THIRD FLOOR (VIEW DECK)

SSL.+11650

COLUMN 12 PLEASE VERIFY


PROPOSED PLANTED
COLUMN
SECOND FLOOR
SSL.+8150
RAMP SLAB
SSL.+7460

GROUND FLOOR MEZZANINE


SSL.+4650

COLUMN 12

GROUND FLOOR TRANSITION COLUMN


SSL.+200

GROUND FLOOR
SSL.+00

G2 (500X800) G2A (500X800)

COLUMN 12
1. Crank + LD located at recommended spliced location
FOUNDATION COLUMN 13
2. Vertical Bars and Ties as per column schedule
SSL.-3900
3. Add 2 pcs top and bottom extra bars at G2 (Right Support) and G2A (Left Support)

4. Provide 2-Ø16mm WEB Bars Each Face at G2 and G2A