University Constraction Project Plan / Prapared by Hikmatullah Umar

Duration
Numbers Activities Start End Total days Responsible
1 Obtaining approvals 1-Jun-23 2-Jun 2 Owner
2 Layouting 1-Jun-23 2-Jun 2 Surveyor
3 Excavation 3-Jun-23 5-Jun 3 Sit Engineer
4 Contracts 5-Jun-23 5-Jun 1 Manager
5 Suppl and beam making 6-Jun-23 10-Jun-23 5 Sit Engineer
6 Stone Masonary 11-Jun-23 14-Jun 4 Sit Engineer
7 Break Masonary 11-Jun-23 14-Jun 4 Sit Engineer
8 Walls Works 15-Jun-23 19-Jun 5 Sit Engineer
9 RCC Concrete 20-Jun-23 21-Jun 2 Sit Engineer
10 Electric Work 22_Jun-23 24-Jun 3 Sit Engineer
11 Window and Door installation 22-Jun-23 24-Jun 3 Sit Engineer
12 Plaster 22-Jun-23 25-Jun 4 Sit Engineer
13 PCC Work 23-Jun-23 25-Jun 3 Sit Engineer
14 Painting 26-Jun-23 28-Jun 3 Sit Engineer