Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

LONG SECTION

Pergi Pulang Jarak Jarak


Stand Point
Bacaan benang Bacaan benang
∆H1 ∆H2 ∆H RATA-RATA Tinggi titik
BA BA Belakang Muka Belakang Muka
Berdiri Alat Target BT BT
BB BB
1.420 1.342
P0 1.358 12.500 12.500 30.990
1.295 1.280 1.217
I 0.108 -0.083 0.095
1.312 1.425
1.250 12.500 12.500 31.086
1.187 1.363 1.300
P1
1.307 1.472
1.245 12.500 12.500
1.182 1.410 1.347
II -0.138 0.149 -0.144
1.445 1.323
1.383 12.500 12.500 30.942
1.320 1.261 1.198
P2
1.180 1.720
1.118 12.500 12.500
1.055 1.658 1.595
III -0.512 0.518 -0.515
1.692 1.202
1.630 12.500 12.500 30.427
1.567 1.140 1.077
P3
0.676 2.283
0.614 12.400 12.700
0.552 2.220 2.156
IV -1.585 1.598 -1.592
2.262 0.683
2.199 12.600 12.300 28.836
2.136 0.622 0.560
P4
0.515 2.045
0.453 12.500 12.300
0.390 1.983 1.922
V -1.520 1.522 -1.521
2.035 0.525
1.973 12.500 12.700 27.315
1.910 0.462 0.398
P5
0.865 1.772
0.802 12.700 12.500
0.738 1.710 1.647
VI -0.865 0.887 -0.876
1.728 0.885
1.667 12.300 12.500 26.438
1.605 0.823 0.760
P6
1.308 1.405
1.245 12.600 12.300
1.182 1.344 1.282
VII -0.098 0.098 -0.098
1.405 1.309
1.343 12.400 12.700 26.341
1.281 1.245 1.182
P7
1.311 1.382
1.249 12.500 12.200
1.186 1.321 1.260
VIII -0.031 0.055 -0.043
1.342 1.330
1.280 12.500 12.800 26.298
1.217 1.266 1.202
P8
1.350 1.305
1.288 12.500 12.500
1.225 1.243 1.180
IX 0.062 -0.063 0.063
1.288 1.368
1.226 12.500 12.500 26.360
1.163 1.306 1.243
P9
1.430 1.541
1.368 12.500 12.500
1.305 1.479 1.416
X -0.140 0.081 -0.111
1.570 1.460
P10 1.508 12.500 12.500 26.249
1.445 1.398 1.335
CROSS SECTION
TINGGI BACAAN
TITIK JARAK TITIK BEDA TINGGI ELEVASI Keterangan
ALAT
BA BT BB
30.000
P1 A 1425 0 -0.095 29.905 Ujung Kiri Drainase
1330 B 1882 0.26 -0.552 29.448 Tengah/Dalam Drainase
C 1410 0.26 -0.080 29.920 Ujung Kanan Drainase
D 1258 2.9 0.072 30.072 Ujung Kiri Bahu Jalan
E 1165 2.29 0.165 30.165 Tengah Jalan
F 1295 2.29 0.035 30.035 Ujung Jalan
G 1280 3.83 0.050 30.050 Bahu Jalan Kanan

P2 30.000
1330 A 1430 0 -0.100 29.900 Ujung Kiri Drainase
B 1910 0.3 -0.580 29.420 Tengah/Dalam Drainase
C 1385 0.3 -0.055 29.945 Ujung Kanan Drainase
D 1355 2.9 -0.025 29.975 Ujung Kiri Bahu Jalan
E 1325 2.275 0.005 30.005 Tengah Jalan
F 1415 2.275 -0.085 29.915 Ujung Jalan
G 1438 3.43 -0.108 29.892 Bahu Jalan Kanan

P3 30
1510 A 0 0 1.510 31.51 Ujung Kiri Drainase
B 0 0 1.510 31.51 Tengah/Dalam Drainase
C 1590 0 -0.080 29.92 Ujung Kanan Drainase
D 1680 0.1 -0.170 29.83 Ujung Bahu Jalan
E 1600 2.3 -0.090 29.91 Tengah Jalan
F 1645 2.3 -0.135 29.865 Ujung Jalan
G 1898 3.4 -0.388 29.612 Bahu Jalan Kanan

P4 30.000
1320 A 1882 0 -0.562 29.438 Ujung Kiri Drainase
B 2365 0.23 -1.045 28.955 Tengah/Dalam Drainase
C 1898 0.23 -0.578 29.422 Ujung Kanan Drainase
D 1930 3.36 -0.610 29.390 Ujung Bahu Jalan
E 1885 2.3 -0.565 29.435 Tengah Jalan
F 2060 2.3 -0.740 29.260 Ujung Jalan
G 2195 1.8 -0.875 29.125 Bahu Jalan Kanan

P5 30.000
1310 A 1908 0 -0.598 29.402 Ujung Kiri Drainase
B 2469 0.3 -1.159 28.841 Tengah/Dalam Drainase
C 1942 0.3 -0.632 29.368 Ujung Kanan Drainase
D 1730 2.88 -0.420 29.580 Ujung Bahu Jalan
E 1635 2.29 -0.325 29.675 Tengah Jalan
F 1817 2.29 -0.507 29.493 Ujung Jalan
G 2017 1.8 -0.707 29.293 Bahu Jalan Kanan

P6 30.000
1280 A 1310 0 -0.030 29.970 Ujung Kiri Drainase
B 1845 0.255 -0.565 29.435 Tengah/Dalam Drainase
C 1402 0.255 -0.122 29.878 Ujung Kanan Drainase
D 1389 3.3 -0.109 29.891 Ujung Bahu Jalan
E 1303 2.3 -0.023 29.977 Tengah Jalan
F 1575 2.3 -0.295 29.705 Ujung Jalan
G 1690 1.8 -0.410 29.590 Bahu Jalan Kanan

P7 30.000
1280 A 942 0 0.338 30.338 Ujung Kiri Drainase
B 1375 0.25 -0.095 29.905 Tengah/Dalam Drainase
C 995 0.25 0.285 30.285 Ujung Kanan Drainase
D 1208 4.5 0.072 30.072 Ujung Bahu Jalan
E 1152 2.4 0.128 30.128 Tengah Jalan
F 1280 2.4 0.000 30.000 Ujung Jalan
G 1389 1.3 -0.109 29.891 Bahu Jalan Kanan

P8 30.000
1280 A 1310 0 -0.030 29.970 Ujung Kiri Drainase
B 1845 0.255 -0.565 29.435 Tengah/Dalam Drainase
C 1402 0.255 -0.122 29.878 Ujung Kanan Drainase
D 1389 4.5 -0.109 29.891 Ujung Bahu Jalan
E 1303 2.3 -0.023 29.977 Tengah Jalan
F 1575 2.3 -0.295 29.705 Ujung Jalan
G 1690 1.4 -0.410 29.590 Bahu Jalan Kanan

P9 30.000
1250 A 0 0 1.250 31.250 Ujung Kiri Drainase
B 0 0 1.250 31.250 Tengah/Dalam Drainase
C 0 0 1.250 31.250 Ujung Kanan Drainase
D 1312 0 -0.062 29.938 Ujung Bahu Jalan
E 1400 2.3 -0.150 29.850 Tengah Jalan
F 1339 2.3 -0.089 29.911 Ujung Jalan
G 1502 1.4 -0.252 29.748 Bahu Jalan Kanan
LONG SECTION
Pergi Pulang Jarak Jarak
Stand Point
Bacaan benang Bacaan benang
∆H1 ∆H2 ∆H RATA-RATA Tinggi titik
BA BA Belakang Muka Belakang Muka
Berdiri Alat Target BT BT
BB BB
1.400 1.360
P0 1.320 16.000 11.000 30.810
1.240 1.305 1.250
I 0.077 0.043 0.017
1.305 1.325
1.243 12.500 12.500 30.827
1.180 1.263 1.200
P1
1.300 1.325
1.235 13.000 12.000
1.170 1.265 1.205
II -0.123 -0.130 0.004
1.400 1.460
1.358 8.500 13.000 30.831
1.315 1.395 1.330
P2
1.150 1.203
1.095 11.000 13.600
1.040 1.135 1.067
III -0.525 -0.501 -0.012
1.680 1.700
1.620 12.000 12.800 30.819
1.560 1.636 1.572
P3
0.676 0.680
0.614 12.400 12.000
0.552 0.620 0.560
IV -1.585 -1.596 0.006
2.262 2.283
2.199 12.600 13.300 30.825
2.136 2.217 2.150
P4
0.515 0.520
0.453 12.500 12.200
0.390 0.459 0.398
V -1.273 -1.523 0.125
1.800 2.042
1.725 15.000 12.000 30.950
1.650 1.982 1.922
P5
0.860 0.886
0.795 13.000 12.600
0.730 0.823 0.760
VI -0.865 -0.888 0.011
1.720 1.772
1.660 12.000 12.300 30.961
1.600 1.711 1.649
P6
1.300 1.300
1.238 12.500 13.000
1.175 1.235 1.170
VII -0.107 -0.109 0.001
1.405 1.405
1.345 12.000 12.200 30.962
1.285 1.344 1.283
P7
1.300 1.325
1.235 13.000 13.000
1.170 1.260 1.195
VIII -0.040 -0.055 0.007
1.335 1.375
1.275 12.000 12.000 30.970
1.215 1.315 1.255
P8
1.350 1.400
1.290 12.000 16.000
1.230 1.320 1.240
IX 0.070 0.077 -0.004
1.285 1.305
1.220 13.000 12.500 30.966
1.155 1.243 1.180
P9
1.350 1.445
1.278 14.500 11.000
1.205 1.390 1.335
X -0.220 -0.080 -0.070
1.550 1.525
P10 1.498 10.500 11.000 30.896
1.445 1.470 1.415
CROSS SECTION
TINGGI BACAAN
TITIK JARAK TITIK BEDA TINGGI ELEVASI Keterangan
ALAT
BA BT BB
31.086
P1 A 1425 0 -0.095 30.991 Ujung Kiri Drainase
1330 B 1882 0.26 -0.552 30.534 Tengah/Dalam Drainase
C 1410 0.26 -0.080 31.006 Ujung Kanan Drainase
D 1258 2.9 0.072 31.158 Ujung Kiri Bahu Jalan
E 1165 2.29 0.165 31.251 Tengah Jalan
F 1295 2.29 0.035 31.121 Ujung Jalan
G 1280 3.83 0.050 31.136 Bahu Jalan Kanan

P2 30.942
1330 A 1430 0 -0.100 30.842 Ujung Kiri Drainase
B 1910 0.3 -0.580 30.362 Tengah/Dalam Drainase
C 1385 0.3 -0.055 30.887 Ujung Kanan Drainase
D 1355 2.9 -0.025 30.917 Ujung Kiri Bahu Jalan
E 1325 2.275 0.005 30.947 Tengah Jalan
F 1415 2.275 -0.085 30.857 Ujung Jalan
G 1438 3.43 -0.108 30.834 Bahu Jalan Kanan

P3 30.427
1510 A 1590 0 -1.590 -1.590 Ujung Kanan Drainase
B 1680 0.1 -1.680 -1.680 Ujung Bahu Jalan
C 1600 2.3 -1.600 -1.600 Tengah Jalan
D 1645 2.3 -1.645 -1.645 Ujung Jalan
E 1898 3.4 -1.898 -1.898 Bahu Jalan Kanan

P4 28.836
1320 A 1882 0 -0.562 28.274 Ujung Kiri Drainase
B 2365 0.23 -1.045 27.791 Tengah/Dalam Drainase
C 1898 0.23 -0.578 28.258 Ujung Kanan Drainase
D 1930 3.36 -0.610 28.226 Ujung Bahu Jalan
E 1885 2.3 -0.565 28.271 Tengah Jalan
F 2060 2.3 -0.740 28.096 Ujung Jalan
G 2195 1.8 -0.875 27.961 Bahu Jalan Kanan

P5 27.315
1310 A 1908 0 -0.598 26.717 Ujung Kiri Drainase
B 2469 0.3 -1.159 26.156 Tengah/Dalam Drainase
C 1942 0.3 -0.632 26.682 Ujung Kanan Drainase
D 1730 2.88 -0.420 26.894 Ujung Bahu Jalan
E 1635 2.29 -0.325 26.990 Tengah Jalan
F 1817 2.29 -0.507 26.807 Ujung Jalan
G 2017 1.8 -0.707 26.607 Bahu Jalan Kanan

P6 26.438
1280 A 1310 0 -0.030 26.408 Ujung Kiri Drainase
B 1845 0.255 -0.565 25.873 Tengah/Dalam Drainase
C 1402 0.255 -0.122 26.316 Ujung Kanan Drainase
D 1389 3.3 -0.109 26.329 Ujung Bahu Jalan
E 1303 2.3 -0.023 26.415 Tengah Jalan
F 1575 2.3 -0.295 26.143 Ujung Jalan
G 1690 1.8 -0.410 26.028 Bahu Jalan Kanan

P7 26.341
1280 A 942 0 0.338 26.777 Ujung Kiri Drainase
B 1375 0.25 -0.095 26.344 Tengah/Dalam Drainase
C 995 0.25 0.285 26.723 Ujung Kanan Drainase
D 1208 4.5 0.072 26.510 Ujung Bahu Jalan
E 1152 2.4 0.128 26.566 Tengah Jalan
F 1280 2.4 0.000 26.438 Ujung Jalan
G 1389 1.3 -0.109 26.329 Bahu Jalan Kanan

P8 26.298
1280 A 1310 0 -0.030 26.408 Ujung Kiri Drainase
B 1845 0.255 -0.565 25.873 Tengah/Dalam Drainase
C 1402 0.255 -0.122 26.316 Ujung Kanan Drainase
D 1389 4.5 -0.109 26.329 Ujung Bahu Jalan
E 1303 2.3 -0.023 26.415 Tengah Jalan
F 1575 2.3 -0.295 26.143 Ujung Jalan
G 1690 1.4 -0.410 26.028 Bahu Jalan Kanan

P9 26.360
1250 A 1312 0 -1.312 25.126 Ujung Bahu Jalan
B 1400 2.3 -1.400 25.039 Tengah Jalan
C 1339 2.3 -1.339 25.100 Ujung Jalan
D 1502 1.4 -1.502 24.937 Bahu Jalan Kanan

You might also like