Requisition for Allocation of Equipmet, Spares and Stores From Central Depol, BPDB. PROFORM "A" 4TH RRVISION.
OR (FOR PROPRIETORY ITEM ONLY)

For Procurement Through the Director of Purchase, BPDB.

1 Name of Scheme / under taking : Electrical Maintenance Division-1, Karnafuli Hydro Station, Kaptai .

2 Manufacturer's Name and Adress : ABB S.p.A - Power System Division

3 Supplier's Name and Address :

4 Budget Provision yes/not : Yes Head A/c. Code No. .

Ref. of Actul REQUIRMENT


manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Symphony Plus System HMI Upgrade 555161
HMI Server
Tower Type(With Pre-loaded SW)
Intel® Xeon® Sliver Processor, 8 Core
RAM: 16GB, HDD drive: 2 × 1.2 TB SAS,
RAID1, Keyboard: Standard-QWERTY As soon as Software
1.1 2 2 ABB 0 2 - 2 Nill - - - 2 Incl. possible
Air
Type, DVD r/RW, Operating System: Update
Windows Server 2019 Microsoft Office Std
2019

Laptop for EWS


Intel Core processor, RAM 8 GB, HDD
Drive 1 TB 7200rpm SATA Hard Drive,
15”Display, LAN Interface, DVD R/RW,
As soon as
1.2 Operating System – Windows 10 LTSC 0 1 - 0 1 - 1 Nill - - - 1 Incl. possible
Air
2019 Microsoft Office Std 2019

A4 Colour Laser jet Printer As soon as


1.3 1 1 EPSON 0 1 - 1 Nill - - - 1 Incl. possible
Air Defective
Hrischmann Ethernet Network Switch (24
port) As soon as
1.4 2 2 Phoenix 0 2 - 2 Nill - - - 2 Incl. possible
Air

Control room Console for Single Monitor


As soon as
1.5 OWS 2 2 HP 2 2 - 2 Nill - - - 2 Incl. possible
Air

Latest Symphony Plus Software version 3.3


(includes all existing features & licenses)
MODBUS / MODBUS TCP (Master)-Yes
OPC Client-Yes PGP Software
As soon as
1.6 1000 Real-time tags and 1000 Historian version 4.1 1 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air
tags AC800M Connect. Service Pack 2
Ref. of Actul REQUIRMENT
manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Latest Compact Control Builder AC 800M
License (includes all existing features & As soon as
1.7 1 1 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air
license)
Microsoft Office Std 2019 Software for all
supplied Servers & Laptops Windows XP
As soon as
1.8 Version 2002 3 ABB 0 3 - 3 Nill - - - 3 Incl. possible
Air
Service Pack 2

2 Generator / Generator Transformer Protection Upgrade - 346000 Air

Generator Protection relay


(87G, 21G, 32G, 40G, 78, 51, 24G, 27G,
59G, 59GN, 81G, 63, 49, 26)
REG670 v2.2 ¾ 19’ size case, 2*TRM,
Numerical As soon as
2.1 3*BIM, 2*BOM, 1*IRIG-B, 2*IEC6 1850 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air
port. COO – Europe. Relay- 1 set
50% existing
Static Relay - protection
1 set relay
Generator Transformer relay defective
(87GT, 21, 32, 40, 78, 51, 24, 27, 59, 59N,
81)
TYPE-RET 670 v2.2 ½ 19’ size case, Numerical As soon as
2.2 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air
1*TRM, 2*BIM, 2*BOM, 1*IRIG-B, Relay- 1 set
2*IEC6 1850 port. COO – Europe.

Trip relay
As soon as
2.3 RXMS1 1 5 ABB 0 5 - 5 Nill - - - 5 Incl. possible
Air

Lock-out relay
As soon as
2.4 RZMVB2 1 5 ABB 0 5 - 5 Nill - - - 5 Incl. possible
Air

Test block RTXP24 As soon as


2.5 12 5 ABB 0 5 - 5 Nill - - - 5 Incl. possible
Air

Test plug RTXH24 As soon as


2.6 0 1 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air

Auxiliary relay TCS


As soon as
2.7 RXEM1 2 2 ABB 0 2 - 2 Nill - - - 2 Incl. possible
Air

Panel and Accessory 2200*800*600


As soon as
2.8 1 1 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air

Injection unit As soon as


2.9 (64F for Rotor, 64G for Stator) REX060 + 0 1 ABB 0 1 - 1 Nill - - - 1 Incl. possible
Air
061 + 062, COO – Europe.
3 Low Voltage Switchgear - Air
RTD for Thrust bearing, Lower guide
bearing, turbine guide bearing (PT100)
with cable As soon as Defective
3.1
TSP111 – SensyTemp TSP111
13 5 ABB 0 5 - 5 Nill - - - 5 22110
possible
Air
5 Nos
Temperature Sensor, without thermowell,
COO – Germany.
Ref. of Actul REQUIRMENT
manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
RTD for Water and air temperature
(PT100)
with cable.
As soon as
3.2 TSP111 – SensyTemp TSP111 18 4 ABB 0 4 - 4 Nill - - - 4 17688
possible
Air
Temperature Sensor, without thermowell,
COO – Germany.

RTD for Stator Copper Temperature


(PT100) with cable
TSP111 – SensyTemp TSP111
As soon as Defective
3.3 Temperature Sensor, without thermowell, 18 4 ABB 0 4 - 4 Nill - - - 4 17688
possible
Air
2 Nos
COO – Germany.

RTD for Stator Iron Temperature (PT100)


with
cable
As soon as Defective
3.4 TSP111 – SensyTemp TSP111 3 4 ABB 0 4 - 4 Nill - - - 4 17688
possible
Air
2 Nos
Temperature Sensor, without thermowell,
COO – Germany.

Circuit Breaker 2 poles 10A, 25kA S202M


C10A + S2C-H6R, S202M-C10 As soon as
3.5 4 2 ABB 0 2 - 2 Nill - - - 2 168
possible
Air

Circuit Breaker 2 poles 4A, 25kA S202M


C4A + S2C-H6R, S202M-C4. consumption
As soon as
3.6.1 20 6 ABB 4 6 - 6 Nill - - - 6 840
possible
Air from panel
spare

Circuit Breaker 2 poles 4A, 25kA


S2C – H6R, S2C-H^R On/Off Auxiliary consumption
As soon as
3.6.2 Contact. 20 6 ABB 4 6 - 6 Nill - - - 6 360
possible
Air from panel
spare

Overload Cut-Out 3 Poles 1.6 – 2.5A 25kA.


MS225-2.5 + HKF – 11 + SK – 11 As soon as
3.7 MS116-2.5 Manual Motor Starter. 1 1 ABB 0 1 - 1 Nill - - - 1 197
possible
Air

Overload Cut-Out 3 Poles 12.5–16A 25kA.


MS225-16 + HKF – 11 + SK – 11 consumption
MS116-16 Manual Motor Starter. As soon as
3.8 2 1 ABB 1 1 - 1 Nill - - - 1 213
possible
Air from panel
spare

Overload Cut-Out 3 Poles 20–25A 25kA.


MS225-25 + HKF – 11 + SK – 11 As soon as
3.9 MS116-25 Manual Motor Starter. 1 1 ABB 0 1 - 1 Nill - - - 1 298
possible
Air

Overload Cut-Out 3 Poles 50A 25kA. consumption


MS225-63 + HK4 – 11 + SK4– 11 As soon as
3.10 1 1 ABB 1 1 - 1 Nill - - - 1 808
possible
Air from panel
MS165-65 Manual Motor Starter. spare
Overload Cut-Out 3 Poles 6.3–9A 25kA. consumption
MS225-9 + HKF – 11 + SK – 11 As soon as
3.11
MS116-10 Manual Motor Starter. 3 2 ABB 1 2 - 2 Nill - - - 2 426
possible
Air from panel
spare
Ref. of Actul REQUIRMENT
manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Overload Cut-Out 3 Poles 28 – 40A 25kA.
MS225-40 + HK4 – 11 + SK4– 11 consumption
As soon as
3.12.1 MS165-42 Manual Motor Starter. 3 2 ABB 1 2 - 2 Nill - - - 2 1518 Air from panel
possible
spare

Overload Cut-Out 3 Poles 28 – 40A 25kA.


HKF1-11 Aux.-contact for front mounting. As soon as
3.12.2 3 2 ABB 0 2 - 2 Nill - - - 2 74
possible
Air

Overload Cut-Out 3 Poles 28 – 40A 25kA. As soon as


3.12.3 SK1-11 Signal Contact. 3 2 ABB 0 2 - 2 Nill - - - 2 122
possible
Air

Overload Cut-Out 3 Poles 160–250A 25kA.


T4N250 200A, XT4N 250TMA 200-2000
As soon as
3.13 3p F F. 2 2 ABB 0 2 - 2 Nill - - - 2 2610
possible
Air

Overload Cut-Out 3 Poles 9-12.5A 25kA.


MS225-12.5 + HKF – 11 + SK – 11 consumption
As soon as
3.14 MS116-12 Manual Motor Starter. 2 1 ABB 2 1 - 1 Nill - - - 1 213
possible
Air from panel
spare

Overload Cut-Out 3 Poles 4–6.3A 25kA.


MS225-6.3 + HKF – 11 + SK – 11 consumption
As soon as
3.15 MS116-6.3 Manual Motor Starter. 1 1 ABB 2 1 - 1 Nill - - - 1 197
possible
Air from panel
spare

Circuit Breaker 3 Poles 16A 25kA


S203P C16A + S2C – H6R, S203P-C16. As soon as
3.16 4 2 ABB 0 2 - 2 Nill - - - 2 408
possible
Air

Circuit Breaker 3 Poles 100A 25kA consumption


S803S C100A + S800 - AUX. As soon as
3.17 2 2 ABB 1 3 - 3 Nill - - - 3 408
possible
Air from panel
spare
Circuit Breaker 3 Poles 63A 25kA S803S As soon as
3.18 C63A+ S800 – AUX, S803S-B63. 6 2 ABB 0 2 - 2 Nill - - - 2 2052
possible
Air

Circuit Breaker 3 Poles 63A 25kA S800 –


As soon as
3.18.1 AUX, 6 2 ABB 0 2 - 2 Nill - - - 2 368 Air
S800 – AUX (Auxiliary Contact). possible

Circuit Breaker 3 Poles 20A 25kA


consumption
S203P C20A + S2C – H6R, S203P-C20. As soon as
3.19 5 2 ABB 2 2 - 2 Nill - - - 2 408
possible
Air from panel
spare
Circuit Breaker 1 Poles 10A 25kA S201P consumption
C16A + S2C – H6R, S201P-C16. As soon as
3.20 4 2 ABB 1 2 - 2 Nill - - - 2 80
possible
Air from panel
spare
Circuit Breaker 1 Poles 16A 25kA S201P
consumption
C16A + S2C – H6R, S201P-C16. As soon as
3.21 21 4 ABB 1 4 - 4 Nill - - - 4 160
possible
Air from panel
spare
Circuit Breaker 1 Poles 6A 25kA
As soon as
3.22.1 S201P C6A, S201P-C16. 3 2 ABB 0 2 - 2 Nill - - - 2 80
possible
Air
Ref. of Actul REQUIRMENT
manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Circuit Breaker 1 Poles 6A 25kA
As soon as
3.22.2 S2C-H6R,S2C-H6R On/Off Auxiliary 3 2 ABB 0 2 - 2 Nill - - - 2 120 Air
Contact. possible

Key Selector 0 – 1
M2SSK1-101, Selector Switchers B-C As soon as
3.23 ALL#M2SSK1-101. 2 2 ABB 0 2 - 2 Nill - - - 2 96
possible
Air

Auxiliary Relay 4 Contacts


CR-M110AC4L+1SVR405651R3000, CR-
M110AC4L Pluggable interface relay. As soon as
3.24.1 44 10 ABB 0 10 - 10 Nill - - - 10 580
possible
Air

Auxiliary Relay 4 Contacts As soon as


3.24.2 CR-M4SS Standard socket 44 10 ABB 0 10 - 10 Nill - - - 10 310
possible
Air

Contractor 4 kW 110VAC
A9 30-10 110Vac, AF09-30-10-12 48- As soon as
3.25 130V 50/60HZ-DC Contactor. 6 2 ABB 0 2 - 2 Nill - - - 2 158
possible
Air

Auxiliary Electronic Timer


CT-ERE.02, CT-ERE Timer relay, ON As soon as
3.26
delay.
4 2 ABB 0 2 - 2 Nill - - - 2 452
possible
Air

Contractor 3 kW 110VAC
A9 30-10 110Vac, AF09-30-10-12 48- As soon as
3.27 6 2 ABB 0 2 - 2 Nill - - - 2 164
possible
Air
130V 50/60HZ-DC Contactor.
Contractor 7.5 kW 110VAC consumption
A16 30-10 110Vac, AF16-30-10-12 48- As soon as
3.28 2 2 ABB 1 2 - 2 Nill - - - 2 250
possible
Air from panel
130V 50/60HZ-DC Contactor. spare
2 Position Selector Switch
M2SS1-10B, Selector Switch #M2SS1- As soon as
3.29
10B.
1 2 ABB 0 2 - 2 Nill - - - 2 40
possible
Air

Contractor 30 kW 110VAC
A63 30-00 110Vac, AF63-30-00 100-250V consumption
As soon as
3.30 50Hz / 100-250V 60Hz/ 100-250V DC. 1 2 ABB 1 2 - 2 Nill - - - 2 3728
possible
Air from panel
spare

Contractor 18.5 kW 110VAC consumption


A40 30-10 110Vac, AF40-30-11-12 48- As soon as
3.31 3 2 ABB 1 2 - 2 Nill - - - 2 1200
possible
Air from panel
130V 50/60HZ-DC Contactor. spare
Contractor 75 kW 110VAC consumption
A185 30-10 110Vac, CONTACTOR# As soon as
3.32
AF190- 30-11-12#48-130V.
2 4 ABB 1 4 - 4 Nill - - - 4 8712
possible
Air from panel
spare
Contractor 22 kW 110VAC consumption
A50 30-10 110Vac, AF52-30-11-12 48- As soon as
3.33
130V50/60HZ-DC Contactor.
1 1 ABB 1 1 - 1 Nill - - - 1 629
possible
Air from panel
spare
Contractor 5.5 kW 110VAC consumption
As soon as
3.34 A12 30-10 110Vac, AF12-30-10-12 48- 2 1 ABB 1 1 - 1 Nill - - - 1 98
possible
Air from panel
130V50/60HZ-DC Contactor. spare
Phoenix Power Supply 24VDC, 20A As soon as
3.35 QUINT-PS/1AC/24DC/20A 4 6 ABB 0 6 - 6 Nill - - - 6 3438
possible
Air
Ref. of Actul REQUIRMENT
manufacturer' consumption
s spare parts during last For 5 Years Total
No of such Total Cost
Item
equipment in
Name of list or 1/3/5 years as reconditionin requirment Quantity for
Ad dl Quantity (C&F) When stores
Proposed
No. as Particulars of the equipment (Name equipment catalogue per record g of including over Present Stock which P. O. Last P. O. Last P.O. mode or
use under equipment hauling if any to be procured Offered are required Remarks
per Plate details) spares/store to held has already and date rate Shipment by
respective (6-(7+8)) estimated at site
offer be procured been issued sea/air
jurisdiction (USD)

A B C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
4 132KV CT-PT for metering - Air
132kV Current Transformer
IMB-145, Outdoor, IEC 61869-2, 50Hz, Energy
With metering at
Brown Porcelain Insulator. Ratio: All
As soon as 132kV
4.1 600/1200/2400/5-5-5A protection 16 ABB 0 16 - 16 Nill - - - 16 191536
possible
Air
Voltage
Accuracy Class: 0.2/5P20/5P20 Burden: CT level(for SBU
30VA/30VA/30VA Make: Europe.
purpose)

132kV Potential Transformer


EMF-145, Outdoor, IEC 61869-3, 50Hz,
With
Energy
Brown Porcelain Insulator. All metering at
As soon as 132kV
4.2 Primary: 132000/√3 protection 16 ABB 0 16 - 16 Nill - - - 16 153264
possible
Air
Voltage
Core 1: 110V/√3, Class 0.2, 50VA Core 2:
110V/√3, Class 3P, 50VA Make: Europe. PT level(for SBU
purpose)

Signature of the Requisitioning officer with date and address


( Not below the rank of Executive Engineer )