Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
JERES-P-113
This standard defines the minimum mandatory requirements governing design and supply for
induction and synchronous motors and generators.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 1 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
Revised to update
N. Mosson, STC D. Grunemwald
2 21-Apr-2009 paragraph: 5.6 (reference L. Duquesne
F. Silva, Eng. Mgr. Project Director
to JERES-C-101)
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 2 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
Revision Tracking
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 3 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
Table of Contents
1 Scope 5
3 References 5
4 Definitions 6
8 Protection 9
Appendixes
A Motor Type 12
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 4 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
1. Scope
1.1 This standard defines the minimum mandatory requirements governing design and
supply for induction and synchronous motors and generators, fixed installations.
1.2 This standard sets the rules and basis for selecting the applicable SATORP
Engineering Standards and/or Material Specifications that supplement the
applicable Codes.
2. Conflicts and Deviations
2.1 Any conflicts between this standard and other applicable Company Engineering
Standards (JERES), Material Specifications (JERMS), Standard Drawings
(JERSD), Engineering Procedures (JEREP), Company Forms or Industry
standards, specifications, Codes and forms shall be brought to the attention of
Company Representative by the Contractor for resolution.
Until the resolution is officially made by the Company Representative, the most
stringent requirement shall govern.
2.2 Where a licensor specification is more stringent than those of this standard, the
Licensor’s specific requirement shall apply.
2.3 Where applicable Codes or Standards are not called by this standard or its
requirements are not clear, it shall be brought to attention of Company
Representative by Contractor for resolution.
2.4 Direct all requests for deviations or clarifications in writing to the Company or its
Representative who shall follow internal Company procedure and provide final
resolution.
3. References
The selection of material and equipment, and the design, construction,
maintenance, and repair of equipment and facilities covered by this standard shall
comply with the latest edition of the references listed below as of the CUT-OFF
DATE as specified in the Contract unless otherwise noted.
Company References
Company Engineering Standards
JERES-A-105 Noise Control
JERES-A-112 Meteorological and Seismic Design Data
JERES-B-068 Electrical Area Classification
JERES-C-101 Basis design of Data
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 5 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 7 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
USA/Canada Intertek Testing Services (ITSNA) (Formerly known as ETL) Labeled or listed
UK BASEEFA Certified
NOTE: For Third Party not listed, Contractor shall confirm to Company that Third party is part of the International
Standard Certified equipment program list.
5.4 Motors used in hazardous locations shall be repaired by a repair agency approved
to recertify the motors for use in hazardous locations. After repair, the motor shall
be recertified.
5.5 Where electrical equipment has to be installed in hazardous area, equipment with a
type of protection suitable for the relevant zone shall be selected and specified in
accordance with requirement of paragraph 8.6 of JERES-P-100.
5.6 Motors and generators exposed to ambient temperatures shall be rated in
accordance with JERMS-P-7502 for ambient temperature as specified inside
JERES-C-101. Motors shall be applied and sized based on their 1.0 service factor
rating.
5.7 Diesel-engine driven generator sets shall comply with JERMS-P-7518.
5.9 Specialty (definite-purpose) motors shall meet the requirements of IEC 60034.
5.10 Protective instruments (Temperature, vibration, speed, etc.) for motors shall
comply with JERES-J-604.
5.11 Motor and generator packages shall meet the noise requirements of JERES-A-105.
6. Motors for Industrial Facilities
6.1 Motors shall comply with JERMS-P-7502.
6.2 Motors shall be selected in accordance with Appendix A.
6.3 Fractional Kilowatt (Horsepower) Motors
6.3.1 The requirements of this section do not apply to fractional horsepower motors
which are an integral part of packaged parent equipment such as air conditioning
units.
6.3.2 Motors rated less than 0.746 kW (1 HP) shall comply with IEC 60034, and the
following additional requirements:
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 8 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 9 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 10 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
This section provides general protection requirements for small low voltage
standby/emergency, diesel-engine driven generators.
8.5.3.1 Where built-in protection is provided by the generator manufacturer, the protection
for generators above 250 kW shall be subject to review by Company
Representative.
8.5.3.2 The minimum protection shall consist of phase overcurrent and ground
overcurrent, protection devices.
8.5.3.3 The type of ground fault protection required for emergency generators shall be
subject to review by Company Representative.
8.5.3.4 The generator protection scheme shall be compatible with the following generator,
exciter, and system parameters:
- Type of Excitation System
- Magnitude and duration of generator fault currents
- Generator short-circuit withstand capability
- Coordination with downstream protective devices
8.5.3.5 Where a generator system is supplied with a molded-case main circuit breaker, the
breaker shall have a continuous current rating not exceeding 125% of the
generator's rated capacity.
8.5.3.6 Where a low-voltage main power circuit breaker is used, the breaker shall have a
continuous current rating not less than the generator maximum rating. When a
circuit breaker integral protection device is provided, it shall have long-time and
short-time phase units only. A separate ground fault relay shall alarm only.
8.5.3.7 The Vendor shall supply the following generator data for review and for use in
calculating the relay settings:
Nameplate ratings:
- Short-circuit test data showing the magnitude and duration of fault
currents for various types of faults on the generator terminals.
- Type and characteristics of excitation system.
- Short-circuit withstand capability (I²T).
- Built-in protection devices that are supplied as part of the generator
assembly.
8.5.4 Relay Selection and Functions
8.5.4.1 Relays for generator protection shall be in accordance with JERMS-P-6513.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 11 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
Notes:
1) 208V rating only for operation on 208V system, and 240V only for operation on
240V system. Note 1, shall follow the guidelines for 240V and 480V rated motors
respectively.
2) Dual voltages 277/480V are only acceptable for motors up to 30 HP.
3) Above 1000kW (1340HP), the additional level of 6.6kV is permitted. The use of 6.6
kV motor plus unit transformer must be compared with a 13.8 kV motor on the basis
of cost. The documentation shall be submitted to Company approval.
4) Could be asynchronous if available.
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 12 of 13
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
Issuer: PMT
May 2012
Rev: 2D
Motors and Generators JERES-P-113
Motor >75-7500 2
Motor >7500 3
This document is the property of SATORP and shall not be reproduced in any form. Copies provided by SATORP shall only be
disclosed or provided to third parties insofar as relevant for the operations of SATORP and the information provided in this
document shall be used for no other purpose than these operations.
The content of this document will be regularly updated by SATORP and the validated version will be published on its intranet
site. Consequently, the validity of hard copies of this document must be verified prior to its use against the version on the
SATORP intranet site. Only soft copies on the SATORP intranet site dedicated to SATORP QMS are considered controlled
documents.
Page 13 of 13