Case Pick Standard
Case Pick Standard
VP CREATION/LOAD BUILD
Load creation
Mandatory field is
Zone number: FLE (refers as the pin code of the particular area)
Select shipment form row exit, and enter the sales order and find, it populates the sales
order select shipment from row exit and cancel it.
Delivery sequence:
It tells that which load should be deliver first ,
We can have the different delivery sequence for multiple loads.
Approve VP
Once Approved VP
VP/LOAD -30 status
Shipment 10 status
Order 527 to 535 status.
Pick request created at status 200
A pick request will create at the time of VP approved. It requests to pick the stock from
available location.
Pick suggestion tells that suggesting to pick the stock from available location.
Pick confirming using RDT HILLLTOP/INTERLINK – P6141025
Here we have to slect the case pick standard application to pick confirmation.
Check the Branch plant and enter the VP
Once click on to the save button , opens the case pick standard-2 screen, here check the load
number and sequence
Once click on the select button, opens the case pick standard – 3 screen ,
Check the order number
Here RDT is selecting the available location and lot which as the stock of 38 PK (3800SH).
Enter the same location and quantity for the fields and save it.
Once saving the case pick standard -5 screen, can observe the VP inquiry has order line 1
splitted to 1.001 line.
Because the item has the 3800SH in particular lot and location so line 1 got splitted to 1.001
and 16200SH remains in the line 1.
Line 1.001 pick confirmed using case pick standard RDT and moved the status to 560,
location , UPI, rainbow UPI populated from the RDT.
Request confirmed at 250 status
Select the grids and confirm by row exit and click on close button.
After Confirming VP
VP/LOAD status will be at 50,
Shipment status will be at 30,SO status will be at 560 to 575.
---------------------------------------------------------------------------------------------------------------