STANDARDS OF PROFESSIONAL CONSULTING ARCHITECT

PRACTICE
CA
SPP
CODES OF ETHICAL CONDUCT
CEC
ARCHITECT
A natural person under Philippine law with a
DEPARTMENT OF LABOR AND
valid certificate of registration and a valid
EMPLOYMENT
professional identification card for the
lawful practice of Architecture. DOLE

ALTERNATIVE DISPUTE DEPARTMENT OF TRADE AND


RESOLUTION INDUSTRY
ADR DTI

ARCHITECTURAL FIRM FILIPINO PROFESSIONAL


CONSULTING ARCHITECTS
AF
FPCA

ARCHITECTURAL DESIGN
COMPETITION INTEGRATED AND ACCREDITED
PROFESSIONAL ORGANIZATION OF
ADC
ARCHITECTS
IAPOA
ARCHITECT IN CHARGE OF
CONSTRUCTION
KNOWLEDGE PROCESS
AICC
OUTSOURCING
KPO
ARCHITECT-OF-RECORD
AOR
MANUAL OF PROCEDURE
MOP
BUSINESS PROCESS OUTSOURCING
BPO
PROFESSIONAL ARCHITECTURAL COMPARATIVE SELECTION
CONSULTING SERVICES
Type of selection conducted by committees
PACS representing institutions, corporations or
public agencies

PROFESSIONAL CONSULTING
ARCHITECT DESIGN COMPETITION
PCA Type of selection used for civic or
monumental projects

PROFESSIONAL REGULATION
COMMISSION MULTIPLE OF DIRECT PERSONNEL
EXPENSES
PRC
Computation made by adding all costs of
technical services (man hours x rate) and
PROFESSIONAL REGULATORY then multiplying it by a multiplier to cover
BOARD OF ARCHITECTURE overhead and profit

PRBOA
MULTIPLE OF DIRECT PERSONNEL
EXPENSES
SECURITIES AND EXCHANGE
COMMISSION Applicable only to non-creative work such
as accounting, secretarial, research, data
SEC gathering, preparation

REGISTERED AND LICENSED PROFESSIONAL FEE + EXPENSES


ARCHITECT
This method of compensation is frequently
RLA used where there is continuing relationship
involving a series of projects

TEMPORARY/ SPECIAL PERMIT


TSP LUMP SUM/ FIXED FEE
This method of compensation may be
applied to government projects since they
DIRECT SELECTION entail more paper work and time-consuming
Type of selection used when undertaking efforts
relatively small projects
Per diem/ honorarium Architectural research
Type of compensation wherein the architect The conduct of primary and secondary
may be paid for work which will require his researches and assembled facts used as basis
personal time such as the architect's out-of- for conclusion
pocket expenses

Architectural programming
SPP 201
An analytical problem-seeking process that
Pre-design Services will lead to the statement and identification
of both horizontal and vertical requirements
in offering a solution
Consultation
When a client calls upon the Architect to
Space planning
give oral or written advice and direction, to
make evaluations and appraisals regarding a Architect determines the adequate size and
contemplated project and similar activities appropriate configuration for a proposed
project in consideration if the use, allocation
and interface of spaces for given activities
Pre-feasibility studies
Involves the procurement, analysis and use
SPP 202
of secondary information gathered for the
project to aid the client in early decision- Regular design services
making

Temporary/ special permit, work permit


Feasibility studies from DOLE, local RLA counterpart
Detailed analysis of the project based in pre- Requirements for foreign architect to render
feasibility studies that will determine the regular design services
viability of a proposed development

Project Definition, Schematic Design,


Site selection and analysis Design Development, Contract Document,
Bidding or Negotiation, Construction
Analysis to determine most appropriate site
for a project The six phases of the regular design services

Project definition phase


The preparation of an initial statement of
probable construction cost
Schematic design phase Architect
In this phase, the architect prepares the The lead professional who works with other
initial line drawings representing design professionals in the engineering and allied
studies leading to a recommended solution professions in rendering regular design
services

Design Development Phase


Simple
In this phase, the architect prepares design
development documents consisting of plans, Project classification of buildings of the
elevations, sections and other drawings simplest utilization and character (no
partitions)

Contract document phase


Moderate
In this phase, the architect assists the owner
in filing the requires documents to secure Project classification of buildings of
approval of government authorities having moderate complexity of plan/ design
jurisdiction over the design of the project

Exceptional
Bidding/ negotiation phase
Project classification of buildings with
In this phase, the architect helps the owner exceptional character and complexity of
establish a list of prospective contractors. plan/ design
For competitive bids, the architect furnishes
complete sets of the bid documents for
purposes of bidding and responds to Residences
questions from bidders
Single-detached, single-attached or duplex;
or row-houses or shop-houses, small
apartment houses and townhouses are part of
Construction phase
this project classification
In this phase, the architect makes decisions
on all claims of the Owner and Contractors
on all matters relating to the execution and Shophouse
progress of work or the interpretation of the
Contract Documents A vernacular architectural building type that
are mostly two or three stories high, with a
shop on the ground floor and a residence
above the shop
Monumental 6% of PCC (SPP 202), 5% (DAEDS), 3%
(DADS)
Mausoleums, memorials and monuments are
part of this project classification Percentage of compensation for group 1
structures not more than 50M

Repetitive construction
7% of PCC (SPP 202), 6% (DAEDS),
Projects where the plan/ design and related
3.6% (DADS)
contract documents are re-used for the
construction of similar buildings without Percentage of compensation for group 2
amending the drawing and specifications projects not more than 50M

Housing projects 8% of PCC (SPP 202), 7% (DAEDS),


4.2% (DADS)
Projects involving the construction of
several residential units on a single site with Percentage of compensation for group 3
the use of one (1) set of plans/ design, projects not more than 50M
specifications and related documents

10% of PCC (SPP 202), 10% (DAEDS),


Extensive detail 6% (DADS)
Projects having designs for built-in Percentage of compensation for group 4
components or elements, built-in equipment, projects
special fittings, screens, counters,
architectural interiors and development
planning and/or design 12% of PCC (SPP 202), 12% (DAEDS),
7.5% (DADS)
Percentage of compensation for group 5
Consultancy
projects
The architect is engaged to render opinion or
give advice, clarifications or explanation on
technical matters pertaining to architectural 80% of MBF (SPP 202), 50% (DAEDS)
works.
Compensation for the second structure in
Repetitive Construction
PCC
Project Construction Cost 60% of MBF (SPP 202), 40% (DAEDS)
Compensation for the third structure in
Repetitive Construction
40% of MBF (SPP 202), 30% (DAEDS) 150% of MBF (SPP 202 & DAEDS)
Compensation for the 4th and succeeding Compensation for group 9 projects
structures in Repetitive Construction

200 per hour (SPP 202), 1000 per hour


60% of MBF (SPP 202), 50% (DAEDS), (DAEDS)
30% (DADS)
Minimum compensation for rendering an
Compensation for the 2nd-10th units in a opinion or giving expert advice
housing project

500 (SPP 202), 5000 (DAEDS)


30% of MBF
Minimum compensation when an architect
Compensation for the succeeding units after gives his/her expert testimony (witness)
the 10th unit in a housing project from SPP
5%
202
Percentage upon signing of the Service
Agreement
40% (DAEDS), 24% (DADS)
Compensation for the 11th to 30th unit in a
15% (total of 20%)
group 7 project
Additional percentage given upon
completion and submission under schematic
25% (DAEDS), 15% (DADS) design phase
Compensation for the 31st to 50th unit in a
group 7 project
20% (total of 40%)
Additional percentage given upon
15% (DAEDS), 9% (DADS) completion of the design development phase
Compensation for the 51st unit and
succeeding units in a group 7 project
50% (total of 90%)
Additional percentage given upon
15% of PCC (SPP 202 & DAEDS) completion of the Contract Document Phase
Compensation for group 8 projects
10% (total of 100%)
Additional percentage given upon
completion of the work
5% Project development cost
Percentage from the 10% (percentage upon PDC
completion of the work) that is for
Architect's Liability under the Civil Code
Specialized Architectural Services
SPP 203
5%
Percentage from the 10% (percentage upon
completion of the work) that is for Periodic Specialized Architectural Services
Construction Supervision
Services that deal with specific expertise for
the further enhancement of the architectural
interior and exterior components of a project
90% of the work
Specialized Architectural Services
The architect has prepared and completed
the detailed design and contract documents Architectural Interiors and Acoustic Design
phase of his/her services which is equivalent is under what type of services?
to _______________________

Architectural interiors
Doubled
Involves the detailed planning and design of
When the suspension of construction the indoor areas of any proposed building
exceeds a period of six (6) months, the fee
will be ____________________
12-20% (old), 10-15% (new)

Owner Range of compensation depending on the


complexity of the work in architectural
Who will pay for full-time construction interiors
supervisors?

Acoustic design
Sec 33 of RA 9266
Services involving the detailed planning and
Stipulates that all designs, drawings, models, design to control sound transmission for
specifications and other contract documents compatibility with the architectural design
and copies thereof prepared, duly signed, concept
stamped and sealed and furnished as
instruments of service are the intellectual
property of the Architect Lighting layout/ design
Involves the detailed planning and design of
light transmission, timing and control
Building testing/ commissioning
Site development planning The architect recommends the systematic
process of ensuring that a building's array of
The space planning, lay-outing and
systems is planned, designed, installed and
utilization of spaces within and surrounding
tested to perform according to the design
a specific building have to be a well-
intent and the building's operational needs
coordinated effort so that the building and
the host environment shall act as one
Forensic architecture
Physical planning The architect in this area undertakes a
scientific study on the built environment's
The orderly management within a piece of
well-being, focusing in the ways in which
land in which vertical and horizontal
the building can best maintain itself and
developments are to be proposed
prolong its life in a cost-efficient manner
and finally provide recommendations to the
client
Master development plan
MDP
Appraisal
Defined as an act or process of estimating
Environment impact assessment value
EIA

Building appraisal
Building systems design The consulting architect in this area of
The architect in this area of practice engaged practice places value on the building
in methods of producing building condition and defects, and on its repair and
components in a highly engineered, efficient maintenance, including the required
and cost-effective manner, particularly for improvements
residential and commercial applications

Fire safety and life assessment report


Facilities maintenance support FALAR
The consulting architect in this area of
practice provides the client with means and
measures to ensure the proper function and Arbitration
maintenance of the building and site after
A voluntary dispute resolution process
final inspection
Mediation supervision, building equipment
maintenance, business development and
A voluntary process in which a person
management
selected by the disputing parties, facilitates
communication and negotiation and assist
the parties in reaching a voluntary
4-6% of gross rentals
agreement regarding a dispute
Range of compensation for building and
facilities administrator or he/she could also
Fulltime supervision services be paid by salary basis
SPP 204a
Comprehensive Architectural Services
Clerk-of-works SPP 206
When projects were still manageable in size,
the architect was then assisted by a
Prime Professional
construction inspector, traditionally called
________________________ The architect is considered the
____________________

Construction supervision group


Project management
CSG
When the owner hires an architect or a firm
to coordinate the whole range of
Construction management services comprehensive architectural services
SPP 204b
Project manager
Construction manager He/she plans, programs, monitors the
various activities, and will act as an adviser
CM
on material costs and construction methods

Post-construction services
2-5% of estimated Project cost
SPP 205
Range of project manager's compensation

Building and facilities admin


Design-build services
Scope of services include building
SPP 20
maintenance, grounds and landscaping
Professional advisor
State licensed contractor An architect nominated by the owner and
approved by IAPOA to organize the ADC
The architect must be a ________________
om behalf of the owner
to implement his design in design build
services
Technical advisors
Owner Specialist personnel who mat be consulted
by the jurors during the conduct of the ADC
Who pays for all costs for labor and
to permit them to obtain all necessary
materials in a design build by administration
relevant information
service?

Competition secretariat
Architectural design competitions
The body formed by the owner and
SPP 208
approved by the Professional Advisor to
assist the Professional Advisor and the Jury
in the administrative conduct of the ADC
Code of ethical conduct
SPP 200
Conditions
Includes the program, instructions in
Pre-design services submission of entries, site plans, entry forms
SPP 201 and official envelopes and labels

Owner IAPOA ADC Committee

The person or organization who undertakes Appointed by the IAPOA National President
or promotes an architectural design to oversee all architectural design
competition with the primary objective of competitions referred to the IAPOA
obtaining excellence in design for a project
or for a development concept
7
Maximum number of jurors in a
Jury architectural design competition
The people appointed by the owner to assess
the entries to the competition
1 month Consulting architectural firm
The owner undertakes to accept the An architectural corporation that performs
decisions of the Jury and to pay the prizes state-regulated architectural services such as
allotted within __________ of the official PACS
announcement of the ADC results

Professional Architectural Consulting


Honorarium Services (PACS)
Each participant in a limited ADC by Means the rendering by a professional
invitation shall receive an ___________ in consulting architect or firm independent
addition to the prizes awarded advice, extension of technical assistance and
services requiring appropriate knowledge,
skills, training and experience
Professional Architectural Consulting
Services (PACS)
Project development cost
SPP 209
Means the total cost of the project which
includes but is not limited to construction
Accredited Professional Organizations cost, fees for professional services, the cost
of land, road right of way, legal,
APO administrative and other related expenses of
the client

Consortium or Association
A coalition of purely Filipino professional Government Procurement Reform Act
consultants or consulting firms in RA 9184
collaboration with foreign professional
consultants and/or foreign consulting firms
authorized to render consultancy services in
100 km
the Philippine setting
The owner covers for the traveling and
living expenses of the architect or his/her
Consulting Agreement representative is required to perform
services at a locality beyond ________ from
A binding covenant entered into by a PCA his established office
and/or consulting firm with a client that
provides such terms and conditions under
which specific work, study or joint venture
The alternative dispute resolution act of
requiring special technical skills and
2004
expertise shall be undertaken
RA 9285
Recommended professional fee Statute of frauds
RPF A rule that certain kinds of contract are
enforceable unless signed and in writing or
unless there is a written memorandum of
Detailed architectural and engineering their terms signed by the party to be charged
design services
DAEDS
2-2.5% (old), 1.5-2.5% (new)
Range of the multiplier in multiple of direct
Detailed architectural design services personnel expenses type of compensation

DADS
1-1.5%

50% of the fee Range of Compensation for Full Time


Supervision
For specialized architectural services, the
architect shall be paid what percentage of
the fee upon submission of the final design
1.5-3%
Range of compensation for Construction
30% of the fee Manager

For specialized architectural services, the


architect shall be paid what percentage of
2-5%
the fee upon submission of the preliminary
design Range of compensation for Project Manager

Statute of limitation
A statute specifying the period of time
within which legal action must be brought
for alleged damage or injury

Statutory bond
A bond, the form or content of which is
prescribed by statue

You might also like