevation Shotcrete
Day Sun Drill
Date jan 24 Charge + Blast

Setting Normed &


Grouting Machine
Chainage Muck

Break
Breaker
Steel Support Grouting Grouting Rockbolt & Shotcrete 12
Wiremesh Rockbolt Kubik
Rockbolt
Shotcrete 6 Kubik

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Diversion Activity
Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 18 Charge + Blast
Chainage Muck
BREAK

Scal / Breaker
Steel Support
JI Survey
Wiremesh
Rockbolt/Forepole Concrete Invert STA 264 -
Concrete Invert STA 264 - 276
Shotcrete 276

Day Thu Drill


Date Jan 19 Charge + Blast
Chainage Muck
BREAK

Breaker
Steel Support
Concrete Invert STA 40 Finishing Invert STA 40
Wiremesh - 60 & Breaker Wall - 60 & Breaker Wall
Rockbolt/Forepole STA 260 STA 260
Shotcrete
Moving Rebar to Tunnel +
Day Wed Drill
Install FormBox Dinding
Date Jan 20 Charge + Blast STA 164 - 186
Chainage Muck
BREAK

Scal
Steel Support Breaker Bottom STA 310 - Breaker Bottom STA 310 -
Wiremesh 281 281
BREAK
Rockbolt/Forepole
Shotcrete
Day Tue Drill
Date Jan 21 Charge + Blast
Chainage Muck

BREAK
Scal
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Fri Drill
Date jan 22 Charge + Blast
Chainage Muck

BREAK
Scal/Breaker No Activ
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Sat Drill
breaker lantai
Date Jan 23 Charge + Blast
Chainage Muck Cleaning
Lantai +

BREAK
Breaker
langsir
Steel Support Material
Wiremesh Ke Tunnel
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date jan 24 Charge + Blast
Chainage Muck
BREAK

Breaker
Steel Support Breaker STA 300 - 320
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Upstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill Survey & Survey &
Date Jan 18 Charge + Blast Marking Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill Survey &
Date Jan 19 Charge + Blast Marking
Chainage Muck
Scal Prepare
Steel Support Shotcrete
Wiremesh Shotcrete 12
Rockbolt/Forepole Kubik
Shotcrete
Day Wed Drill Survey &
Date Jan 20 Charge + Blast Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Tue Drill Survey &
Date Jan 21 Charge + Blast Marking
Chainage Muck
Scal
Survey &
Marking

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill Survey &
Date jan 22 Charge + Blast Marking
Chainage Muck
Break

Scal
Steel Support
Survey &
Wiremesh Marking
Rockbolt
Shotcrete
Day Sat Drill
Preparation SHotcrete

Date Jan 23 Charge + Blast


Chainage Muck
Scal
Survey &

Steel Support
Marking

Safety Shotcrete
Wiremesh 12 Kubik
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill Survey & Survey &
Date jan 24 Charge + Blast Marking Marking
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Downstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Jan 18 Charge + Blast

Survey & Marking


Chainage Muck Crew
Focused
Scal Crew Focused
On
Steel Support On Upstream
Upstrea
Wiremesh m
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Jan 19 Charge + Blast

Survey & Marking


Chainage Muck Crew
Focuse
Scal Crew Focused
d On
Steel Support On Upstream
Upstre
Wiremesh am
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Jan 20 Charge + Blast
Chainage Muck
Scal
Crew Focused On Upstream
Steel Support Survey +
Wiremesh Marking
Rockbolt
Shotcrete
Day Tue Drill
Date Jan 21 Charge + Blast
Chainage Muck
Scal Crew Focused On Crew Focused On Upstr
Steel Support Upstream
Survey +
Wiremesh Marking
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date jan 22 Charge + Blast
Chainage Muck Crew
Focused
Crew Focused On
On
Upstream
Upstrea
m
Crew
Focused
Scal Crew Focused On
On
Steel Support Upstream
Upstrea
Survey &
Wiremesh m
Marking
Rockbolt
Shotcrete
Day Sat Drill
Date Jan 23 Charge + Blast
Chainage Muck
Scal Crew Focused On
Steel Support Upstream
Survey &
Wiremesh Marking
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date jan 24 Charge + Blast
Survey & Marking
Chainage Muck
Scal Crew Focused On
Steel Support Upstream
Wiremesh
Rockbolt/Forepole
Shotcrete
IME f
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

No Activity

6 Kubik

Evaluasi

No Activity
kbolt STA 380 - 407 ( 76
Pcs)

Evaluasi

No Activity
Grouting
Rockbolt

Evaluasi

g Rockbolt STA
431 ( 17 Btg)
6 Kubi STA 151 - BREAK No Activity
154

Evaluasi

No Activity
k + Grouting
Evaluasi

No
No Activity
Activity

bik STA 161 - 182

Evaluasi

No Activity
g Rockbolt & Shotcrete 12
Kubik

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
BREAK

Finishing
No Activity
Invert

Invert STA 264 - 276

Evaluasi
BREAK

No Activity
Invert STA 40
Breaker Wall
TA 260

Evaluasi

No Activity
ottom STA 310 -
281
No Activity

Evaluasi

BREAK
No Activity

Evaluasi

No Activity

Evaluasi
BREAK

No Activity

Evaluasi
Cleaning

BREAK

No Activity

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Survey &
Marking
Survey & Survey &
Evaluasi
Marking Marking

Evaluasi
Survey & Marking

Survey & Evaluasi


Marking

Survey & Evaluasi


Marking

Evaluasi
Survey & Marking

Survey + Marking

Safety Shotcrete
12 Kubik

Survey & Survey & Evaluasi


Marking Marking
IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Surve
y&
Mark
ing
Crew Focused
On Upstream

Evaluasi
Survey & Marking

Crew Focused On Upstream

Evaluasi

Crew
Focused
On
Upstream Survey +
Marking

Evaluasi

Crew Focused On Upstream Crew Focused On


Upstream

Evaluasi

Crew Focused On
Upstream
Crew Focused On
Upstream
Survey &
Marking

Evaluasi

Crew Focused On Upstream & Survey

Evaluasi
Crew
Focus
Crew Focused On
ed On
Upstream
Upstre
Survey
am
Evaluasi Kendala Headrace Adit 1 Activity
Downstream
Day Mon Drill
Date Jan 18 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 19 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 20 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 21 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Date jan 22 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 23 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date jan 24 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Evaluasi Kendala
Adit 2 Activity

Day Mon Drill


Date Jan 18 Charge + Blast
Chainage Muck
Scal/Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 19 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 20 Charge + Blast
Chainage Muck
Scalling
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Tue Drill
Date Jan 21 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Fri Drill
Date jan 22 Charge + Blast
Chainage Muck
Scal/ Ekskavasi
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 23 Charge + Blast
Chainage Muck
Excavation/Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date jan 24 Charge + Blast
Chainage Muck
Scal
Steel Support
Wiremesh
Forepoling
Shotcrete

Evaluasi Kendala
End Portal Activity

Day Mon Drill


Date Jan 18 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Thu Drill
Date Jan 19 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Evaluasi Kendala Day Wed Drill
Date Jan 20 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Forepole
Shotcrete& Concrete
Evaluasi Kendala Day Tue Drill
Date Jan 21 Charge + Blast
Chainage Muck
Scal/ Excavation
Steel Support
Wiremesh
Forepoling
Shotcrete
Evaluasi Kendala Day Fri Drill
Date jan 22 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Forepole
Shotcrete
Evaluasi Kendala Day Sat Drill
Date Jan 23 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt
Elevation Shotcrete
Evaluasi Kendala Day Sun Drill
Date jan 24 Charge + Blast
Chainage Muck
Excavation
Steel Support
Wiremesh
Rockbolt
Shotcrete

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala
Evaluasi Kendala

Evaluasi Kendala
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Briefing & Moving andang

Briefing & Moving andang


+ survey + Setting Legdrill

+ survey + Setting Legdrill


Charge + Blast

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Moving Andang & Setting


Moving Andang + Survey &

Charge + Blast
Marking

Legdrill
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

Moving Andang & Setting Moving Andang & Setting


Moving Andang + Survey &

Charge + Blast

Legdrill
Marking

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang + Survey &

Charge + Blast
Legdrill
Marking

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang & Setting

Moving Andang & Setting

Moving Andang & Setting

Charge + Blast
Sholat Jumat
Legdrill

Legdrill

Legdrill

Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang & Setting

Marking +Setting Legdrilll


Marking +Setting Legdrilll
Charge + Blast

Steel Support Legdrill


Wiremesh
Rockbolt/Forepole
Shotcrete

Moving Andang & Setting

Marking +Setting Legdrilll


Charge + Blast

Legdrill
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

Charge + Blast
Prepare Shotcrete

Scal/Excavation Welding
Steel Support Forepoling
Shotcrete 4
Wiremesh Kubik
Rockbolt/Forepole 6 Kubik
Shotcrete

Charge + Blast
Prepare Shotcrete

Prepare Shotcrete
Break

Excavation
Steel Support Shotcret
Wiremesh e6
Rockbolt/Forepole 6 Kubik Kubik
Shotcrete

Charge + Blast
Prepare Shotcrete

Steel Support
Kaki Kanan
Wiremesh Ribs + R Shotcrete 6
Ribs Kubik
Prepare Shot
Kaki Kanan
Ribs + R Shotcrete 6
Rockbolt/Forepole Ribs Kubik 10 Kubik
Shotcrete

Cleaning Equipment +
Charge + Blast
Moving

Timbun Lantai
Waterpum

BREAK
p+
No Activity
Steel Support Mixing
Material
Wiremesh
Shotcrete 6 Kubik
Rockbolt/Forepole
Shotcrete

Charge + Blast

Prepare Shotcrete
Scal/ Ekskavasi
Oper Shift
Steel Support
Wiremesh
6 Kubik
Shotcrete

Cleaning & Shotcrete


Charge + Blast
Safety talk

Waitin

Machine
BREAK

Excavation/Scal Prepare Jumbo Drill


g
Steel Support Access Road
Mixer
Wiremesh 6 Kubik 4 Kubik
Rockbolt/Forepole
Shotcrete

3
Install Ducting
Welding Forepoling

Charge + Blast
Welding K
BREAK

Forepoling & u
Prepare b
Steel Support
Shotcrete i
Wiremesh k
Forepoling
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00
Preparation Mucking
Preparation Mucking

Charge + Blast

Scal/ Excavation
Steel Support

4 Kubik
Preparation Mucki

Preparation Muck
Wiremesh
4 Kubik

Shotcrete

Preparation Install Steel


Preparation Shotcrete

Install Vent Ducting


Charge + Blast
Cleaning

Cleaning
Excavation 346 347

RIb
Steel Support
4
Wiremesh Kubik
Rockbolt/Forepole
Shotcrete Concrete LC Worshop

Preparation Install Steel

Prepare Install Steel Rib


Preparation Mucking
Charge + Blast

Bringout Jumbo
5 Kubik
Break

Excavation RIb 348


Steel Support
Shotcret
Wiremesh Shotcrete e
4 Kubik 4 Kubik
Shotcrete& Concrete
Maintenance Blower
Preparation Mucking

Preparation Mucking
Charge + Blast
Bringout Jumbo

Cleaning
BREAK

Scal/ Excavation
Steel Support
Wiremesh Shotcrete Shotcrete
Forepoling 7 Kubik 3 Kubik
Shotcrete
Preparation Shotcrete +

Preparation Mucking
Cleaning Filter Solar

Charge + Blast
Cleaning
BREAK

BREAK
Genset

Excavation + Prepare
Steel Support Install
Steelrib
Wiremesh Shotcrete
7 Kubik
Shotcrete
Hydraulic Hose Breaker

Preparation Mucking

Charge + Blast
Install Rockbolt

Hydraulic
Cleaning

System Breaker Mixer


4 Pcs
Leaked

Excavation 352
2 Kubik

problem + Daici Tdk


Steel Support Service Genset+ Bisa Maju
Wiremesh Cleaning

Shotcrete

Charge + Blast

Modified Breaker PC130F


to 320 D2 & House Keeping No Activity
+ Maintenance jumbo Drill
Modified Breaker PC130F
Excavation
to 320 D2 & House Keeping No Activity
Steel Support + Maintenance jumbo Drill
Wiremesh

Shotcrete
Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00 Mucking Terhambat
Briefing & Moving andang
+ survey + Setting Legdrill

Evaluasi
Moving Andang & Setting

Mucking Lebih Lama


Legdrill

Evaluasi
Moving Andang & Setting

Mucking Lebih Lama


Legdrill

Evaluasi
Mucking Terhambat

Evaluasi
Repair Road Access
Evaluasi

Moving Andang & Setting


Legdrill
Evaluasi
Marking +Setting Legdrilll

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Shotcrete Terhambat
Break

Evaluasi
Break

Evaluasi
Evaluasi
Break

Evaluasi
Break

Evaluasi

Prepare
Break

Jumbo
Drill

Evaluasi
Setting Shotcrete
Break

Evaluasi
24.00 01.00 02.00 03.00 04.00 05.00 06.00
Cleaning
Break

3
Kubik
ity
Break Preparation Shotcrete BREAK BREAK Break Break
BREAK
Prepare Install Steel Rib Prepare Install Steel Rib Install Bondex
Install Rockbolt
21 Pcs

Kubik
Preparation Shotcrete

350
349

Shotcrete 6
Prepare Shotcrete
3
Kubik

4 Pcs

Drilling
+ Install
Forepoli
Rockbolt

ng 28 Pcs
Forepolin
g 17 Pcs +
Kubik
Shotcrete 6 Cleaning

6 Kubik
Shotcrete
Install Bondex Install Bondex

Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
ity
BREAK
Kendala
PLN Padam
Howo 17 & 20 Breakdown

Kendala
Howo 15,17,20 Breakdown

Kendala
Menghabiskan Material Sisa Blasting
Sebelumnya
Howo 16, 17, 20 Trouble

Kendala
Wheel Loader 18 Trouble
Howo 29 Bocor

Kendala

Week 47
Week 47
Kendala
Drilling
Charging + Blasting
Mucking
Scaling
Survey + marking
Mapping

Kendala

Kendala
Kompressor Trouble Hose Radiator Lepas
Shtcrete Tabung angin tersumbat material
Shotcrete

Kendala

Kendala
Kendala

Kendala

Kendala

Kendala

Kendala
Kendala

Kendala

Kendala

Kendala

Kendala

Kendala
Cycle Tercepat Cycle Terlama
Adit 1 Down Adit 3 Up Adit 3 Down Adit 1 Down Adit 3 Up Adit 3 Down
90 Minutes 90 80 150 Minutes 330 330
60 Minutes 20 20 90 Minutes 40 40
150 Minutes 90 90 320 Minutes 330
30 Minutes 30 30 150 Minutes 40 40
40 Minutes 30 30 60 Minutes 30 30
30 Minutes 20 20 30 Minutes 30 30
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Headrace Adit 1 Activity


Tim
Upstream 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Des 25 Charge + Blast

Setting Normed
Chainage Muck
Breaker
Steel Support Install Rockbolt 94 batang ( STA 431 - 462) & Shotcrete 36 Kubi
Wiremesh (STA 191 - 213)
Rockbolt/Forepole
Shotcrete
Day Thu Drill
Date Des 26 Charge + Blast
Chainage Muck
Breaker
Steel Support Install Rockbolt 34 Btg ( STA 462 - 474) +
Wiremesh Shotcrete 24 Kubik ( STA 213 - 242)
Setting Normed
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Des 27 Charge + Blast
Setting
Chainage Muck Normed
Scal
Steel Support Install Rockbolt 37 Btg ( STA 474 - 487) + Shotcr
Wiremesh 12 Kubik ( STA 245 - 252)
Rockbolt/Forepole
Shotcrete
Day Tue Drill
Seting + Prepare install

Date Des 28 Charge + Blast


Chainage Muck
Rockbolt

Scal
Steel Support Shotcrete 24 Kubik ( STA 212 - 228 ) + Install Rockbolt 45 Btg (
Wiremesh STA 487 - 497)
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date Des 29 Charge + Blast
Cleaning Normed

Chainage Muck
Breaker Cleaning Area Upstream +
No Activity
Steel Support Breaker Floor
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Sat Drill
Date Des 30 Charge + Blast

Setting Normed
Chainage Muck

Break
Breaker
Steel Support
Cleaning
Wiremesh
Material
Rockbolt Breaker
Elevation Shotcrete
Day Sun Drill
Date Des 31 Charge + Blast
Shotcre
Chainage Muck te 7
Prepare
Breaker Kubik
Drilling Marking Area Steelrib
Steel Support STA 60
Anchoor Stelrib
- 65
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Diversion Activity
Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Concrete invert STA 60 - Concrete invert STA 60 -71
Date Des 25 Charge + Blast
71
Chainage Muck
BREAK

Scal / Breaker
Steel Support Clearing
Wiremesh Floor +
Rockbolt/Forepole Instal water
stop
Shotcrete
Day Thu Drill
Date Des 26 Charge + Blast
Chainage Muck
BREAK

Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Des 27 Charge + Blast
Chainage Muck
BREAK

Scal
Steel Support
Wiremesh
BREAK
Rockbolt/Forepole
Shotcrete
Day Tue Drill
Date Des 28 Charge + Blast
Chainage Muck

BREAK
Scal
Steel Support
Wiremesh Breaker Wall STA 280 + Breaker Wall STA 280 + Install
Rockbolt Install Besi STA 164 Besi STA 164
Shotcrete
Day Fri Drill
Date Des 29 Charge + Blast
Chainage Muck

BREAK
Scal/Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Sat Drill
Date Des 30 Charge + Blast
Chainage Muck

BREAK
Breaker
Steel Support Concrete Invert STA 164 - Breaker Bottom STA
Wiremesh 175 Concrete Invert STA 164 -
Rockbolt/Forepole 175
Elevation Concrete
Day Sun Drill
Date Des 31 Charge + Blast Cleaning Lantai + Install Install Rebar STA 173 - 184
Chainage Muck Rebar STA 173 - 184
BREAK

Breaker
Steel Support
Wiremesh
Rockbolt/Forepole
Repair Acces Road
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Upstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Des 25 Charge + Blast
Survey & Marking

Chainage Muck
Scal
Steel Support
Survey & Markin
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Thu Drill Survey &
Date Des 26 Charge + Blast Marking
Chainage Muck
Scal
Dewaterin
Steel Support Survey g
Wiremesh &
Rockbolt/Forepole Markin
g
Shotcrete
Day Wed Drill
Date Des 27 Charge + Blast

Survey & Marking


Chainage Muck
Scal
Steel Support
Wiremesh Survey &
Rockbolt Marking
Shotcrete
Day Tue Drill
Date Des 28 Charge + Blast
Chainage Muck
Scal Prepare
Steel Support Shotcrete
Wiremesh
6 Kubik
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date Des 29 Charge + Blast
Chainage Muck
Scal
Pray Jumat
Steel Support
Wiremesh
Rockbolt
Shotcrete
Day Sat Drill
Date Des 30 Charge + Blast
Chainage Muck
Crew Focused
Scal
On
Steel Support Downstream
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date Des 31 Charge + Blast
Survey & Marking

Chainage Muck
Survey & Marking
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Adit 3 Downstream Activity


Tim
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Day Mon Drill
Date Des 25 Charge + Blast
Chainage Muck
Crew
Scal Standb
Focused On
Steel Support Survey y
Upstream
&
Wiremesh
Markin
Rockbolt/Forepole g
Shotcrete
Day Thu Drill
Date Des 26 Charge + Blast
Survey & Marking

Chainage Muck
Scal
Standby
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Wed Drill
Date Des 27 Charge + Blast
Chainage Muck
Scal Prepare
Steel Support Shotcrete
Wiremesh
Rockbolt Shotcrete 12 Kubik
Shotcrete
Day Tue Drill
Date Des 28 Charge + Blast
Survey & Marking

Chainage Muck
Scal
Standby & Dewatering
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Day Fri Drill
Date Des 29 Charge + Blast
Chainage Muck
Crew Focused
On Upstream
Scal Crew Focused
Steel Support On Upstream
Wiremesh
Rockbolt
Shotcrete
Day Sat Drill
Date Des 30 Charge + Blast

Survey & Marking


Chainage Muck
Scal Crew Focused
Dewatering
Steel Support On Upstream
Wiremesh
Rockbolt/Forepole
Elevation Shotcrete
Day Sun Drill
Date Des 31 Charge + Blast
Chainage Muck
Scal Crew Focused On
Steel Support Upstream Surve
y&
Wiremesh marki
Rockbolt/Forepole ng
Shotcrete
IME f
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Kegiatan Fokus Ke Downstream


462) & Shotcrete 36 Kubik
3)

Evaluasi

Kegiatan Fokus Ke Downstream


Btg ( STA 462 - 474) +
k ( STA 213 - 242)

Evaluasi

No Activity
g ( STA 474 - 487) + Shotcrete
( STA 245 - 252)

Evaluasi
Prepare Lebih Lama

No Activity
nstall Rockbolt 45 Btg (

Evaluasi

ning Area Upstream + Repair


Breaker Floor Normed
Evaluasi
Shotcrete Tidak Bisa Dilakukan

No Activity
Cleaning
Material
Breaker

Evaluasi
Drilling Rockbolt
STA 399 - 401 ( 9
Prepare Driling

Holes)
No Activity

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

crete invert STA 60 -71


BREAK

No Activity

Evaluasi
BREAK

No Activity

Evaluasi

No Activity
No Activity

Evaluasi

BREAK
No Activity

Wall STA 280 + Install


Besi STA 164

Evaluasi

No Activity

Evaluasi
BREAK

No Activity
r Bottom STA
Invert STA 164 -
175

Evaluasi
bar STA 173 - 184
Cleaning

BREAK

No Activity

r Acces Road

IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Survey &
Marking
Survey + Marking
Survey & Marking Survey + Markin

Survey & Marking


Marking
Survey &

Mixer Trouble
Survey & Marking

Survey & marking

Survey & marking

Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
IME
OWER PROJECT

Time Evaluasi
17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Survey & Marking

Crew Focused On
Upstream

Evaluasi

Crew
Standby Focused On
Survey & Upstream
Marking
Survey

Evaluasi

Standby & Survey &


Dewatering Marking

Shotcrete 12 Kubik

Evaluasi
Survey & Marking

Dewatering

Evaluasi
urvey & Marking

Crew Focused On Upstream


Survey & Marking
Crew Focused On Upstream

Evaluasi

Survey & Marking


Dewatering

Evaluasi

Crew Focused On Upstream


Evaluasi Kendala Headrace Adit 1
Downstream
Day Mon
Date Des 25
Chainage

Evaluasi Kendala Day Thu


Date Des 26
Chainage

Evaluasi Kendala Day Wed


Date Des 27
Chainage

Evaluasi Kendala Day Tue


Prepare Lebih Lama Menunggu Material dari BP Date Des 28
Chainage

Evaluasi Kendala Day Fri


Date Des 29
Chainage
Evaluasi Kendala Day Sat
Shotcrete Tidak Bisa Dilakukan Normed Trouble Date Des 30
Chainage

Elevation
Evaluasi Kendala Day Sun
Date Des 31
Chainage

Evaluasi Kendala
Adit 2
Day Mon
Date Des 25
Chainage

Evaluasi Kendala Day Thu


Date Des 26
Chainage

Evaluasi Kendala Day Wed


Date Des 27
Chainage
Evaluasi Kendala Day Tue
Date Des 28
Chainage

Evaluasi Kendala Day Fri


Date Des 29
Chainage

Evaluasi Kendala Day Sat


Date Des 30
Chainage

Elevation
Evaluasi Kendala Day Sun
Date Des 31
Chainage

Evaluasi Kendala
End Portal
Day Mon
Date Des 25
Chainage
Evaluasi Kendala Day Thu
Date Des 26
Chainage

Evaluasi Kendala Day Wed


Date Des 27
Chainage

Evaluasi Kendala Day Tue


Date Des 28
Chainage

Evaluasi Kendala Day Fri


Date Des 29
Chainage

Evaluasi Kendala Day Sat


Date Des 30
Chainage

Elevation
Evaluasi Kendala Day Sun
Date Des 31
Chainage
Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala

Evaluasi Kendala
Evaluasi Kendala

Evaluasi Kendala
CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00
Drill

Moving Andang + Survey

Moving Andang + Survey


Leveling Floor + Scalling
Charge + Blast
Muck
Scal Instal

Face
Steel Support Rockbol
t 5 Pcs
Wiremesh
Rockbolt/Forepole
Shotcrete
Drill
Charge + Blast
Muck
Moving Andang
Scal
+Joint Survey +
Steel Support Setting Legdrill
Wiremesh
Rockbolt/Forepole
Shotcrete
Moving Andang + Survey
Moving Andang + Survey

Drill
Charge + Blast
Muck
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Survey + Marking + Setting

Drill
Moving Andang + Survey

Charge + Blast
Muck
Legdrill

Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Drill
Survey + Marking +

Charge + Blast
Setting Legdrill

Muck
Break Jumat

Setting Normed
Scal
+ Prepaare Kegiatan di Headrace Upward
Steel Support Shotcrete 12
Wiremesh Kubik
Rockbolt/Forepole
Shotcrete
hang + Setting
drill
Drill

Moving Andhang + Setting

Moving Andhang + Setting


Charge + Blast
Muck

LEgdrill

LEgdrill
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete
Drill

Moving Andhang + Setting

Moving Andhang + Setting


Charge + Blast
Muck
LEgdrill

LEgdrill
Scal
Steel Support
Wiremesh
Rockbolt/Forepole
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00
Drill
Mixing Material From BP

Charge + Blast
Muck Scalling Wall
Scal/Excavation
Break

Steel Support
Wiremesh Full Shotcrete 10 Shotcrete 6 Kubik
Rockbolt/Forepole Kubik
Shotcrete
Drill
Charge + Blast
Muck Cleaning
Equipm
Break

Scal/Excavation
ent &
Steel Support Dewater
Wiremesh ing
Shotcrete 6
Rockbolt/Forepole Kubik
Shotcrete
Drill
Prepare Pipa Forepoling
Install Pipa Support +

dewatering + setting

Charge + Blast
Muck
Jumbo
Break

Excavation Penimbunan Lantai dudukan


Steel Support Jumbo Drill shotcrete 4
Wiremesh Kubik
dewatering + s
Prepare Pipa For
Install Pipa Su

Jumbo
Break
Penimbunan Lantai dudukan
Jumbo Drill

Rockbolt/Forepole
Shotcrete
Drill
Charge + Blast
Muck
Continue

Break
Scal Welding
Steel Support Forepoling
Wiremesh
SHotcrte 11 Kubik
Rockbolt/Forepole
Shotcrete
Drill
Charge + Blast
Muck
Scal/ Ekskavasi Oper Shift
Steel Support
Shotcrete 6
Wiremesh
Kubik
Forepole
Shotcrete
Drill
Charge + Blast

Prepare Shotcrete
Muck
BREAK

Excavation/Scal Waiting
Steel Support Mixer
Shotcret Shotcret
Wiremesh e6 e6
Rockbolt/Forepole Kubik Kubik
Concrete
Drill
Charge + Blast
Muck
Cleaning
BREAK

Scal
Steel Support
Survey Install Shotcrete 6
Wiremesh Kaki Kubik
Rockbolt/Forepole Steelrib
Shotcrete

CYCLE TIME
MERANGIN HYDRO POWER PROJECT

Activity
Time
07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00
Drill
Preparation Shotcrete
Concrete LC 6 Kubik

Charge + Blast
Muck
4 Kubik

Cleaning

Track
Break

Scal/ Excavation
Exca
Steel Support Lepas
Concrete LC 6 Kub

Preparation Shotcr

4 Kubik

Cleaning
Track

Break
Exca
Lepas
Wiremesh
Forepole 4 Kubik
Shotcrete
Drill

Preparation Excavasi

BP EMpty Hooper
Charge + Blast
Muck

Break
Excavation
Steel Support Shotcrete
4 Kubik +
Wiremesh 354 Cleaning
Rockbolt/Forepole
Shotcrete
Drill
Charge + Blast

Prepare Mucking
Muck

Break
Excavation
Steel Support
Wiremesh Shotcrete Shotcrete
Rockbolt 3 Kubik 3 Kubik
Shotcrete
Mixing Material Shotcrete

Drill
Preparation Mucking

Charge + Blast

Deicy Probelm
Muck
Scal/ Excavation
Steel Support

3 Kubik
3
Wiremesh Kubi
Forepoling k
Shotcrete
Drill
Preparation Mucking

Charge + Blast
Break Sholat Jumat

Muck
Excavation
Steel Support Shotcrete
Wiremesh Shotcrete 3 Kubik
Forepole 6 Kubik
Shotcrete
Batang Bor Jumbo Bengkok

Drill
Preparation Mucking

Charge + Blast
Muck
Cleaning
break

Excavation 356
Steel Support
Wiremesh
3 Kubik
Rockbolt
Shotcrete
Drill
Charge + Blast
Muck
Tidak Ada Suplay
No Activity
Solar
Excavation Tidak Ada Suplay
No Activity
Steel Support Solar
Wiremesh 3 Kubik
Rockbolt
Shotcrete
Moving Andang + Survey
Moving Andang + Survey

hang + Setting Moving Andang + Survey


drill

Moving Andang + Survey

Oper SHift
Moving Andang + Survey
22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00

Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi

Mucking Lebih Lama


Evaluasi

Moving Andhang + Setting


Mucking Terhambat

LEgdrill

Evaluasi
Moving Andhang + Setting

Mucking Lebih Lama


LEgdrill

Evaluasi
22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00 Mucking Out Lebih Lama
Excavasi Terhambat
Shotcrete Lebih Lama
Break

Install Shotcrete 6
Steelrib 1 Kubik
Set
Evaluasi
Axc 6 Breaker Baut Lepas
setting
water
Pump &
Shotcret + Shotcret
Break e6
Kubik

Evaluasi
Break

shotcrete 4
Install Forepoling 30 Holes
Kubik
Break
Evaluasi

SHotcrte 11 Kubik

Evaluasi
Break

hotcrete 6
Kubik

Evaluasi
Prepare Shotcrete
Break

Shotcret Shotcrete 6
e6 Kubik
Kubik

Evaluasi
Scalling Terkendals
Break

6 Kubik

Evaluasi
22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 06.00
Preparation Install Steelrib

Preparation Mucking

Track
BREAK

Exca
Lepas
Kubik
hotcrete
3 Kubik
Exca

Shotcrete
Track

Lepas

Preparation Install St
Preparation Mucking

No Activity
Break BREAK BREAK

3 Kubik
BREAK
Break Preparation Mucking Preparation Mucking

357
6 Kubik
Shotcrete
3 Kubik

6 Kubik
Preparation Install Steelrib

Prepare Shotcrete Cleaning Preparation Mucki


355

Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
Evaluasi
BREAK
No Activity
Kendala

Kendala
DT Howo Trouble

Kendala

Kendala

Kendala
Kendala
Re, Loader Tidak Ada

Kendala
Howo 29 Pecah Ban + Howo 19 Trouble

Kendala
Genangan air terlalu tinggi
Batuan Keras
Angin Kecil

Kendala

Kendala
Kendala

Kendala

Kendala

Kendala
Breaker Trouble

Kendala
Kendala

Kendala

Kendala

Kendala

Kendala

Kendala