SSL.+11650
COLUMN 12
GROUND FLOOR
SSL.+00
COLUMN 12
1. Crank + LD located at recommended spliced location
FOUNDATION COLUMN 13
2. Vertical Bars and Ties as per column schedule
SSL.-3900
3. Add 2 pcs top and bottom extra bars at G2 (Right Support) and G2A (Left Support)