BACK UP DATA QUANTITY

SATKER :
KEGIATAN :
KONTRAKTOR :
KONSULTAN :
PEKERJAAN : Pasangan Dinding 1/2 Bata 1 Pc 3 Psr

SKETSA GAMBAR PELAKSANAAN


20

H
List Profil Beton
Ringbalk 11/20 cm

F G 20
7

I
E
DILATASI

15
20

DILATASI

J L DETAIL X
Skala 1 : 10

D
20 20

M
Ringbalk 11/20 cm Ringbalk 11/20 cm
Pas. 1/2 Bata Pas. 1/2 Bata
Kolom 20/20 cm Kolom 20/20 cm

K
200 160 200 160

N
Sloof 12/20 cm Sloof 12/20 cm
Pas. Batu Kali Pas. Batu Kali
Finishing Plester Finishing Plester
Acian dan Cat Acian dan Cat

C
20 20
21,1 24,9
20
100 Plester 100 Plester
Acian dan Cat Acian dan Cat
155 155

O
55 55
Poer Plat Poer Plat

Gambar Detail Gambar Detail


POTONGAN A POTONGAN B
Skala 1 : 40 Skala 1 : 40

B
Dilatasi Ringbalk 11/20 cm Dilatasi
A Kolom 20/20 cm
Sloof 12/20 cm
B

200 Pas. 1/2 Bata Pas. 1/2 Bata Pas. 1/2 Bata Pas. 1/2 Bata Pas. 1/2 Bata Pas. 1/2 Bata

P
Pas. Batu Kali Pas. Batu Kali Pas. Batu Kali Pas. Batu Kali Pas. Batu Kali Pas. Batu Kali
100 Finishing Plester Finishing Plester Finishing Plester Finishing Plester Finishing Plester Finishing Plester
150 Acian dan Cat Acian dan Cat Acian dan Cat Acian dan Cat Acian dan Cat Acian dan Cat

50

Pas. Batu Kali Finishing


299,2 299,2 299,2 299,2 299,2 299,2 Plester Acian dan Cat
1795,3 Pedestal Kolom
Poer Plat

A
1815,3

Q
Gambar Detail
2738,2 TAMPAK PAGAR SEGMENT B
Skala 1 : 100
SEGMEN T

2182,5

SEGMEN U
T S 326,5

SEG. R

U R 299,2

Gambar Detail
299,2 299,2
1795,3
1815,3
299,2 299,2 299,2

Gambar Rencana DENAH PAGAR SEGMEN B


DENAH PAGAR KELILING Skala 1 : 100
Skala 1 : 300

Ukuran Volume
No. Item Kerja Ket.
P t n M²

1 Pasangan Dinding 1/2 Bata 1 Pc 3 Psr 151.65 1.60 1.00 242.64

2 Plesteran Dinding, Beton dan Kaki Pondasi 1 Pc 3 Psr 35.92 2.00 1.00 71.84

3 Acian Dinding Bata, Kolom & Kaki Pondasi 17.12 2.00 1.00 34.24