BUTEC
BUTEC
3 4
More than 50 years ago BUTEC began It delights me that you may now realize
Milestones
Company Profile
Company Profile
as a venture that embodied a dream, the extent of my deep affection for you
a certain perception of life, and a vision and for the younger generations, and
for development and social progress. the energy it bestows upon me to •1964 BUTEC was founded -
accomplish what I promised my grand incorporated in 1966
What we have achieved since fills me children and what I am promising you
with pride and satisfaction. The company today - the “Other Lebanon” and your •1971 First regional project
BUTEC
BUTEC
5 6
BUTEC, "Bureau Technique d'Etudes
Company Profile
Company Profile
BUTEC
BUTEC
BUTEC is
A bold contractor, who believes more perpetual, dynamic and yet careful
in the capacity of its men and women movement which will keep us ahead of
to learn, improve, innovate and deliver the game and will allow us to grow. I look
than in the book value of depreciating to each one of you to play your specific
machinery. and essential part in the exciting journey
we have embarked upon.
A faithful and prudent contractor,
who understands that the essence of its
role is to make good on its contractual
obligations, act in the best interest of
its clients and has never failed one in
50 years.
Profile
Company
8
• Water
9 • Oil & Gas 10
• Industrial Facilities
Company Profile
Company Profile
• Power
• Infrastructure
• Building Construction
• Utility Services
BUTEC
BUTEC
IMS
BUTEC S.A.L
Butec Tower Mkalles Square,
Beirut, Lebanon
ISO 9001:2015
Integrated Management System General contracting & engineering design" Civil, electrical &
electromechanical works"
For the following activities
Authorised by
Page 1 of 2
Company Profile
limitations of liability, indemnification and jurisdictional issues established therein. The
Company Profile
greater efficiency.
BUTEC S.A.L
BUTEC
BUTEC
ISO 14001:2015
BUTEC’s awarded certification in Quality For the following activities
and Safety Assessment Series (OHSAS SGS Société Générale de Surveillance SA□Certification & Business Enhancement
Technoparkstrasse 1□8005 Zurich□Switzerland
t +41 (0)44 445-16-80□f +41 (0)44 445-16-88□www.sgs.com
18001:2007). Page 1 of 2
This document is issued by the Company subject to its General Conditions of Certification
Services accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the
limitations of liability, indemnification and jurisdictional issues established therein. The
authenticity of this document may be verified at http://www.sgs.com/en/certified-clients-and-
products/certified-client-directory. Any unauthorized alteration, forgery or falsification of the
content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.
QHSE
Certificate LB18/234286
BUTEC S.A.L
BUTEC Tower, Mkalles Square
Beirut - Lebanon
Quality, Health, Safety, Environment has been assessed and certified as meeting the requirements of
OHSAS 18001:2007
For the following activities
BUTEC is committed to protecting SGS Société Générale de Surveillance SA□Certification and Business Enhancement
Technoparkstrasse 1□8005 Zurich□Switzerland
t +41 (0)44 445-16-80□f +41 (0)44 445-16-88□www.sgs.com
Page 1 of 2
13
BUTEC
Water
LEBANON
Tripoli
Wastewater
Treatment
Plant
15 16
Company Profile
Company Profile
BUTEC
BUTEC
Project Description
Jbeil
Wastewater Barwa
Treatment Wastewater
Plant Treatment Plant
17 18
Financing Project Description Employer
Barwa City – Marafeq Qatar
Company Profile
Company Profile
BUTEC
• Sea outfall DN: 500 mm,
BUTEC
Delegated Employer
Council for Development and length: 910 m Awarded
Reconstruction (CDR) 2010
• 20 buildings and structures,
landscaping, irrigation, process
Role of BUTEC and service networks
Contractor for civil & MEP works and • 2 generator sets of 860 kVA and
installation of process equipment 260 kVA, 2 transformers and
Contractor for process: Degrémont, MV switch gears. UPS, normal
subsidiary of “Groupe Suez”, France lighting fixtures, CCTV, data, telephone
network, SCADA, and intrusion alarm
Awarded systems Scope of Work
2007
• HVAC, water supply, drainage, EPC for civil works, electro-mechanical
irrigation and sewer, and industrial installation as well as erection of all
water network equipment.
QATAR
UAE
Deira Island
Wastewater
Treatment Plant
19 20
Project Name
Company Profile
Company Profile
Employer
NAKHEEL Group PJSC / the Palm Deira
BUTEC
LLC, Dubai
BUTEC
Role of BUTEC
Main contractor in consortium with
VWS Emirates LLC (Veolia Water
Systems)
Awarded
2017
Scope of Work
EPC for civil works, electro-mechanical
installation as well as erection of all
equipment.
Project Description
• Population equivalent: 240,000 PE • Electrical & control equipment
• Total daily design flow: 36,000 m3/d installation
• Design peak flow: 3,000 m3/d • Installation of all process mechanical
equipment and mechanical process *
• Designed based on a Membrane
networks (sewerage, Process water &
Bioreactor type (MBR) of biological
compressed air)
treatment process. The proposed plant
consists of all major treatment steps, • Installation of mechanical non-process *
i.e. preliminary treatment, secondary networks (Water supply, irrigation,
treatment, tertiary treatment, storm water & firefighting)
sludge and odor treatment. and HVAC system for utility and
administration buildings.
• Structural design and construction of
20 process & facility buildings
LEBANON
Chekka,
Batroun, Zahle
Wastewater
Treatment
Plants
21 22
Company Profile
Company Profile
French Protocol for process Contractor for civil & MEP works and
for Chekka, and Batroun installation of process equipment in Figures Popuation Equivalent 49,500 PE 45,000 PE 300,000 PE
Italian Protocol for process for Zahle Contractor for process: Degrémont, Total Daily Design Flow 9,500 m3/d 3,888 m3/d 56,000 m3/d
Lebanese Government for civil works subsidiary of “Groupe Suez”
Design Peak Flow 903 m3/h 512 m3/h 3,800 m3/h
Employer Awarded
BUTEC
BUTEC
Scope of Work
EPC for civil works and
electromechanical installation
as well as erection of all equipment.
ALGERIA
Djelfa, Mecheria,
Mostaganem
Wastewater
Treatment
Plants
23 24
Projects
Company Profile
Company Profile
Employer Awarded
Ministry of Hydraulic Resources 2009 – Djelfa
National Office for Sanitation (ONA) 2011 – Mecheria in Figures
2014 – Mostaganem
Role of BUTEC
Main Contractor in consortium with:
BUTEC
BUTEC
Total Daily
Design Flow 36,300 m3/d 12,880 m3/d 56,000 m3/d
EPC for civil works, as well as installation works for process and non-process as Hydraulic
of the various process & utility networks, well as testing and commissioning of Concrete 11 20 17
and erection of all equipment for Djelfa, the plant, in addition to management Structures
and Mecheria wastewater treatment and operation for a period of two years
plants. In Mostaganem it covered starting with the date of the preliminary
architectural, civil, and electromechanical acceptance.
QATAR
Mahlissa &
Aspire Zone Laklouk
TSE Plant by Agricultural
Reverse Development
Osmosis Plan
25 26
Company Profile
Company Profile
Employer
NOVAFLOR S.A.L.
Role of BUTEC
Main contractor
BUTEC
BUTEC
Awarded
Phase I: 1995
Phase II: 2012
Scope of Work
• Construction of 7 lakes with capacities
from 60,000 m³ to 350,000 m³
• Gravity drainage system in the basaltic
Employer
ASPIRE Zone Foundation
Scope of Work formations Mahlissa tray on 250 ha
(length of 11 300 m)
EPC for civil works and installation
Role of BUTEC • Pressurized irrigation system (drip and
of process equipment in addition to
Main contractor in consortium with sprinkler) with 7 pumping stations;
testing, commissioning, operation and
Degrémont, subsidiary of “Groupe Suez”, each station comprises of two groups
maintenance for treated sewer effluent
France of pump power varying from
(TSE) water supplied by ASHGHAL and
60 kW to 125 kW
water coming from Aspire ground water
Awarded network. • Bypass channel that feeds the hill lakes
2015 from El Nabaa Kalhab
• TSE maximum inlet flow: 33,000 m3/d • Transformation of arid land into fertile
• TSE maximum outlet flow: 18,750 m3/d land for agriculture, an area of 250 ha
LEBANON
guidelines of WHO for the safe use of
wastewater in agriculture.
LEBANON
Sea Outfalls for Type GRP SN 5000 HDPE, SDR HDPE, SDR HDPE, SDR
26 PE 100 26 PE 100 26 PE 100
Wastewater
DN 300 mm 1 600 mm 500 mm 350 mm
Treatment
Under Seabed
Plants Submersion 1.5 m 1m 2m 2m
End Suction
Diffuser Length 20 m 175 m 75 m 17.5 m
27 28
Diffuser Risers 3, DN 200 mm 16, DN 700 mm 16, DN 500 mm 8, DN 110 mm
Company Profile
Company Profile
BUTEC
Council for Development and 2009 – Jbeil
BUTEC
Role of BUTEC
Main contractor in JV with
Land & Marine for Tripoli’s Sea Outfall
Main contractor for Civil and Sea
Outfall Works for Jbeil,
Batroun and Chekka
Scope of Work
EPC on turnkey basis including testing, Although the UV tertiary treatment
commissioning and maintenance for 4 ensures the elimination of pathogenic
sea outfalls to discharge treated water agents, a model simulating the discharge
offshore into the sea. dilution using CORMIX-GI was developed
in order to protect the frontal coast
from any risk of pollution. CORMIX-GI
is a program approved by the US
Environmental Protection Agency (EPA).
Company Profile
Company Profile
BUTEC
BUTEC
Employer Awarded
Ministry of Water Resources - MRE Phase I: 2005
Phase II: 2006
Delegated Employer
National Office for Sanitation – (ONA)
Role of BUTEC
Phase I: Main contractor
Phase II: Main contractor in JV with
VINCI Construction Grands Projets and
SOGEA SATOM
Scope of Work
EPC for civil works, sewer networks,
ground water drainage network and all
related appurtenances.
ALGERIA
LEBANON
Potable Water
Treatment
South Bekaa Plants &
Irrigation Pumping
Project Stations
31 32
Financing
World Bank Employer
Company Profile
Company Profile
BUTEC
BUTEC
Awarded Awarded
1998 1996
Scope of Work
Scope of Work
EPC and rehabilitation of various pumping stations, water reservoirs,
structures, hydraulic and electro- main supply canal, deep water wells,
mechanical equipment, irrigation water level (control and measuring EPC of civil works and installation of Rehabilitation and construction of 209
networks, electrical substations, structures) service roads, office hydraulic, mechanical, and electrical new pumping stations, 45 wells,
high and medium power supplies, building, workshop and store yard, equipment for 7 potable water chlorinating systems, electrical works,
transmission and monitoring networks, and installation of all equipment. treatment plants including coagulation, reservoirs, pumps, valves, pipes, etc.
flocculation, decantation, sand filtration The diversified locations of the pumping
and sterilization units in addition to the stations required a detailed logistics plan
Project Description drilling of wells. to adapt to technical and other site
requirements.
LEBANON
pumping station
- 2,000 m of various pipework,
• Drilling of 5 deep water wells, DN 150 to DN 200
up to 220 m deep
Company Profile
33
BUTEC
35 36
Company Profile
Company Profile
Employer Employer
SAUDI ARAMCO Al Hosn Gas (Abu Dhabi Gas
Development Company Limited)
Role of Rawabi BUTEC
Main Contractor Role of BUTEC
BUTEC
Main contractor
BUTEC
Awarded
2019 Awarded
2015
UAE
JORDAN
Aqaba New
Liquefied QAIA Fuel
Petroleum Hydrant System
Gas Terminal Project
37 38
Employer Employer
Aqaba Development Corporation AIG – Airport International Group
Company Profile
Company Profile
Awarded Awarded
2014
BUTEC
BUTEC
2011
Scope of Work
EPC and commissioning of an LPG jetty
located on the south shoreline of Aqaba,
Jordan.
Scope of Work
Project Description
Project Description
• Laying of fuel pipe network, 9,000 m block and bleed valves with actuators,
long, of 16” seamless specially coated 3” drain and vent ball valves
The jetty platform is equipped with • General lighting and power supply
pipes, with 1,000 m of 20” double • Civil works including excavation,
two marine loading arms mounted in • Control cables encasement pipes under taxiways, backfill, concrete and asphalt saw
duty/standby configuration, having an
• Standby emergency generator set and all related accessories, link seals cutting, reinstatement of concrete
unloading capacity of 300 m3/h each,
for critical loads; (quick release heat shrink sleeves and pipes cathodic aprons, construction of valve pits
and connected to an LPG line of 8
hooks with remote monitoring) protection with sections of 6.5 m x 4.5 m, most
inches diameter which ties the
jetty to an existing LPG pipeline • Automatic berthing/docking system • Supply and installation of 100 fuel of which are 6.5 m deep
600 meters away from the jetty, • Onshore civil works for access ramp hydrants, outlet Ø1.5” • Installation of 2 km of control cables
below the oil terminal trestle. • Fire and gas detection system and a • Supply and installation of 11 double
JORDAN
The works included: fire fighting system
• Wharf furniture for the jetty
UAE
Shah Gas
Development
Program
Buildings Works Arzew GNL
Package B 3Z Project
39 40
Company Profile
Company Profile
Employer
Al Hosn Gas, Abu Dhabi
Project Description
Employer
Package 2:
Role of BUTEC SONATRACH
• Central area: 3 primary
BUTEC
BUTEC
Scope of Work
EPC in addition to testing and U.A.E. in the frame of the Shah Gas
commissioning for all civil works, Development (SGD) Program.
as well as associated MEP works
and equipment installation. It Scope of work includes also the
covers 12 buildings of package construction of a site camp covering
“B” related to the units Shah an area of 70,000 m² for 700 residents
Process Plant (EPC package 2)
& Shah Sulfur Recovery Units
(housing canteen, nursery, recreation
areas and sport fields, etc.).
Scope of Work
(EPC package 3), located at Shah, Construction of the following structures:
ALGERIA
QATAR Rafic Hariri
International
Airport
Reconstruction
Pearl GTL & Rehabilitation
Temporary of 3 Jet A1
Power Supply Storage Tanks
41 42
Company Profile
Company Profile
Employer Employer
Qatar Shell GTL Limited Scope of Work Council for Development and
Reconstruction (CDR)
Role of BUTEC Power supply for the construction site of General Directorate for Civil Aviation
Main contractor in consortium the gas to liquid plant; covering an area
of 4 km2 and power supply for a
BUTEC
Role of BUTEC
BUTEC
Project Description
EPC of the following: Scope of Work
• Civil works for 4 substations,
33/11 kV, 40 MVA each The project consisted mainly of
• 120 km of underground rebuilding facilities destroyed during
11 kV cables for ring main units the war of July 2006 including 3 fuel
• 110 km of underground 33 kV storage steel tanks with a concrete
cables and connection to power skin for protection and a supported
grid cone roof. The capacity of each tank
is 6 000 m3
• 20 km of underground • 2 restored as follows:
fiber optic cables
- Bottom 10%
• Earthing grid for substations
- Shell 40%
• Installation of the following:
- Roof structure 100%
• 130 ring main units, 1 MVA each
- Roof plates 100%
• 11 kV and 33 kV switchgears
- Accessories 100%
• Power transformers and oil refilling
- Painting (internal and external)
• Assistance to SIEMENS in testing 100%
and commissioning
- Fire fighting system (water
cooling & foam networks) 100%
- Control system and
instrumentation 100%
• 1 completely rebuilt including all
related works, concrete ring
foundation, dikes and roads
• Reconstruction of site networks
LEBANON
- Kerosene filling and emptying
systems
- Fire fighting system
ALGERIA
Ohanet Station
Condensate
Storage Tank
Project Description 44
Company Profile
43
Company Profile
Employer • One storage tank (floating roof, - Emptying pipes: Ø 24” 36”, 30”, 24”, 20”, 16” &10”
SONATRACH double deck) for condensate - Underground piping system • Process instrumentation system
- Internal diameter: 57 m, Height: with cathodic protection - Level gauging system
BUTEC
Role of BUTEC 17m, Nominal volume 35,000m³
Main contractor in consortium • Fire fighting system as per NFPA - Temperature monitoring system
- 1,000 tons of steel plates standards with fire hydrant network
BUTEC
45 46
Project Description
Company Profile
Company Profile
Employer
Qatar Liquefied Natural
Scope of Work
Gas Company Limited (3),
Qatar Petroleum & Shell EPC contract for the construction of 25 • Full and detailed tank design according profiles, shell & roof nozzles, internal
Gas-Power Development B.V steel tanks for the storage of chemical to API 650 addendum 4 and Qatar Gas piping CS & SS, PV vents, insulation
products with diameters up to 21.4 m special requirements and painting)
BUTEC
BUTEC
Banias Refinery
Fuel Storage
Tanks & Related
Pipeworks
47 48
Company Profile
Company Profile
Employer
Banias Refinery Company
Ministry Of Petroleum
And Mineral Resources
Role of BUTEC
BUTEC
BUTEC
Main contractor
Awarded
2003
Scope of Work
• EPC contract for the construction of
10 storage steel tanks, 33,000 m3 each
• 8 tanks with floating roof for heavy
crude oil, light crude oil, naphta and
gasoil
• 2 tanks with fixed roof for fuel oil
Project Description
Sharjah Waste
to Energy
Project
51 52
Company Profile
Company Profile
Employer
Sharjah Waste to Energy Company (a JV Scope of Work
between Masdar and Bee’ah)
Civil works of the entire site and the
Role of BUTEC construction of all buildings of the
Subcontractor to CNIM project which consist of 30MW
BUTEC
BUTEC
Project Description
Company Profile
Company Profile
BUTEC
BUTEC
Employer
Algerian Qatari Steel Spa
Scope of Work
Role of BUTEC Civil construction including piling
Main contractor in JV with Elecnor foundations and steel structure
buildings, Mechanical and Electrical
Awarded Erection Works for the ASU Package
2017 (Construction of an Air Separation Unit
Plant for that separates atmospheric air
into its primary components: Nitrogen,
Oxygen and Argon).
UAE
Kizad Zone
Aluminum
Extrusion Plant
55 56
Company Profile
Company Profile
BUTEC
BUTEC
Value engineering, design, procurement • Presses annual capacity: 87,600,000 room, serving hydrants, reels &
& construction of an aluminum plant, tonnes of extruded aluminum profiles sprinklers
associated infrastructure, ancillary • Total site area: 200,100 m2 - Water: storage and pumping
buildings, as well as erection of all 2 for process, chilled, domestic
• Total built-up area: 67,194 m
process equipment. and irrigation systems
TALEX is an Estidama project -
- Drainage: sewage and storm
Pearl II rating. Civil Works:
water piping and pumping
The scope of work includes process, • Pre-engineered buildings: 63,382 m2
non-process buildings and site works • Compressed air system: 3,000 m3/h
• External works
as follows: demand, provided by 3 compressors
- Road works & pavement: 58,330 m2 160 kW each
• Buildings: - Green areas: 26,580 m2 • Natural gas system: 300 m3
Cast house building, extrusion • LPG concrete channels: 2,081 m3 underground storage, provided with
building, entrance building, delivery pumping and distribution networks
• Concrete buildings: 28,300 m3
gate building, visitor gate building, • Process water cooling: 4 chillers
substation buildings, MV switchgear • Dynamic compaction: 127,170 m2
1,171 kW each, cooling towers
room, compressor room • Piling: 49 l/s each
• Site Works: - 449 piles of 100 cm diameter
Underground process tank; (4 600 m3) Electrical Works:
piezometric tank; landscaping & - 62 piles of 90 cm diameter (550 m3) • MV/LV distribution network:
external areas; fences; R/C works 32.33 MW plant including 6
(trenches, thrustblocks, platforms, Mechanical Works: substations with 23 1.5 MVA
etc.); mechanical systems and • HVAC system: rooftop packages, DX transformers
electrical systems units and wind driven ventilators
• Building services including lighting,
• Wet systems: small power, lightning, earthing and
- Fire fighting: 2,500 GPM pumping ELV systems
Employer
TALEX – Taweelah Aluminium
Extrusion Company LLC
Role of BUTEC
Main contractor
Awarded
2013
QATAR
Lusail Marina
District Cooling
Plant
57 58
Company Profile
Company Profile
Employer
Marafeq Qatar L.L.C. Scope of Work
Role of BUTEC EPC contract on turnkey basis for a
Main contractor in JV with district cooling plant with a capacity of
ADC Energy Systems LLC 33 250 TR (Phase I) at Marina District in
BUTEC
BUTEC
Lusail.
Awarded
2013
Project Description
Bellara Steel
Complex
Balance of Plant
59 60
Company Profile
Company Profile
Employer
Algerian Qatari Steel Scope of Work
Consultant The works consist in the development,
Idom, Spain installation and coordination between
the various external networks related to
the new steel complex in Bellara with a
BUTEC
BUTEC
Role of BUTEC
Main contractor in JV with Elecnor production capacity of 2,000,000 tons
per year. Scope of work includes as well
Awarded construction of all utility buildings,
2016 foundation works for technological
packages, piping and cabling
interconnection between technological
packages, roads, and infrastructure
surrounding the different process
facilities of the steel factory.
Project Description
Lattakia
Spinning Mill
Complex
Project I - II
61 Project Description 62
Company Profile
Company Profile
Employer
Ministry of Industry In Syria Scope of Work • Mill annual capacity: 27,000 tons pumps, capacity 120 m3/h each,
of combed & carded cotton 6 deep wells, capacity 100 m3/h
EPC of civil works, industrial plant • Total site area: 420,000 m2 each, and a water storage reservoir
Delegated Employer
utilities and related networks, as of 3,500 m3
GOTI (General Organization for Textile • Total built area: 147,000 m2, including
BUTEC
BUTEC
Industries) well as erection of all process 115,000 m2 of metallic pre-engineered • Water treatment and softening plants
equipment. buildings (filtration, decantation, flocculation):
Role of BUTEC capacity 36 m3/h
• Roads and parking areas: 68,000 m2
Main contractor in consortium • Air plants, 4×16 m3/min for process
• 20 km of reinforced concrete channels
with PECO GmbH and 4×8 m3/min for cleaning network,
(200 cm wide × 300 cm high) for
with all ancillaries including filters,
underground return air
Awarded dryers, receivers and distribution
Project I: 1993 • 20 kV/400 V electrical sub-station with networks
Project II: 1997 18 2500 kVA transformers, ring main
• Fire fighting system, with fire pumping
units, including incoming / outgoing
station (216 m3/hr), fire hydrants
MV cubicles and metering / protection
network for site protection, hose
MV cubicles
reels for production areas and
• 19 built-up air handling plants sprinkler system in all stores
with air filters, air washers and (includes fire brigade equipment)
heat exchangers; cooling capacity
• Underground drainage network: 15 km
1,760 kW each
• Surface concrete channels for rain
• Industrial heating plant: 2,000 kW
water drainage: 20 km
• Water collection and storage utility,
• Sewage treatment plant 100 m3/d,
with river water intake structure: 4×6”
with primary and secondary treatment
Company Profile
63
BUTEC
Power
QATAR
Mesaieed
IPP of 2000
MW/400 kV
65 66
Company Profile
Company Profile
BUTEC
BUTEC
Project Description
• 400 kV GIS building: 310 KW (91 TR) each, and fire rated
Employer - Floor area 2×3,000 m2; 14.5 m precast smoke exhaust system 2×11 735 l/s
Mpc Ltd, Scope of Work beams length; 12.6 m floor clear head and 2×5 869 l/s
KAHRAMAA (Qatar General - The HVAC system consists of 4
EPC of civil works for the construction • 132 kV GIS building:
Electricity & Water Corporation) packaged units (2 standby), capacity
of 400, 220 and 132 kV GIS buildings
388 kW (115 TR) each, and fire rated - Floor area 2×650 m2; 8.5 m
including all associated MEP works and
Role of BUTEC smoke exhaust system 4×14828 l/s floor clear head
equipment installation:
Subcontractor for civil works and 2×9 886 l/s - The HVAC system consists of 2
• Mechanical: Plumbing, HVAC, and fire
Main contractor: Iberdrola - Spain packaged units (1 standby),
fighting
capacity 164 KW (48 TR) each
Awarded • Electrical: Internal/external lighting, • 400 kV control building:
2007 small power, distribution boards, - Floor area 410 m2; 4.4 m
telephone network system, intrusion floor clear head • 132 kV control building:
alarm, fire detection and alarm, - The HVAC system consists of 2
- Floor area 510 m2; 5.7 m
earthing, and lightning packaged units (1 standby),
floor clear head
• Architectural and finishing capacity 109 KW (32 TR) each
- The HVAC system consists of 2
works for the construction of all package units (1 standby) capacity
400/220/132/11 kV GIS buildings • 220 kV GIS building:
192 KW (56 TR) each, and fire rated
• Infrastructure, site works and - Floor area 2×1400 m2; 8.5 m smoke exhaust system 1 × 9 452 l/s
landscaping floor clear head and 1 × 5 108 l/s
- The HVAC system consists of 2
packaged units (1 standby) capacity
QATAR
Power
Power Transmission
Transmission System
System Expansion P VIII
Expansion P VIII S/S: Packages
Umm Birka S/S S-2-2 & S-4-1
67 68
Employer
Scope of Work
Company Profile
Company Profile
BUTEC
BUTEC
QATAR
UAE
New 33/11 kV
Primary S/S &
Modification of
Existing S/S
69 70
Company Profile
Company Profile
BUTEC
BUTEC
Project Description
Employer
ADWEA (Abu Dhabi Water
Scope of Work
& Electricity Authority)
• EPC, commissioning and delivery of The works of the 2 phases include all • Lot 1B: 33 kV cable works for
Role of BUTEC new 33/11 kV primary substations civil works, buildings, electrical power interconnection between substations
Main contractor in consortium equipment, transformers and under lot 1A and other interconnections
• Modification of existing 33/11 kV switchgears, auxiliary electrical
with SIEMENS GmbH primary substations as well as related equipment and all equipment Phase II:
cable connections to interconnect the necessary to establish the complete
Awarded new primaries with the existing • Lot 2A: supply & installation of five
2007 substation such as remote end, 33/11 kV new primary substations,
network telecommunication and DMS works. relocation of one 33/11 kV package,
extension of 33 kV switchgear at NIT
Phase I: substation, extension works at one
• Lot 1A: supply & installation of six existing primary substation and
33/11 kV new primary substations extension of 33 kV switchgear at
and extension works at one existing Mussafah GIC
33/11 kV primary substation
UAE
2 x 4 MW
Battery Energy Gas Turbine
Storage System Units
71 72
Employer
Company Profile
Company Profile
SONELGAZ
Role of BUTEC
Subcontractor for civil And MEP works
Main contractor: PW Power Systems
BUTEC
BUTEC
Awarded
2014
Scope of Work
• Installation and erection of the GT
units including power trailer, control
trailer, gas skids and small accessory
components
Employer • Supply, prefabrication and installation
ADWEA (Abu Dhabi Water
Scope of Work of gas piping including all necessary
& Electricity Authority) supports, NDT test, painting and
• EPC including the following:
insulation
Role of BUTEC - New BESS buildings complete
• Supply, prefabrication and
Main contractor with MEP works
installation of steel structure
- Trenching & cabling between including all necessary supports,
Awarded main substation & BESS building painting and insulation
2009 - Integration of BESS and • Installation and connection
associated systems of the mobile MV substations
- Lightning protection and earthing • Installation of the instrumentation
system
Project Description
- 2 auxiliary transformers, dry type,
11/0.41 kV, 1,500 kVA • Supply, installation and connection of Installation and commissioning of 11
power cable between the GT units and Mobile Pac® GT units of 25 MW each,
the substations with all necessary including the power trailer, gas skids,
cable trays and accessories small accessory components, cabling
Project Description • Supply, installation and connection of and pipe fitting. The project is divided
into two lots: 9 units at M’sila site and 2
control cable between the GT units,
2 units (concrete and steel auxiliaries’ equipment and substations units at Boufarik site.
pre-engineered buildings), 4 MW with all necessary cable trays and
each, at the following substations: accessories
• HTCO 132/11 kV primary grid • Pre-commissioning and
substation (E25) commissioning of the plant
• Port 132/11 kV primary grid
substation (E14)
ALGERIA
IRAQ
Umm Qasr
Power Plant
29.34 MW
73 74
Company Profile
Company Profile
BUTEC
BUTEC
Employer
Prime Metro Power Holding (PMPH)
Scope of Work Project Description
The Umm Qasr Power Plant (“UQPP”) Overall turnkey design, procurement, balance of plant services, including
Role of BUTEC
project consists of the design, construction, and commissioning of tanks, steel structures and concrete
Main Contractor
procurement, construction, and Umm Qasr Power Plant 29.34 MW based structures
commissioning of a 29.34 MW (Phase 1) on reciprocating gas engines (3 x • Administrative Building, guard house,
Awarded
gas fired captive power plant located at 20V34SG) in accordance with warehouse and workshop facilities
2019
Umm Qasr Port, Basra Governorate, WARTSILA(FI)’s specifications and • Connection to the Natural Gas 40bars
Republic of Iraq. Employer’s requirements, including: pipeline through Gas Pressure
The purpose of this plant is to deliver • Power House Reducing Station
base load 24/7 power to the Umm Qasr • Electrical Building including LV, MV • Step-up transformer (60MVA –
port operated by the general company switchgears, control room 11/33KV) and transmission lines
for ports of Iraq (“GCPI”). • Electro-Mechanical process and connecting the plant to the existing
GCPI substation.
Company Profile
75
BUTEC
Infrastructure
QATAR
NDIA Perimeter
Security Systems
Enhancements
77 78
Scope of Work
Company Profile
Company Profile
BUTEC
BUTEC
Project Description
The project consists of facilities,
equipment, building infrastructure,
life safety and other special systems
and utilities/site improvements;
• Perimeter intrusion
detection system (PIDS)
• Enhancements at access
control points (ACPs)
Client • Perimeter fence enhancements
New Doha International • Temporary site improvements
Airport Steering Committee
Consultant
OBI– Overseas Bechtel Inc.
Role of BUTEC
Subcontractor for civil, MEP works,
and installation of security systems
Awarded
2011
LEBANON
Reconstruction
Restoration of of Mudeirej
Casino Bridge Bridge
79 80
Company Profile
Company Profile
Employer
US Government
Project Description
Role of BUTEC • 40 m span precast U-section including
Subcontractor in JV with Freyssinet wings, each element weighing 210 tons
BUTEC
BUTEC
LEBANON
LEBANON
81 82
Employer
Scope of Work
Company Profile
Company Profile
BUTEC
BUTEC
Scope of Work
EPC and renovation of the pavement
Project Description including associated electromechanical
systems of the north runway at the
• Construction, distribution systems and
new Queen Alia International Airport
installation are in compliance with U.S.
in Amman.
codes and standards
• A traffic control plan, including key Works are bounded by the
plan drawing of traffic flow, was set 4,080 m x 300 m runway strip plus
prior to mobilization two 240 m x 150 m runway end safety
Employer • A quality control plan (QCP) and a areas (RESAs) beyond each end of the
POB (Port of Beirut) health & safety plan (H&S) were runway strip. In addition, the full extent
prepared prior to mobilization of both approach lighting systems is also
Delegated Employer • Coordination with U.S. government part of the scope of the project, with
Washington Defense Division engineers and with the port authorities associated implications to the
of URS Corporation, Cleveland - Ohio functionality of the systems.
Role of BUTEC
Main contractor
JORDAN
strip - 586,000 m2 approximately
Building
83 Construction
Company Profile
BUTEC
QATAR
Qatar
Foundation
QSTP Tech 4
Buildings
85 86
Company Profile
Company Profile
Employer
Qatar Foundation
Scope of Work
EPC, coordination, development,
Role of BUTEC
installation, testing and commissioning
Main contractor in JV with Murray &
of the Tech 4 facility with internal
BUTEC
Roberts
BUTEC
Project Description
The Tech 4 building worksite is located In order to respond to the key guiding
in Zone 4 of Education City, which is in principles such as high quality, natural
the central area of the North Campus. light, contextual, etc., the exterior
The facility is providing modules of 500 m2 envelop is proposed to be composed of:
of clear lettable floor space with 15 m
height. Integrated structural provisions • On the esplanade side, a curtain wall
are provided for a full mezzanine floor at system layered by an aluminum
+9.0 m level within each typical module. sunshade louver system to control
Complete fit-out daylight in the common areas
of the common/landlord areas and • On the roof and on the loading dock
provision of service interfaces only side, a double skin system composed
for the tenant areas. Each typical of a layer of semi-transparent
module space of 500 m2 provides composite material to allow for natural
adequate utility connection points. light to penetrate the entire volume
Provisions are sufficiently foreseen and a layer of perforated aluminum
within the main fire alarm panel for sheet system serving as “musharabia”.
integration of tenant fit-out related
requirements, and under the base build.
QATAR
87 88
Company Profile
Company Profile
BUTEC
BUTEC
QATAR
LEBANON
Beirut
Central District
Hilton Hotel
89 90
Company Profile
Company Profile
BUTEC
BUTEC
Project Description
• Overall built area 23,000 m²,
17,000 m² of superstructure
and 6,000 m² underground
• 5 basement levels, ground &
mezzanine levels, 7 current
floors,and a roof floor
• Rooftop restaurant, swimming
pool and a solarium terrace on roof
• Total of 162 guestrooms, 20 suites
and 2 royal suites on the current floors
• Entrance lobby, reception, luxurious
designer boutique shops and a
French brasserie overlooking a
backyard garden on ground floor,
Employer
Al-Iquarat wal Abniat
Scope of Work with management offices at
mezzanine level
Role of BUTEC Construction of a five-star hotel in • Business centers, conference hall, bar
Main contractor downtown Beirut, with special and a ballroom at first basement level
attention to architectural and • 75 parking spaces on basement
• Building management system
Awarded interior design details, which levels, 6 passenger and service lifts
2003 create a high quality designer hotel. • Fire alarm and public address systems
• Glazed central atrium
• CAT6 telecommunication network
• Advanced sound treatment
for rooms, and recreation areas • WIFI access points
• 3 generator sets 630 kVA each, • Central HVAC system with
for complete power redundancy independent hot and chilled
circuits in each room
• Programmable scenery for lighting
and auxiliaries in guestrooms • Smoke exhaust system
• Interactive television system with LCD • Fire protection system in
TV sets in rooms, splash-proof sets in guestrooms & public areas and
suite bathrooms suppression systems for service areas
LEBANON
Tripoli South
Stadium
91 92
Company Profile
Company Profile
Project Description
• Concrete volume: 24,450 m3 tunnel test, at the “Centre d’Essais
BUTEC
BUTEC
Employer
Council for Development and
Scope of Work
Reconstruction (CDR)
EPC for an olympic sports stadium
Role of BUTEC (football and other athletic sports)
Main contractor constructed for the Asian Football
Cup in a restricted timeframe.
Awarded
1999
Company Profile
93
BUTEC
Utility
Services
LEBANON
Distribution
Network with
Customer and
Metering Services
95 96
Company Profile
Company Profile
Employer
Ministry of Energy and Water
Electricité du Liban (EDL)
Role of BUTEC
BUTEC
BUTEC
Awarded
2012
Scope of Work
Company Profile
Company Profile
BUTEC
BUTEC
Smart Meters
Laboratory
Four shoe factories in Nabek,
History Sueida, Daraa, & Mosiaf, Syria
Unichem
Ceramic & Chinaware Plant Project, Lebanon
& Archive Uniceramic Dubai Branch
Company Profile
Company Profile
BUTEC
BUTEC
Over 50 Years
of Excellence 1971 1974 1977 1978
BUTEC prides itself with half a Iraq Branch
century of excellence for quality Syria Branch (Active until 1990)
and timeliness of projects delivered.
It boasts an impeccable track record Quarantine Compost Plant, Lebanon
of engineering, integrity, and safety Ministry of Public Health
covering a wide variety of complex
and innovative projects. BUTEC has
given top priority to the interest of
its clients believing that client
satisfaction is aligned with the
firm’s own long-term success.
The firm’s unique business model
brings international standards to
First regional
local markets across the MENA region,
project
thus positioning the firm as the “local
contractor of choice”. BUTEC plans to
continue on delivering world-class
engineering and construction projects
for the next 50 years and beyond.
Batroun Government Hospital, Lebanon
Ministry of Public Health
Pedestrian Steel Overpass, Iraq Sigillah & Hindiyah Irrigation Project, Iraq Kerosene Storage Tanks & Pumping Station, Electrical System & Utilities Jubail Al Sinayah, KSA
Municipalities of Baghdad & Tikrit Ministry of Irrigation Beirut International Airport, Lebanon Royal Commission for Jubail & Yanbu
Civil Aviation Authority
101 102
Company Profile
Company Profile
BUTEC
BUTEC
Bridges at Beirut Entrances, Lebanon Dubai Tower, UAE Fence, Peripheral Road & Runways Construction
Ministry of Public Works Arab Bank for Investment & Foreign Trade of Rafic Hariri Int’l Airport, Lebanon
Executive Council for Beirut Grand Projects
Company Profile
Company Profile
BUTEC
BUTEC
Fire fighting & Telecom Facilities, King BUTEC Tower, Lebanon Refueling Scheme, Rafic Hariri Algeria Branch Abu Dhabi Branch
Fahd Int’l Airport, Dahran, KSA BUTEC S.A.L. International Airport, Phase I &
Ministry of Defense & Aviation Phase II, Lebanon
Civil Aviation Authority
Iraq Branch
Establishment of BUS
(BUTEC UTILITY SERVICES)
Relocation of
Headquarters
to Beirut
Btalloun Village Buildings
Renovation, Lebanon
Council for Development and
Reconstruction (CDR)
Jordan Branch
105
Company Profile
BUTEC
Contact