1 2

Company Profile
Company Profile

Founder Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 03 Industrial Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49


Chairman Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 05 Sharjah Waste to Energy Project - UAE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Company Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 07 Air Separation Unit Civil Construction, Mechanical & Electrical Erection - Algeria 53
Kizad Zone Aluminum Extrusion Plant - UAE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Lusail Marina District Cooling Plant - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

BUTEC
BUTEC

Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Bellara Steel Complex Balance of Plant - Algeria . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59


Tripoli Wastewater Treatment Plant - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Lattakia Spinning Mill Complex Project I - II - Syria . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Jbeil Wastewater Treatment Plant - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Barwa Wastewater Treatment Plant - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Mesaieed IPP of 2000 MW/400kV - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Deira Island Wastewater Treatment Plant - UAE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Power Transmission System Expansion P VIII - Umm Birka S/S - Qatar . . . . . . . . . 67
Chekka, Batroun, Zahle Wastewater Treatment Plants - Lebanon . . . . . . . . . . . . . . . . . 21
Power Transmission System Expansion P VIII S/S: Packages S-2-2 & S-4-1 - Qatar 68
Djelfa, Mecheria, Mostaganem Wastewater Treatment Plants - Algeria . . . . . . . . . . . . 23
New 33/11 kV Primary S/S & Modification of Existing S/S - UAE . . . . . . . . . . . . . . 69
Aspire Zone TSE Plant by Reverse Osmosis - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . 25
2 x 4 MW Battery Energy Storage System - UAE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Mahlissa & Laklouk Agricultural Development Plan - Lebanon . . . . . . . . . . . . . . . . . 26
Gas Turbine Units - Algeria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Treated Water Sea Outfalls for Wastewater Treatment Plants - Lebanon . . . . . . . 27
Umm Qasr Power Plant 29.3 MW - Iraq . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Valley of Ouargala Sewerage & Drainage Networks Phases I & II - Algeria . . . . . . . 29
South Bekaa Irrigation Project - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Potable Water Treatment Plants & Pumping Stations - Lebanon . . . . . . . . . . . . . . 32
NDIA Perimeter Security Systems Enhancements - Qatar . . . . . . . . . . . . . . . . . . . . 77
Restoration of Casino Bridge - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Oil & Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Reconstruction of Mudeirej Bridge - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Upgrade Fire Protection and Industrial Drainage System Turaif - KSA . . . . . . . . . 35
Port of Beirut Second Line Defense - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Design & Construct Chemical of Offloading Bays & Railways Crossover Bridge - UAE 36
QAIA North Runway Rehabilitation - Jordan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Aqaba New Liquefied Petroleum Gas Terminal - Jordan . . . . . . . . . . . . . . . . . . . . . . 37
QAIA Fuel Hydrant System Project - Jordan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Building Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Shah Gas Development Program - Buildings Works - Package B - UAE . . . . . . . . . . 39 Qatar Foundation QSTP Tech 4 Buildings - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Arzew GNL 3Z Project - Algeria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 Two New Schools at Doha & Villages, Stage (10A), Package 3 - Qatar . . . . . . . . . . 87
Pearl GTL Temporary Power Supply - Qatar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 NDIA Terminal & Qatar Airways Operation Centers - Qatar . . . . . . . . . . . . . . . . . . . 88
RHIA Reconstruction & Rehabilitation of 3 Jet A1 Storage Tanks - Lebanon . . . . . 42 Beirut Central District Hilton Hotel - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Ohanet Station Condensate Storage Tank - Algeria . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Tripoli South Stadium - Lebanon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Qatar Gas 3 & 4 Onshore Project - Storage Tanks Works - Qatar . . . . . . . . . . . . . . . 45
Banias Refinery Fuel Storage Tanks & Related Pipeworks - Syria . . . . . . . . . . . . . . . 47 Utility Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
Distribution Network with Customer & Metering Services - Lebanon . . . . . . . . . . 95

History & Archive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99


Contacts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
Founder
Address

3 4
More than 50 years ago BUTEC began It delights me that you may now realize
Milestones

Company Profile
Company Profile

as a venture that embodied a dream, the extent of my deep affection for you
a certain perception of life, and a vision and for the younger generations, and
for development and social progress. the energy it bestows upon me to •1964 BUTEC was founded -
accomplish what I promised my grand incorporated in 1966
What we have achieved since fills me children and what I am promising you
with pride and satisfaction. The company today - the “Other Lebanon” and your •1971 First regional project

BUTEC
BUTEC

has flourished through the years, despite BUTEC.


all the challenges it faced, including •1974 Syria Branch
Lebanon’s 16-year civil war, and the
current torments of the Middle East. •1976 Relocation of Headquarters
to Paris (until 1990)
Today, many new challenges are still
•1978 Iraq Branch (active until 1990)
ahead. I have passed the torch to the
Dr. Nizar Younes
Chairman, Ziad Younes, who is setting
Founder •1980 Dubai Branch
BUTEC on a path that continues our
strong track record. I would not have
•1982 Saudi Arabia Branch
taken this step had it not been for my (active until 1991)
confidence in Ziad’s merits, excellent My dear companions on this arduous
competence, and determination to lead path, I will always be a companion for •1990 Relocation of Headquarters
our company into the highest ranks of all of you, the one who follows up on to Beirut
its fellows worldwide. your work and achievements, and
observes you come to grips with •2005 Algeria Branch
I may now move on to what has always difficulties and solve them. I am
been my very deep and strong personal exhilarated by the perfection, prowess, •2006 Qatar Branch
duty: bringing together all components and pride embodied in your work.
of our diversified Lebanese society and I am impressed by your adherence to •2007 Abu Dhabi Branch
drive all my efforts into crossing to “my the highest values, the code of ethics
other Lebanon”. Namely helping make of our noble profession, and the dignity •2008 The International Finance
Lebanon a democratic civil state that of the company to which you belong. Corporation (IFC) member of the
secures a culture of citizenship, coupled World Bank Group, became an
with freedom and development. I believe Rest assured I have never lost sight of equity partner (16.67%) of
that our country faces an existential BUTEC Group
your suffering when you are away from
danger against which we must all fight. your country and your families; however,
•2010 Jordan Branch
I find solace in the great significance of
While I do not perceive as easy the your achievements, and their relevance
abandonment of my career, in a noble •2011 Establishment of BUS (BUTEC
to the national struggle for Lebanon’s
profession which I have cherished and UTILITY SERVICES)
role. Please remember that this is your
spent most of my life on, I am not able struggle for the dignity of your country,
to resist my drive to make a move in •2015 Rawabi BUTEC Limited Co. in KSA
to reestablish its values in your lives,
order to fight for national issues and and to consolidate its cultural
for Lebanon. •2015 Iraq Branch
distinctiveness and fundamentally
the essential economic growth
without which nothing is possible.
Chairman
Address

5 6
BUTEC, "Bureau Technique d'Etudes

Company Profile
Company Profile

et de Construction", or Technical Office


for Engineering and Construction, was
conceived as an EPC contractor some
50 years ago, long before the concept
or its acronym even existed.

BUTEC
BUTEC

As an innovative and new entity, this


was a telling start that susbsequently
set the tone for the next 50 years.
BUTEC was then, as it is now, a
contractor that strived to be at the
forefront of its field and a leader to
a better way of doing business. BUTEC
never believed that modernity was only
a status to achieve but rather a path to
forge and a continuous motor to remain Ziad Younes
ahead. Chairman

BUTEC is
A bold contractor, who believes more perpetual, dynamic and yet careful
in the capacity of its men and women movement which will keep us ahead of
to learn, improve, innovate and deliver the game and will allow us to grow. I look
than in the book value of depreciating to each one of you to play your specific
machinery. and essential part in the exciting journey
we have embarked upon.
A faithful and prudent contractor,
who understands that the essence of its
role is to make good on its contractual
obligations, act in the best interest of
its clients and has never failed one in
50 years.

A competitive and competent


contractor, who can, in every country
it is active in, have the cost structure
of a local contractor and the technical
expertise of an international contractor.
Finally, a company that has retained the
values of a family while having the World
Bank, through the IFC, as a shareholder.

I am honored to have been chairman of


this groundbreaking and successful
contracting company since 2015 and
relish the next phase of our growth path.
The challenge for us all is not an easy
one; in these uncertain times, we look to
preserve the BUTEC tradition of
7
BUTEC Company Profile

Profile
Company
8

BUTEC Company Profile


Business Activities
BUTEC’s business activities focus
on the following sectors:

• Water
9 • Oil & Gas 10
• Industrial Facilities

Company Profile
Company Profile

• Power
• Infrastructure
• Building Construction
• Utility Services

BUTEC
BUTEC

BUTEC as EPC Contractor

Engineering Procurement Construction Services


BUTEC prides itself on its in-house BUTEC’s central procurement Drawing on its considerable resources, BUTEC has diversified into the services
multidisciplinary engineering and design department is dedicated to providing expertise and talent, BUTEC confidently sector in order to further answer its
capabilities. This has been a hallmark of the widest range of professional services undertakes any job, in any location with Clients’ needs. BUTEC Utility Services
the firm since inception. The ability to to serve each of the company’s projects unmatched proficiency. Leveraging the “BUS” is envisioned to be a leading
create value engineering is a core part efficiently and effectively. The firm has company’s solid foundation of technical utility services provider in the MENA
of the firm’s offering. It has empowered strong relationships with both local capabilities, BUTEC excels at managing region. The firm currently owns
BUTEC with a strong competitive and international suppliers. During any projects with the client’s best interests capabilities in the power, water, oil and
advantage while enabling the firm to procurement process, close collaboration in mind. gas, industrial, waste, renewable energy,
offer its Clients more value-based between the central procurement and other utility sectors.
solutions. Such solutions range from department and procurement officers The company’s expertise in
analysis of requirements to project at various branch offices abroad takes construction and logistics as well as
execution, and include conception and place to ensure prompt deliveries. its well-established local presence in
design of turnkey projects, financial The department also ensures that its various markets enables the prompt
analysis, in-depth study and a selection all procured materials, equipment mobilization of equipment. This coupled
of materials and methods. and sub-contracted services match with the skills of a highly qualified
the Client’s specific quality and engineering team, allows BUTEC to
budget requirements. complete every project on time and
within budget, while adding value at
every level.
Certificate LB18/234283

The management system of

IMS
BUTEC S.A.L
Butec Tower Mkalles Square,
Beirut, Lebanon

has been assessed and certified as meeting the requirements of

ISO 9001:2015

Integrated Management System General contracting & engineering design" Civil, electrical &
electromechanical works"
For the following activities

This certificate is valid from 4 November 2018 until 29 October 2019


and remains valid subject to satisfactory surveillance audits
Recertification audit due before 29 September 2019
Issue 1. Certified since September 2016
SGS Ref CH18/1246.00

BUTEC’s integrated management This is a multi-site certification


Additional site details are listed on the subsequent page

Authorised by

system (IMS) combines the company’s


three separate quality, environment, SGS Société Générale de Surveillance SA
Technoparkstrasse 1□8005 Zurich□Switzerland
t +41 (0)44 445-16-80□f +41 (0)44 445-16-88□www.sgs.com

Page 1 of 2

11 and occupational health & safety 12


management systems into one, thus This document is issued by the Company subject to its General Conditions of Certification
Services accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the

Company Profile
limitations of liability, indemnification and jurisdictional issues established therein. The
Company Profile

authenticity of this document may be verified at http://www.sgs.com/en/certified-clients-and-


products/certified-client-directory. Any unauthorized alteration, forgery or falsification of the

reducing bureaucracy and ensuring


content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.

greater efficiency.

The IMS defines how the firm’s activities


are conducted and ensures that the Certificate LB18/234285

relevant procedures and documentation


The management system of

BUTEC S.A.L

BUTEC
BUTEC

BUTEC Tower, Mkalles Square

are in place to satisfy the criteria of


Beirut - Lebanon

has been assessed and certified as meeting the requirements of

ISO 14001:2015
BUTEC’s awarded certification in Quality For the following activities

General contracting & engineering design" Civil, electrical &

Management Systems (ISO 9001:2015), electromechanical works"

This certificate is valid from 4 November 2018 until 29 October 2019


and remains valid subject to satisfactory surveillance audits
Recertification audit due before 29 September 2019
Issue 1. Certified since September 2016

Environment Management Systems (ISO SGS Ref CH18/1247.00

This is a multi-site certification


Additional site details are listed on the subsequent page

14001:2015), and Occupational Health Authorised by

and Safety Assessment Series (OHSAS SGS Société Générale de Surveillance SA□Certification & Business Enhancement
Technoparkstrasse 1□8005 Zurich□Switzerland
t +41 (0)44 445-16-80□f +41 (0)44 445-16-88□www.sgs.com

18001:2007). Page 1 of 2

This document is issued by the Company subject to its General Conditions of Certification
Services accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the
limitations of liability, indemnification and jurisdictional issues established therein. The
authenticity of this document may be verified at http://www.sgs.com/en/certified-clients-and-
products/certified-client-directory. Any unauthorized alteration, forgery or falsification of the
content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.

QHSE
Certificate LB18/234286

The management system of

BUTEC S.A.L
BUTEC Tower, Mkalles Square
Beirut - Lebanon

Quality, Health, Safety, Environment has been assessed and certified as meeting the requirements of

OHSAS 18001:2007
For the following activities

General contracting & engineering design" Civil, electrical &

BUTEC’s success and growth are a


electromechanical works"

This certificate is valid from 4 November 2018 until 29 October 2019


and remains valid subject to satisfactory surveillance audits
Recertification audit due before 29 September 2019
Issue 1. Certified since September 2016

direct result of the company’s emphasis SGS Ref CH18/1248.00

This is a multi-site certification


Additional site details are listed on the subsequent page

on quality across all of its activities.


A Qualified Workforce
Authorised by

BUTEC is committed to protecting SGS Société Générale de Surveillance SA□Certification and Business Enhancement
Technoparkstrasse 1□8005 Zurich□Switzerland
t +41 (0)44 445-16-80□f +41 (0)44 445-16-88□www.sgs.com

Page 1 of 2

the environment on project sites while


equally paying attention to the health This document is issued by the Company subject to its General Conditions of Certification
Services accessible at www.sgs.com/terms_and_conditions.htm. Attention is drawn to the
limitations of liability, indemnification and jurisdictional issues established therein. The
authenticity of this document may be verified at http://www.sgs.com/en/certified-clients-and-

and safety of the workforce by regularly


products/certified-client-directory. Any unauthorized alteration, forgery or falsification of the
content or appearance of this document is unlawful and offenders may be prosecuted to the
fullest extent of the law.

To create optimal solutions relies on updates and apprenticeships abroad.


allocating the necessary resources to
the skills of the best human talent, a BUTEC’s engineers are distinguished
minimize any potential risk or hazards.
fact that guides BUTEC in its selection for their in-depth local knowledge and
Although the diversified nature of
of employees. As such, the company’s strong ability to create on-the-spot
undertaken projects dictates varying
more than 6,000 personnel, including solutions, as well as for their thorough QHSE requirements, BUTEC rises to the
670 expert engineers and administrators, grounding in the construction industry challenge, successfully adapting to each
constitute a solid network of and its latest, state-of-the-art project’s needs, a fact evidenced by the
professionals who deliver impeccable developments. company’s various certifications. All this
service to BUTEC’s clientele. is successfully navigated while achieving
Nurturing a genuine team spirit and sustainable growth.
In its pursuit of excellence, BUTEC dedication to the firm are essential for
employs a rigorous hiring procedure, BUTEC’s aims of client satisfaction and
selecting its senior hires from their long-term corporate sustainability.
impressive industry track records, This is achieved through a company
and handpicking its junior hires from culture of transparency and honesty,
esteemed universities in Lebanon and forming the bedrock of an environment
around the world. BUTEC is committed that enables all potential challenges,
to developing the potential of its whether on site or elsewhere, to be
employees, offering in-house training resolved efficiently.
prior to starting, as well as training
Company Profile

13
BUTEC

Water
LEBANON

Tripoli
Wastewater
Treatment
Plant

15 16

Company Profile
Company Profile

BUTEC
BUTEC

Project Description

• Population equivalent: 1,000,000 PE (compressible layer of clay from 3 to


• Total daily design flow: 135,000 m3/d 30 m thick):
Financing Role of BUTEC
• Design peak flow: 9,263 m3/h - 10,000 pre-drilling of 8 to 20 m
European Investment Bank (EIB) for Contractor for civil & MEP works and
deep holes (wick drains)
process installation of process equipment. • 3 phases of treatment:
Lebanese Government for civil works Contractor for process: Degrémont, Pre-treatment, biological - 3,000 dynamic compaction points
subsidiary of “Groupe Suez”, France treatment and UV sterilization using a 15-ton load dropped by a
Employer 40 m crane
• 120,000 m2 of plant area, out of
Ministry of Energy and Water Awarded which 40,000 m2 is reclaimed land - 1,000,000 m3 of earth works and
2003 general fill
• 4,500 m of assorted pipework,
Delegated Employer • 40,000 m3 of concrete works
DN 300 to DN 1,800
Council for Development and
• A total of 30 structures for process • 5,000 tons of reinforcement
Reconstruction (CDR)
and facilities including construction steel bars
of reinforced concrete aeration tank • 90,000 m2 of formwork
with a capacity of 41,368 m3, 6 • Design and construction of non-
clarifiers with the capacity of process electrical works for all
7,827 m3 each structures & buildings: low voltage
Scope of Work • 2,500 drawings and technical equipment, complete plant lighting,
documents lightning protection, earthing
EPC for civil works and electro-
• 14,500 m2 of roads and 55,000 m2 protection, telephone system,
mechanical installation as well as
of landscaping and green areas and fire alarm system
erection of all equipment.
• 734 m sea breakwater • 12 transformers (1,600 kVA, 2,000 kVA,
3,150 kVA)
• Treatment of the heterogeneous soil
-
LEBANON

Jbeil
Wastewater Barwa
Treatment Wastewater
Plant Treatment Plant

17 18
Financing Project Description Employer
Barwa City – Marafeq Qatar

Company Profile
Company Profile

French protocol for process


Lebanese Government for civil works
• Population equivalent: 45,000 PE Role of BUTEC
Employer Main contractor in Consortium with
• Total daily design flow: 8,179 m3/d Degrémont, subsidiary of “Groupe Suez”,
Ministry of Energy and Water
• Design peak flow: 903 m3/h France

BUTEC
• Sea outfall DN: 500 mm,
BUTEC

Delegated Employer
Council for Development and length: 910 m Awarded
Reconstruction (CDR) 2010
• 20 buildings and structures,
landscaping, irrigation, process
Role of BUTEC and service networks
Contractor for civil & MEP works and • 2 generator sets of 860 kVA and
installation of process equipment 260 kVA, 2 transformers and
Contractor for process: Degrémont, MV switch gears. UPS, normal
subsidiary of “Groupe Suez”, France lighting fixtures, CCTV, data, telephone
network, SCADA, and intrusion alarm
Awarded systems Scope of Work
2007
• HVAC, water supply, drainage, EPC for civil works, electro-mechanical
irrigation and sewer, and industrial installation as well as erection of all
water network equipment.

Scope of Work Project Description


EPC for civil works and electro-
mechanical installation as well as • Population equivalent: 50,000 PE
erection of all equipment.
• Total daily design flow: 13,500 m3/d
The biofiltration used in the process
system ensures an increase up to 50% • Design peak flow: 1,400 m3/h
to the overall capacity of the plant. • EPC of 18 process structures
(pretreatment cyclor cells, filtration,
dewatering building, etc.)
• Construction of ancillary buildings
(administration, workshops, laboratory,
pump house,etc.)
• Landscaping and related networks
• Installation of process utility networks
(sludge, industrial water, rain water
drainage, etc.)

QATAR
UAE

Deira Island
Wastewater
Treatment Plant

19 20

Project Name

Company Profile
Company Profile

Deira Island Wastewater Treatment


Plant

Employer
NAKHEEL Group PJSC / the Palm Deira

BUTEC
LLC, Dubai
BUTEC

Role of BUTEC
Main contractor in consortium with
VWS Emirates LLC (Veolia Water
Systems)

Awarded
2017

Scope of Work
EPC for civil works, electro-mechanical
installation as well as erection of all
equipment.

Project Description
• Population equivalent: 240,000 PE • Electrical & control equipment
• Total daily design flow: 36,000 m3/d installation
• Design peak flow: 3,000 m3/d • Installation of all process mechanical
equipment and mechanical process *
• Designed based on a Membrane
networks (sewerage, Process water &
Bioreactor type (MBR) of biological
compressed air)
treatment process. The proposed plant
consists of all major treatment steps, • Installation of mechanical non-process *
i.e. preliminary treatment, secondary networks (Water supply, irrigation,
treatment, tertiary treatment, storm water & firefighting)
sludge and odor treatment. and HVAC system for utility and
administration buildings.
• Structural design and construction of
20 process & facility buildings
LEBANON

Chekka,
Batroun, Zahle
Wastewater
Treatment
Plants

21 22

Financing Role of BUTEC Projects Chekka Batroun Zahle

Company Profile
Company Profile

French Protocol for process Contractor for civil & MEP works and
for Chekka, and Batroun installation of process equipment in Figures Popuation Equivalent 49,500 PE 45,000 PE 300,000 PE

Italian Protocol for process for Zahle Contractor for process: Degrémont, Total Daily Design Flow 9,500 m3/d 3,888 m3/d 56,000 m3/d
Lebanese Government for civil works subsidiary of “Groupe Suez”
Design Peak Flow 903 m3/h 512 m3/h 3,800 m3/h
Employer Awarded

BUTEC
BUTEC

Ministry of Energy and Water 2003 – Chekka Hydraulic Concrete Structures 22 18 20


2006 – Zahle
Delegated Employer 2007 – Batroun
Council for Development and
Reconstruction (CDR)

Scope of Work
EPC for civil works and
electromechanical installation
as well as erection of all equipment.
ALGERIA

Djelfa, Mecheria,
Mostaganem
Wastewater
Treatment
Plants

23 24

Projects

Company Profile
Company Profile

Employer Awarded
Ministry of Hydraulic Resources 2009 – Djelfa
National Office for Sanitation (ONA) 2011 – Mecheria in Figures
2014 – Mostaganem
Role of BUTEC
Main Contractor in consortium with:

BUTEC
BUTEC

OTV subsidiary of VEOLIA for Djelfa


Djelfa Mecheria Mostaganem
COMSA for Mecheria
Mennani for Mostaganem Popuation
Equivalent 270,000 PE 92,000 PE 350,000 PE

Total Daily
Design Flow 36,300 m3/d 12,880 m3/d 56,000 m3/d

Scope of Work Design Peak


Flow 2,360 m3/h 915 m3/h 3,735 m3/h

EPC for civil works, as well as installation works for process and non-process as Hydraulic
of the various process & utility networks, well as testing and commissioning of Concrete 11 20 17
and erection of all equipment for Djelfa, the plant, in addition to management Structures
and Mecheria wastewater treatment and operation for a period of two years
plants. In Mostaganem it covered starting with the date of the preliminary
architectural, civil, and electromechanical acceptance.
QATAR

Mahlissa &
Aspire Zone Laklouk
TSE Plant by Agricultural
Reverse Development
Osmosis Plan

25 26

Company Profile
Company Profile

Employer
NOVAFLOR S.A.L.

Role of BUTEC
Main contractor

BUTEC
BUTEC

Awarded
Phase I: 1995
Phase II: 2012

Scope of Work
• Construction of 7 lakes with capacities
from 60,000 m³ to 350,000 m³
• Gravity drainage system in the basaltic
Employer
ASPIRE Zone Foundation
Scope of Work formations Mahlissa tray on 250 ha
(length of 11 300 m)
EPC for civil works and installation
Role of BUTEC • Pressurized irrigation system (drip and
of process equipment in addition to
Main contractor in consortium with sprinkler) with 7 pumping stations;
testing, commissioning, operation and
Degrémont, subsidiary of “Groupe Suez”, each station comprises of two groups
maintenance for treated sewer effluent
France of pump power varying from
(TSE) water supplied by ASHGHAL and
60 kW to 125 kW
water coming from Aspire ground water
Awarded network. • Bypass channel that feeds the hill lakes
2015 from El Nabaa Kalhab
• TSE maximum inlet flow: 33,000 m3/d • Transformation of arid land into fertile
• TSE maximum outlet flow: 18,750 m3/d land for agriculture, an area of 250 ha

The project aims at improving the


water consumption sustainability by
minimizing the dependence on
KAHRAMAA potable water for major
consumption areas like the irrigation
system and cooling purposes. The
water should be polished in a reverse
osmosis (RO) treatment plant to remove
the large majority of contaminants,
sediment, suspended particulate
matter, viruses and pathogens. The
water parameters should be refined in
order to meet the requirements and

LEBANON
guidelines of WHO for the safe use of
wastewater in agriculture.
LEBANON

Chekka Tripoli Jbeil Batroun


Projects
Treated Water in Figures Length 1,200 m 1,475 m 910 m 760 m

Sea Outfalls for Type GRP SN 5000 HDPE, SDR HDPE, SDR HDPE, SDR
26 PE 100 26 PE 100 26 PE 100
Wastewater
DN 300 mm 1 600 mm 500 mm 350 mm
Treatment
Under Seabed
Plants Submersion 1.5 m 1m 2m 2m

End Suction
Diffuser Length 20 m 175 m 75 m 17.5 m

27 28
Diffuser Risers 3, DN 200 mm 16, DN 700 mm 16, DN 500 mm 8, DN 110 mm

Company Profile
Company Profile

Reinforced Thrust block at each


direction change Collar every 2 m Collar every 5 m Collar every 5 m
Employer Concrete Ballasts
Ministry of Energy and Water Awarded
2005 – Chekka
Delegated Employer 2008 – Tripoli

BUTEC
Council for Development and 2009 – Jbeil
BUTEC

Reconstruction (CDR) 2010 – Batroun

Role of BUTEC
Main contractor in JV with
Land & Marine for Tripoli’s Sea Outfall
Main contractor for Civil and Sea
Outfall Works for Jbeil,
Batroun and Chekka

Scope of Work
EPC on turnkey basis including testing, Although the UV tertiary treatment
commissioning and maintenance for 4 ensures the elimination of pathogenic
sea outfalls to discharge treated water agents, a model simulating the discharge
offshore into the sea. dilution using CORMIX-GI was developed
in order to protect the frontal coast
from any risk of pollution. CORMIX-GI
is a program approved by the US
Environmental Protection Agency (EPA).

The simulation methodology was


adopted in optimizing the proposed
outfall to assure appropriate dilution
rates that meet MED POL II seawater
quality standards, which are consistent
with the standards disseminated by the
Ministry of Environment Decree (1/52).
Valley of
Ouargla
Sewerage &
Drainage Project Description
Networks
• 33 sewage pumping stations including water table (60 cm below ground
Phases I & II installation of hydraulic and electro- surface) and loose nature of subsoil
mechanical equipment (sand)
• 120 km of sewers, DN 300 to DN 1,100 • Client senior staff accommodation
covering an area of 7 000 ha (apartment buildings – built-up area
29 of 2,500 m2) 30
• 1,500 tons of steel sheet piling for:
• Contractor’s camp total area:

Company Profile
Company Profile

- Lost formwork in construction of


pump stations, most of which are 20,000 m2 (labor housing, canteen,
over 11m deep infirmary, administration building,
offices, workshops, recreation areas,
- Box sheeting for excavation and
landscaping and green area)
installation of sewers, due to high

BUTEC
BUTEC

Employer Awarded
Ministry of Water Resources - MRE Phase I: 2005
Phase II: 2006
Delegated Employer
National Office for Sanitation – (ONA)

Role of BUTEC
Phase I: Main contractor
Phase II: Main contractor in JV with
VINCI Construction Grands Projets and
SOGEA SATOM

Scope of Work
EPC for civil works, sewer networks,
ground water drainage network and all
related appurtenances.

ALGERIA
LEBANON

Potable Water
Treatment
South Bekaa Plants &
Irrigation Pumping
Project Stations

31 32
Financing
World Bank Employer

Company Profile
Company Profile

Council for Development and


Employer Reconstruction (CDR)
Litani River Authority
Role of BUTEC
Role of BUTEC Main contractor in consortium with
Main contractor OTV-Veolia

BUTEC
BUTEC

Awarded Awarded
1998 1996

Scope of Work
Scope of Work
EPC and rehabilitation of various pumping stations, water reservoirs,
structures, hydraulic and electro- main supply canal, deep water wells,
mechanical equipment, irrigation water level (control and measuring EPC of civil works and installation of Rehabilitation and construction of 209
networks, electrical substations, structures) service roads, office hydraulic, mechanical, and electrical new pumping stations, 45 wells,
high and medium power supplies, building, workshop and store yard, equipment for 7 potable water chlorinating systems, electrical works,
transmission and monitoring networks, and installation of all equipment. treatment plants including coagulation, reservoirs, pumps, valves, pipes, etc.
flocculation, decantation, sand filtration The diversified locations of the pumping
and sterilization units in addition to the stations required a detailed logistics plan
Project Description drilling of wells. to adapt to technical and other site
requirements.

• Rehabilitation of Karoun main pumping • Construction of office building,


station downstream from the Karoun workshop and storage yard
dam • Installation of a remote supervision
• Reconstruction of 66 kV overhead and monitoring system
supply line and electrical substation Project Description
• Concrete lining of the 14.4 km
long existing main supply canal
Contract No. 1733 Contract No. 1734
• Rehabilitation of the Karoun secondary
pumping stations, Karoun 1 and • Rehabilitation of potable water • Pumping station characteristics:
Karoun 2, with their delivery pipelines, treatment plants ranging from - Submersible well pumps; capacity
elevated water storage tanks and 10,000 m3/d to 40,000 m3/d range: 342 m3/h at 257 m head
irrigation networks serving an area • Construction of potable water - End suction pumps; capacity range
of 700 ha treatment plants ranging from 172 m3/h at 200m head
• Construction of a 4.4 km extension of 12,000 m3/d to 16,000 m3/d
- Vertical multi stage pumps; capacity
the main supply canal, and 18 km of • Supply and installation of range 172 m3/h at 300 m head
service road pumping stations
- Horizontal multi stage pumps;
• Construction of Joub-Jannine capacity range 72 m3/h at 300 m head

LEBANON
pumping station
- 2,000 m of various pipework,
• Drilling of 5 deep water wells, DN 150 to DN 200
up to 220 m deep
Company Profile

33
BUTEC

Oil & Gas


KSA Design and
Construct
Upgrade Fire Chemical
Protection and Offloading Bays
Industrial and Railway
Drainage System Crossover
Turaif Bridge

35 36

Company Profile
Company Profile

Employer Employer
SAUDI ARAMCO Al Hosn Gas (Abu Dhabi Gas
Development Company Limited)
Role of Rawabi BUTEC
Main Contractor Role of BUTEC

BUTEC
Main contractor
BUTEC

Awarded
2019 Awarded
2015

Project Description Scope of Work Project Description Scope of Work


Works on the project can be described To upgrade the existing Storm Water Design and build extension and Chemical Unloading:
as follows: Drainage and Firewater Distribution enhancement works at the Shah Gas The objective is to safely and securely
- Civil: Excavation, Backfilling, Concrete, systems. The purpose of the facility is to Sulphur recovery live plant to increase discharge Biocide and Surfactant from
Steel Structure, and Architectural works restore and upgrade the firefighting the safety and efficiency of the plant’s an ISO container (24,000L) delivered
- Mechanical: Firefighting, Dewatering, capability and industrial drainage critical operations. upon a lorry into the respective Chemical
HVAC, Industrial Drainage and systems to meet safety requirements. storage tanks (40,000 L capacity) within
Plumbing works BUTEC is responsible of material the Chemical injection Packages.
- Piping: Welding Works and Non procurement, construction
Destructive Testing of Underground management, quality management and The scope included the supply and
Product Supply Lines and testing and commissioning of all works installation of air operated double
Suction/Discharge piping related to the upgrade of the Bulk Plant diaphragm type chemical unloading
Electrical: Power Distribution and in , Saudi Arabia. pumps in PDVF/ Teflon diaphragm with
Power Cabling piping and standard accessories.
- Low Current: Fire Detection, Fiber and
Copper Structured Cabling and Railway Crossover Bridge:
Distribution Panels, Paging System, The objective is to provide a Railway
Audio/Video and Telephone systems Over Bridge to the North side of the
- Instrumentation: Field devices, Local tracks at the Sulphur Loading Facility
Control panels and Structured Cabling. with a retractable access platform made
of structural steel, to enable safe access
of the operators to the North side of the
railway when a train is in station and to
enable safe access to the top of the
railway carriage for Sulphur re-
distribution activity.

The scope included the design and


construction of a structural steel
crossover bridge running above the “live”
Etihad railway line. The scope includes
the supply and installation of special
mechanical system for handling of sulfur
as well as the installation of explosion-
proof CCTV system.

UAE
JORDAN

Aqaba New
Liquefied QAIA Fuel
Petroleum Hydrant System
Gas Terminal Project

37 38
Employer Employer
Aqaba Development Corporation AIG – Airport International Group

Company Profile
Company Profile

Role of BUTEC Role of BUTEC


Main contractor in JV with Al-Tarawneh Main contractor

Awarded Awarded
2014

BUTEC
BUTEC

2011

Scope of Work
EPC and commissioning of an LPG jetty
located on the south shoreline of Aqaba,
Jordan.

Scope of Work

Construction of the fuel hydrant together with all electrical, mechanical,


network for the new Queen Alia and civil works.
International Airport in Amman
including the emergency fuel The emergency fuel shut down
shut down system EFSO and the system and leak detection system
leak detection system, tightness was subcontracted to Hansaconsult
monitoring system (TMS), GmbH.

Project Description
Project Description
• Laying of fuel pipe network, 9,000 m block and bleed valves with actuators,
long, of 16” seamless specially coated 3” drain and vent ball valves
The jetty platform is equipped with • General lighting and power supply
pipes, with 1,000 m of 20” double • Civil works including excavation,
two marine loading arms mounted in • Control cables encasement pipes under taxiways, backfill, concrete and asphalt saw
duty/standby configuration, having an
• Standby emergency generator set and all related accessories, link seals cutting, reinstatement of concrete
unloading capacity of 300 m3/h each,
for critical loads; (quick release heat shrink sleeves and pipes cathodic aprons, construction of valve pits
and connected to an LPG line of 8
hooks with remote monitoring) protection with sections of 6.5 m x 4.5 m, most
inches diameter which ties the
jetty to an existing LPG pipeline • Automatic berthing/docking system • Supply and installation of 100 fuel of which are 6.5 m deep
600 meters away from the jetty, • Onshore civil works for access ramp hydrants, outlet Ø1.5” • Installation of 2 km of control cables
below the oil terminal trestle. • Fire and gas detection system and a • Supply and installation of 11 double

JORDAN
The works included: fire fighting system
• Wharf furniture for the jetty
UAE

Shah Gas
Development
Program
Buildings Works Arzew GNL
Package B 3Z Project

39 40

Company Profile
Company Profile

Employer
Al Hosn Gas, Abu Dhabi
Project Description
Employer
Package 2:
Role of BUTEC SONATRACH
• Central area: 3 primary

BUTEC
BUTEC

Subcontractor for civil works and substations 33/11 kV


installation of equipment Role of BUTEC
• West area: 2 primary Subcontractor for civil works
Main contractor: ENI – Saipem S.p.A
substations 33/11 kV Main contractor: Saipem-Italy /
Awarded • East area: 3 IES Chiyoda-Japan J.V.
2011 (instrument equipment shelters)
Package 3: Awarded
• Central area: 3 primary substations 2011
33/11 kV and 1 IES (instrument
equipment shelter)

Scope of Work
EPC in addition to testing and U.A.E. in the frame of the Shah Gas
commissioning for all civil works, Development (SGD) Program.
as well as associated MEP works
and equipment installation. It Scope of work includes also the
covers 12 buildings of package construction of a site camp covering
“B” related to the units Shah an area of 70,000 m² for 700 residents
Process Plant (EPC package 2)
& Shah Sulfur Recovery Units
(housing canteen, nursery, recreation
areas and sport fields, etc.).
Scope of Work
(EPC package 3), located at Shah, Construction of the following structures:

• Discharge holding basin


• Separation tanks and annexed trenches
• Liquefying tank and annexed trenches
• Safety/security building
• Administrative building

ALGERIA
QATAR Rafic Hariri
International
Airport
Reconstruction
Pearl GTL & Rehabilitation
Temporary of 3 Jet A1
Power Supply Storage Tanks

41 42

Company Profile
Company Profile

Employer Employer
Qatar Shell GTL Limited Scope of Work Council for Development and
Reconstruction (CDR)
Role of BUTEC Power supply for the construction site of General Directorate for Civil Aviation
Main contractor in consortium the gas to liquid plant; covering an area
of 4 km2 and power supply for a

BUTEC
Role of BUTEC
BUTEC

with SIEMENS GmbH


construction camp accommodating up Main contractor
Awarded to 25,000 persons on a plot of 1.7 km2.
2006 Awarded
2006

Project Description
EPC of the following: Scope of Work
• Civil works for 4 substations,
33/11 kV, 40 MVA each The project consisted mainly of
• 120 km of underground rebuilding facilities destroyed during
11 kV cables for ring main units the war of July 2006 including 3 fuel
• 110 km of underground 33 kV storage steel tanks with a concrete
cables and connection to power skin for protection and a supported
grid cone roof. The capacity of each tank
is 6 000 m3
• 20 km of underground • 2 restored as follows:
fiber optic cables
- Bottom 10%
• Earthing grid for substations
- Shell 40%
• Installation of the following:
- Roof structure 100%
• 130 ring main units, 1 MVA each
- Roof plates 100%
• 11 kV and 33 kV switchgears
- Accessories 100%
• Power transformers and oil refilling
- Painting (internal and external)
• Assistance to SIEMENS in testing 100%
and commissioning
- Fire fighting system (water
cooling & foam networks) 100%
- Control system and
instrumentation 100%
• 1 completely rebuilt including all
related works, concrete ring
foundation, dikes and roads
• Reconstruction of site networks

LEBANON
- Kerosene filling and emptying
systems
- Fire fighting system
ALGERIA

Ohanet Station
Condensate
Storage Tank
Project Description 44

Company Profile
43
Company Profile

Employer • One storage tank (floating roof, - Emptying pipes: Ø 24” 36”, 30”, 24”, 20”, 16” &10”
SONATRACH double deck) for condensate - Underground piping system • Process instrumentation system
- Internal diameter: 57 m, Height: with cathodic protection - Level gauging system

BUTEC
Role of BUTEC 17m, Nominal volume 35,000m³
Main contractor in consortium • Fire fighting system as per NFPA - Temperature monitoring system
- 1,000 tons of steel plates standards with fire hydrant network
BUTEC

with Rym Sekoura - Inventory system of tank farm


conformant to ASTM and API 650 serving the site and the following
systems for storage tank(s): - Mechanical level gauging system
Awarded - Welding procedures according to
2009 ASME and American Welding - Automatic fire detection system - Remote monitoring from control
Society norms & code including a linear heat detection room of motorized valves
- Non destructive testing according cable, IR flame detectors on the • Lightning protection and earthing
to API 650 and ASME codes rim, and gas detectors inside systems
retention dike • Infrastructure works: internal roads,
- Provisions for identical future tank
- Automatic spray water cooling system new dikes & concrete lining for
• Distribution pipework according to
- Automatic discharge foam system existing dikes, external lighting,
ASME and API standards
with rim mounted foam pourers peripheral fence, drainage system
- 300 tons of steel pipes conformant
to API Gr.x 52 and Gr. B • Supply of trunnion mounted ball
valves, with Rotork actuators, sizes
- Filling pipes: Ø 36, 30 & 24”
QATAR

Qatar Gas 3 & 4


Onshore Project
Storage Tanks
Works in
Ras Laffan

45 46

Project Description

Company Profile
Company Profile

Employer
Qatar Liquefied Natural
Scope of Work
Gas Company Limited (3),
Qatar Petroleum & Shell EPC contract for the construction of 25 • Full and detailed tank design according profiles, shell & roof nozzles, internal
Gas-Power Development B.V steel tanks for the storage of chemical to API 650 addendum 4 and Qatar Gas piping CS & SS, PV vents, insulation
products with diameters up to 21.4 m special requirements and painting)

BUTEC
BUTEC

Role of BUTEC and heights up to 25.5 m.


• Design, fabrication, and installation of • Fabrication, testing, packing,
Subcontractor to internal and external steam heating transportation and handling
Chiyoda / Technip J.V. (CTJV) coils for several tanks • Erection and non destructive testing
• Welding procedures specification including ladders, platforms, pipe
Awarded and procedures qualification records supports & spiral staircases
2007
• Quality plan • Insulation and external and internal
• Procurement and inspection of surface treatment works
materials (plates CS & SS, structural • Pre-commissioning and commissioning
SYRIA

Banias Refinery
Fuel Storage
Tanks & Related
Pipeworks

47 48

Company Profile
Company Profile

Employer
Banias Refinery Company
Ministry Of Petroleum
And Mineral Resources

Role of BUTEC

BUTEC
BUTEC

Main contractor

Awarded
2003

Scope of Work
• EPC contract for the construction of
10 storage steel tanks, 33,000 m3 each
• 8 tanks with floating roof for heavy
crude oil, light crude oil, naphta and
gasoil
• 2 tanks with fixed roof for fuel oil

Project Description

• Steel plates conformant to ASTM • Power distribution network for lighting


and API specifications system and supply of motorized valves
• Distribution pipe network - according • Lightning and earthing protection
to ASME & API standards: system
- Supply pipes Ø 24”, underground • Process instrumentation:
with cathodic protection - Remote terminal:
- Suction line from tanks: Ø 28” storage/transmission of data in
above ground real time through a bi-directional
• Fire fighting network – foam communication link with the central
and cooling systems control
• Heating network with steam for coils - Telemetry network
inside fuel oil tanks. Both fuel oil and - Software of supervision
tracing lines are insulated • External site works: roads, dikes, fence,
• Spider network in each crude oil tank drainage network, exterior lighting etc.
Industrial
49 Facilities
Company Profile
BUTEC
UAE

Sharjah Waste
to Energy
Project

51 52

Company Profile
Company Profile

Employer
Sharjah Waste to Energy Company (a JV Scope of Work
between Masdar and Bee’ah)
Civil works of the entire site and the
Role of BUTEC construction of all buildings of the
Subcontractor to CNIM project which consist of 30MW

BUTEC
BUTEC

generation from the Sharjah Municipality


Awarded domestic waste and tie-in to SEWA’s
2019 grid.

Project Description

Diverting more than 300,000 tonnes of sent to landfills.


solid waste from landfill each year, The incineration process converts the
Waste-to-energy plant will contribute to waste into produced heat which is then
Sharjah's effort to reach "zero waste-to- used to drive an electrical turbine. The
landfill" target by 2020 and the UAE to net electrical power produced will be up
deliver its 2021 goal of diverting 75% of to 30 MW which will be supplied to the
solid waste from landfills. Sharjah electricity grid. The flue gas of
The facility will incinerate around 37.5 the waste incineration will be treated
tonnes of municipal solid waste per hour before being released into the
to generate energy and will be located atmosphere.
adjacent to Bee’ah’s existing Material
Recovery Facility in Sharjah, where
Emirate of Sharjah waste is collected,
sorted, recycled and, where necessary,
ALGERIA

Air Separation Project Description


Unit Civil
Construction, Civil works: Mechanical works:
• Piling and civil works for foundations • Erection and installation of
Mechanical and of buildings mechanical equipment and systems,
including coldboxes, gas products
Electrical • Process equipment foundations
• Erection of steel structure buildings
skids, main air compressor along with
its supplied items such as pump skids
Erection • Road works walkways fence and and ducts, buffer vessels, cooling
external lighting towers, etc. (around 1600 Tons of
erection)
Electrical and Instrumentation works: • Heavy lifting of coldboxes, vessels, etc.
53 • Erection and installation of electrical 54
• Piping, sandblasting, insulation works,
equipment and systems, such as MV/LV and testing for pipes and joints

Company Profile
Company Profile

transformer, LV and MV switchgears,


control panels, field equipment, cable
routes, earthing and lightning systems,
field instrumentation devices, etc.

BUTEC
BUTEC

Employer
Algerian Qatari Steel Spa
Scope of Work
Role of BUTEC Civil construction including piling
Main contractor in JV with Elecnor foundations and steel structure
buildings, Mechanical and Electrical
Awarded Erection Works for the ASU Package
2017 (Construction of an Air Separation Unit
Plant for that separates atmospheric air
into its primary components: Nitrogen,
Oxygen and Argon).
UAE

Kizad Zone
Aluminum
Extrusion Plant

55 56

Company Profile
Company Profile

Scope of Work Project Description

BUTEC
BUTEC

Value engineering, design, procurement • Presses annual capacity: 87,600,000 room, serving hydrants, reels &
& construction of an aluminum plant, tonnes of extruded aluminum profiles sprinklers
associated infrastructure, ancillary • Total site area: 200,100 m2 - Water: storage and pumping
buildings, as well as erection of all 2 for process, chilled, domestic
• Total built-up area: 67,194 m
process equipment. and irrigation systems
TALEX is an Estidama project -
- Drainage: sewage and storm
Pearl II rating. Civil Works:
water piping and pumping
The scope of work includes process, • Pre-engineered buildings: 63,382 m2
non-process buildings and site works • Compressed air system: 3,000 m3/h
• External works
as follows: demand, provided by 3 compressors
- Road works & pavement: 58,330 m2 160 kW each
• Buildings: - Green areas: 26,580 m2 • Natural gas system: 300 m3
Cast house building, extrusion • LPG concrete channels: 2,081 m3 underground storage, provided with
building, entrance building, delivery pumping and distribution networks
• Concrete buildings: 28,300 m3
gate building, visitor gate building, • Process water cooling: 4 chillers
substation buildings, MV switchgear • Dynamic compaction: 127,170 m2
1,171 kW each, cooling towers
room, compressor room • Piling: 49 l/s each
• Site Works: - 449 piles of 100 cm diameter
Underground process tank; (4 600 m3) Electrical Works:
piezometric tank; landscaping & - 62 piles of 90 cm diameter (550 m3) • MV/LV distribution network:
external areas; fences; R/C works 32.33 MW plant including 6
(trenches, thrustblocks, platforms, Mechanical Works: substations with 23 1.5 MVA
etc.); mechanical systems and • HVAC system: rooftop packages, DX transformers
electrical systems units and wind driven ventilators
• Building services including lighting,
• Wet systems: small power, lightning, earthing and
- Fire fighting: 2,500 GPM pumping ELV systems

Employer
TALEX – Taweelah Aluminium
Extrusion Company LLC

Role of BUTEC
Main contractor

Awarded
2013
QATAR

Lusail Marina
District Cooling
Plant

57 58

Company Profile
Company Profile

Employer
Marafeq Qatar L.L.C. Scope of Work
Role of BUTEC EPC contract on turnkey basis for a
Main contractor in JV with district cooling plant with a capacity of
ADC Energy Systems LLC 33 250 TR (Phase I) at Marina District in

BUTEC
BUTEC

Lusail.
Awarded
2013

Project Description

• The plant is built in two phases, • Space for thermal energy


Phase 1: 33,250 TR storage installed on grade level
Phase 2: 58,750 TR • Cooling towers installed on roof level
• Engineering for the ultimate plant with • Pipe, valves, pumps, and other
installed cooling capacity of 92,000 TR mechanical components
• Construction of the entire civil works • Distribution network pumps with
for the basement for the ultimate space allocated for pumps required
plant capacity 92,000 TR for the ultimate plant capacity
• Supply and installation of Phase 1 • Instrumentation, control
chillers with the aggregate installed and monitoring systems
cooling capacity of 33,250 TR, together
• Electrical services for
with required mechanical, electrical,
mechanical equipment
and instrumentation equipment and
services • Below ground water storage
for cooling tower makeup
• Twelve 11 kV feeders with a total
capacity of 43 MVA. (Electrical • Connections to distribution network
service for Phase I) • Building services such as plumbing,
• Booster pumps are installed in the drainage, HVAC, fire protection,
plant to push water from the north lighting, telecommunications, security,
to the south etc.
• Water cooled electric centrifugal • Utility connections (electricity,
chillers installed on grade level water, blowdown, sewage, and
telecommunications)
ALGERIA

Bellara Steel
Complex
Balance of Plant

59 60

Company Profile
Company Profile

Employer
Algerian Qatari Steel Scope of Work
Consultant The works consist in the development,
Idom, Spain installation and coordination between
the various external networks related to
the new steel complex in Bellara with a

BUTEC
BUTEC

Role of BUTEC
Main contractor in JV with Elecnor production capacity of 2,000,000 tons
per year. Scope of work includes as well
Awarded construction of all utility buildings,
2016 foundation works for technological
packages, piping and cabling
interconnection between technological
packages, roads, and infrastructure
surrounding the different process
facilities of the steel factory.
Project Description

• Foundation Works for the • Supply and installation of the steel


Technological packages including pipe network between the
827 piles and 50,000 m3 of concrete technological packages (10,000 lm)
footing
• Supply and installation of electrical
• Construction of concrete utility and instrumentation network
buildings (offices, clinic, industrial between the technological
kitchen, …) with a built-up area of packages (100,000 lm)
17,000 m2 , concrete water tanks • Site works including 85,000 m2 of
with a built-up area of 11,000 m2 roads and 1,000 lm of fence
and metal buildings (warehouses,
workshops, …) with a built-up area • Supply and installation of rail ways
of 82,000 m2 and 5,500 tons of steel inside the boundary of the project
(8,670 lm)
Construction of pipe rack between
• the technological packages (1,500 • Construction of an accommodation
tons) camp for 80 staff & 200 labors and
covering an area of 12,600 m2
SYRIA

Lattakia
Spinning Mill
Complex
Project I - II

61 Project Description 62

Company Profile
Company Profile

Employer
Ministry of Industry In Syria Scope of Work • Mill annual capacity: 27,000 tons pumps, capacity 120 m3/h each,
of combed & carded cotton 6 deep wells, capacity 100 m3/h
EPC of civil works, industrial plant • Total site area: 420,000 m2 each, and a water storage reservoir
Delegated Employer
utilities and related networks, as of 3,500 m3
GOTI (General Organization for Textile • Total built area: 147,000 m2, including

BUTEC
BUTEC

Industries) well as erection of all process 115,000 m2 of metallic pre-engineered • Water treatment and softening plants
equipment. buildings (filtration, decantation, flocculation):
Role of BUTEC capacity 36 m3/h
• Roads and parking areas: 68,000 m2
Main contractor in consortium • Air plants, 4×16 m3/min for process
• 20 km of reinforced concrete channels
with PECO GmbH and 4×8 m3/min for cleaning network,
(200 cm wide × 300 cm high) for
with all ancillaries including filters,
underground return air
Awarded dryers, receivers and distribution
Project I: 1993 • 20 kV/400 V electrical sub-station with networks
Project II: 1997 18 2500 kVA transformers, ring main
• Fire fighting system, with fire pumping
units, including incoming / outgoing
station (216 m3/hr), fire hydrants
MV cubicles and metering / protection
network for site protection, hose
MV cubicles
reels for production areas and
• 19 built-up air handling plants sprinkler system in all stores
with air filters, air washers and (includes fire brigade equipment)
heat exchangers; cooling capacity
• Underground drainage network: 15 km
1,760 kW each
• Surface concrete channels for rain
• Industrial heating plant: 2,000 kW
water drainage: 20 km
• Water collection and storage utility,
• Sewage treatment plant 100 m3/d,
with river water intake structure: 4×6”
with primary and secondary treatment
Company Profile

63
BUTEC

Power
QATAR

Mesaieed
IPP of 2000
MW/400 kV

65 66

Company Profile
Company Profile

BUTEC
BUTEC

Project Description

• 400 kV GIS building: 310 KW (91 TR) each, and fire rated
Employer - Floor area 2×3,000 m2; 14.5 m precast smoke exhaust system 2×11 735 l/s
Mpc Ltd, Scope of Work beams length; 12.6 m floor clear head and 2×5 869 l/s
KAHRAMAA (Qatar General - The HVAC system consists of 4
EPC of civil works for the construction • 132 kV GIS building:
Electricity & Water Corporation) packaged units (2 standby), capacity
of 400, 220 and 132 kV GIS buildings
388 kW (115 TR) each, and fire rated - Floor area 2×650 m2; 8.5 m
including all associated MEP works and
Role of BUTEC smoke exhaust system 4×14828 l/s floor clear head
equipment installation:
Subcontractor for civil works and 2×9 886 l/s - The HVAC system consists of 2
• Mechanical: Plumbing, HVAC, and fire
Main contractor: Iberdrola - Spain packaged units (1 standby),
fighting
capacity 164 KW (48 TR) each
Awarded • Electrical: Internal/external lighting, • 400 kV control building:
2007 small power, distribution boards, - Floor area 410 m2; 4.4 m
telephone network system, intrusion floor clear head • 132 kV control building:
alarm, fire detection and alarm, - The HVAC system consists of 2
- Floor area 510 m2; 5.7 m
earthing, and lightning packaged units (1 standby),
floor clear head
• Architectural and finishing capacity 109 KW (32 TR) each
- The HVAC system consists of 2
works for the construction of all package units (1 standby) capacity
400/220/132/11 kV GIS buildings • 220 kV GIS building:
192 KW (56 TR) each, and fire rated
• Infrastructure, site works and - Floor area 2×1400 m2; 8.5 m smoke exhaust system 1 × 9 452 l/s
landscaping floor clear head and 1 × 5 108 l/s
- The HVAC system consists of 2
packaged units (1 standby) capacity
QATAR

Power
Power Transmission
Transmission System
System Expansion P VIII
Expansion P VIII S/S: Packages
Umm Birka S/S S-2-2 & S-4-1

67 68

Employer
Scope of Work

Company Profile
Company Profile

KAHRAMAA (Qatar General


Electricity & Water Corporation)
EPC, site delivery, testing &
commissioning of all civil works, Role of BUTEC
including all associated MEP works Subcontractor for civil works
and equipment installation for Main contractor: Isolux Ingeniera S.A.

BUTEC
BUTEC

400/220/132/11 kV GIS substations:


Awarded
• Mechanical: Plumbing, 2008
HVAC and fire fighting
• Electrical: Internal/external lighting,
small power, distribution boards,
telephone network system, intrusion
alarm, fire detection and alarm,
earthing and lightning
• Architectural and finishing works for
the construction of all GIS buildings
• Infrastructure, site works and
landscaping
Scope of Work
EPC,site delivery, testing & control, telecom, batteries, LV service
commissioning of all civil works for the equipment, and basement for cable
new 66/11 kV transformer feeders and entry room
Employer GIS substations in accordance with the • Transformers yard for
KAHRAMAA (Qatar General specifications of the KAHRAMAA all the substations
Electricity & Water Corporation) contract documents as follows:
• HV 66 kV & 11 kV cable corridors,
Role of BUTEC LV cable ways and external ducts
• Construction of 5 GIS buildings 66 kV:
Subcontractor for civil and MEP works Umm Salal West, Al Khissa North, • Fire water tank, pump room, HVAC
Main contractor: Areva T&D S.A South East Wakrah, and Mesaieed yard
Industrial City (two substations) • Substation lightning protection system
Awarded
• Construction of 11 kV switchgear room • Road works inside substation
2008
• Construction of halls for relay & connecting to existing/future
/ASHGHAL roads

QATAR
UAE

New 33/11 kV
Primary S/S &
Modification of
Existing S/S

69 70

Company Profile
Company Profile

BUTEC
BUTEC

Project Description
Employer
ADWEA (Abu Dhabi Water
Scope of Work
& Electricity Authority)
• EPC, commissioning and delivery of The works of the 2 phases include all • Lot 1B: 33 kV cable works for
Role of BUTEC new 33/11 kV primary substations civil works, buildings, electrical power interconnection between substations
Main contractor in consortium equipment, transformers and under lot 1A and other interconnections
• Modification of existing 33/11 kV switchgears, auxiliary electrical
with SIEMENS GmbH primary substations as well as related equipment and all equipment Phase II:
cable connections to interconnect the necessary to establish the complete
Awarded new primaries with the existing • Lot 2A: supply & installation of five
2007 substation such as remote end, 33/11 kV new primary substations,
network telecommunication and DMS works. relocation of one 33/11 kV package,
extension of 33 kV switchgear at NIT
Phase I: substation, extension works at one
• Lot 1A: supply & installation of six existing primary substation and
33/11 kV new primary substations extension of 33 kV switchgear at
and extension works at one existing Mussafah GIC
33/11 kV primary substation
UAE

2 x 4 MW
Battery Energy Gas Turbine
Storage System Units

71 72

Employer

Company Profile
Company Profile

SONELGAZ

Role of BUTEC
Subcontractor for civil And MEP works
Main contractor: PW Power Systems

BUTEC
BUTEC

Awarded
2014

Scope of Work
• Installation and erection of the GT
units including power trailer, control
trailer, gas skids and small accessory
components
Employer • Supply, prefabrication and installation
ADWEA (Abu Dhabi Water
Scope of Work of gas piping including all necessary
& Electricity Authority) supports, NDT test, painting and
• EPC including the following:
insulation
Role of BUTEC - New BESS buildings complete
• Supply, prefabrication and
Main contractor with MEP works
installation of steel structure
- Trenching & cabling between including all necessary supports,
Awarded main substation & BESS building painting and insulation
2009 - Integration of BESS and • Installation and connection
associated systems of the mobile MV substations
- Lightning protection and earthing • Installation of the instrumentation
system
Project Description
- 2 auxiliary transformers, dry type,
11/0.41 kV, 1,500 kVA • Supply, installation and connection of Installation and commissioning of 11
power cable between the GT units and Mobile Pac® GT units of 25 MW each,
the substations with all necessary including the power trailer, gas skids,
cable trays and accessories small accessory components, cabling
Project Description • Supply, installation and connection of and pipe fitting. The project is divided
into two lots: 9 units at M’sila site and 2
control cable between the GT units,
2 units (concrete and steel auxiliaries’ equipment and substations units at Boufarik site.
pre-engineered buildings), 4 MW with all necessary cable trays and
each, at the following substations: accessories
• HTCO 132/11 kV primary grid • Pre-commissioning and
substation (E25) commissioning of the plant
• Port 132/11 kV primary grid
substation (E14)

ALGERIA
IRAQ

Umm Qasr
Power Plant
29.34 MW

73 74

Company Profile
Company Profile

BUTEC
BUTEC

Employer
Prime Metro Power Holding (PMPH)
Scope of Work Project Description
The Umm Qasr Power Plant (“UQPP”) Overall turnkey design, procurement, balance of plant services, including
Role of BUTEC
project consists of the design, construction, and commissioning of tanks, steel structures and concrete
Main Contractor
procurement, construction, and Umm Qasr Power Plant 29.34 MW based structures
commissioning of a 29.34 MW (Phase 1) on reciprocating gas engines (3 x • Administrative Building, guard house,
Awarded
gas fired captive power plant located at 20V34SG) in accordance with warehouse and workshop facilities
2019
Umm Qasr Port, Basra Governorate, WARTSILA(FI)’s specifications and • Connection to the Natural Gas 40bars
Republic of Iraq. Employer’s requirements, including: pipeline through Gas Pressure
The purpose of this plant is to deliver • Power House Reducing Station
base load 24/7 power to the Umm Qasr • Electrical Building including LV, MV • Step-up transformer (60MVA –
port operated by the general company switchgears, control room 11/33KV) and transmission lines
for ports of Iraq (“GCPI”). • Electro-Mechanical process and connecting the plant to the existing
GCPI substation.
Company Profile

75
BUTEC

Infrastructure
QATAR

NDIA Perimeter
Security Systems
Enhancements

77 78

Scope of Work

Company Profile
Company Profile

EPC, start-up and commissioning of


all elements of the perimeter security
systems enhancement (PSSE) and final
design of some of these elements, for
the New Doha International Airport

BUTEC
BUTEC

(NDIA). The works included but were


not limited to engineering, procurement,
supply of labor, materials and equipment,
transportation, field erection and
installation, supervision, facilities,
environmental, safety and health
management, quality control, calibration,
testing and commissioning, training of
operations and maintenance personnel.

Project Description
The project consists of facilities,
equipment, building infrastructure,
life safety and other special systems
and utilities/site improvements;
• Perimeter intrusion
detection system (PIDS)
• Enhancements at access
control points (ACPs)
Client • Perimeter fence enhancements
New Doha International • Temporary site improvements
Airport Steering Committee

Consultant
OBI– Overseas Bechtel Inc.

Role of BUTEC
Subcontractor for civil, MEP works,
and installation of security systems

Awarded
2011
LEBANON

Reconstruction
Restoration of of Mudeirej
Casino Bridge Bridge

79 80

Company Profile
Company Profile

Employer
US Government
Project Description
Role of BUTEC • 40 m span precast U-section including
Subcontractor in JV with Freyssinet wings, each element weighing 210 tons

BUTEC
BUTEC

• Pre-cast slab permanent


Awarded formwork application
2008 • Deck slab normal cast
• Post tensioning of pre-cast girders,
transportation and maneuver by
means of straddle carriers, each
having a lifting capacity of 110 tons
and a launching truss for application
• External post-tensioning of diaphragm
after cast
Scope of Work
Replacement of the main structural
elements (decks and beams) and
installation of the supporting bearings
for both the north and the south bridges
on an EPC basis.

Employer Project Description


Council for Development and
Reconstruction (CDR) • Arch bridge - clear span 95 m
Casino du Liban • Project restoration consisted of:
- Demolition & reconstruction of
Donor
almost 120 m of damaged arches
Casino du Liban
with associated deck slab
Role of BUTEC - Utilization of prestressed strand for
Main contractor in JV with Freyssinet stress relief on remaining structure
(300 tons) & jacking (400 tons) at
Awarded key end after reconstruction
2006 - Use of suspended platform
over variable heights
- High strength concrete
application (600 kg/cm2)

LEBANON
LEBANON

Port of Beirut QAIA North


Second Line Runway
Defense Rehabilitation

81 82
Employer
Scope of Work

Company Profile
Company Profile

AIG - Airport International Group,


Amman, Jordan
The scope of work includes conceptual
design, procurement and installation
Role of BUTEC
of the radiation portal monitors (RPM),
Main contractor in JV With Al Tarawneh
including related works such as

BUTEC
BUTEC

earthworks, pavement, foundations,


Awarded
electrical work, collision protection,
2015
structural support for the enclosures,
security, traffic controls and
modifications to the existing electrical
infrastructure. The scope of work also
includes power and communication
cables to the detection system (i.e.,
monitors, central alarm station, etc.).

Scope of Work
EPC and renovation of the pavement
Project Description including associated electromechanical
systems of the north runway at the
• Construction, distribution systems and
new Queen Alia International Airport
installation are in compliance with U.S.
in Amman.
codes and standards
• A traffic control plan, including key Works are bounded by the
plan drawing of traffic flow, was set 4,080 m x 300 m runway strip plus
prior to mobilization two 240 m x 150 m runway end safety
Employer • A quality control plan (QCP) and a areas (RESAs) beyond each end of the
POB (Port of Beirut) health & safety plan (H&S) were runway strip. In addition, the full extent
prepared prior to mobilization of both approach lighting systems is also
Delegated Employer • Coordination with U.S. government part of the scope of the project, with
Washington Defense Division engineers and with the port authorities associated implications to the
of URS Corporation, Cleveland - Ohio functionality of the systems.

Role of BUTEC
Main contractor

Awarded Project Description


2010
The works are divided into 6 main areas: • Taxiway paved areas -
• Runway paved areas (runway, runway 52,000 m2 approximately
shoulders and stopways) - 297,000 m2 • Airfield lighting systems: these
approximately systems are composed mainly
• Graded portion of the runway strip - of lights, bases, primary and
289,000 m2 approximately secondary cables, transformers,
• Runway end safety areas - 72,000 m2 remote and master control units,
approximately constant current regulators, and
approach lighting masts
• Non-graded portion of the runway

JORDAN
strip - 586,000 m2 approximately
Building
83 Construction
Company Profile
BUTEC
QATAR

Qatar
Foundation
QSTP Tech 4
Buildings

85 86

Company Profile
Company Profile

Employer
Qatar Foundation
Scope of Work
EPC, coordination, development,
Role of BUTEC
installation, testing and commissioning
Main contractor in JV with Murray &
of the Tech 4 facility with internal

BUTEC
Roberts
BUTEC

mezzanine floors, workshops and


offices. The scope also involves
Awarded
infrastructure development works
2014
within the plot limit, such as roads,
parking, paved areas, landscape works,
signage, etc.

Project Description

The Tech 4 building worksite is located In order to respond to the key guiding
in Zone 4 of Education City, which is in principles such as high quality, natural
the central area of the North Campus. light, contextual, etc., the exterior
The facility is providing modules of 500 m2 envelop is proposed to be composed of:
of clear lettable floor space with 15 m
height. Integrated structural provisions • On the esplanade side, a curtain wall
are provided for a full mezzanine floor at system layered by an aluminum
+9.0 m level within each typical module. sunshade louver system to control
Complete fit-out daylight in the common areas
of the common/landlord areas and • On the roof and on the loading dock
provision of service interfaces only side, a double skin system composed
for the tenant areas. Each typical of a layer of semi-transparent
module space of 500 m2 provides composite material to allow for natural
adequate utility connection points. light to penetrate the entire volume
Provisions are sufficiently foreseen and a layer of perforated aluminum
within the main fire alarm panel for sheet system serving as “musharabia”.
integration of tenant fit-out related
requirements, and under the base build.
QATAR

Two New NDIA Terminal


Schools at Doha & Qatar Airways
& Villages, Stage Operation
(10A), Package 3 Centers

87 88

Company Profile
Company Profile

Employer Employer Project Description


Public Works Authority (ASHGHAL) Scope of Work New Doha International
Building Affairs Airport Steering Committee • Architectural fit-out including interior
The works consist of the development
special finishes compatible with the
of shop drawings, procurement, Consultant
Role of BUTEC overall PTC and in accordance with the

BUTEC
BUTEC

construction, testing & commissioning OBI – Overseas Bechtel Inc.


Main contractor contract documents, vertical moveable
and maintenance of 2 New Standard
partition with structural support
Schools at Al-Mearad. Role of BUTEC
Awarded framing, custom video wall built-in units
2015 Subcontractor for civil & MEP works with related steel structural supports
• Mechanical fit-out including plumbing,
Awarded
HVAC systems with chilled water piping,
2010
and controls and interface with BMS
• Electrical fit-out including power
panel boards, lighting fixtures,
circuiting, controls and interface
with BMS, electrical connections
to HVAC and plumbing equipment,
and earthing

Project Description Scope of Work • Fire protection fit-out including


sprinkler heads and piping, and
complete system of FM-200 clean
EPCM contract to perform works for agent gas suppression as per NFPA
• 50,000 m2 total plot areas and terminal operation centers & Qatar requirements
27,000 m2 total built-up areas Airways Operations Control Center. • Special systems & security fit-out
• 1,400 m2 of multi-purpose covered
sport courts and 3,800 m2 of exterior
sport courts
• 8,500 m2 total roads area
and 5,200 m2 landscaping
• 2 substations of 2,600 kVA
• 4 transformers of 1,000 kVA
and 1,600 kVA
• Exterior networks including
• Plumbing: 2 main water tanks
street lighting, MV/LV cabling
(23,700 gal. potable water & 3,000 gal.
• Building services including lighting, irrigation), 3 sets of booster pumps, 6
outlets, telephone, data, video system, toilet batteries (made of 180 sanitary
public address and fire alarm system fixtures), storm water and sewage
• HVAC: 26 AC roof packaged units collection networks
with total capacity of 550 TR, and 20 • Fire fighting: fire pump set 100 GPM:
roof mounted exhaust fans for toilets (1 electrical, 1 diesel and 1 jockey
& kitchens serving 17 internal hose reels)

QATAR
LEBANON

Beirut
Central District
Hilton Hotel

89 90

Company Profile
Company Profile

BUTEC
BUTEC

Project Description
• Overall built area 23,000 m²,
17,000 m² of superstructure
and 6,000 m² underground
• 5 basement levels, ground &
mezzanine levels, 7 current
floors,and a roof floor
• Rooftop restaurant, swimming
pool and a solarium terrace on roof
• Total of 162 guestrooms, 20 suites
and 2 royal suites on the current floors
• Entrance lobby, reception, luxurious
designer boutique shops and a
French brasserie overlooking a
backyard garden on ground floor,
Employer
Al-Iquarat wal Abniat
Scope of Work with management offices at
mezzanine level
Role of BUTEC Construction of a five-star hotel in • Business centers, conference hall, bar
Main contractor downtown Beirut, with special and a ballroom at first basement level
attention to architectural and • 75 parking spaces on basement
• Building management system
Awarded interior design details, which levels, 6 passenger and service lifts
2003 create a high quality designer hotel. • Fire alarm and public address systems
• Glazed central atrium
• CAT6 telecommunication network
• Advanced sound treatment
for rooms, and recreation areas • WIFI access points
• 3 generator sets 630 kVA each, • Central HVAC system with
for complete power redundancy independent hot and chilled
circuits in each room
• Programmable scenery for lighting
and auxiliaries in guestrooms • Smoke exhaust system
• Interactive television system with LCD • Fire protection system in
TV sets in rooms, splash-proof sets in guestrooms & public areas and
suite bathrooms suppression systems for service areas
LEBANON

Tripoli South
Stadium

91 92

Company Profile
Company Profile

Project Description
• Concrete volume: 24,450 m3 tunnel test, at the “Centre d’Essais

BUTEC
BUTEC

• Total number of seats: 22,300, Aéronautique de Toulouse CEAT


with VIP and presidential cubicles • 2 generator sets of 860kVA and
• Total green area : 12,800 m 2 260kVA
• Facilities, lounges and reception areas, • 2 transformers and MV switch gears
media podiums and amphitheater, • 4 lighting masts 52 m high with 316
interview studios: total area 10,800 m2 hot restrike projectors
• Precast grandstand beams on fair-face • Anti-panic lighting
concrete frame and cantilever section ; • Uninterruptible power
design of foundations and structure System and Standby power unit
according to French Norms (conditions
• CCTV, Data system,
“ très préjudiciables “ pour effet
and Telephone network
sismique , zone 2B ) very conservative
assumptions for seismic design • Giant score board
• Athletic field track, lawn for football • Control , security and
areas surveillance system
• Steel structure roof frame with PVC • A seashore 350 m protection
textile composite membrane roofing breakwater designed for 20 years
for the grandstand. A 1/10 model for of high tide. The blocks resisting the
the west stand was subjected to wind shocks vary between 0 to 60 mm, 0.1
to 0.5 kg, 1 to 3 tons, and 2 to 5 tons

Employer
Council for Development and
Scope of Work
Reconstruction (CDR)
EPC for an olympic sports stadium
Role of BUTEC (football and other athletic sports)
Main contractor constructed for the Asian Football
Cup in a restricted timeframe.
Awarded
1999
Company Profile

93
BUTEC

Utility
Services
LEBANON

Distribution
Network with
Customer and
Metering Services

95 96

Company Profile
Company Profile

Employer
Ministry of Energy and Water
Electricité du Liban (EDL)

Role of BUTEC

BUTEC
BUTEC

BUS (BUTEC Utility Services)


Distribution service provider

Awarded
2012
Scope of Work

Network survey MV/LV substations complaints


• Assessing the condition of all assets • Extension of the MV and • Responding to customer
• Developing network mapping LV overhead networks related operational requests
• Network inventory • Extension of the MV and LV • Informing the responsible parties
Project Description underground networks to dispatch the technical teams in
Plans & programs order to perform the necessary fault
• Territory covered 3,000 km2 • Developing procedures for each Operations & maintenance isolation and power restoration
• 535,000 customers of the activities to be performed • Efficient operation of the MV
• 2,000,000 inhabitants in the execution of the contact and LV distribution network Meter reading & bill collection
• 850 employees • Developing an investment plan to • Availability and reliability of • Meter reading management
• 6,000 km of MV overhead network improve the state of the network the distribution network • Collection of bills issued by EDL
• 12,000 km of LV overhead network based on the survey findings • Minimizing unplanned interruption • Maintaining detailed records of
• 700 km of MV underground network • Responding to customer-related customer bill collection and
• 500 km of LV underground network Planning & design operational and emergency requests accounts receivable
• 6,000 MV/LV substations • Revision of existing MV and LV • Public and staff safety • Identifying and recording all
networks to identify network outstanding accounts
bottlenecks and advise of necessary Advanced metering infrastructure • Reporting all non-paying
re-enforcement schemes Roll-out of an advanced metering customers and performing
• Network re-configuration and infrastructure for remote operation disconnect and re-connect activities
schemes for power flow optimization of MV and LV meters including: • Generation of relevant indices related
• Thorough mapping of the network • Remote reading to meter reading, collection
• Design of substations, overhead lines • Remote connection management and quality of service
and underground cables • Remote disconnection
• Design of distribution • Etc. Non-technical losses reduction
network protection schemes • Monitoring & analyzing of non-
• New connections to customers Using power line carrier technology technical losses by region
for communication between meters • Setting & performing procedure
Construction of new distribution and data concentrator units (DCUs) for violations discovery
facilities installed next to MV/LV substations. • Detection and disconnection of
• Providing new connections illegal connections
to MV and LV customers Customer services
• Construction of indoor and outdoor • Managing and analyzing all customer
Services Achievements Selaata Training
• Operations and Maintenance • Reduction of total network losses Center
• Construction of new Distribution by 50%
97 Facilities and Intelligent Meters • Increase in the income of EDL by more 98
• Meter Reading and Bill Collection than 50%

Company Profile
Company Profile

• Customer Services • Integration of more than 600 ex daily


• Planning and Design workers of EDL
• Detection & Removal of illegal • Installation and energization of more
connections than 700 km of underground cables
2,500 km of overhead lines 1,200 new
HV/LV substations

BUTEC
BUTEC

Smart Meters
Laboratory
Four shoe factories in Nabek,
History Sueida, Daraa, & Mosiaf, Syria
Unichem
Ceramic & Chinaware Plant Project, Lebanon
& Archive Uniceramic Dubai Branch

99 BUTEC Relocation of 100


was founded - Headquarters to

Company Profile
Company Profile

incorporated Paris (until 1990)


in 1966

BUTEC
BUTEC

Damascus Military Hospital & Tishreen School,


Syria
Ministry of Defense

1964 1976 1980

Over 50 Years
of Excellence 1971 1974 1977 1978
BUTEC prides itself with half a Iraq Branch
century of excellence for quality Syria Branch (Active until 1990)
and timeliness of projects delivered.
It boasts an impeccable track record Quarantine Compost Plant, Lebanon
of engineering, integrity, and safety Ministry of Public Health
covering a wide variety of complex
and innovative projects. BUTEC has
given top priority to the interest of
its clients believing that client
satisfaction is aligned with the
firm’s own long-term success.
The firm’s unique business model
brings international standards to
First regional
local markets across the MENA region,
project
thus positioning the firm as the “local
contractor of choice”. BUTEC plans to
continue on delivering world-class
engineering and construction projects
for the next 50 years and beyond.
Batroun Government Hospital, Lebanon
Ministry of Public Health
Pedestrian Steel Overpass, Iraq Sigillah & Hindiyah Irrigation Project, Iraq Kerosene Storage Tanks & Pumping Station, Electrical System & Utilities Jubail Al Sinayah, KSA
Municipalities of Baghdad & Tikrit Ministry of Irrigation Beirut International Airport, Lebanon Royal Commission for Jubail & Yanbu
Civil Aviation Authority
101 102

Company Profile
Company Profile

BUTEC
BUTEC

Bridges at Beirut Entrances, Lebanon Dubai Tower, UAE Fence, Peripheral Road & Runways Construction
Ministry of Public Works Arab Bank for Investment & Foreign Trade of Rafic Hariri Int’l Airport, Lebanon
Executive Council for Beirut Grand Projects

1982 1984 1986 1988

1982 1983 1985 1986 1989

Mosul Compost Plant, Mosul Sewing Factory


& Nassiriya Cables Factory, Iraq Bridges at Beirut Crossroads, Lebanon PTT Power Station, Lebanon Iraq Oil Pipeline Trans Saudi Arabia Project - Phase II, KSA
Ministry of Industry & Minerals Ministry of Public Works Ministry of Post & Telecommunications State Company for Oil Projects - SCOP

Saudi Arabia Branch


(Active until 1991)
Mosul Power Plant, Iraq
State Organization of Electricity, Power Plant for Beirut International Airport,
Dbayeh Water Treatment Plant, Lebanon
Ministry of Industry & Minerals Lebanon
Lebanese Water Organization
Civil Aviation Authority

Gas Compression Station, Basra, Iraq


Ministry of Industry & Minerals
103 104
The International Rawabi BUTEC
Finance Corporation Limited Co. in KSA

Company Profile
Company Profile

(IFC) member of the


World Bank Group,
became an equity
partner (16.67%) of
BUTEC Group

BUTEC
BUTEC

Fire fighting & Telecom Facilities, King BUTEC Tower, Lebanon Refueling Scheme, Rafic Hariri Algeria Branch Abu Dhabi Branch
Fahd Int’l Airport, Dahran, KSA BUTEC S.A.L. International Airport, Phase I &
Ministry of Defense & Aviation Phase II, Lebanon
Civil Aviation Authority

1992 1999 2001 2005 2007 2008 2015

1990 1994 2002 2006 2010 2011 2015

King Saud Hospital, Riyadh, KSA


HRH Prince Nahar Ben Saud Ben Abdul Aziz Aresco Center, Lebanon
Arab Real Estate Company Qatar Branch

Iraq Branch

Establishment of BUS
(BUTEC UTILITY SERVICES)
Relocation of
Headquarters
to Beirut
Btalloun Village Buildings
Renovation, Lebanon
Council for Development and
Reconstruction (CDR)
Jordan Branch
105
Company Profile
BUTEC

Contact

Lebanon Algeria Iraq


BUTEC Tower, Mkalles Square, 29 Rue des Pins, Hydra, Office No. 10, 2nd Flr,
Beirut, Lebanon Algiers, Algeria Manawi St. 59/12,
P.O. Box 55326, Sin el Fil P.O. Box 16035, Hydra Basra, Iraq
Tel. +961 1 512 333 Tel. +213 560 47 35 23
Fax +961 1 512 444 Fax +213 982 401 634

Jordan KSA Qatar


Office No. 202, Complex No. 15, Rawabi Butec Ltd. Co., 8th Flr, Qatar Tower Bldg No. 35,
Abdul Rahim Haj Mohammad St., Rawabi Holding Tower, Al Khobar 31952 Street No. 920, Dafna West Bay Zone 63,
Al Swaifyeh, Kingdom of Saudi Arabia Doha, Qatar
Amman, Jordan P.O. Box 30445, Al Khobar P.O. Box 7340, Doha
Tel. +962 6 5823376 Tel. +966 13 814 6336 Tel. +974 44 55 2865
Fax +962 6 5823079 Fax +966 13 812 4209 Fax +974 44 55 2864

UAE
Office No. 306, SJ Tower,
Airport Road, Abu Dhabi, UAE
P.O. Box 109829, Abu Dhabi
Tel. +971 2 443 9869
Fax +971 2 443 9852