This document provides a bill of materials and labor costs for kitchen carpentry work. It lists 10 line items for materials like shutters, cabinets, and shelves made of marine ply and high gloss laminate totaling Rs. 124844.50. It also includes providing and fixing an entry safety door made of pine wood and laminate for Rs. 15092 and two wash basins with fancy mirrors for Rs. 3500, totaling Rs. 18592 for sections B and C. The grand total for all materials and labor is Rs. 143436.50.
This document provides a bill of materials and labor costs for kitchen carpentry work. It lists 10 line items for materials like shutters, cabinets, and shelves made of marine ply and high gloss laminate totaling Rs. 124844.50. It also includes providing and fixing an entry safety door made of pine wood and laminate for Rs. 15092 and two wash basins with fancy mirrors for Rs. 3500, totaling Rs. 18592 for sections B and C. The grand total for all materials and labor is Rs. 143436.50.
This document provides a bill of materials and labor costs for kitchen carpentry work. It lists 10 line items for materials like shutters, cabinets, and shelves made of marine ply and high gloss laminate totaling Rs. 124844.50. It also includes providing and fixing an entry safety door made of pine wood and laminate for Rs. 15092 and two wash basins with fancy mirrors for Rs. 3500, totaling Rs. 18592 for sections B and C. The grand total for all materials and labor is Rs. 143436.50.
A Kitchen Carpentry Work Material Details with Rates. 1 Shutter Sqft 55.75 550.00 30662.50 (Made With Marine Ply & High gloss finish sunmica press in machine)
2 Cabinate Sqft 29.19 750.00 21892.50
3 Shelf (Tall Cabinate) Sqft 12.00 300.00 3600.00 4 Accessories (SS Make 304) i Plain Basket (12 PC) Sqft 100.61 250.00 25152.50 ii PF Culeary (1PC) Sqft 7.56 450.00 3402.00 iii SS Pull Out No 1.00 3000.00 3000.00 5 Hardware i Telescope Channel 22" (hettich Regular) Nos 6.00 510.00 3060.00 ii Telescope Channel 22" (hettich Regular) Nos 7.00 625.00 4375.00 6 Handels Nos 24.00 450.00 10800.00 7 90^ Hinges soft clossing (Boss) Nos 9.00 400.00 3600.00 8 Hardware (All Hardware Fitting) LS 1050.00 1050.00 9 Hydrulic LS 2.00 750.00 1500.00 10 Installation Charges Sqft 85.00 150.00 12750.00
Total (A) 124844.50
Sr.No Description Unit Qty Rate Amount B Providing & Fixing Entry Safety door. 1 Door Material Pine Wood & Mate Finish Sunmica & Sqft 21.56 700.00 15092.00 Hardware ( Lock, Hinges,Etc ,.Complete)
C Proving & fixing Wash Basin Fancy Mirror Glass. Nos 2.00 1750.00 3500.00