Cotton soil taking out – 2 weeks

35,000
Himming 1 water
Hard stones – 9 x 9 = 5 lorries 41,000
Ballast 44 tons = 2 lorries 44,000
Sand 44 tons = 2 lorries 60,000
Cement 200 bags 126,000
Twister bars Y 10 = 36 12,600
Twister bars Y 8 = 30 8,700
Twister bars R 8 = 30 7,500
Twister bars R 6 = 30 5,400
Binding wire on roll 30 kg 2,400
Hard core = 10 lorries 40,000
6 lorries 6 x 9 for main walls 96,000
Iron sheets 3 meters 47 per 25,850
Iron sheets 2 meters 32 per 14,040
Roofing nails = 18 keg 5 2,160
Ordinary nails = 18 – 5 1,440
Ordinary nails = 18 – 4 1,440
Ordinary nails = 18 – 3 1,440
Ordinary nails = 10 – 2 800
Hard –boards 30 pieces 21,000
Soft – boards 30 pieces 21,000
Mukuwa one roll 25 kg 7,000
Lintel or Ring beam 8,000
Damp proof course one roll 5,000
Painters at 30,000
Doors 16 – 4 each hours 36,000
Windows 16 – 4 each hours 16,000
Timber 4 x 2 – 1600 feet 40,000
Timber 3 x 2 – 190 feet 4,320
Timber 6 x 1 – 200 feet 18 3,600
Ridge Board = 8 x 1 – 156 feet 3,900
TOTAL 721,590