Download as pdf
Download as pdf
You are on page 1of 1
KIRLOSKAR BROTHERS LIMITED PRE COMMISSIONING GUIDELINES FOR ENGINE & MOTOR DRIVEN PUMPSETS Sr. | FOR MOTOR DRIVEN PUMP. YES | NO 1_| Pump should be leveled within the limit of 0.05mm/m. 2__| Holding down bolts are tightened. 3. | Foundation should be sufficiently rigid to absorb vibration and to provide rigid support to Base frame. 4__| Alignment of pump and motor should be within the limit of 0.05 mm Suction & Delivery pipe size should be as per the recommendation given by manvfacturer Pump should be located nearest to the Liquid source with min, Suction lift. ‘Avoid short bend and use eccentric piece at Suction pipe to avoid air pocket. NNRV & Gate Valve at Delivery side are provided to avoid reverse rotation. Use Foot Valve as per the recommendation of Manufacturer. 10 | Suction & Delivery pipes should be supported properly to ensure pump free of pipeline stresses. TT | Pressure Gauge of appropriate range should be fitted in batween pump delivery flange & NRV. Compound Gauge should be fitted in suction pipe line. 12_| Motor terminal connection has been done. 13 | Power availability. Pump Type: . Pump Sr. Ni Total Head: ..m. Discharge: ... ignature of Customer)

You might also like